View
214
Download
0
Category
Preview:
Citation preview
State of Delaware Department of Natural Resources and Environmental Control
Delaware Division of Parks and Recreation 89 Kings Highway
Dover, Delaware 19901
CONTRACT DOCUMENTS & TECHNICAL
SPECIFICATIONS ADDENDUM NO. 5
Holts Landing
Boat Trailer
Parking Lot
Contract No. 2017-HL-8
ADDENDUM NO. 5
Project Name: Holts Landing Boat Trailer Parking Lot
Contract No.: 2017-HL-8
Date of Issue: December 8, 2017
Notice No. 5: Attach this addendum to the Project Manual for this project. It modifies and
becomes part of the Bidding Documents. Work or material not specifically
mentioned herein is to be as described in the main body of the specifications and
as shown on the drawings.
Bids Due: December 14, 2017, 2:00 PM
"DNREC CONTRACT NO. 2017-HL-8 SEALED BID – DO NOT OPEN".
Dept. of Natural Resources & Environmental Control
Division of Parks and Recreation
Office of Design and Development
89 Kings Highway, Dover DE 19901
Attn: Cindy A. Todd, RLA. Phone Number: 302-739-9210
QUESTIONS:
1. Addendum #3 wants us to list an Electrician on the Bid Documentation. The project doesn't
call for electrical....just some conduit.
The existing light pole in the parking lot was slated to be relocated in the previous
parking layout, and Parks may elect to install additional light poles as a part of this
project.
2. Are you expecting import topsoil or are we using existing materials to line the ditches?
No additional top soils need to be imported to the site. The existing ditches need to be
regraded to provide positive flow.
Holts Landing Boat Trailer Parking Lot December 8, 2017
Addendum 5 Page 2
3. Is the new shading at parking lot #3 used to denote the limits of parking lot 3?
The hatching within parking lot #3 depicts the limit of the parking lot and it provides
the pertinent information to bid Alternate 2. See the enclosed plansheets C-101 and
C-102 for your use.
4. If Alternate 1 is chosen do you still want the ditch work near the Service Road completed?
Yes, the regrading of the ditch needs to occur even if Alternate 1 is not selected.
5. What is the top of ditch elevation?
See the enclosed plansheets C-101 and C-102 for your use.
6. How wide is the bottom of the ditch?
The bottom of the ditch can be 1-foot wide, and it should not be any wider than 2-
foot.
7. Is the spoils material to be left on site as shown on sheet ES-101 or is spoil material to be
removed from the site?
The spoil material can be transported to other locations within Holts Landing State
Park.
8. Plan page states “NOT FOR CONSTRUCTION”. Do we bid using the information on this
addendum 4 plan page?
See the enclosed plansheets C-101 and C-102 for your use.
DRAWINGS:
Drawings: The revised site plans C-101, C-102, ES-101 with the pertinent grading and the
striping are enclosed for your use.
8.44
8.22
7.74
7.747.87
7.98
7.86 7.847.70
7.39
7.19
6.95
6.75
6.61
6.63
6.28
5.92
5.475.35
4.824.99
4.334.41
4.10
4.204.103.88
3.874.25
4.44
4.45
5.17
4.18
4.18
EW14.30
EW15.02
EW15.02
5.18
5.28EW15.71
EW16.24
5.76
5.51EW1 PC6.33
EW16.66
5.98
5.68
EW16.68
EW16.81
6.52
6.36
EW16.32
EW16.88
7.07
EW1 PT7.14
6.245.29
5.716.88
6.99
6.69
6.38
EW17.55
3.00
3.84
EW17.75
EW17.39
EW17.75
EW18.60
8.66
8.38
8.26
8.78
8.48 7.657.71
EW25.21
4.484.67
5.00
4.70
5.20
5.13
5.60
5.40
5.36
5.19
5.46
5.27
5.29
6.11
6.47
6.77
6.82
6.92
7.10
7.23
7.23
7.47
7.58
7.73
7.73
7.57
7.42
7.32
7.31
6.92
6.49
6.13
5.505.46
6.05
6.55
7.00
7.14
7.066.94
7.19
7.41
7.77
7.84
8.097.93
7.81
8.01
8.05CRWN18.57
CRWN17.96
CRWN17.39
7.11
7.62
7.99
8.01
7.747.86
8.037.12
7.57
PP/856486.66
