View
101
Download
4
Category
Preview:
Citation preview
1
COMPANY PROFILE
PT. CITRA WAHYU DIATAMAENGINEERING AND CONSTRUCTION
“ Committed to High QualityPerformance as a ResponsiveAnd Reliable Partner toOur Clients “
Jl. Raya Kelapa Sawit BD 12 No. 30Gading Serpong, Tangerang 15810Phone : 021-5467974Fax : 021-5467974Email : citrawahyu@cbn.net.id
2
CONTENT
Company Identity
Our Vision
Our Mission
Company Data
Organization Structure
Scope of Work
Customer Plant
Work Experiences
3
COMPANY IDENTITY
PT. Citra Wahyu Diatama established in 2004 and started a small engineering contractor company. This start-up company had only 10 employees with simple project in our first customer Teijin Fiber Corporation (TIFICO). While the industrial prosperity keep growing and many industrial company had policy about outsourcing program, we decided to take larger scope of work and we hired a lot of manpower to succeed our project is strictly following proper recruitment qualification in order to achieve good workmanship.
We provide complete scope of maintenance and electrical work. For example piping work from cast iron to stainless steel, install and assembling of all machineries and equipment, insulation services for piping, tanks tower and related equipment based on wide range of experience and knowledge of hot and cool insulation, refractory, painting, coating and ducting and we provide outsourcing employees for daily maintenance or manpower for production department and other maintenance works. We provide whole services with quality satisfaction.
With the previous experience as engineering and construction company in the Polyester plant, we also concerned in maintenance service. We provide an integrated plant maintenance services in the field of engineering project management and utilizing qualified manpower and tools.
We have completed many project of Polyester plants, shoes industry, tyre industry, textile, automotive, Ceramics and other industries. Among our client are major company in Indonesia, for example Bridgestone, IRC, Pratama (NIKE), Teijin Fiber Corporation (Tifico), etc.
Services quality is our primary concern in all project at our customer. It has been the basic of our success and the reason that clients continually handling us their project. And for the safety, we always care about that, we provide safety program for each project to minimize site accident.
4
VISION AND MISSION
OUR VISION ” To be a big contractor
company in Indonesia with good quality result and on time scheduling as a measurement of customer satisfaction ”
OUR MISSION ” Always try continually
improve our services in order to fulfill the customer’s requirements and ensure our client satisfaction by providing high quality services at proportional cost ”
5
COMPANY DATA
COMPANY NAME : PT. CITRA WAHYU DIATAMA
OFFICE : Jl. Raya Kelapa Sawit Blok BD 12 No. 30
Gading Serpong, Tangerang - 15810
Phone : 62-21-5467974 / 70927974
Fax : 62-21-5467974
Email : citrawahyu@cbn.net.id
DATE OF ESTABLISHMENT : 17 SEPTEMBER 2004
BANK : BCA - Cikokol Branch
TAX REGISTRATION / NPWP : 02.423.665.5-411.000
OPERATION LICENSE / SIUP : 503.1/0548/30-03/PK/XI/2004
LINE OF BUSINESS : ENGINEERING AND CONSTRUCTION
EMPLOYEES : 30 Permanent Employees
150 Non Permanent Employees
6
SERVICESMaintenance We can provide supplemental maintenance to the customers for existingprogram or we can provide the total maintenance program. The following aresome of the services, we are capable providing :• Preventive, Shutdown and Resident Maintenance Program• Maintenance Outsourcing or Third Party Maintenance• Install, assembling and repair of machinery and equipment (Static and
Rotary), There are Gear boxes, Cyclo, Beier, Centrifugal Pump, Non seal Pump, Trochoid Pump, Mechanical seal etc.
