Commitment to Reliable Power Service Presented to the Chamber of Commerce by:
John M. Benavente, P.E.General ManagerJoaquin C. Flores, P.E.Assistant General Manager, OperationsRandall V. WiegandChief Financial OfficerGuam Power Authority
IntroductionThe Consolidated Commission on Utilities (CCU) is an Elected Group of Experienced Professionals from Various Sectors of the Guam Community5-member CommissionElected in November 2002 to 4-year staggered termsResponsible for the governance of Guam Power Authority and Guam Waterworks AuthorityMeets on a weekly basis to formulate policy and conduct oversightGPA was made an independent public corporation in June 2002Since its inception in January 2003, the CCU has conducted all business under full public disclosureDeveloped strong working relationships with policy makers, the U.S. Military and the community
IntroductionConsolidated Commission on Utilities (CCU)Simon Sanchez, ChairmanFormer Senator, 8 years on PUC, businessman, graduate of Stanford University & Harvard UniversityFrank Shimizu, Vice Chairman (GPA)GPA Chairman (1995-2000), businessman, former J.H.S. math-science teacher, B.S. Mathematics Pomona CollegeVincent Camacho, TreasurerCertified Public Accountant, Series 7, 6, 63, 26 licenses, RVP of Great West Financial Services, B.S. Accounting, M.B.A., Professor of Finance at University of Guam
Guam Power AuthorityJohn Benavente, General Manager20 years experience at GPA, General Manager (1987-1993), licensed professional engineer, businessman, M.E. University of Dayton, Masters in Engineering Management University of MissouriRandy Wiegand, Chief Financial Officer Certified Public Accountant, former OPA Audit Manager, GPA Comptroller (1995-2000), Deloitte & Touche (1990-1995), B.A. Finance Seattle Pacific University, M.B.A. Finance University of Washington
Guam Public Utilities CommissionBoth the CCU and GPA have a Strong Working Relationship with the Guam PUCPUC members are appointed by the Governor and confirmed by the Legislature for six-year termsGPAs bond covenants require that the PUC must be able to act independentlyPUC members cannot be forced to resignThe PUC is required by the laws of the Territory of Guam to set rates which are fair, non-discriminatory and adequate to provide revenues sufficient to pay for all costs of owning, properly maintaining and operating the Authoritys electric utility systemThe PUC may require the Authoritys rates to be adjusted upwards or downwards at any time in order to meet these conditions; however, rates must always be set at a level to meet Indenture requirementsIn October 2001, the PUC approved a surcharge to enable GWA to pay $18MM in GPA past due billsIn May 2003, the PUC approved the request of the CCU to allow GWA to also pay for a $9MM Navy obligation The PUC approved the LEAC adjustment which took effect on October 1, 2003
Rate DesignRates for Electric Service are Initiated by the CCU and Approved by the PUCGPAs Rate design consists of the following charges :kWh Energy ChargeDemand Charge (Non-Residential)Customer ChargeEmergency Water Well and Wastewater ChargeLifeline Rate (for Residential class)Fuel Recovery Charge (LEAC)Insurance Charge (if Self Insurance Fund falls below a $2.5MM threshold)Special Surcharges
Rate ComparisonGPAs Rates are Competitive in Comparison to Other Island Utilities(1) Converted to U.S. Dollars using exchange rates as of 12/04/02
GPA Revenue BaseGPA Customer Revenue Composition by ClassAs of Fiscal Year 2002GPAs Revenue Base is Well Diversified and is Steadily Growing
GPA Customer Growth1998-2002
Top 10 CustomersApproximately 30% of GPAs Revenues is Derived from its Top 10 CustomersGPA Top 10 CustomersAs of FY 2002
FISCAL YEAR 2002
GUAM POWER AUTHORITY
TEN LARGEST CUSTOMERS
FOR FISCAL YEAR 2002
OVERALL TOP TEN
ACCOUNT NAMEKWHANNUAL REVENUE
kWhAnnual Revenue
U.S. Navy316,985,533$31,030,315
Guam Waterworks Authority50,501,1697,717,852
Dept of Education46,440,5397,627,747
Guam Airport Authority27,366,9423,845,052
Goodwin Development16,996,8002,237,705
Hyatt Regency Guam15,411,2001,902,526
Tanota Partners14,182,5201,790,010
University of Guam13,101,6822,177,727
Pacific Island Club12,624,4001,587,385
Miyama Guam Inc.12,146,4001,571,245
Total525,757,185$61,487,563
Average Monthly Total43,813,099$5,123,964
% of GPA Total33%30%
(Annual Basis)
TOP 10 COMMERCIAL
ACCOUNT NAMEKWHANNUAL REVENUE
1GOODWIN DEVELOPMENT CORP16,996,8002,237,705
2HYATT REGENCY GUAM15,411,2001,902,526
3TANOTA PARTNERS14,182,5201,790,010
4PACIFIC ISLAND CLUB12,624,4001,587,385
5MIYAMA GUAM (WESTIN)12,146,4001,571,245
6DUTY FREE SHOPPERS11,480,1001,485,721
7REPUBLIC OF NAURU (MARRIOTT)10,659,6001,345,393