GW6.75
7.066.48
6.95
6.80 5.826.85
BUSH/5'SPREAD5.97
BUSH/5'SPREAD5.96
6.445.216.69
BUSH/5'SPREAD5.27
BUSH/5'SPREAD5.30
6.44 4.975.84
5.894.786.23
6.10
5.096.68
BENCH/CL6'5.77
6.075.77
5.99
6.326.01
6.44
6.896.41
6.75
7.02
6.75
7.10
7.126.99
7.42
7.52
7.147.37
7.357.04
7.73 7.497.01
7.15
6.696.55
7.37
7.22
6.22
6.71
6.44
6.13
7.11
7.00
6.01
6.36
6.31
5.73
6.87
6.70
5.93
6.27
6.33
6.076.43
EW25.56
EW25.46
EW25.31
EW25.29
EW25.63
EW25.90
EW25.98
EW25.95EW2
5.70
EW25.58
EW36.04
EW36.18EW3
6.28
6.39
6.71
7.11
6.84
6.72
6.276.23
6.77
7.04
7.16
7.22
6.87
6.63
6.22
5.34
5.20
5.96
6.36
6.86
6.95
6.89
6.89
6.47
6.05
5.575.29
5.70
6.34
6.44
6.32
5.99
5.32
EXISTINGBENCH
12" C
MP
INV=5.84
INV=5.25
E
EX. 5" BOLLARD,3' ABOVE GRADE,TYP.- 10
EX. 6" BOLLARD,4.5' ABOVEGRADE, TYP.- 2
EX. 6" BOLLARD,4.5' ABOVE GRADE
EX. BIRDHOUSE
KAYAKINGSIGN
NO PARKINGLOADINGZONE SIGN
7
4
5
6
7
7
7
66
6
6
6
66
6
55 5
6 5
6
6
7
7
8
8
8
66
5
5
4
4
EX. P
EDES
TRIA
N P
ATH
BENCHMARKPK NAIL FOUNDN 215428.274E 739119.452ELEV. = 5.62' MLW
BM
BENCHMARKIRON ROD W/ CAP SETN 215150.850E 739160.485ELEV. = 6.49' MLW
BM
EX. LIGHPOLE
EX. PARKING LOT
WF1/C15.43
WF1/C25.26
WF1/C35.38
WF1/C45.27
WF1/C55.85
WF1/C65.67
WF1/C75.59
WF1/C85.61
WF1/C9 END5.38
WF2/A13.02WF2/A2
2.96
WF2/A33.41
WF2/A43.75
WF2/A53.90
WF2/A64.20
WF2/A75.15
WF2/A84.54
WF2/A94.66
WF2/A10 END3.95
WF3/B63.49
WF3/B53.42
WF3/B44.63
WF3/B34.73
WF3/B24.12
WF3/B13.83
WF4/D14.26
WF4/D24.02
WF4/D34.31
WF4/D44.51
WF4/D5 END11.10
WDLWDL
WDL
WDL
WDL
WDL WDL
WDL
WDL
WDL
WDL
WDL
WDLWDL
WDL
WDL
WD
L
WD
L
WDL
WD
L
WD
L
WD
LW
DL
WD
L
WD
L
WDL
WDL
WDL
WDL
WDL
WD
L
WD
L
WD
L
WDLWDL
EX. WETLANDVEGETATION
EX. BOAT RAMP
HANDICAP SIGN
YIELDYIELD
12.0'
TYP.
PORTABLE RESTROOMW/ RAMP LOCATION
PROPOSED STEELBOLLARDS, TYP. (3)
PROPOSED CONCRETE BUMPER.REUSE OF EXISTING BUMPER UNDERTHE DISCRETION OF THE OWNER.
CONTRACTOR SHALL REMOVE EXISTINGCONCRETE BUMPERS ONLY NECESSARY FORCONSTRUCTION AND STOCKPILE ON-SITE.
PROPOSED PARKINGSPACE STRIPING SHALL BE4" WIDE MIN. WHITEPAVEMENT MARKING PAINT.
PROPOSED DIRECTIONALARROW (TYP.)
PROPERTY OFSTATE OF DELAWARETAX MAP 134-4.00-1.00
PROPERTY OFINDIAN RIVERVIEW LPTAX MAP 134-4.00-4.00
12.0'
8.0'
HANDICAPACCESSIBLE ROUTE
1
PROPOSED REMOVABLEBOLLARDS 5' CLEARSPACEBETWEEN, TYP. (2)
PROPOSED MILL & OVERLAY,MINIMUM 4" THICKNESS
5.19'
3.38
'
RE-STRIPE EXISTINGHANDICAP SPACE &NO PARKING AREA
CONTRACTOR SHALLCLEAN OUT THE EXISTING12" DIA. CULVERTPROPOSED STOP BAR
SHALL BE 16" WIDEWHITE THERMOPLASTIC
G
B
A
E
D
2
2' WIDE TRUNCATEDDOME WARNING STRIP
B
3
3 - 4", PVCCONDUITS WITHQUAZITE BOX
F
PROPOSED ALTERNATE: MILL & OVERLAY (2")EXISTING BOAT RAMP PARKING AREA
CONTRACTOR SHALL FILL & PROVIDETOPSOIL IN THE EXISTING DRAINAGESWALE AND GRADE AREA TOPROVIDE POSITIVE DRAINAGE.
3 - 4", 40' LONG PVCCONDUIT, TYP.
12.0'
TYP.
12.0'
TYP.
18.0
'43
.8'
43.8
'18
.0'
43.8
'20
.0'
35.4
'
50.0'
(TYP-4) 62
.0'
62.0'
62.0'
R75'R25'
R10'
R25'
16.0'
R100'R25'
R5'
R15'
R75'
R41'
R25'
R15'
R2'
RELOCATED KAYAKINGSIGN PLACEMENT
REMOVE EXISTING PAVEMENTIN THIS AREA AND GRADE TOPROVIDE POSITIVE DRAINAGE
CONTRACTOR SHALL FILL & PROVIDETOPSOIL IN THE EXISTING DRAINAGESWALE AND GRADE AREA TOPROVIDE POSITIVE DRAINAGE.
1
FPROPOSED HATCHEDSTRIPING SHALL BE4" WIDE YELLOWPAVEMENT MARKINGPAINT @ 45°, 32" CC
G
TYP.45°
F
G
4
CONTRACTOR SHALLBLACK OUT STRIPING
RE-GRADE DITCH @0.30% SLOPE
RE-GRADE DITCH @0.30% SLOPE
33
BB
FLOOD ZONE AE - EL 8
FLOOD ZONE VE - EL 9
FLOOD ZONE AE - EL 7
CONTRACTOR SHALL COORDINATERELOCATION WITH OWNER
7.20MATCH EX.
7.10MATCH EX.
7.05
5.76
5.58
7.15MATCH EX.
MATCH EX.
6.55MATCH EX.
6.49MATCH EX.
MATCH EX.
5.40MATCH EX.
