Completed in January 2010

Preview:

DESCRIPTION

S5 Project High-resolution multi-disciplinary monitoring of active fault test-site areas in Italy project web site: http://dpc-s5.rm.ingv.it/ Task 4 L’Aquila fault. Completed in January 2010. Completed in January 2010. The database structure is completed - PowerPoint PPT Presentation

Citation preview

DPC 2007-2009 High-resolution multi-disciplinary monitoring of active fault test-site

areas in ItalySS55

Roma 24/03/ Roma 24/03/

20102010

S5 ProjectS5 Project High-resolution High-resolution

multi-disciplinary monitoring of active fault test-site areas multi-disciplinary monitoring of active fault test-site areas in Italyin Italy

project web site: http://dpc-s5.rm.ingv.it/

Task 4L’Aquila faultL’Aquila fault

Completed in January 2010

Completed in January 2010

The database structure is completedThe DB is mostly populated – 90% doneData on EIDA

2866 eqks relocated with different Velocity models – done

Fps of 554 earthquakes computed with Cut-andPaste technique (80% done)

Technique optimization: done. Parameters computed for a subset of eqks (on-going)

Vp/Vs and anisotropy variations in time to detect fluid migration: 70% done (to be completed)

Still to be done, field work in mid-April

Still to be done, field work in mid-April

Still to be done, field work in mid-April

Completed

GIS structure completed 90%Fault data collection completed 80%Data inclusion in the DB 30%

Completed at 80%, work in progress for Fossa and San Demetrio trenches (mid-April to May), dating completed 80%

Interpretation completed at 80%Suggested future activities in progress

Two strategies identified and explored.Completed evaluation of candidates to be adopted for evaluations and forecasts.Report and proposed strategy in progress

Recommended