8CITY HILL CO (GUAM)10,584,7201,416,376
9ONWARD BEACH RESORT INC.10,434,0001,306,440
10TNN GUAM INC (NIKKO)9,102,6001,231,080
Total123,622,34015,873,882
TOP 10 GOVERNMENT
1Guam Waterworks Authority50,501,1697,717,852
2Dept of Education46,440,5397,627,747
3Guam Airport Authority27,366,9423,845,052
4University of Guam13,101,6822,177,727
5DPW Village St Lights12,037,6912,909,030
6Guam Memorial Hospital9,515,7431,275,573
7Guam Telephone Authority5,899,058882,768
8Dept of Correction4,656,634704,185
9DPW-Fac/Adm4,339,030678,422
10Superior Court of Guam3,991,468567,515
Total177,849,95628,385,870
Historical & Projected Non-Fuel Revenues from Energy SalesIncludes the Authority's small general non-demand, small general demand, small government non-demand and small government demand categories.Includes the Authority's large general and large government categories. Most hotels are included in this category. Includes the Authority's private and government public street/outdoor lighting categories.Despite a weak economy, revenues from energy sales prior to FY 2002 experienced steady growthSales in FY 2002 and FY 2003 were impacted by two major typhoonsSales for FY 2004 through FY 2007 are projected to match the pre-typhoon growth rateTyphoon ChataanTyphoon Pongsona
GPA Organizational StructureThe CCU and GPA New Management are Well-Qualified and Have Many Years of Experience General Manager & Chief Financial Officer appointed by the Consolidated Commission on Utilities
Independent Power Producer & Performance Management ContractsGPA has Agreements with Independent Power Producers (IPPs) to Improve Reserves and ReliabilityMEC (Enron) 88 MW slow speed diesel plant in PitiTEMES 40 MW combustion turbine plant in Piti, reserve unitPruvient Energy 53 MW refurbishment of GPAs Tanguisson power plantTEMES 132 MW Cabras 1 & 2 management contractCabras 3 & 4 will be converted to a Performance Management Contract (PMC) during FY 2004GPA continues to put more of the system under IPPs and PMCs to improve operations, maintenance, management, procurement and training (O-M-M-P-T)
Risk Management PoliciesGPA implemented a Fuel Hedging Program in January 2001 Received $5.8 million since implementedCurrently in-the-moneyGPA and Fuel Hedge Provider assess the oil market on a regular basis Preparing to extend hedge past December 2004GPA has a Risk Management Consultant who is a power utility specialistAdvises GPA Board and Management on all insurance mattersAssists in the renewals of insurance policies, which are currently out for bid and will be awarded before the October 31, 2003 expiration date Assists in review of contractual insurance provisions
GPA Has Instituted Both Fuel Risk and Insurance Risk Management ProgramsSingapore 180 CST vs. GPA Ceiling July 2002 July 2003
Chart1
155.3207156.5
161.6012156.5
170.675156.5
159.8043156.5
150.45156.5
165.4625156.5
183.1875156.5
200.7458156.5
180.475156.5
155.8274156.5
160.3487156.5
167.244156.5
176.4402156.5
$/mt
GPA Ceiling
Hedging
Funds received from fuel hedging since the January 2001 inception
Sep-02$193,216
Oct-020.0
Nov-020.0
Dec-02$351,281
Jan-03$293,555
Feb-03$1,186,366
Mar-03$1,182,120
Apr-03$928,011
May-030.0
Jun-03$138,255
Jul-03406,961
Aug-03755,287
$5,435,051
180 CST PRICES
Historical Average Monthly Price of Singapore FO180
Sing FO180$/mtGPA Ceiling
1-Jan-90102.24
1-Feb-9094.09
1-Mar-9091.84
1-Apr-9085.18
1-May-9082.89
1-Jun-9061.13
1-Jul-9074.11
1-Aug-90136.10
1-Sep-90144.27
1-Oct-90148.35
1-Nov-90143.30
1-Dec-90142.94
1-Jan-91161.95
1-Feb-91107.52
1-Mar-9175.05
1-Apr-9180.00
1-May-9184.53
1-Jun-9185.72
1-Jul-9186.65
1-Aug-9182.66
1-Sep-9178.38
1-Oct-9187.76
1-Nov-9188.33
1-Dec-9174.10
1-Jan-9268.47
1-Feb-9268.55
1-Mar-9276.03
1-Apr-9284.83
1-May-9289.34
1-Jun-9292.43
1-Jul-9291.59
1-Aug-9294.78
1-Sep-92102.88
1-Oct-92105.64
1-Nov-9292.04
1-Dec-9274.34
1-Jan-9376.37
1-Feb-9382.82
1-Mar-9386.00
1-Apr-9391.48
1-May-9387.49
1-Jun-9377.46
1-Jul-9368.52
1-Aug-9375.48
1-Sep-9376.04
1-Oct-9373.89
1-Nov-9361.39
1-Dec-9358.66
1-Jan-9470.26
1-Feb-9468.76
1-Mar-9465.11
1-Apr-9478.13
1-May-9489.77
1-Jun-9490.24
1-Jul-94102.60
1-Aug-9499.48
1-Sep-9479.37
1-Oct-9489.22
1-Nov-9496.10
1-Dec-9490.39
1-Jan-9597.14
1-Feb-95103.63
1-Mar-95106.22
1-Apr-95107.30
1-May-95105.86
1-Jun-9593.27
1-Jul-9585.42
1-Aug-9585.65
1-Sep-9583.43
1-Oct-9589.14
1-Nov-9596.58
1-Dec-95110.41
1-Jan-96115.76
1-Feb-96108.44
1-Mar-96108.46
1-Apr-96112.18
1-May-9699.92
1-Jun-9690.95
1-Jul-9693.28
1-Aug-9699.65
1-Sep-96114.92
1-Oct-96119.53
1-Nov-96119.75
1-Dec-96122.71
1-Jan-97108.00
1-Feb-9799.94
1-Mar-97100.67
1-Apr-9799.16
1-May-97101.84
1-Jun-97100.55
1-Jul-9798.64