6.16
5.88
5.84
5.96 6.30
5.74
7.24
7.02 7.31
6.09
6.00
7.57
6.63
6.87 7.20
6.25
6.14
6.27
6.55 6.83
6.59
6.71
6.91
6.50
6.23
6.157.68
6.77
6.00
6.62
6.84
7.48
7.28
6.81
5.32MATCH EX.
5.30MATCH EX.
5.94
5.55
5.60
6.66
6.93
5.64
5.91
5.25
LOD
6
7
7
7
7
6
6
6
6
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LODLODLODLODLODLODLOD
LODLODLOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LODLOD
PARKING LOT NO. 3
SERVICE ROAD
PARKING LOT NO. 2
PARKING LOT NO. 1
REV
ISIO
NS
Dwg No:
PROJ. NO.
SCALE
DATE
BYIT
EMN
O.
DAT
E
DRAWN DESIGNED CHECKED
of
A Di
visio
n of
:An
drew
s, M
ille
r &
Ass
ocia
tes
FRIE
DEL
, IN
C.
DAV
IS,
BOW
EN &
ARCH
ITEC
TSEN
GIN
EERS
SURV
EYO
RS
SA
LIS
BU
RY
, MA
RY
LAN
D (4
10) 5
43-9
091
MIL
FOR
D, D
ELA
WA
RE
(302
) 424
-144
1 E
AS
TON
, MA
RY
LAN
D (4
10) 7
70-4
744
SMS KBE JPL
DEC. 2017
1945C003
5
Pro
po
se
d B
oat
Ram
p P
ark
ing
Ho
lts
La
nd
ing
Sta
te P
ark
Dep
artm
ent o
f Nat
ural
Res
ourc
es a
nd E
nviro
nmen
tal C
ontr
olDi
vision
of P
arks
and R
ecre
ation
1" = 20'
C-101
SIT
E P
LA
N
2
1
12/0
7/17
P
AR
KS
AN
D R
EC
RE
ATI
ON
CO
MM
EN
TS
P:\_
DB
F\19
45C
003
Hol
ts P
king
Lot
\DW
G\C
101
Site
Pla
n.dw
g, C
-101
, 12/
7/20
17 1
1:14
:31
AM
, ste
s, D
WG
To
PD
F.pc
3
TYPICAL STEEL BOLLARD DETAIL
TYPICAL PRECAST CONCRETE BUMPER DETAIL
2 1/
4"
6"3
3/4" 1"
8"
2 - #5 BARS2 1/2"
1'-2" 1'-3" 1'-2" 1'-3" 1'-2"
6'-0"
1" DIA. OPENINGS FOR STEEL BARS
2 - #6 BARS, 18" LONG
ELEVATION
SECTION
SCALE: 1"= 2'
NO SCALE
4'2'0'
SCALE : NONE
4'-4" 5'-0"
9'-4"
17"
10"
17"
3'-8
"
4"
WHITE PAINT
TRAFFIC FLOW DIRECTION ARROW
6"3'
-0"
1"
4'-0
"
2' DIA. OF 3000 PSI CONCRETE.
FINAL GRADE.
2' DIAMETER
6" DIA. GALVANIZED STEEL PIPE.FILL WITH CONCRETE. PLACEYELLOW 0.25" HDPE DOME TOPBUMPER POST SLEEVE OVER PIPE.ATTACH PER MANUFACTURERSINSTRUCTIONS.
3' (TYP.)
ACCESSIBILITY PARKING SPACE MARKINGHANDICAPPED PARKING SIGN DETAIL
NOTES :
2"
1"
6"
2 1/2"
1 1/2"
1"
1 1/2"7 3/4"
3/4"1 3/4"
4"
WHITE
BLUE
GREEN
12"2" HIGH LETTERING(GREEN)
12"
PARKING SPACE STRIPINGSHALL BE 4" WIDE MIN. WHITEPAVEMENT MARKING PAINT
8' WIDEMIN.
1. BOTTOM EDGE OF SIGN SHALL BE A MINIMUM OF 7' ABOVE FINISHED GRADE.2. CONTRACTOR SHALL INSTALL ONE SIGN PER HANDICAP PARKING SPACE.3. SIGNS ARE TO BE CENTERED ON STALL WIDTH, FACING PARKING.4. ALL SIGNS SHALL HAVE A WHITE BACKGROUND WITH GREEN LETTERING IN ACCORDANCE
WITH THE MUTCD AND DELDOT STANDARDS, LATEST EDITION THEREOF.
18"(MANUAL UNIFIED TRAFFICCONTROL DEVICES (MUTCD)SIGN R7-8)
SCALE : NONE SCALE : NONE
EDGE OFPARKING STALL
7'-0" TO GRADE
32"cc
45°
TYPICAL HANDICAPPED CAR PARKING STALL PLANSCALE: NONE
(ONE PER SPACE)HANDICAPPED PARKING SIGN
SEE DETAIL, THIS SHEET8' WIDE
MIN.
8' WIDEMIN.
R1-1
R5-1
R1-1: 30"x 30" OCTAGONALREFLECTORIZED WHITELEGEND ON REDBACKGROUND
24"x24" RED WITHREFLECTORIZED WHITELEGEND & BACKGROUND
SCALE : NONE
NOTE: ALL ROAD SIGNS SHALL SHALL BE INACCORDANCE WITH THE MUTCD AND DELDOTSTANDARDS, LATEST EDITION THEREOF.
SIGNAGE DETAIL
TYPICAL STEEL BOLLARD W/ SIGN DETAILSCALE: 1"= 2'
4'2'0'
6"3'
-0"
1"
6'-0
"
DIA. 3000 PSI CONCRETE.
