COMPANY PROJECT ATTENDANCE & APPROVALS · 2020-01-13 · Description Description:Dear Emaar MEP...

Preview:

Citation preview

COMPANY PROJECT

ATTENDANCE &

APPROVALS

www.valveit.com

IND

EX

• UAE

• SRI LANKA

• QATAR

• KUWAIT

• SAUDI ARABIA

• EGYPT

INDEX

www.valveit.com

UA

E

PROJECT APPROVAL:

• EMAAR RESIDENTIAL TOWER – OPERA DISTRICT (DUBAI)

• THE ADDRESS RESIDENCE DUBAI OPERA (DUBAI)

• EMAAR DOWNTOWN VIEWS II (DUBAI)

• ROVE LAMER HOTEL PROJECT (DUBAI)

• NSHAMA TOWN SQUARE DEVELOPMENT – DISTRICT COOLING PLANT 01 (DUBAI)

• EXTENSION OF DUBAI OUTLET MALL (DUBAI)

• MULBERRY HEIGHTS (DUBAI)

• AL BASHRA 3RD BUILDINGS (DUBAI)

• BOULEVARD POINT (DUBAI)

UAE

• THE HILLS (DUBAI)

• MADA TOWER (DUBAI)

• ANANTARA SKY COLLECTION Collection (DUBAI)

• TELAL HOTEL & HOTEL APARTMENTS (DUBAI)

• JEBEL ALI HAZARDOUS WASTE TREATMENT FACILITY (DUBAI)

• REFURBISHMENT OF ADDC DMS MEZZANINE & SERVICE FLOOR (ABU DHABI)

• AL FILAYAH STP (RAS AL KHAIMAN)

• DIYAFAH INTERNATIONAL SCHOOL (ABU DHABI)

 File Name  Title  Revision No.  Size  Issue Date

B1-B2-RCC-P-MAS-003 -Plumbing Valves -KEO Comments.pdf

  B1-B2-RCC-P-MAS-003 - Plumbing Valves -KEO Comments

  0   53 MB   03/04/2019 12:00 AM(UTC+4)

 Comment Date  Created By  Company       

 Comment Text

 Attachments

  Attachments (0) Linked Records () Linked Mail (0)  

Page 5 of 5

Submittal-Main Contract

 View Form General

RecordNumber:

SUB-000138 Creator: Zahid Hussain

CreatorCompany:

MACE Creation Date: 03/04/2019 05:35 PM (UTC+4)

Status: Pending_By_PMO Target Date:

 Title

Title: B1B2a Material Submittal; Plumbing Valves Rev00

 Project Detail

Project Name: Opera District B1-B2 Plot Number:

Project Number: DTD-B1-B2

Contractor: China StateConstructionEngineeringCorporation

Consultant: KEO InternationalConsultants

MEP Contractor: Reliance ContractingCompany - RCC

 Submittal Details

Submittal Register: Contract Reference:

Submittal Register Line: LOA No:

Drawing No: Reference No: B1-B2-RCC-P-MAS-003

Planned Start Date: 03/04/2019 Planned Finish Date: 10/04/2019

Submittal Type: Material Submittal Document Type: Material Submittal

Discipline: Plumbing Revision: 00

Submittal Phase: Construction Submittal Issued For: Approval

Make: VALVE IT Origin: ITALY

Specialist Supplier/Integrator:

FLUIDTECH FZE

Page 1 of 5

 Description

Description: Dear Emaar MEP As per your instructions, we attach the following materialsubmittal; Plumbing Valves Rev00 The submittal has been reviewed by thesupervising consultant, KEO, and has been given Status B – Approved AsNoted Please review and provide your comments accordingly. Sent on behalf of:Michael Harvey Project Director Thanks, Regards, Zahid Hussain

 List of Enclosure

List of Enclosures:

 Material Details

Material Specified:

Material Proposed:

Manufacturer:

Reason for Alternative:

 Consultant Comment

The ConsultantComments:

1- Gate valve 65 mm and above shall be non-rising stem as specified. 2-Strainer 50 mm and below shall be PN 25 as specified. 3- Strainer DN 65 andlarger shall be cast iron epoxy coating with drilled and tapped cap complete withdrain cock as specified. 4- Valves for transfer line to tower shall be PN 20minimum. 5- Schedule of valves to be updated after approval of shop drawings.6- Certificate of origin confirming Italy origin to be submitted upon delivery.

Consultant Status: B - Approved_As_Noted

 Cost Consultant Review

QS / CostConsultant Review:

 PMO Comments

PMO Remarks:

 Employers Representative

Employer'sRepresentative's

Comments:

Contractor to comply with the consultant comments.

