View
4
Download
0
Category
Preview:
Citation preview
4TH ST
ARROW RTE
FOOTHILL BLVD
BASELINE ST
19TH ST
BANYAN ST
ALMOND ST
GROV
E AV
HILLSIDE RD
WILSON AV
8TH ST
EAST
AV
ETIW
ANDA
AV
ROCH
ESTE
R AV
MILL
IKEN
AV
HAVE
N AV
CARN
ELIA
N ST
SAPP
HIRE
ST
ARCH
IBAL
D AV
VINE
YARD
AV
CHER
RY AV
HELL
MAN
AV
§̈¦10
§̈¦
|210
15
DP 6840 - 23 Residential Lots on 46.0 Acres
DP 7220 - 33 Residential Lots on 10 Acres
DP 6118/ TR16324 81 Residential Lots on 90.04 Acres
CP 7134 Relocate Waterlinein Wilson Ave from East Ave to
Wardman Bullock Rd
DP 6118/ TR16226-1 97 Residential Lots on 34.15 Acres
DP 7224 - 119 Condo Units on 18.66 Acres
DP 7225 - 32 Residential Lots on 7.9 Acres
CP 7095 LMWTP Project
CP 7172 Sewer Main Relocation inBaseline Rd and East Ave
DP 7276- 30 Single Residential Lots on 9 Acres
DP 7328 - 42 Single Family Homes
ECONSTRUCTION PROJECTS 2012 - 2013
Q:\G
IS\1In
terna
l\Eng
ineeri
ng\W
ater\C
onstr
uctio
nProj
ects\
Cons
tructi
onPr
ojects
11_W
ebsit
e.mxd
WATER PROJECTSLEGEND
RW PROJECTS
DEVELOPMENT PROJECTS
SEWER PROJECTS
OCTOBER 2013 DP UPDATE
DP 7276 / WF 263168
Project: 30 Single Residential Lots on 9 Acres
Project Location: Stable Falls Avenue and Rodeo Drive
Developer: Lennar Homes
Construction Contractor: CP Construction
Construction Superintendant: Ryan Combs
Engineering Tech: Raymond Abeyta
Construction Inspector: Dave Pastor
Anticipated Completion Date: February 2015
TRACT NO. 18744
OCTOBER 2013 DP UPDATE
DP 7225 / WF 252676
Project: 32 Residential Lots on 7.9 Acres
Project Location: Southwest corner of East Avenue and Via Veneto Dr
Developer: Crestwood Corp.
Construction Contractor: BT Pipeline
Construction Superintendant: Mike Dorsey
Engineering Tech: Ted Munson
Construction Inspector: Tere Worsham
Anticipated Completion Date: October 2013
TRACT NO. 18096
OCTOBER 2013 DP UPDATE
DP 7224 / WF 00251238
Project: 119 Condo Units on 18.66 Acres
Project Location: Southwest corner of Archibald Avenue and 6th Street
Developer: Beizer Homes
Construction Contractor: Kana Pipeline
Construction Superintendant:
Engineering Tech: Raymond Abeyta
Tract No. 18804
Construction Inspector: Dave Pastor
Anticipated Completion Date: January 2014
TRACT NO. 18804
OCTOBER 2013 DP UPDATE
DP 7220 / WF 248433
Project: 33 Residential Lots on 10 Acres
Project Location: Baseline and Shelby
Developer: LVD Rancho Cucamonga, LLC
Construction Contractor: Mayer’s Pipeline
Construction Superintendant: Ken Hardy (909) 322-0115
Engineering Tech: Raymond Abeyta
Construction Inspector: Tere Worsham
Anticipated Completion Date: January 2014 TRACT NO. 18806
OCTOBER 2013 DP UPDATE
DP 6840 / WF 228319
Project: 56 Residential Lots on 46.0 Acres
Project Location: Banyan Street East of East Avenue
Developer: K. Hovnanian Homes
Construction Contractor: King Construction
Construction Superintendant: Eric Lawson
Engineering Tech: Ted Munson
District Inspector: Tere Worsham
Anticipated Completion Date: January 2014
12” WATER PIPELINE
TRACT NO. 18782
TRACT NO. 17651
OCTOBER 2013 DP UPDATE
DP 6118 / W 0053408
Project: 81 Residential Lots on 90.04 Acres
Project Location: End of Wardman Bullock Road north of Wilson Avenue
Developer: Granite Homes
Construction Contractor: Meritage Homes
Construction Superintendant: Rick Wood
Engineering Tech: Raymond Abeyta
Construction Inspector: Tere Worsham
Anticipated Completion Date: January 2014
TRACT NO. 16324
OCTOBER 2013 DP UPDATE
DP 6118 / W 0053408
Project: 97 Residential Lots on 34.15 Acres
Project Location: Indian Wells Place west of Day Creek Boulevard
Developer: BCA Development
Construction Contractor: K Hovnanian
Construction Superintendant: Chris Courtney
Engineering Tech: Ted Munson
Construction Inspector: Tere Worsham
Anticipated Completion Date: January 2014
TRACT NO. 16226-1
OCTOBER 2013 CIP UPDATE
CP 7172/ WO 237510
Sewer Main Relocation in Baseline Road and East Avenue
The State of California, in conjunction with the City of Rancho Cucamonga, is performing a new interchange configuration at the I-15 Freeway and Baseline Road. The work includes building new on and off ramps over Baseline Road and East Avenue. The existing sewer main located within these streets are required to be relocated to make room for bridge footings for the new ramps. The City is also constructing a new storm drain facility in East Avenue from Foothill Boulevard to the storm drain basin just north or Baseline Road.