1-Aug-97103.95
1-Sep-97110.70
1-Oct-97111.98
1-Nov-97106.64
1-Dec-9792.48
1-Jan-9865.91
1-Feb-9857.86
1-Mar-9868.35
1-Apr-9877.90
1-May-9873.31
1-Jun-9864.85
1-Jul-9862.35
1-Aug-9859.92
1-Sep-9876.51
1-Oct-9882.04
1-Nov-9875.05
1-Dec-9863.28
1-Jan-9965.59
1-Feb-9958.16
1-Mar-9967.74
1-Apr-9982.46
1-May-9987.40
1-Jun-9986.91
1-Jul-9999.88
1-Aug-99117.65
1-Sep-99127.30
1-Oct-99138.05
1-Nov-99142.92
1-Dec-99141.45
1-Jan-00135.88
1-Feb-00143.44
1-Mar-00170.41
1-Apr-00152.92
1-May-00163.19
1-Jun-00174.80
1-Jul-00152.04
1-Aug-00149.03
1-Sep-00171.44
1-Oct-00181.79
1-Nov-00167.68
1-Dec-00136.02
1-Jan-01127.41156.5
1-Feb-01137.88156.5
1-Mar-01138.77156.5
1-Apr-01142.29156.5
1-May-01151.65156.5
1-Jun-01139.48156.5
1-Jul-01131.97156.5
1-Aug-01143.23156.5
1-Sep-01150.45156.5
1-Oct-01127.78156.5
1-Nov-01107.28156.5
1-Dec-01111.31156.5
1-Jan-02111.02156.5
1-Feb-02117.73156.5
1-Mar-02133.85156.5
1-Apr-02148.20156.5
1-May-02156.18156.5
1-Jun-02149.65156.5
1-Jul-02155.32156.5
1-Aug-02161.60156.5
1-Sep-02170.68156.5
1-Oct-02159.80156.5
1-Nov-02150.45156.5
1-Dec-02165.46156.5
1-Jan-03183.19156.5
1-Feb-03200.75156.5
1-Mar-03180.48156.5
1-Apr-03155.83156.5
1-May-03160.35156.5
1-Jun-03167.24156.5
1-Jul-03176.44156.5
CHART
CHART
155.3207156.5
161.6012156.5
170.675156.5
159.8043156.5
150.45156.5
165.4625156.5
183.1875156.5
200.7458156.5
180.475156.5
155.8274156.5
160.3487156.5
167.244156.5
176.4402156.5
$/mt
GPA Ceiling
Sufficient Generation Capacity
The GPA system will support a 1 day in 4.5 Years LOLE for a peak of 345 MW or what amounts to a 70 MW increase in present day system demand.
Sheet1
Chart1
242.3
232.3
244.3
246.4
255.4
251.47
252.6
258.8
253.6
260.3
261.75
257.7
250.2
243.9
249.9
264.5
270.05
274
265.7
269.5
274.5
271.8
268.2
254
267.5
261
262
269
278.5
274
276
277.5
281
279.5
271
276.1
227.5
237
253.1
258.5
262.5
264.6
268
278.5
268.3
273.5
267
269
256.5
258.5
267.5
271
269
262.3
258
275.5
277
275.7
276
274
264
272
274
275.5
278.1
268
262.7
268
273
266.5
276.1
276.5
272.6
264
265
276.5
278.5
272.5
277
280
280
281.5
281
269
254
260
256
261
265
262
265
266
266
264
268
257
205
226
243
247
259
250
254
263
260.2
265
258
261
Peak System Load (MW)
Month
Peak System Demand (MW)
Chart2
274406435.41658590
264396435.41658552.3
272404435.41658552.3
274406435.41658552.3
275.5407.5435.41658552.3
278.1410.1435.41658552.3
268400435.41658552.3
262.7394.7435.41658552.3
268400435.41658552.3
273405435.41658552.3
266.5398.5435.41658552.3
276.1408.1435.41658552.3
276.5408.5435.41658552.3
272.6404.6435.41658552.3
264396435.41658552.3
265397435.41658552.3
276.5408.5435.41658552.3
278.5410.5435.41658552.3
272.5404.5435.41658552.3
277409435.41658552.3
280412435.41658552.3
280412435.41658552.3
281.5413.5435.41658552.3
281413435.41658552.3
269401435.41658552.3
254386435.41658552.3
260392435.41658552.3
256388435.41658552.3
261393435.41658552.3
265397435.41658552.3
262394435.41658552.3
265397435.41658552.3
266398435.41658552.3
266398435.41658552.3
264396435.41658552.3
268400435.41658552.3
257389435.41658552.3
205337435.41658552.3
226358435.41658552.3
243375435.41658552.3
247379435.41658552.3
259391435.41658552.3
250382435.41658552.3
254386435.41658552.3
263395435.41658552.3
260.2392.2435.41658552.3
265397435.41658552.3
258390435.41658552.3
261393435.41658552.3
Peak System Load (MW)
Peak + 2 Largest Units (MW)
Reserve to Support 1 Day in 4.5 years (MW)
Installed Capacity (MW)
Power Demand and Reserve Requirements
552.3 MW Installed Capacity
Sheet2
Month/YearGross Peak Demand (MW)
199519961997199819992000200120022003
January242.3250.2267.5227.5256.5264272.6254205
February232.3243.9261237258.5272264260226
March244.3249.9262253.1267.5274265256243
April246.4264.5269258.5271275.5276.5261247
May255.4270.05278.5262.5269278.1278.5265259
June251.47274274264.6262.3268272.5262250
July252.6265.7276268258262.7277265254
August258.8269.5277.5278.5275.5268280266263
September253.6274.5281268.3277273280266260.2
October260.3271.8279.5273.5275.7266.5281.5264265
November261.75268.2271267276276.1281268258
December257.7254276.1269274276.5269257261
Min232.3243.9261227.5256.5262.7264254205
Max261.75274.5281278.5277278.1281.5268265
MonthMonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)
January1995January 1995Jan-95242.3374.3435.41658
February1995February 1995Feb-95232.3364.3435.41658
March1995March 1995Mar-95244.3376.3435.41658
April1995April 1995Apr-95246.4378.4435.41658
May1995May 1995May-95255.4387.4435.41658
June1995June 1995Jun-95251.47383.47435.41658
July1995July 1995Jul-95252.6384.6435.41658
August1995August 1995Aug-95258.8390.8435.41658
September1995September 1995Sep-95253.6385.6435.41658
October1995October 1995Oct-95260.3392.3435.41658