Employer'sRepresentative's

Approval:

B- Approved as Noted

 Contractor Response

Contractor Remark:

Page 2 of 5

David.Fittis
Highlight
David.Fittis
Highlight

 

  

 Reviwer Remark

Remarks:

 Task Details 

From: Task DueDate:

 Not Applicable Task Notes (0)

To: Zahid Hussain Task Status: View Only

Cc: David Fittis  

Sent For: PMO Review

 Workflow Progress Step Name  Assignee  Company  Status  Action  Completion Date

  Creation   Zahid Hussain 

 MACE   Completed   Send ForEMAAR MEPReview 

 03/Apr/2019 05:35 PM 

  PMO Review   Zahid Hussain 

 MACE   Not Started       

  PMO Review   David Fittis   MACE   View Only       

  Emaar MEP(DC) 

 Tariq Khan   EMAAR   Completed   Send BackFor PMOReview 

 04/Apr/2019 11:42 AM 

  Emaar MEP(DC) 

 Tariq Khan   EMAAR   Closed   Submit for M,E (or) PReview 

 03/Apr/2019 05:46 PM 

  M, E (or) PReview 

 Mohamad AlRamal 

 EMAAR   Completed   Send Back toMEP DC 

 04/Apr/2019 11:21 AM 

           

 

  Document Log   1 Item(s)

Page 3 of 5

 

 

 

 

 No. Name Reference ID

Document Type

ShortDescription

Revision RevisionDate

LineItemStatus

ClosureDate

Variation FromContractDocuments

Variation FromContractDocumentDescription

000

 B1-B2-RCC-P-MAS-003 -PlumbingValves - KEOComments.pdf

 RCC-P-MAS-003

 MaterialSubmittal

 Plumbing Valves  0  

 B -Approved_As_Noted

   No  

  Supporting Documents   0 Item(s)

   No. Short Description   

 <Document Log> - Line item - details

        Line Item No: 000

File Name: B1-B2-RCC-P-MAS-003 - Plumbing Valves - KEO Comments.pdf

Reference ID: RCC-P-MAS-003

Document Type: Material Submittal

Short Description: Plumbing Valves

Line Item Status: B - Approved_As_Noted

Variation FromContract Documents:

No

Variation FromContract Document

Description:

Revision: 0

Revision Date:

Closure Date:

Attachments1 Item(s)

Page 4 of 5

www.valveit.com

SRI

LAN

KA

PROJECT APPROVAL:

• HAVELOCK CITY PROJECT (COLOMBO)

SRI LANKA

,'vV'

........5.:SQ\~~(P..q~0.~., , ~ -. ;.IC>.~r ..~{8. q.~..M}\R 2018. .: '1'~R~.qu

"'AstedBy- .-('Name) ,- ,"."" ,.. -.'" Signature I Oat ""':-~ -,;....~./" .. .~.... . - -; •v ·)•.··\;9.t' ,../.t.. . V ',,;-": .... C ~ ~·I lI'l t I': . ~.I .:

-, ,' .• ,... ., 11 t;; ~ \t ,.. . ,-~.=::;;,--;-·7./""....---~~~::;:;:;:t...:-:-.........;...L~~~~~:;::;;;;:;:::~;,··'..·c\'~.,Approved Y:" Not Approvea........ . : ..'!'!.'~~'''-'-..__• - .

Project: Havelock City Proj£·;;t - Phase IV Submittal No: ICC/H.C.P";~VlMAlFIRE/SF/037.~.l;~;:",t•.j :.~-.'t~..

Descri tion of MaterialMaterial: OS& Y Resilient Seated (-~'IteValve

, .Brand IMake: Valve IT ,':')Country of Manufacture: Italy ~~I:Model No: VIT~GTR-300

Local Supply;,,'Imported Frci;~: Italy

Applicabl~ Standards as perDrawings I Document

N/A

Special Details I Descriptions (if 300PSIany)

Name of Standards UL Listed I FM Approved

, ..L.·Additional Description & MaterialDescription

100mm

Technical Data Sheet ofManufacturer

Test Certification N/A

Other

Subcontractor

.....N:.U).:}L ..\Zv.W\CAXCA ....

Requested By. (Name)

Ice

EMPLOYER'S PM 'V:,';'"

. v

Project: Havelock Citl£-?roject - Phase IV Submittal No: ICC/HCP-IVlMAlFIRE/SF/038.~;:~~?~. .•~-:i~:)

Descri tion of Material -;-------------1Material: Ball Cock Valve ~~ Local S·;,.pply

Brand IMake: Valve IT ., Importer! FromCountry of Manufacture: Ita.i. '

Model No: VIT-'25-BLBZ

Italy

.••••••••••••:: •••••••••••••••••••••••••••••••••••••••••••••~ ••••••••••••••..••.';..... ·f.......: ~~.~hk~...... 9.:t.~~.:~~f€Name of Employer's PM Signature of Employer's PM Date

(

Applicable- Standards as perDrawings I Document

Not mention in the spec

Special Details I Descriptions (ifBody: Bronze

any) Ball : Dzr Brass

Name of Standards

Additional Description & M.deri.al Valve Sizes: 15, 20 & 25mm

Description Pressure Rating: PN25

Technical Data Sheet ofManufacturer

N/ATest Certification

Other

Subcontractor

...N:.ffiJL .K.~mC?\f.C:\ .