FINAL GRADE
2' DIAMETER
1'-0
"
2" PERFORATEDSQUARE TUBING
FASTEN TUBING W/2 - 3/8" DIA. BOLTS
2'-0
"
6" DIA. GALV. STEEL PIPE. FILL WITHCONCRETE. PLACE YELLOW0.25"HDPE DOME TOP BUMPER POSTSLEEVE OVER PIPE. ATTACH PERMANUFACTURER'S INSTRUCTIONS.
2 1/4" PERFORATEDSQUARE TUBINGNEATLY CUT OPENINGIN DOME FOR TUBING.
OR
(R7-8)
NO SCALE
8" MIN. DEPTH OF GRADED AGGREGATED BASE STONE, TYPE B (ITEM 302005)
TYPICAL PAVEMENT SECTION AND TIE-IN DETAIL
2" WMA, SUPERPAVE, TYPE B, PG64-22, 160 GYRATIONS (ITEM 401810)
TOP 12" OF SUBGRADE SHALL BE COMPACTED TO 95% OF THEMODIFIED PROCTOR MAXIMUM DRY DENSITY
NOTE:1. WHERE ORGANIC, VERY SOFT OR LOOSE SOILS ARE ENCOUNTERED, THE AREA
SHALL BE OVEREXCAVATED AN ADDITIONAL 5" MINIMUM AND BACKFILLED WITHDELAWARE "CRUSHER RUN TYPE B or CR-1".
2" WMA, SUPERPAVE, TYPE C, PG64-22, 160 GYRATIONS (CARBONATE STONE) (ITEM 401827)
NON-WOVEN GEOTEXTILE EQUAL TO CONTECH C-120NW
INTERNATIONAL SYMBOL OFACCESSIBILITY PARKING SPACEMARKER SEE DETAIL, THIS SHEET
INTERNATIONAL SYMBOL OF
Blue Background
White
FULL DEPTH SAWCUT
1.0'
ROTOMILL TO 2" BELOW FINISH GRADEAND REPLACE WITH TYPE C SUPERPAVE
TACK COAT
JOINT TO BE SEALEDWITH HOT CRACK SEALER
EXISTING PAVEMENT
6"
2'-0
"
11 2"
3"
2'-6
"
SECTION PLAN VIEW
434" O.D. POLYETHYLENE
THERMOPLASTIC BOLLARD
78" DIA. HOLE THRU STEEL AND PLASTIC
34" DIA. x 8" ROUND BAR W/ 3 4" GRADE 8
USS FLAT WASHER WELDED TO END.DRILL 3 8" HOLE TO ACCEPT PADLOCK.
3,000 PSI CONCRETE
18" DIA. SONOTUBE
5" I.D. STEEL PIPE
WELD 3 4" x 13" REBAR
34" DIA. HOLE
THRU STEEL
6" DELAWARE #57DRAINAGE STONE
REMOVABLE BOLLARD DETAILSCALE: 1"= 1'
2'1'0'
REV
ISIO
NS
Dwg No:
PROJ. NO.
SCALE
DATE
BYIT
EMN
O.
DAT
E
DRAWN DESIGNED CHECKED
of
A Di
visio
n of
:An
drew
s, M
ille
r &
Ass
ocia
tes
FRIE
DEL
, IN
C.
DAV
IS,
BOW
EN &
ARCH
ITEC
TSEN
GIN
EERS
SURV
EYO
RS
SA
LIS
BU
RY
, MA
RY
LAN
D (4
10) 5
43-9
091
MIL
FOR
D, D
ELA
WA
RE
(302
) 424
-144
1 E
AS
TON
, MA
RY
LAN
D (4
10) 7
70-4
744
SMS KBE JPL
DEC. 2017
1945C003
5
Pro
po
se
d B
oat
Ram
p P
ark
ing
Ho
lts
La
nd
ing
Sta
te P
ark
Dep
artm
ent o
f Nat
ural
Res
ourc
es a
nd E
nviro
nmen
tal C
ontr
olDi
vision
of P
arks
and R
ecre
ation
AS SHOWN
C-102
SIT
E D
ET
AIL
S
3
1
12/0
7/17
P
AR
KS
AN
D R
EC
RE
ATI
ON
CO
MM
EN
TS
P:\_
DB
F\19
45C
003
Hol
ts P
king
Lot
\DW
G\C
102
Site
Det
ails
.dw
g, L
ayou
t1, 1
2/7/
2017
11:
04:4
1 A
M, s
tes,
DW
G T
o P
DF.