November1995November 1995Nov-95261.75393.75435.41658
December1995December 1995Dec-95257.7389.7435.41658
January1996January 1996Jan-96250.2382.2435.41658
February1996February 1996Feb-96243.9375.9435.41658
March1996March 1996Mar-96249.9381.9435.41658
April1996April 1996Apr-96264.5396.5435.41658
May1996May 1996May-96270.05402.05435.41658
June1996June 1996Jun-96274406435.41658
July1996July 1996Jul-96265.7397.7435.41658
August1996August 1996Aug-96269.5401.5435.41658
September1996September 1996Sep-96274.5406.5435.41658
October1996October 1996Oct-96271.8403.8435.41658
November1996November 1996Nov-96268.2400.2435.41658
December1996December 1996Dec-96254386435.41658
January1997January 1997Jan-97267.5399.5435.41658
February1997February 1997Feb-97261393435.41658
March1997March 1997Mar-97262394435.41658
April1997April 1997Apr-97269401435.41658
May1997May 1997May-97278.5410.5435.41658
June1997June 1997Jun-97274406435.41658
July1997July 1997Jul-97276408435.41658
August1997August 1997Aug-97277.5409.5435.41658
September1997September 1997Sep-97281413435.41658
October1997October 1997Oct-97279.5411.5435.41658
November1997November 1997Nov-97271403435.41658
December1997December 1997Dec-97276.1408.1435.41658
January1998January 1998Jan-98227.5359.5435.41658
February1998February 1998Feb-98237369435.41658
March1998March 1998Mar-98253.1385.1435.41658
April1998April 1998Apr-98258.5390.5435.41658
May1998May 1998May-98262.5394.5435.41658
June1998June 1998Jun-98264.6396.6435.41658
July1998July 1998Jul-98268400435.41658
August1998August 1998Aug-98278.5410.5435.41658
September1998September 1998Sep-98268.3400.3435.41658
October1998October 1998Oct-98273.5405.5435.41658
November1998November 1998Nov-98267399435.41658
December1998December 1998Dec-98269401435.41658
January1999January 1999Jan-99256.5388.5435.41658590
February1999February 1999Feb-99258.5390.5435.41658590
March1999March 1999Mar-99267.5399.5435.41658590
April1999April 1999Apr-99271403435.41658590
May1999May 1999May-99269401435.41658590
June1999June 1999Jun-99262.3394.3435.41658590
July1999July 1999Jul-99258390435.41658590
August1999August 1999Aug-99275.5407.5435.41658590
September1999September 1999Sep-99277409435.41658590
October1999October 1999Oct-99275.7407.7435.41658590
November1999November 1999Nov-99276408435.41658590
MonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)Installed Capacity (MW)
December1999December 1999Dec-99274406435.41658590
January2000January 2000Jan-00264396435.41658552.3
February2000February 2000Feb-00272404435.41658552.3
March2000March 2000Mar-00274406435.41658552.3
April2000April 2000Apr-00275.5407.5435.41658552.3
May2000May 2000May-00278.1410.1435.41658552.3
June2000June 2000Jun-00268400435.41658552.3
July2000July 2000Jul-00262.7394.7435.41658552.3
August2000August 2000Aug-00268400435.41658552.3
September2000September 2000Sep-00273405435.41658552.3
October2000October 2000Oct-00266.5398.5435.41658552.3
November2000November 2000Nov-00276.1408.1435.41658552.3
December2000December 2000Dec-00276.5408.5435.41658552.3
January2001January 2001Jan-01272.6404.6435.41658552.3
February2001February 2001Feb-01264396435.41658552.3
March2001March 2001Mar-01265397435.41658552.3
April2001April 2001Apr-01276.5408.5435.41658552.3
May2001May 2001May-01278.5410.5435.41658552.3
June2001June 2001Jun-01272.5404.5435.41658552.3
July2001July 2001Jul-01277409435.41658552.3
August2001August 2001Aug-01280412435.41658552.3
September2001September 2001Sep-01280412435.41658552.3
October2001October 2001Oct-01281.5413.5435.41658552.3
November2001November 2001Nov-01281413435.41658552.3
December2001December 2001Dec-01269401435.41658552.3
January2002January 2002Jan-02254386435.41658552.3
February2002February 2002Feb-02260392435.41658552.3
March2002March 2002Mar-02256388435.41658552.3
April2002April 2002Apr-02261393435.41658552.3
May2002May 2002May-02265397435.41658552.3
June2002June 2002Jun-02262394435.41658552.3
July2002July 2002Jul-02265397435.41658552.3
August2002August 2002Aug-02266398435.41658552.3
September2002September 2002Sep-02266398435.41658552.3
October2002October 2002Oct-02264396435.41658552.3
November2002November 2002Nov-02268400435.41658552.3
December2002December 2002Dec-02257389435.41658552.3
January2003January 2003Jan-03205337435.41658552.3
February2003February 2003Feb-03226358435.41658552.3
March2003March 2003Mar-03243375435.41658552.3
April2003April 2003Apr-03247379435.41658552.3
May2003May 2003May-03259391435.41658552.3
June2003June 2003Jun-03250382435.41658552.3
July2003July 2003Jul-03254386435.41658552.3
August2003August 2003Aug-03263395435.41658552.3
September2003September 2003Sep-03260.2392.2435.41658552.3