Requested By. (Name)

Ice

......5.:510.&Q.\!j2~V(J~ .-- -...;:... - -:. -~Requested By. (Name)

EMPLOYER'S ;.5>.}>-: ,..-

.•

.-.~~City P V

Project: Havelock City, ~~!.Jject- Phase IV Submittal No: ICC/H~P-IV/MAIFIRE/SF/039~.:rf::!;~'".•.•~ r:;r.".1J;!.

Material: Check Valve

Brand IMake: Valve ITCountry of Manufacture: Italy, -,Model No: VIT-SCF-300

, . Local SUPI~;'IImported Fr,)m Italy

j

·:::.(z.'·~

Descri tion of Material

Not mention in the specApplicable Standards as perDrawings I Document

Special Details I Descriptions (ifBody: Ductile Iron

any) Pressure Ratin : 300PSI

Name of Standards UL Listed I FM Approved

·.•• l,

Additio,nal Description & Matenai Valve Sizes: 150, 100,80 & 50mm1;Description'

Other

Tec.hnical Data Sheet ofManufacturer

Test Certification N/A

( Subcontractor

.....N:.-1).j·i,.: ..¥\.Mw.~'(.~.Requested By. (Name)

ICC

, S,~~d{'.at lp.9-':9~ .- .. '~ ..Requested By. (Name)

,'V'-'

............... ;.;vb. ~ ';/A~f:~ .Signature lOaf";'>' -- .. -.

• • ""'MO!!<'nr •••~

. ....r,.c ..'

EMPLOYER'S PM '.<. >f~>.'", Ad-\"'-- N "t-A"--"':~ -'d' " \.. ~Ha"oI •..••..•J~ jf'., 1"; •••:x~q:)~.;, pprove......................... 0 pprove ....•.•• , ~l'f1-vvl\ vt •••.V r- W,R~markt! .•.............. : : / 0..-'8. .. INl~;R :NJI :

···~-.····c=~Ll,~··················································~:~:r~-=-··j..................~ D .. .Name of Employer's PM Signature of Employer's PM Date

~""'.J,.;

.•...~,

Prolect: Havelock City Proj~,t - Phase IV Submittal No: ICC/HCR';(4/MAlFIRE/SF/040~.•.•.~,~ ••. ~"!l~"':' ..;

_ ,vv

. , '.-,;,.,'1IIJ"'l f"7. .' •• - ··i·;::··'-~ •••••• -.'!- •• ( ••••••• -Db ':O'rl·r.....:.<·./J············~··!.:~······~··~ .~.,~ - "

Signature I at" ~ -- -:~ ",~~. ',,,_ CC • Ha':/eloc~~City ? IV. " .,

." ~.---. ·.••.•l;i

Approved c-«: Not Approwd ...•••~. .. - ,.

o 6 MAR 2018Remark! " .................•• d

:(::::::::::::::~ia~~::::~5~·~~· - V e........~~~?.If.~........... . ~.............. ..'?1:~~.~~

Descrl tlon of Material~~~--~~~--------~ ...~----------------~MaterIal: SS Flexible Connection '_: Local Supply . <Brand IMake: Valve IT t~ Imported From~;Country of Manufacture: Italy

Model No: VIT-16-FBS

Italy

Applicable Standards as perDrawings I Document

Not mention in the spec

Special Details I Descriptions (if Beillow: Stainless Steel

any) Flan e: Carbon Stainless ste

Name of Standards

Additional Description & Material Size: 65, 80, 100 & 150mmDescription

me

Technical Data Sheet ofManufacturer

Test Certification N/A

Other

Subcontractor

Requested By. (Name)

Ice

..:..,;~6..f3Q\<Q.bl.pg~~;:·Requested By. (Name)

EMPLOYER'S PM ..... -:'

Signature of Employer's PMName of Employer's PM Date

- .. .:> Proies;ti Havelock City Project ~.J:;;haseIV Submittal No: ICC/HCP-IVl~~,!,JFIRE/SF/041z.: ~ :~ "

Descrl tlon of Materiala , Material: Pressure Reducing Valve

.,.» Brand IMake: Valve IT".,

Country of Manufacture: ItalyModel No: VlT-25-PRB

Local SupplyImported From :.: Italy

••• '~ •••• - p •• ~ , -.!';; ~. - ~" :..:

" ..•. ,R£'~rence_CQ"t!'!!;t Drawing>,",' "-', . ,No:lDataIlLS~~t!9.r;,.•·\!~.,··

= ...,

Applicable Standards as perDrawings I Document

Not mention in the spec

Maximum inlet Pressure: 25 barSpecial Details I Descriptions (if Downstream Pressure range: 1 _6 bar

any) Maximum Tem erature: 100°C

Name of Standards

Additional Description & Material Size: 'i/2" - 4"Description~ ----A ~ _

.'