pc3
8.22
7.74
7.747.87
7.98
7.86 7.847.70
7.39
7.19
6.95
6.75
6.61
6.63
6.28
5.92
5.475.35
4.824.99
4.334.41
4.10
4.204.103.88
3.874.25
4.44
4.45
5.17
4.18
4.18
EW15.02
EW15.02
5.18
5.28EW15.71
EW16.24
5.76
5.51EW1 PC6.33
EW16.66
5.98
5.68
EW16.68
EW16.81
6.52
6.36
EW16.32
EW16.88
7.07
EW1 PT7.14
6.245.29
5.716.88
6.99
6.69
6.38
EW17.55
3.00
EW17.75
EW17.39
EW17.75
8.78
8.48 7.657.71
EW25.21
4.484.67
5.00
4.70
5.20
5.13
5.60
5.40
5.36
5.19
5.46
5.27
5.29
6.11
6.47
6.77
6.82
6.92
7.10
7.23
7.23
7.47
7.58
7.73
7.73
7.57
7.42
7.32
7.31
6.92
6.49
6.13
5.505.46
6.05
6.55
7.00
7.14
7.066.94
7.19
7.41
7.77
7.84
8.097.93
7.81
CRWN17.96
CRWN17.39
7.11
7.62
7.997.747.86
7.57
PP/856486.66
GW6.75
7.066.48
6.95
6.80 5.826.85
BUSH/5'SPREAD5.97
BUSH/5'SPREAD5.96
6.445.216.69
BUSH/5'SPREAD5.27
BUSH/5'SPREAD5.30
6.44 4.975.84
5.894.786.23
6.10
5.096.68
BENCH/CL6'5.77
6.075.77
5.99
6.326.01
6.44
6.896.41
6.75
7.02
6.75
7.10
7.126.99
7.42
7.52
7.147.37
7.357.04
7.73 7.497.01
7.15
6.696.55
7.37
7.22
6.22
6.71
6.44
6.13
7.11
7.00
6.01
6.36
6.31
5.73
6.87
6.70
5.93
6.27
6.33
6.076.43
EW25.56
EW25.46
EW25.31
EW25.29
EW25.63
EW25.90
EW25.98
EW25.95EW2
5.70
EW25.58
EW36.04
EW36.18EW3
6.28
6.39
6.71
7.11
6.84
6.72
6.276.23
6.77
7.04
7.16
7.22
6.87
6.63
6.22
5.34
5.20
5.96
6.36
6.86
6.95
6.89
6.89
6.47
6.05
5.575.29
5.70
6.34
6.44
6.32
5.99
5.32
EXISTINGBENCH
12" C
MP
INV=5.84
INV=5.25
E
EX. 5" BOLLARD,3' ABOVE GRADE,TYP.- 10
EX. 6" BOLLARD,4.5' ABOVEGRADE, TYP.- 2
EX. 6" BOLLARD,4.5' ABOVE GRADE
EX. BIRDHOUSE
KAYAKINGSIGN
NO PARKINGLOADINGZONE SIGN
7
4
5
6
7
77
66
6
6
6
66
6
55 5
6 5
6
6
7
7
8
8
66
5
5
4
EX. P
EDES
TRIA
N P
ATH
BENCHMARKPK NAIL FOUNDN 215428.274E 739119.452ELEV. = 5.62' MLW
BM
BENCHMARKIRON ROD W/ CAP SETN 215150.850E 739160.485ELEV. = 6.49' MLW
BM
EX. LIGHPOLE
EX. PARKING LOT
WF1/C15.43
WF1/C25.26
WF1/C35.38
WF1/C45.27
WF1/C55.85
WF1/C65.67
WF1/C75.59
WF1/C85.61
WF1/C9 END5.38
WF2/A13.02WF2/A2
2.96
WF2/A33.41
WF2/A43.75
WF2/A53.90
WF2/A64.20
WF2/A75.15
WF2/A84.54
WF2/A94.66
WF2/A10 END3.95
WF3/B63.49
WF3/B34.73
WF3/B24.12
WF4/D24.02
WF4/D44.51
WF4/D5 END11.10
WDLWDL
WDL
WDL
WDL
WDL WDL
WDL
WDL
WDL
WDL
WDL
WDLWDL
WD
L
WDL
WD
L
WD
L
WD
LW
DL
WDL
WDL
WDL
WDL
WDL
WD
L
WD
L
WD
L
WDLWDL
EX. WETLANDVEGETATION
EX. BOAT RAMP
PROPERTY OFSTATE OF DELAWARETAX MAP 134-4.00-1.00
PROPERTY OFINDIAN RIVERVIEW LPTAX MAP 134-4.00-4.00
SCE
CIP
SP
SPSP
SPSP
SP
SP
SP
SP
LOD
6
7
7
7
7
6
6
6
6
SM-C
SM-C
SM-C
SM-C
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LODLODLODLODLODLODLOD
LODLODLOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LODLODSF
SF
SF
SF
SFSFSF
SFSFSF
SFSF
SFSF
SF
SF
SF
SF
SF
STOCKPILEAREA
YIELDYIELD
REV
ISIO
NS
Dwg No:
PROJ. NO.
SCALE
DATE
BYIT
EMN
O.
DAT
E
DRAWN DESIGNED CHECKED
of
A Di
visio
n of
:An
drew
s, M
ille
r &
Ass
ocia
tes
FRIE
DEL
, IN
C.
DAV
IS,
BOW
EN &
ARCH
ITEC
TSEN
GIN
EERS
SURV
EYO
RS
SA
LIS
BU
RY
, MA
RY
LAN
D (4
10) 5
43-9
091
MIL
FOR
D, D
ELA
WA
RE
(302
) 424
-144
1 E
AS
TON
, MA
RY
LAN
D (4
10) 7
70-4
744
SMS KBE JPL
DEC. 2017
1945C003
5
Pro
po
se
d B
oat
Ram
p P
ark
ing
Ho
lts
La
nd
ing
Sta
te P
ark
Dep
artm
ent o
f Nat
ural
Res
ourc
es a
nd E
nviro
nmen
tal C
ontr
olDi
vision
of P
arks
and R
ecre
ation
1" = 20'
ES-101
ER
OS
ION
& S
ED
IME
NT
CO
NT
RO
L P
LA
N
4
LEGEND
LIMIT OF DISTURBANCE LOD
SILT FENCE
SOIL STOCKPILE
STABILIZED CONSTRUCTION ENTRANCE
CULVERT INLET PROTECTION
SF
SP
SCE
CIP
GENERAL CONSTRUCTION NOTES
SEQUENCE OF CONSTRUCTION
1. THE DNREC SEDIMENT AND STORMWATER PROGRAM MUST BE NOTIFIED IN WRITING FIVE (5) DAYS PRIOR TOCOMMENCING WITH CONSTRUCTION. FAILURE TO DO SO CONSTITUTES A VIOLATION OF THE APPROVEDSEDIMENT AND STORMWATER MANAGEMENT PLAN.