October2003October 2003Oct-03265397435.41658552.3
November2003November 2003Nov-03258390435.41658552.3
December2003December 2003Dec-03261393435.41658552.3
Sheet3
Generation UnitTechnologyPrimary FuelMax. Gross Capacity(MW)Yr. Commissioned
Cabras 1Steam TurbineRFO #6661974
Cabras 2Steam TurbineRFO #6661975
Cabras 3Slow Speed DieselRFO #6401996
Cabras 4Slow Speed DieselRFO #6401996
Piti 8 (ENRON/MEC)Slow Speed DieselRFO #6441999
Piti 9 (ENRON/MEC)Slow Speed DieselRFO #6441999
Tanguisson 1 (MIRANT)Steam TurbineRFO #626.51976
Tanguisson 2 (MIRANT)Steam TurbineRFO #626.51976
Dededo CT 1Combustion TurbineDiesel #2231992
Dededo CT 2Combustion TurbineDiesel #2231994
Macheche CtCombustion TurbineDiesel #2211993
Marbo CTCombustion TurbineDiesel #2161993
Yigo CTCombustion TurbineDiesel #2211993
Piti 7 (TEMES)Combustion TurbineDiesel #2401997
Dededo Diesel 1Medium Speed DieselDiesel #22.51972
Dededo Diesel 2Medium Speed DieselDiesel #22.51972
Dededo Diesel 3Medium Speed DieselDiesel #22.51972
Dededo Diesel 4Medium Speed DieselDiesel #22.51972
Pulantat Diesel 1Medium Speed DieselDiesel #251994
Pulantat Diesel 2Medium Speed DieselDiesel #251994
Talofofo Diesel 1Medium Speed DieselDiesel #24.41993
Talofofo Diesel 2Medium Speed DieselDiesel #24.41993
Tenjo Diesel 1Medium Speed DieselDiesel #24.41993
Tenjo Diesel 2Medium Speed DieselDiesel #24.41993
Tenjo Diesel 3Medium Speed DieselDiesel #24.41993
Tenjo Diesel 4Medium Speed DieselDiesel #24.41993
Tenjo Diesel 5Medium Speed DieselDiesel #24.41993
Tenjo Diesel 6Medium Speed DieselDiesel #24.41993
Yr. Commissioned
MBD00010E9F.xls
Chart1
267.212590393.212408.83436
276.126546402.126422.47278
284.586546410.586435.41658
292.173546418.173447.02469
300.664546426.664460.01592
309.334546435.334473.28102
320.475546446.475490.32675
332.121546458.121508.14513
345.187546471.187528.13611
359.02586485.02549.3006
366.714586492.714561.07242
373.965616499.965572.16645
381.641616507.641583.91073
388.812616514.812594.88236
398.323656524.323609.43419
407.341656533.341623.23173
416.752929656542.752929637.63198137
Peak Load
Installed Capacity
Peak Load + 2 Largest Unit Capacities
Peak Load + 1 Day In 4.5 LOLE Reserve Reqm't
Chart2
267.212590393.212408.83436
276.126546402.126422.47278
284.586546410.586435.41658
292.173546418.173447.02469
300.664546426.664460.01592
309.334546435.334473.28102
320.475546446.475490.32675
332.121546458.121508.14513
345.187546471.187528.13611
Peak Load
Installed Capacity
Peak Load + 2 Largest Unit Capacities
Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't
Fiscal Year
Capacity Requirements (MW)
proscrn
SYSTEM19992000200120022003200420052006200720082009201020112012201320142015
ENERGY REQUIREDGWH17301738173917451749177017781785179718101824183918551872189719251953
THERM GENERATIONGWH17301738173917451749177017781785179718101824183918551872189719251953
EMERGENCY ENERGYGWH00000000000000000
PEAK LOADMW286287289290292295298300302304307310312314318321326
LOAD FACTORPCT69.0368.9768.7468.668.4268.2568.1167.9367.8467.7767.7967.7867.7967.7768.0768.3768.44
INSTALLED CAPACITYMW590546546546546546546546546586586616616616656656656
RESERVE MARGINMW304259257256254251248246244282279306303301337334330
RESERVE MARGINPCT106.2690.3489.078887.1384.9483.2582.0380.5392.790.7498.7597.0695.77106.06104101.25
CAPACITY MARGINPCT51.5247.4647.1146.8146.5645.9345.4345.0644.6148.1147.5749.6949.2648.9251.4750.9850.31
ENERGY RESV MARGINPCT-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100
LOSS LOADHOURS00000000000000000
FUEL BURNED 000MBTU1680616433164361646916582168201687316949170571719017351171231725117258174851777018024
FIXED FUEL COST$00020792090210221142127214021532167218121962210222622422258227422922309
TOTAL FUEL COST$0005413853723535985405954935562155692957875587265972560792609876200862696640796575867404
VAR. O&M COST$00048444509462247604888506552175370554056976100636765787176741676587977
FIXED O&M COST$0004915454282542635661957425565345732958148608616331962387650126610569402714877059271971
TOTAL THERM COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352
THERMAL COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44
EMER ENERGY COST$00000000000000000000
TOTAL SYS. COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352
SYSTEM COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44
AVG. MARG. COST$/MWH32.5831.9331.7732.0432.3532.7333.1133.5633.9334.4234.6633.9234.434.935.535.8836.46
EXTERNAL COSTS$00000000000000000000
CUST. IMPACT COSTS$00000000000000000000
1.53
19992000200120022003200420052006200720082009201020112012201320142015
Peak Load267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929
Installed Capacity590546546546546546546546546586586616616616656656656