Technical Data Sheet ofManufacturer

N/ATest Certification

Other

Subcontractor

Approved ..~ Not Approved .•.:~:: :..•...... ·Q··8··t1p,R 2DDS

R~m.rk<•••••••••••••••••••••::::::::::::::::::: •••:.:::::::.::::.: ••::::•••::.••••••••••••.•••••••••••+~.~.."'l":"••• ,.....~,...,i_"_--'-_-+-..:J,.. . .

..........Q~":~~:4~:.:::::::::..··..·······...........•::.:••••~:::::.................~;~~.~~~

.....N :~:.1-1.:.'Y.U\.:\ YY.\ Y.-.'f0....

Requested By. (Name)

Ice

......G..·5~.t()\,o;:<\!p0,:<).e)...~·rReq! sted By. (Name)

EMPLOYER'S PM ...;

Signature of Employer's PM DateName of Employer's PM

,..

Havelock City Project - Pha;T8IV Submittal No: ICC/HCP-IVlMAlEI~E/SF/043

~ascription of MaterialM;-:ferial: Air Release ValveB1'(JndIMake: Valve ITC.~untry of Manufacture: ItalyMt:del No: VIT-10-ABV

~-y------------~Local SupplyImported From

Applicable Standards as perDrawings I Document

Not mention in the spec

Special Details I Descriptions (if.Size: 1/2" - '3/4"any) ,

Name of Standards

Additional Description & Material Body: BraesDescription cap : Brass

Technical Data Sheet ofManufacturer

Test Certification N/A

Other

Subcontractor

...N '<D:.H.:. h.MYI1.c~,:r.~ .Requested By. (Name)

ICC

~ f.....5.:Sc7.1.t0.blp.g~g...... ;".: . . .Q~r~f?~,"':":' ...~...:":':"..~...~..~::-!""•• -- •••••••• ~

Roq~.~t~d By: (Na~e) :+- ~ iir~t~.;1u;~lgnatureI , iceM'~'fy~lo;;~~ai.~'"~tl

. pp"';ved s«: ' Not ApprovOd···l·:=·O·8· ·MAR D

Remarks: ; r. .~.?.::-- ~-: :~ -i J ••

.................. i __ "'," 1••••• •••• _ ..•.••••,.,.....-.

r:

"EMPLOYER'S PM

·rftllht,.9hVt>-............... ~ .Name of Employer's PM Signature of Employer's PM Date

" __ "" ::i. "."]

P!.9!!':':' Havelock City Project - Phase ~~k>Submittal No: ICC/HCP-IVlMAlFIRE!~r':I044i'

Descr!~.fion of Material..

Materlr-:: Pressure Release Valve . Local SupplyIltalY '~

- . .

Brand1lfake: Valve IT Imported Fromcoumi,: of Manufacture: ItalyModel rJo: VIT·25·VRCA

.~ef~renc~"ontr~ctD!'~~lii1~J' l . . .., .. .,-,,-~.~

I;;:", 12 r." '. '. ..•....;." . . .'-~ ., , . ",- . .... , ..

;•.~,~;iJ:·;~JIfS~dj··n ;:i-':: .' . ',: "ri- .....:t . . ..~~:I.-.;-it ' ~.~:~:.~ , '." . ,

• : : _-r ~ :, .'.1

Applicable Standards as perDrawings I Document

.'Not mention in the spec

N/A

Special I?etalls I Descriptions (if Body: Ductile cast iron

any) Size: 50, 80 & 100mm

Name of Standards

Additlorlal Description & Material Pressure Rating~--PN25

Description

Technical Data Sheet ofManufacturer

Test Certification

Other

Subcontractor

.....N.: .(1):.\i.:.V:U~.fuCl:-(D. ...Requested By. (Name)

Ice

<e: PLOYER'S PM

,'II"

",.In •• ! 're I i?i . ~.fI,.I,P.a£8.···· .'itC·~~'elc"" C),.I:(' . . .. ...., j/',-,.v ,...'0.... '.)

Approved Not Approved ...••...••. , ().p,. +.st.'r!) ~1il1It1l..,• t, .) nf<ll\ ~ilUJf0

Remarkl e .............. i'": .