2. APPROVED PLANS REMAIN VALID FOR 3 YEARS FROM THE DATE OF APPROVAL.
3. REVIEW AND OR APPROVAL OF THE SEDIMENT AND STORMWATER MANAGEMENT STANDARD PLAN SHALL NOTRELIEVE THE CONTRACTOR FROM HIS OR HER RESPONSIBILITIES FOR COMPLIANCE WITH THE REQUIREMENTS OFTHE DELAWARE SEDIMENT AND STORMWATER REGULATIONS, NOR SHALL IT RELIEVE THE CONTRACTOR FROMERRORS OR OMISSIONS IN THE APPROVED PLAN.
4. IF THE APPROVED PLAN NEEDS TO BE MODIFIED, ADDITIONAL SEDIMENT AND STORMWATER CONTROL MEASURESMAY BE REQUIRED AS DEEMED NECESSARY BY THE DNREC OR THE DELEGATED AGENCY.
5. DNREC RESERVES THE RIGHT TO ENTER PRIVATE PROPERTY FOR PURPOSES OF PERIODIC SITE INSPECTION.
6. FOLLOWING SOIL DISTURBANCE OR REDISTURBANCE, PERMANENT OR TEMPORARY STABILIZATION SHALL BECOMPLETED FOR ALL PERIMETER CONTROLS, SOIL STOCKPILES, AND ALL OTHER DISTURBED OR GRADED AREASON THE PROJECT SITE WITHIN 14 CALENDAR DAYS UNLESS MORE RESTRICTIVE FEDERAL REQUIREMENTS APPLY.
7. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL COMPLY WITH THE DELAWARE EROSION ANDSEDIMENT CONTROL HANDBOOK, LATEST EDITION.
8. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN AND REPAIR ALL EROSION, SEDIMENTCONTROL DURING SITE CONSTRUCTION.
9. ALL SEDIMENT AND STORMWATER MANAGEMENT PLANS SHALL CONTAIN CERTIFICATION BY THE OWNER ORDEVELOPER OF THE RIGHT OF THE DEPARTMENT OR DELEGATED INSPECTION AGENCY TO CONDUCT ON-SITEINSPECTIONS.
10. THE SIGNED OWNER'S CERTIFICATION IS ON SHEET C-100.
11. POST CONSTRUCTION VERIFICATION DOCUMENTS ARE TO BE SUBMITTED TO DNREC SEDIMENT ANDSTORMWATER PROGRAM WITHIN 60-DAYS OF THE STORMWATER MANAGEMENT FACILITY COMPLETION.
12. APPROVAL OF A SEDIMENT AND STORMWATER PLAN DOES NOT GRANT OR IMPLY A RIGHT TO DISCHARGESTORMWATER RUNOFF. THE OWNER/DEVELOPER IS RESPONSIBLE FOR ACQUIRING ANY AND ALL AGREEMENTS,EASEMENTS, ETC. NECESSARY TO COMPLY WITH STATE DRAINAGE AND OTHER APPLICABLE LAWS.
13. THE NOTICE OF INTENT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER ANPDES GENERAL PERMIT FOR THIS PROJECT IS #________. AT ANY TIME THE OWNERSHIP FOR THIS PROJECTCHANGES, A TRANSFER OF AUTHORIZATION OR A CO-PERMITTEE APPLICATION MUST BE SUBMITTED TO DNREC.THE PERMITTEE OF RECORD SHALL NOT BE RELIEVED OF THEIR RESPONSIBILITIES UNTIL A NOTICE OFTERMINATION HAS BEEN PROCESSED BY DNREC.
14.15. THE OWNER SHALL BE FAMILIAR WITH AND COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION GENERAL
PERMIT ASSOCIATED WITH THE PROJECT, INCLUDING, BUT NOT LIMITED TO, PERFORMING WEEKLY SITEINSPECTIONS DURING CONSTRUCTION AND AFTER RAIN EVENTS, AND MAINTAINING WRITTEN LOGS OF THESEINSPECTIONS.
16. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION ISESTABLISHED.
17. ALL AREAS NOT COVERED BY PAVEMENT WILL BE SEEDED USING PERMANENT SEED MIXTURE #7 AS SHOWN ONSHEET ES-102.
18. UPON COMPLETION OF STOCKPILING TOPSOIL, SEED AND MULCH USING TEMPORARY SEED MIXTURESPECIFICATIONS IF TO REMAIN IN PLACE LONGER THAN 14 DAYS.
19. PERMANENT STABILIZATION: SEED MIX #7 SHALL BE UTILIZED AND SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD DETAIL 3.4.3 AND
3.4.5 ON SHEET ES-102.
20. TEMPORARY STABILIZATION: SEED MIX # 5 SHALL BE UTILIZED AND SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD DETAIL 3.4.3 AND
3.4.5 ON SHEET ES-102.
21. IF TEMPORARY STABILIZATION IS REQUESTED, PERMANENT SEEDING SHALL BE PERFORMED DURING THE NEXTAPPLICABLE PERIOD PER PARAGRAPH 15 ABOVE.
22. ALL FILL SLOPE AREAS SHOWN HEREON ARE TO BE STABILIZED PER PARAGRAPHS 16 OR 17 ABOVE IMMEDIATELYAFTER COMPLETION OF GRADING OPERATIONS FOR THESE SLOPES.
23. IF CONSTRUCTION ACTIVITY IS COMPLETED OR CEASES FOR A PERIOD OF 14 DAYS, ALL DISTURBED AREAS WILLBE STABILIZED EITHER PERMANENTLY OR TEMPORARILY, FOLLOWING THE SPECIFICATIONS AND STANDARDS INTHE DELAWARE EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST EDITION.