This project will relocate approximately 133 lineal feet of 8-inch vitrified clay pipe (VCP) and approximately 216 lineal feet of 15-inch VCP sewer mains in Baseline Road and East Avenue, respectively. The District is partnering with the City for the relocations of the sewer mains to be completed in conjunction with the new storm drain facilities.
Project Designer: Tuan Truong
Construction Contractor:
Contractor Contact Person:
Construction Inspector : Dave Pastor
Project is schedule to begin
August 2013
District approved CO-OP agreement with City of Rancho Cucamonga
Completion Date
December 2013
OCTOBER 2013 CIP UPDATE
CP 7134/ WF220981
Relocate Waterline in Wilson Ave from East Ave to Wardman Bullock Rd.
The City of Rancho Cucamonga plans to construct a new segment Wilson Avenue from Etiwanda Avenue to Wardman Bullock Road. This improvement will lower the existing finished surface by as much as 17-ft at various locations. The District has as existing 12-in waterline within the proposed road alignment that will be required to be lowered. Staff has analyzed this pipeline and plan to upsize the 12-in line to 24-in order to meet future demands and built transmission flexibility.
This project will construct approximately 4,600 linear feet of new waterline and abandon in place the existing waterline in Wilson Avenue from East Avenue to Wardman Bullock Road. This project must be constructed in conjunction with the City road work.
Project Designer: Tuan Truong, CVWD
Construction Contractor: H&H Construction
Contractor Contact Person:
Construction Inspector : City Inspector: Cathy Dawson
District Inspector: Dave Pastor
Start of Construction : October 2013
Completion Date: June 2014
OCTOBER 2013 CIP UPDATE
CP 7095 / WF220941
LMTP
The purpose of this project is to upgrade and improve the treatment process at the LMWTP to ensure compliance with the USEPA Stage 2 Disinfectants / Disinfection Byproduct Rule. The Surface Water Treatment Master Plan (October 2010) recommends several improvements. The contract for engineering design services for this project was awarded in March 2011. The project will be completed over a three year period. Design work is scheduled to be completed by July 2012 and construction to be completed by March 2014. The budget includes design, construction, construction management, materials testing, and specialty deputy inspections for the successful completion of the project.
Project Designer: Black & Veatch
Construction Contractor: SSC Construction
Contractor Contact Person: Kevin Anderson (B&V)
Eduardo Espinoza (CVWD)
Construction Inspector : District Inspector – Randy Rockwell
Starting Date: December 2012
• Three new ponds are completed and in use.
• New GAC & UV Building under construction.
• South decant pump station in operation.
• Sludge distribution structure north of the new ponds is near completion
• New block wall east of the property completed
• Service water line, 48” overflow & 12” sludge return line completed.
Anticipated Completion Date: February 2015
OCTOBER 2013 DP UPDATE
DP 7328 / WF 278945
Project: 43 Single Family Homes
Project Location: SEC Etiwanda and Miller
Developer: Lennar Homes
Construction Contractor: CP Construction
Construction Superintendant: Ryan Combs
Engineering Tech: Raymond Abeyta
Construction Inspector: Dave Pastor
Anticipated Completion Date: February 2015
TRACT NO. 18466
Recommended