..............1).~.~wq .~y.~...:.Name of Employer's PM Signature of Employer's PM Date

Prolect; :Javelock City Project - Phase IV . ~aDmittal No: ICC/HCP-IV/MAIFIRE/SF:/Q4~i

Descrl tlot~ of Material~~~~----~----------------~------~Material: Pr' ssure Guage Local SupplyBrand IMalt1!; Valve IT Imported FromCountry of .Hanufacture: ItalyModel No: ~ 'T-2S-PSG

i

~~----f

Applicable Standards as perDrawings I Document

Not mention in the spec

(.•f Case size: 100mmSpecial Details I Descriptionsany) Pressure Range: 0-25 bar

Name of Standards

AdditionalJ~scription & Material Case: Steel case w.lf": Black muffing

Description

Technical Data Sheet ofManufacturer

Test Certification N/A

Other

Subcontractor

I:~,S~W~:"R.\.u~ _ .... .UU~~(ICC; ..u.. . ..'" "'.;j ,.': ,-<;;:: I:!'ln•••~t"~r~""·',;~tnl"f/e:;~~/I' Havelock C!'nlr n,'

Req!18steclCy....i~~/~~,.e;~- . ,_·';;/~~~{-,~~r,.:,,:,'" v ,: -.'.',~, .. ,·~I> ',v

Approved .:~~.~~ Not Approved .•.•..•...•.... :;~. B .~'1AR2018

R~mark< .. u.u..14>L .c«!.~f±,h.u.~~. r!c Ju,-?..u.u.u i~~0::':~~.._~-,......................................................... 0.-............................ __.:a._..•_

.u~:·uuJi.~;~~;::::.:uuu~:;;~:B

......N:.U):.H.:..\cu.Y\!.\(x'(. CA.. '

Requested By. (Name)

.:' 'iOY' R'S PM

Name of Employer's PM Signature of Employer's PM Date

1].' f f~

Project: Havelock City Project - Phase IV Submittal No: ICC/HCP-IV/MAlFIREISF/046

ICC

Description of Material·Material: 200mm Foot Valve

Brand !Make: Valve ITCountry of Manufacture: Italy

Model No:

ReferenceContract DrawingNo.lDetaillSection

ItalyLocal SupplyImported From

P-H-42-01

ReferenceContract SpecificationI Document ECADIspecsection7,Pipes& Fittings

Special Details I Descriptions (ifany) Body& Disc: Ductile Iron,PN16

Applicable Standards as perDrawings I Document

Not mentionin the spec

Nameof Standards

"-'"

.. ~\

Shaft: X2QCr13Additional Description & Material Seals: EPDM

Description Spring & Strainer: StainlessSteel

Attachments

Technical DataSheet ofManufacturer

Test Certification N/A

Other

Subcontractor

..M0.1¥.~..~.~~.~~~J.~f......RequestedBy. (Name)

........P~~.I').~~h.~.~......H.:~:.....

Requested By. (Name)

...

......9~..· P~l.~.':'.l.'!-.~l.. .Signature I Date Ice - Havelock City P..p.]

Approved ~ Not Approved .•.....•... "'O.6 ..APR.201B

Remarks .

-I~ ••• " •• :-: •••••

Nameof Employer's PM Signature of Employer's PM Date

Ha.'(-~IockCity Project - Phase IV Subm.~1 No: ICC/HCP-IV/MAIFIRE/SF/047-!... . - ~~.,

Descrl tion of ~~;;;;te:;.;;r.:..;ia;;.;.I -:~.;~Material: Y Strad.,,};')r

Brand !Make: Vi:J:re ITCountry of ManL~acture: Italy

Model No: VIT- Y(:"F-175

Project:

Local Supply~.~ Imported From

Applicable Standards as perDrawings I Document

Not mention in the spec

~ \ r .,\ \

~r7 r \~ . FfB -1'nl'O' ; r i~-~ L.tJ 0 J '-i

J

Special Details I Descriptions (ifBody: Cast iron

any) Screen: Stainless Steel

Name of Standards

Additional Description & Material Size: 65, 80, 100, 150 & '100mmDescription

.;'

Technical Data Sheet ofManufacturer

Test Certification N/A

Other

Subcontractor

......N.:(\):.H:..K-\A.~:'(: Co\,

Requested By. (Name)

ICC

....5. :.50.~1c.Y.i\P.S1~.0.....Request@d-BY~{NfjT("r~~{,;";""

............i:1~~;'0F.:::::::························::::::~::::.::::::: ~;.;; ..~~Name of Employer'S PM Signature of Employer's PM Date

Project: H~ve';t~f~City Project - Phase IV Submi c,:·~·;~o:ICC/HCP-IV/MAIFIRE/SF/048 .

.,.