ElectricThe following are some of the services, we are capable providing :• Wiring Cable• Repair Electric Motor• Installation Panel• Etc
InsulationWe provide complete insulation services for piping, tanks, tower and relatedequipmentbased on the wide range of experience and knowledge of insulation.The following services are :• Hot Insulation, the material from Rockwool, Glasswool, Calsium Silicate,
Cement and Asbestos Cloth.• Cold Insulation, the material from Polyurethane, Polysterene, Foam Glass• Refractory, the from Castable Fire Brick• Metal Jacketing, Alumunium Sheet, Galvanized Steel etc
Chemical Cleaning We provide cleaning system with chemical, the following item are :• A H U• Heat Exchanger• Cooling Tower• Etc
Engineering ConsultationWe can provide the system from conceptual studies to plant start up and maintenance. The following engineering services are :• Layout Drawing• Equipment Drawing• Installation Drawing• Start Up and Commissioning• Production Improvement• Calibrations and Testing• Etc
PROJECT EXPERIENCES
No Projects Name Customer PO Number Remarks
1 Overhoul Spinning Machine Spinning Dept. - TIFICO M1 - X4125 Sub-Contractor
2 Overhoul SF Line 1 – 4 SF Dept. - TIFICO M1 - Z5421 Sub-Contractor
3 Cleaning Cooling Tower 11 – 19 Polymer Dept. - TIFICO M1 - 16701 Main Contractor
4 Painting Creel Area – Balling DSF Dept. - TIFICO M1 - Z4608 Main Contractor
5 Pembongkaran & Pemasangan dari SF Dept. - TIFICO M1 - X4440 Main Contractor
W.Y.P 1Fl ke Area BM # 4k
6 Repair Butterfly Valve SF Dept. - TIFICO M1 - Z4505 Main Contractor
7 Pembuatan Box Penyimpanan Filter CP Dept. - TIFICO M1 - 15501 Main Contractor
8 Pemasangan Concent AC untuk ECR CP Elektrik Dept. – TIFICO EC 331 05 1 Main Contractor
9 Isolasi Pipa DM 2 - 3K Drawing Dept. - TIFICO M1 - Z4471 Main Contractor
10 Construction Recovery Drain Steam SF Dept. - TIFICO M1 - 16701 Main Contractor
11Penggantian Roda Creel Stand TX-14 & 15
SDY Dept. - TIFICO M2 - 56728 Main Contractor
12 Penggantian Screen QS SM # 37 - 40 SDY Dept. - TIFICO M2 - 66616 Main Contractor
13 Renewal For NaOH Tangki Polymer Dept. - TIFICO M1 - 56103 Main Contractor
14 Honey Comb Pin JTC – 10 SDY Dept. - TIFICO M2 - 86612 Main Contractor
15 Cleaning Mesin Hot Press Press Dept - Pratama 0511-0163 Main Contractor
16 Insulation Piping Chiller Utility – Bridgestone Ind M604B - 0414 Main Contractor
17Install Cover Insulation Dowtherm Boiler No.1
Polymer Dept. - TIFICO M1 - 66108 Main Contractor
18 Filter Case Material Unit Double Electric Dept – IRC A0605615 (E) Main Contractor
19 Pekerjaan Ganti Type SF Dept. - TIFICO M1 - 35321 Main Contractor
20 Penyekat Gudang Oil MSF / MFY SF Dept. - TIFICO M1 - 76728 Main Contractor
21 Overhoul SM # 11 – 12 Filament Dept - TIFICO M2 - 96412 Main Contractor
22Modifikasi Tray dibawah Mesin Crimper Line 3 A/B
Drawing Dept. - TIFICO M1 - 86437 Main Contractor
23 Cleaning Polymer Filter CP Dept. - TIFICO M1 - 86527 Main Contractor
24 Modifikasi Pipa Finishing Oil SF Dept. - TIFICO M1 - 86739 Main Contractor
25 And Others
8
EXAMPLE WORKS AT PLANT
Figure 1. Over Haul at Drawing Machine Figure 2. Repair Gear Pump at Spinning Area
Figure 3. Insulation Work at Polimer Area Figure 4. Maintenance Daily at TIFICO
9
OUR ACTIVITIES
Figure 5. Daily Meeting
Figure 7. Estimating at Plant Figure 8. Welding at Workshop
Figure 6. Design Process
10
OUR ACTIVITIES
Figure 10. Insulation WorksFigure 9. Administration Support
Figure 11. Safety Officer Figure 12. Piping Works
11
ORGANIZATION STRUCTURE
DIRECTOR( Indra Wahyudi)
MARKETING MANAGER( Indra Wahyudi )
FIN & ACC MANAGER( Nurdiah Hendriyanti )
PROJECT MANAGER( Ir Edy Rydjantoro )
ADMINISTRATION SPV
CIVIL SPV
MECHANICAL SPV
ELECTRICAL SPV
INSULATION SPV
ACCOUNTING SPV
PURCHASING SPV
SALES ENGINEER