24. TEMPORARY VEGETATIVE COVER, MULCHING AND/OR SPRINKLING WITH WATER SHALL BE THE METHODS USED ASNECESSARY TO CONTROL DUST. SEE DETAIL 3.4.8 ON SHEET ES-102.
25. EROSION CONTROL MATTING IS REQUIRED IN ALL OPEN CHANNELS AND ON ALL SLOPES 3:1 OR GREATER.STABILIZATION MATTING SHALL BE NORTH AMERICAN GREEN SC150BN OR DNREC TYPE SSM-III.
26. A CERTIFIED CONSTRUCTION REVIEWER (CCR), PROVIDED BY THE CONTRACTOR, MAY BE REQUIRED TO REVIEWTHE EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT WORK FOR THIS PROJECT.
27. AT ANY TIME A DEWATERING OPERATION IS USED, IT SHALL BE PREVIOUSLY APPROVED BY THE AGENCYCONSTRUCTION SITE REVIEWER FOR A NON-EROSIVE POINT OF DISCHARGE, AND A DEWATERING PERMIT SHALLBE APPROVED BY THE DNREC WELL PERMITTING BRANCH.
28. THE OWNER SHALL BE FAMILIAR WITH AND COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION GENERALPERMIT ASSOCIATED WITH THE PROJECT, INCLUDING, BUT NOT LIMITED TO, PERFORMING WEEKLY SITEINSPECTIONS DURING CONSTRUCTION AND AFTER RAIN EVENTS, AND MAINTAINING WRITTEN LOGS OF THESEINSPECTIONS.
29. BEFORE ANY EARTHWORK OR EXCAVATION TAKES PLACE, THE CONTRACTOR SHALL CALL MISS UTILITY AT 811 OR1.800.282.8555 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, TO HAVE ALL EXISTING UTILITIES MARKED ONSITE.
30. THE CONTRACTOR SHALL AT ALL TIMES PROTECT AGAINST SEDIMENT OR DEBRIS LADEN RUNOFF OR WIND FROMLEAVING THE SITE. PERIMETER CONTROLS SHALL BE CHECKED DAILY AND ADJUSTED AND/OR REPAIRED TOFULLY CONTAIN AND CONTROL SEDIMENT FROM LEAVING THE SITE. ACCUMULATED SEDIMENT SHALL BEREMOVED WHEN IT HAS REACHED HALF OF THE EFFECTIVE CAPACITY OF THE CONTROL. IN ADDITION, THECONTRACTOR MAY NEED TO ADJUST OR ALTER MEASURES IN TIMES OF ADVERSE WEATHER CONDITIONS, OR ASDIRECTED BY THE AGENCY CONSTRUCTION SITE REVIEWER.
31. THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL MEASURES TO PROTECT STOCKPILE AREAS ANDSTORAGE AREAS. ALL AREAS USED BY THE CONTRACTOR FOR STAGING OPERATIONS SHALL BE FULLY RESTOREDBY THE CONTRACTOR UPON COMPLETION OF THE PROJECT. IF THE STAGING AREA IS PAVED, IT SHALL BERESTORED TO ITS ORIGINAL CONDITION. IF THE STAGING AREA IS UNPAVED, IT SHALL BE RE-GRADED, TOPSOILED,SEEDED AND MULCHED TO THE SATISFACTION OF THE ENGINEER. ALL COSTS ASSOCIATED WITH RESTORATIONOF THE STAGING AREA SHALL BE AT THE CONTRACTOR'S EXPENSE. IF THE ENGINEER DETERMINES THAT ASATISFACTORY STAND OF GRASS DOES NOT EXIST AT THE TIME OF FINAL INSPECTION, ALL COSTS ASSOCIATEDWITH RE-ESTABLISHING A SATISFACTORY STAND OF GRASS SHALL BE AT THE CONTRACTOR'S EXPENSE.
32. EQUIPMENT AND/OR STOCKPILE MATERIAL SHALL NOT BE STORED IN THE DRIPLINE AREA OF ANY TREE.
33. BEST AVAILABLE TECHNOLOGY (BAT) SHALL BE EMPLOYED TO MANAGE TURBID DISCHARGES IN ACCORDANCEWITH REQUIREMENTS OF 7. DEL C. CH 60, REGULATIONS GOVERNING THE CONTROL OF WATER POLLUTION,SECTION 9.1.02, KNOWN AS SPECIAL CONDITIONS FOR STORMWATER DISCHARGES ASSOCIATED WITHCONSTRUCTION ACTIVITIES, AND DEPARTMENT POLICIES, PROCEDURES, AND GUIDANCE.
34. DOCUMENTATION OF SOIL TESTING AND MATERIALS USED FOR TEMPORARY OR PERMANENT STABILIZATIONINCLUDING BUT NOT LIMITED TO SOIL TEST RESULTS, SEED TAGS, SOIL AMENDMENT TAGS, ETC. SHALL BEPROVIDED TO THE DEPARTMENT OR DELEGATED AGENCY TO VERIFY THAT THE PERMANENT OR TEMPORARYSTABILIZATION HAS BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLAN. THE DEPARTMENT ORDELEGATED AGENCY MAY REQUIRE ADDITIONAL SOIL TESTING AND REAPPLICATION OF PERMANENT ORTEMPORARY STABILIZATION IN ACCORDANCE WITH SPECIFICATIONS PROVIDED IN THE DELAWARE EROSION ANDSEDIMENT CONTROL HANDBOOK, OR ALTERNATIVE MEASURES THAT PROVIDE FUNCTIONAL EQUIVALENCY.