Descri .tion of Materi,,'". Material: Butterfly v~j!;:-e-W:-i-th-Te-m-p-er-S-W:-it-ch------~I~cal Supply

Brand IMake: Valven:: li'1iported FromCountry of Manufactu,;'e: ItalyModel No: VIT-BFG-300

Applicable Standards as perDrawings I Document

Special Details I Descriptions (ifany) Body: Ductile Iron

Name of Standards UL Listed I FMApproved

Additional Description & Material Size: 65, 80, 100 & 150mmDescription

Attachments

•.,.

Technical Data Sheet ofManufacturer

Test Certification

Other·

N/A

Subcontractor

...N:. ill.:.\-1:. \\.JNM.CA r~.....Requested By. (Name)

___ • '7

Approved ~ Not Approved . . () -8 "Mp,R 2018

••••••••• 0 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• "' •• 0 ••••••••••• r",1 F."""'••.•..•...-.,~ --1..•••

... .~.~.0.rh.t~ .Name of Employer's PM Signature of Employer's PM .

·.~1~..~?.~.~Date

Project: Havelock .C:!y Project - Phase IV. t~~;i~--::

SubmittalNo: '~C/HCP-IVIMAIFIRE/SF/049: '.~ I ~~0,if';-: . .

Descri tion of MaterialMaterial: Pressure Switc~?

·t·.-.lBrand IMake: Valve ITCountry of Manufacture :-)talyModel No: ELT·36

.\.

Loco;' :SupplyImpt.;rtedFrom Italy~~------------~

.......,.---f."' ...

Applicable Standards as perDrawings I Document

Not mention in the spec

Special Details I Descriptions (ifany) Pressure Sensitve Diaphragm Element : Chome~~!!e!~!fS

Name of Standards

Additional Description & Material Cover: Thermoplastic polyamide

Description Range: 5/16 bar

Attachrn '1~~

Technical Data Sheet ofManufacturer

Test Certification· N/A

Other

1 Subcontractor

....N:. j}. H:..l\,\A'M..CA.'f. Y.\ ...

Requested By. (Name)

Ice

........~ :..S0.~,1P.9.".? ~<""

- .•• . ~ ~'(.;!' 1'''" ~ •..•.

Requested By. (Nalne) -:"~~$.~:r,..EMPLOYER' " ,.~ . ."

'~ sig~~i~( !!'~/~ii::c:':i-ia~;;j~Cl<!,' " •.•• __ ::.:;•.:..:.~'_~~_~r_f'!_' -:-_.-+ _Approved ~ot Approved •............... (}®".

l.: .'-e ,;' s','.·, .";-

Remark! ::: ::: ::: ::: :::::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: ::: :'::::::::::L:~'~3~~":; '_...........•................................................... ~ .

... j)~h.~.... ..7?1:.~:?,:..-?~<~Name of Employer's PM Signature of Employer's PM Date

•..

Project: Havelock City Project - Phase IV Submittal No: ICC/HCP-IVlMAlFIREISF/085

Duba; or Italy

Local SupplyImported From

p_ Q,-el _o~, f> _ 6 - ~i·-e3" .•..F-6-a\·· Ob

J'-H-"'L\-o'l. -- P-H~g'-01

Descri tion of MaterialMaterial: Flow Switch

Brand IMake: PotterCountry of Manufacture: CanadaModel No: VSR-3

Reference Contract DrawingNo./DetaiUSection

8-G-31-01A

8-G-31-02A

~:e;~:c: Contract Specification I ECADISpecSection 5 2.8 Flow Switch Page4 ~/,-~£~!~~'~:~,~\

Special Details I Descriptions (if 3" DN 80 VSR-3 , 1144435any)

Name of Standards

Additional Description & MaterialDescription

Attachments

UL Listed, LPC8 Approved, FM Approved

~\oc &. H.

Technical Data Sheet ofManufacturer

Test Certification

other

N/A

Subcontractor

"",_ ." •••••••• 4

...~ ..: .'~~J~.y .f.?:~.t~ .Signature I Date

Ice - Havelock City P-!V

.M~.~~-'.~...~~~.~!.'1f.~.~.....Requested By. (Name)

Approved ~ Not ~pprovEMPLOYER'S PM

o 2 MAY 2018Remark! .' .