Peak Load + 2 Largest Unit Capacities393.212402.126410.586418.173426.664435.334446.475458.121471.187485.02492.714499.965507.641514.812524.323533.341542.752929
Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't408.83436422.47278435.41658447.02469460.01592473.28102490.32675508.14513528.13611549.3006561.07242572.16645583.91073594.88236609.43419623.23173637.63198137
Year199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020
Low Estimate280.384272.594238.146252.951261.243264.941269.314273.417279.151284.731290.843296.843301.363305.443309.773313.609319.177324.234329.448929334.021464083340.3752436132346.1038961908352.022040388357.2692844784
Forecast280.384272.842267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929425.532464083436.8612436132447.6168961908458.885040388469.5292844784
High Estimate280.384273.09283.494292.759303.279312.949326.549340.963359.179379.258402.559428.755440.522451.966464.125475.861490.754505.3520.609929535.554464083554.1042436132572.3498961908591.735040388610.8132844784
Baseload Availability Cabras 1&2 PMC since January 2003Cabras 3&4 PMC in Place by October 2004
Chart3
0.91070.73560.8810.91460.964219970.89380.8811
0.90290.43760.91270.85890.955119980.61360.9299
0.53520.37340.86370.77960.93730.95150.87850.9142
0.25678571430.6299750.796200.91520.95610.96650.9024
0.67693333330.5898750.8680.4110.88970.92640.95540.9567
0.66990.70454166670.32980.647520020.94910.92710.8018
0.87025528570.812728314400.271420030.93380.95810.8936
Cabras 1
Cabras 2
Cabras 3
Cabras 4
MEC 8
MEC 9
Tango 1
Tango 2
GPA Fiscal Year
Equivalent Availability Factor (%)
Sheet4
Fiscal YearCabras 1Cabras 2Cabras 3Cabras 4MEC 8MEC 9Tango 1Tango 2
199791.07%73.56%88%91%89%88%
199890.29%43.76%91%86%61%93%
199953.52%37.34%86%78%96%95%88%91%
200025.68%63.00%80%0%96%96%97%90%
200167.69%58.99%87%41%94%93%96%96%
200266.99%70.45%33%65%92%95%93%80%
200387.03%81.27%0%27%89%93%96%89%
Sheet1
Chart1
242.3
232.3
244.3
246.4
255.4
251.47
252.6
258.8
253.6
260.3
261.75
257.7
250.2
243.9
249.9
264.5
270.05
274
265.7
269.5
274.5
271.8
268.2
254
267.5
261
262
269
278.5
274
276
277.5
281
279.5
271
276.1
227.5
237
253.1
258.5
262.5
264.6
268
278.5
268.3
273.5
267
269
256.5
258.5
267.5
271
269
262.3
258
275.5
277
275.7
276
0
274
264
272
274
275.5
278.1
268
262.7
268
273
266.5
276.1
276.5
272.6
264
265
276.5
278.5
272.5
277
280
280
281.5
281
269
254
260
256
261
265
262
265
266
266
264
268
257
205
226
243
247
259
250
254
263
260.2
265
258
261
Peak System Load (MW)
Month
Peak System Demand (MW)
Chart2
274406435.41658590
264396435.41658552.3
272404435.41658552.3
274406435.41658552.3
275.5407.5435.41658552.3
278.1410.1435.41658552.3
268400435.41658552.3
262.7394.7435.41658552.3
268400435.41658552.3
273405435.41658552.3
266.5398.5435.41658552.3
276.1408.1435.41658552.3
276.5408.5435.41658552.3
272.6404.6435.41658552.3
264396435.41658552.3
265397435.41658552.3
276.5408.5435.41658552.3
278.5410.5435.41658552.3
272.5404.5435.41658552.3
277409435.41658552.3
280412435.41658552.3
280412435.41658552.3
281.5413.5435.41658552.3
281413435.41658552.3
269401435.41658552.3
254386435.41658552.3
260392435.41658552.3
256388435.41658552.3
261393435.41658552.3
265397435.41658552.3
262394435.41658552.3
265397435.41658552.3
266398435.41658552.3
266398435.41658552.3
264396435.41658552.3
268400435.41658552.3
257389435.41658552.3
205337435.41658552.3
226358435.41658552.3
243375435.41658552.3
247379435.41658552.3
259391435.41658552.3
250382435.41658552.3
254386435.41658552.3
263395435.41658552.3
260.2392.2435.41658552.3
265397435.41658552.3
258390435.41658552.3
261393435.41658552.3
Peak System Load (MW)
Peak + 2 Largest Units (MW)
Reserve to Support 1 Day in 4.5 years (MW)
Installed Capacity (MW)
Power Demand and Reserve Requirements
Sheet2
Month/YearGross Peak Demand (MW)
199519961997199819992000200120022003
January242.3250.2267.5227.5256.5264272.6254205
February232.3243.9261237258.5272264260226
March244.3249.9262253.1267.5274265256243
April246.4264.5269258.5271275.5276.5261247
May255.4270.05278.5262.5269278.1278.5265259
June251.47274274264.6262.3268272.5262250
July252.6265.7276268258262.7277265254
August258.8269.5277.5278.5275.5268280266263
September253.6274.5281268.3277273280266260.2
October260.3271.8279.5273.5275.7266.5281.5264265
November261.75268.2271267276276.1281268258
December257.7254276.1269274276.5269257261
Min232.3243.9261227.5256.5262.7264254205
Max261.75274.5281278.5277278.1281.5268265
MonthMonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)
January1995January 1995Jan-95242.3374.3435.41658
February1995February 1995Feb-95232.3364.3435.41658
March1995March 1995Mar-95244.3376.3435.41658