1. NOTIFY DNREC IN WRITING FIVE (5) DAYS PRIOR TO COMMENCING WITH CONSTRUCTION TO SCHEDULE A PRE-CONSTRUCTION MEETING.FAILURE TO DO SO CONSTITUTES A VIOLATION OF THE APPROVED SEDIMENT AND STORMWATER MANAGEMENT PLAN.
2. PRIOR TO ANY CLEARING, INSTALLATION OF SEDIMENT CONTROL MEASURES OR GRADING, A PRE-CONSTRUCTION MEETING MUST BESCHEDULED AND CONDUCTED WITH THE DNREC DIVISION OF WATERSHED STEWARDSHIP SEDIMENT AND STORMWATER PROGRAMCONSTRUCTION SITE INSPECTOR. THE LANDOWNER/DEVELOPER, CONTRACTOR, AND CERTIFIED CONSTRUCTION REVIEWER AREREQUIRED TO BE IN ATTENDANCE AT THE PRE-CONSTRUCTION MEETING; THE DESIGNER IS RECOMMENDED TO ATTEND.
3. ALL PERIMETER CONTROLS ARE TO BE REVIEWED BY THE DNREC DIVISION OF WATERSHED STEWARDSHIP SEDIMENT AND STORMWATERPROGRAM SITE INSPECTOR AND APPROVED PRIOR TO PROCEEDING WITH FURTHER SITE DISTURBANCE OR CONSTRUCTION.
4. THE CONTRACTOR SHALL AT ALL TIMES PROTECT AGAINST SEDIMENT OR DEBRIS LADEN RUNOFF OR WIND FROM LEAVING THE SITE.PERIMETER CONTROLS SHOULD BE CHECKED DAILY AND ADJUSTED AND/OR REPAIRED TO FULLY CONTAIN AND CONTROLSEDIMENTATION ON THE SITE. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT HAS REACHED HALF OF THE EFFECTIVECAPACITY OF THE CONTROL. IN ADDITION, THE CONTRACTOR MAY NEED TO ADJUST OR REPAIR MEASURES IN TIMES OF ADVERSEWEATHER CONDITIONS, OR AS DIRECTED BY THE DNREC DIVISION OF WATERSHED STEWARDSHIP SEDIMENT AND STORMWATERPROGRAM SITE INSPECTOR.
5. CLEAR AND GRUB ALL AREAS NECESSARY FOR THE INSTALLATION OF PERIMETER CONTROLS.
6. INSTALL PERIMETER SILT FENCE AND STABILIZED CONSTRUCTION ENTRANCES.
7. ESTABLISH TEMPORARY STOCKPILE.
8. REMOVE CONCRETE PARKING BUMPERS TO INCLUDE ANY NECESSARY CLEARING AND GRUBBING.
9. BEGIN ROAD GRADING AND GENERAL GRADING OF SITE.
10. CONSTRUCT PROPOSED DRAINAGE SWALE AND RE-GRADE EXISTING SWALES?
11. CONSTRUCT PARKING LOT.
12. BEGIN PAVEMENT MILLING & CONSTRUCTION OF PARKING AREAS AND RE-ALIGNED PEDESTRIAN TRAIL, FINE GRADE PAVED AREAS ANDINSTALL AGGREGATE BASE COURSE.
13. BOAT RAMP TO REMAIN OPEN DURING CONSTRUCTION OF PROPOSED PARKING LOT. CONTRACTOR TO PROVIDE UNIMPEDED ACCESS ATALL TIMES.
14. STABILIZE ALL DISTURBED AREAS IN ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL NOTES.
15. INSTALL STRIPING
16. FINE GRADING, REDISTRIBUTE TOPSOIL AND STABILIZE WITH PERMANENT SEEDING. INSTALL SIGNS AND OTHER DECORATIONS.
17. INSPECT PAVED AREAS FOR SEDIMENT BEFORE INSTALLING FINAL PAVING SURFACE.
18. EROSION AND SEDIMENT CONTROL DEVICES SHOULD BE REMOVED ONLY AFTER WORK IN AN AREA HAS BEEN COMPLETED ANDSTABILIZED, WITH WRITTEN APPROVAL FROM THE AGENCY CONSTRUCTION SITE REVIEWER.
19. CONTACT THE DNREC DIVISION OF WATERSHED STEWARDSHIP SEDIMENT AND STORMWATER PROGRAM FOR PROJECT CLOSE-OUT.
20. THE TERMINATION OF THE CONSTRUCTION GENERAL PERMIT WILL REQUIRE SUBMISSION AND ACCEPTANCE OF THE POSTCONSTRUCTION VERIFICATION DOCUMENTS, INCLUDING FINAL STABILIZATION THROUGHOUT THE SITE, ALL ELEMENTS OF THE SEDIMENTAND STORMWATER MANAGEMENT PLAN IMPLEMENTED, AND ACCEPTANCE OF THE FINAL OPERATION AND MAINTENANCE PLAN.
21. FILE NOTICE OF TERMINATION FOR NPDES PERMIT WITH THE DNREC DIVISION OF WATERSHED STEWARDSHIP SEDIMENT ANDSTORMWATER PROGRAM.
LIMIT OF DISTURBANCE = 70,702 SF
SM-CSTABILIZED MATTING - CHANNEL(STANDARD DETAIL DE-ESC-3.4.6.2)
N/A
1
12/0
7/17
P
AR
KS
AN
D R
EC
RE
ATI
ON
CO
MM
EN
TS
P:\_
DB
F\19
45C
003
Hol
ts P
king
Lot
\DW
G\E
S10
1 E
SC
Pla
n.dw
g, E
S-1
01, 1
2/7/
2017
11:
00:0
7 A
M, s
tes,
DW
G T
o P
DF.
pc3
Recommended