Requested By. (Name}

www.valveit.com

QA

TAR

PROJECT APPROVAL:

• MASHREIB DOWNTOWN DOHA PROJECT (DOHA)

• DOHA METRO RED LINE NORTH UNDERGROUND (DOHA)

• MEGA RESERVOIR PRPS 2 UMM SALAL (UMM SALAL)

QATAR

www.valveit.com

KU

WA

IT

PROJECT APPROVAL:

• SABAH AL AHMAD SEA CITY (SABAH AL AHMAD)

KUWAIT

ALGHANIM INTERNATIONAL GENERAL TRADING & CONTRACTING CO. W.L.L. r.O.BOX.2118, SAFAT 13022, KUWAIT

DOCUMENT TRANSMITTAL SHEET

A l REF: STPl/Al-LK/M/D-10092 Rev. 01 LAK REF: MT/ME - 033()., . DATE: toth Mar 2018

TO: La' ala Al-Kuwait Real Estate Co. K.S.C

Projec t Site Office SUBJECT:

Sabah Al Ahmad Sea City Kuwait

General Spec: Volume 2, Div No. 3

SECTION 33 33 40, 33 33 41, 33 33 42, 33 33 44, 33 33 48, 33 33 so & 33 33 53, 46

1010,

SL. DWG/ DOC. NO.

I VWG-A lM-PPLT-11045

LAK -Author

~~\~~ ~ 03/o~/A~

LAK Outgoing Ref:

~- - ·1 C,lfr · ,

'· [3ol/o3.

4 ST Pl

STPl: VALVES TECHNICAL SUBMITTAL

Com Iiance Criteria I Contract References Particular Spec: Dwgs: B.O.Q.

N/A N/A NIA

LAK Receipt Reference

REV. DESCRIPTION LAK Code

01 Valves Technical Submittals

LAK Comment

LAK - Authorization LAK - Review Code REVIEW CODES:

tt#7l .B* A. No comment

B. Proceed, but note comments

o.J(~(r~ ®'roceed, but note comment & re-submit

Al Received By: Al Received Date: c. Revise and re-submit

D. Rejected

N. No Response Required

jojy.george
Text Box
Received on 03-04-2018

Sabah Al Ahmed Sea City Project - STP 1: Valves Technical Submittal - Review Comments

Technical Submittal ref.: VWG-A1M-PPLT-11045 Rev.o Date: April 01, 2018

SI. No. Doc. No. Clause Ref. KEO Comment

Section 2 Compliance, Section 1 VWG-AlM-PPLT-11045 33 33 48 Check Valves, Clause Contractor shall comply with specifications requirements.

2.04, Item A-4 ~ -~·~--1-----------·1--·· ·--~-···--------- -- ---·----- -- --------- --

Section 2 Compliance, Section

2 VWG-AlM-PPLT-11045 33 33 48 Check Valves, Clause Contractor shall comply with specifications requirements .

. ··-· ......... 2.07, Item C .. __ .... ·----· .--··· ·----1----------S e cti on 2 Compliance, Section Provided compliance table is not clear. However, Contractor to confirm compfiance with all specifications

3 VWG-AlM-PPLT-11045 4610 lO items ---1-----------r----··-· ·········---------·-·· ·----- ·· -·

No compliance provided for pressure refief I regulating valves. Contractor to confirm it shall be part of this 4 VWG-AlM-PPLT-11045 Section~-~o_m __ P 1_ianc~General submissionoritwill be in separate materjalsubmission

Data sheets provided only for Butterfly Valves, Check Valves and Gate Valves. Data Sheets Shall be

provided for af! va!ves induded under this material submittal. Also, provided data sheets is part of 5 VWG-AlM-PPLT-11045 Section 4 Data Sheet, General . . . . . . .

' catalogues not spec1f1c data sheet for each valve type. Specific data sheet with full spec1ficat1ons shal: be

provided for all types of valves ---··~-·~···~ ·····--··-··-·····--···-·~·-····---- ---------i~P_ro_v_i_d~-~T-d~-t~--sheet is onlY-~-p--t~ 'di-~-meter 400mm while we have gate valves with diameter SOOmm.

6 VWG-AlM-PPLT-11045 Section 4 Data Sheet, Gate Valve . . . . . --·------~- ' Contractor to update data sheet to include all d1am_e.tE>r_s_appl1ed in the proJec .. t ... · .................... .

- Items 19 & 20 refer to lOOmm gate valves for air release valves isolation at SBR feed discharge. These

valves not in contract va[ve list. Contractor to confirm the need of these valves.

- ftems 21 to 26, Contractor to confirm the diameter 200mm as provided or 100mm as per contract

documents.

- Items 27 to 32, Contractor to confirm the diameter 250mm as provided or 200mm as per contract

documents. - Items 62 & 63, Contractor to confirm the diameter 300mm as provided or 200mm as per contract

7 VWG-AlM-PPLT-11045 Section 5, Valve List, Gate Valve d ocuments.

- Two 250mm dia. manual gate valves at irrigation pump station (A3.IRSP.00 PSV.01 & 02) mentioned in

contract documents and missing from va!ve list. Contractor to clarify.

- Two lOOmm dia. manual gate valves at headworks (A3.HW.GV 01 & 02) mentioned in contract

documents and missing from valve list. Contractor to clarify.