April1995April 1995Apr-95246.4378.4435.41658
May1995May 1995May-95255.4387.4435.41658
June1995June 1995Jun-95251.47383.47435.41658
July1995July 1995Jul-95252.6384.6435.41658
August1995August 1995Aug-95258.8390.8435.41658
September1995September 1995Sep-95253.6385.6435.41658
October1995October 1995Oct-95260.3392.3435.41658
November1995November 1995Nov-95261.75393.75435.41658
December1995December 1995Dec-95257.7389.7435.41658
January1996January 1996Jan-96250.2382.2435.41658
February1996February 1996Feb-96243.9375.9435.41658
March1996March 1996Mar-96249.9381.9435.41658
April1996April 1996Apr-96264.5396.5435.41658
May1996May 1996May-96270.05402.05435.41658
June1996June 1996Jun-96274406435.41658
July1996July 1996Jul-96265.7397.7435.41658
August1996August 1996Aug-96269.5401.5435.41658
September1996September 1996Sep-96274.5406.5435.41658
October1996October 1996Oct-96271.8403.8435.41658
November1996November 1996Nov-96268.2400.2435.41658
December1996December 1996Dec-96254386435.41658
January1997January 1997Jan-97267.5399.5435.41658
February1997February 1997Feb-97261393435.41658
March1997March 1997Mar-97262394435.41658
April1997April 1997Apr-97269401435.41658
May1997May 1997May-97278.5410.5435.41658
June1997June 1997Jun-97274406435.41658
July1997July 1997Jul-97276408435.41658
August1997August 1997Aug-97277.5409.5435.41658
September1997September 1997Sep-97281413435.41658
October1997October 1997Oct-97279.5411.5435.41658
November1997November 1997Nov-97271403435.41658
December1997December 1997Dec-97276.1408.1435.41658
January1998January 1998Jan-98227.5359.5435.41658
February1998February 1998Feb-98237369435.41658
March1998March 1998Mar-98253.1385.1435.41658
April1998April 1998Apr-98258.5390.5435.41658
May1998May 1998May-98262.5394.5435.41658
June1998June 1998Jun-98264.6396.6435.41658
July1998July 1998Jul-98268400435.41658
August1998August 1998Aug-98278.5410.5435.41658
September1998September 1998Sep-98268.3400.3435.41658
October1998October 1998Oct-98273.5405.5435.41658
November1998November 1998Nov-98267399435.41658
December1998December 1998Dec-98269401435.41658
January1999January 1999Jan-99256.5388.5435.41658590
February1999February 1999Feb-99258.5390.5435.41658590
March1999March 1999Mar-99267.5399.5435.41658590
April1999April 1999Apr-99271403435.41658590
May1999May 1999May-99269401435.41658590
June1999June 1999Jun-99262.3394.3435.41658590
July1999July 1999Jul-99258390435.41658590
August1999August 1999Aug-99275.5407.5435.41658590
September1999September 1999Sep-99277409435.41658590
October1999October 1999Oct-99275.7407.7435.41658590
November1999November 1999Nov-99276408435.41658590
MonthPeak System Load (MW)Peak + 2 Largest Units (MW)Reserve to Support 1 Day in 4.5 years (MW)Installed Capacity (MW)
December1999December 1999Dec-99274406435.41658590
January2000January 2000Jan-00264396435.41658552.3
February2000February 2000Feb-00272404435.41658552.3
March2000March 2000Mar-00274406435.41658552.3
April2000April 2000Apr-00275.5407.5435.41658552.3
May2000May 2000May-00278.1410.1435.41658552.3
June2000June 2000Jun-00268400435.41658552.3
July2000July 2000Jul-00262.7394.7435.41658552.3
August2000August 2000Aug-00268400435.41658552.3
September2000September 2000Sep-00273405435.41658552.3
October2000October 2000Oct-00266.5398.5435.41658552.3
November2000November 2000Nov-00276.1408.1435.41658552.3
December2000December 2000Dec-00276.5408.5435.41658552.3
January2001January 2001Jan-01272.6404.6435.41658552.3
February2001February 2001Feb-01264396435.41658552.3
March2001March 2001Mar-01265397435.41658552.3
April2001April 2001Apr-01276.5408.5435.41658552.3
May2001May 2001May-01278.5410.5435.41658552.3
June2001June 2001Jun-01272.5404.5435.41658552.3
July2001July 2001Jul-01277409435.41658552.3
August2001August 2001Aug-01280412435.41658552.3
September2001September 2001Sep-01280412435.41658552.3
October2001October 2001Oct-01281.5413.5435.41658552.3
November2001November 2001Nov-01281413435.41658552.3
December2001December 2001Dec-01269401435.41658552.3
January2002January 2002Jan-02254386435.41658552.3
February2002February 2002Feb-02260392435.41658552.3
March2002March 2002Mar-02256388435.41658552.3
April2002April 2002Apr-02261393435.41658552.3
May2002May 2002May-02265397435.41658552.3
June2002June 2002Jun-02262394435.41658552.3
July2002July 2002Jul-02265397435.41658552.3
August2002August 2002Aug-02266398435.41658552.3
September2002September 2002Sep-02266398435.41658552.3
October2002October 2002Oct-02264396435.41658552.3
November2002November 2002Nov-02268400435.41658552.3
December2002December 2002Dec-02257389435.41658552.3
January2003January 2003Jan-03205337435.41658552.3
February2003February 2003Feb-03226358435.41658552.3