- One 125mm dia. manual gate valve at headworks (A3.HW.GV 03 &) mentioned in contract documents

and missing from valve list. Contractor to clarify. ~---'----~-··~··-· ••••••••M•-···- ••••M•-·· -·~·-· ------ ----------- ----- ---------

Sabah Al Ahmed Sea City Project - STP 1: Valves Technical Submittal - Review Comments

Technical Submittal ref.: VWG-A1M-PPLT-11045 Rev.a Date: April 01, 2018

SI. No. Doc. No. Clause Ref. KEO Comment

- Items 71 & 76, Contractor to confirm the diameter 250mm as provided or lOOmm as per contract documents.

- Items 91 & 92, Contractor to confirm the diameter 200mm as provided or 250mm as per contract

Section S, Valve List, Non Return documents. 8 VWG-AlM-PPLT-11045

Valves - Items 93 & 98, Contractor to confirm the diameter 300mm as provided or 200mm as per contract

documents.

- Two 100mm dia. non return valves at headworks (A3.HW.CV 01 & 02) mentioned in contract documents

---------··-- ---------~·- ------- -------- --- - --· ---and J11issingfro_rn_valve_lis!-___Contractor to clarify_

- !terns 121 to 126, Contractor to confirm the diameter 350mm as provided or 250mm as per contract

Section 5, Valve List, Butterfly documents. 9 VWG-AlM-PPLT-11045

Valves - Items 129 to 131, Contractor to confirm the diameter 250mm as provided or 200mm as per contract

documents. ----___ .. ____ ------ ------- -··· .. ----

10 VWG-AlM-PPLT-11045 Section 5, Valve List, Ball Valves Contractor to confirm that ball va!ves and sofenoid valves will be provided as per contract documents and

& Solenoid Valves vendor packages requirements. ·----- ------ -------··-·- ---- f------------·-·- ··--- """ .......... --- ----------- --- ------

11 VWG-AlM-PPLT-11045 Section 5, Valve List, Air Release - ltems 150 & 151 refer to 80mm air release valves at SBR feed discharge. These valves not in contract

Valves valve list. Contractor to confirm the need of these valves. ------·-------- - ---------·-- - -------- ----

12 VWG-AlM-PPLT-11045 Section 5, Valve_Ljst, General ___ Pri:.~-~-Ll-~-~-E~!ief L reg~_!.~.!~ __ r:!_~ valves not i~_~luded in va!ve list. Contractor to clarify ------- ---

ICA Comments --- ------- _________ ,, __

-------------- -------.. ,. ------------ ------------- ------

It is noted that the Contractor has used electrical Actuators from M/s Au ma for Valves & M/s Rotork for

13 VWG-AlM-PPLT-11045 Actuators - Genera! Penstocks. KEO recommends that air actuators are from a sing!e manufacturer. The Client sha!I take the

final decision to accept the Contractor's proposal of having two different manufacturers_ --- --- ---- ------- ---- ------- ----- - -------------------- ----- --

14 VWG-AlM-PPLT-11045 Technical Literature included Actuator Technical Literature is generic in nature. High!ight the relevant options & features

provided, specific to the Project_ ------------- ----------------- r------·-"" ----------- ----- -- ------------------ --------'"'""""" --- ----------- ----

15 VWG-AlM-PPLT-11045 Actuator Data Sheet Project Specific Data Sheet for each Valve/Gate Actuator to be provided ------- ---------------- ·-·- - ---------- -------------····· .. -------------··--.. -- ---------------------------------------- ---------------------

16 VWG-AlM-PPLT-11045 Actuator Spare Parts_Li_st_ _____ Submit Manufacturer recommended Spare Parts list as specified. -·----- !----..... - ---- ------ ---------------------------- - _,_,, ________ ------------------- -------

Are Pressure Gauges, Stem Thermometer & related accessories, part of this submittal or just included as

17 VWG-AlM-PPLT-11045 Instruments - General part of the Company profile? If yes, compliance to relevant parts of the Project specifications has to be

---- ---------- ________ .. _______ ---- ___________ ,,__ ----- ----in_clud ed an d_proje_ct specificdatashe.,_ts to_ bea_ttac_h_ed.

jojy.george
Text Box
Received on 11-07-2018
jojy.george
Text Box
Received on 09-08-2018

www.valveit.com

SAU

DI

AR

AB

IA

SAUDI ARABIA

PROJECT APPROVAL:

• JEDDAH HOSPITAL (JEDDAH)

www.valveit.com

EGY

PT

EGYPT

PROJECT APPROVAL:

• NASR CITY WATER PURIFICATION PLANT - ABU OWEIKAL (CAIRO)

• NEW ADMINISTRATIVE CAPITAL CITY PROJECT (CAIRO)

Recommended