March2003March 2003Mar-03243375435.41658552.3
April2003April 2003Apr-03247379435.41658552.3
May2003May 2003May-03259391435.41658552.3
June2003June 2003Jun-03250382435.41658552.3
July2003July 2003Jul-03254386435.41658552.3
August2003August 2003Aug-03263395435.41658552.3
September2003September 2003Sep-03260.2392.2435.41658552.3
October2003October 2003Oct-03265397435.41658552.3
November2003November 2003Nov-03258390435.41658552.3
December2003December 2003Dec-03261393435.41658552.3
Sheet3
Generation UnitTechnologyPrimary FuelMax. Gross Capacity(MW)Yr. Commissioned
Cabras 1Steam TurbineRFO #6661974
Cabras 2Steam TurbineRFO #6661975
Cabras 3Slow Speed DieselRFO #6401996
Cabras 4Slow Speed DieselRFO #6401996
Piti 8 (ENRON/MEC)Slow Speed DieselRFO #6441999
Piti 9 (ENRON/MEC)Slow Speed DieselRFO #6441999
Tanguisson 1 (MIRANT)Steam TurbineRFO #626.51976
Tanguisson 2 (MIRANT)Steam TurbineRFO #626.51976
Dededo CT 1Combustion TurbineDiesel #2231992
Dededo CT 2Combustion TurbineDiesel #2231994
Macheche CtCombustion TurbineDiesel #2211993
Marbo CTCombustion TurbineDiesel #2161993
Yigo CTCombustion TurbineDiesel #2211993
Piti 7 (TEMES)Combustion TurbineDiesel #2401997
Dededo Diesel 1Medium Speed DieselDiesel #22.51972
Dededo Diesel 2Medium Speed DieselDiesel #22.51972
Dededo Diesel 3Medium Speed DieselDiesel #22.51972
Dededo Diesel 4Medium Speed DieselDiesel #22.51972
Pulantat Diesel 1Medium Speed DieselDiesel #251994
Pulantat Diesel 2Medium Speed DieselDiesel #251994
Talofofo Diesel 1Medium Speed DieselDiesel #24.41993
Talofofo Diesel 2Medium Speed DieselDiesel #24.41993
Tenjo Diesel 1Medium Speed DieselDiesel #24.41993
Tenjo Diesel 2Medium Speed DieselDiesel #24.41993
Tenjo Diesel 3Medium Speed DieselDiesel #24.41993
Tenjo Diesel 4Medium Speed DieselDiesel #24.41993
Tenjo Diesel 5Medium Speed DieselDiesel #24.41993
Tenjo Diesel 6Medium Speed DieselDiesel #24.41993
Yr. Commissioned
MBD00010E9F.xls
Chart1
267.212590393.212408.83436
276.126546402.126422.47278
284.586546410.586435.41658
292.173546418.173447.02469
300.664546426.664460.01592
309.334546435.334473.28102
320.475546446.475490.32675
332.121546458.121508.14513
345.187546471.187528.13611
359.02586485.02549.3006
366.714586492.714561.07242
373.965616499.965572.16645
381.641616507.641583.91073
388.812616514.812594.88236
398.323656524.323609.43419
407.341656533.341623.23173
416.752929656542.752929637.63198137
Peak Load
Installed Capacity
Peak Load + 2 Largest Unit Capacities
Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't
Chart2
267.212590393.212408.83436
276.126546402.126422.47278
284.586546410.586435.41658
292.173546418.173447.02469
300.664546426.664460.01592
309.334546435.334473.28102
320.475546446.475490.32675
332.121546458.121508.14513
345.187546471.187528.13611
Peak Load
Installed Capacity
Peak Load + 2 Largest Unit Capacities
Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't
Fiscal Year
Capacity Requirements (MW)
proscrn
SYSTEM19992000200120022003200420052006200720082009201020112012201320142015
ENERGY REQUIREDGWH17301738173917451749177017781785179718101824183918551872189719251953
THERM GENERATIONGWH17301738173917451749177017781785179718101824183918551872189719251953
EMERGENCY ENERGYGWH00000000000000000
PEAK LOADMW286287289290292295298300302304307310312314318321326
LOAD FACTORPCT69.0368.9768.7468.668.4268.2568.1167.9367.8467.7767.7967.7867.7967.7768.0768.3768.44
INSTALLED CAPACITYMW590546546546546546546546546586586616616616656656656
RESERVE MARGINMW304259257256254251248246244282279306303301337334330
RESERVE MARGINPCT106.2690.3489.078887.1384.9483.2582.0380.5392.790.7498.7597.0695.77106.06104101.25
CAPACITY MARGINPCT51.5247.4647.1146.8146.5645.9345.4345.0644.6148.1147.5749.6949.2648.9251.4750.9850.31
ENERGY RESV MARGINPCT-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100-100
LOSS LOADHOURS00000000000000000
FUEL BURNED 000MBTU1680616433164361646916582168201687316949170571719017351171231725117258174851777018024
FIXED FUEL COST$00020792090210221142127214021532167218121962210222622422258227422922309
TOTAL FUEL COST$0005413853723535985405954935562155692957875587265972560792609876200862696640796575867404
VAR. O&M COST$00048444509462247604888506552175370554056976100636765787176741676587977
FIXED O&M COST$0004915454282542635661957425565345732958148608616331962387650126610569402714877059271971
TOTAL THERM COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352
THERMAL COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44
EMER ENERGY COST$00000000000000000000
TOTAL SYS. COST$000108135112515112483115438117248117814119475121393125127128740129279132366134690139274142982144008147352
SYSTEM COST$/MWH62.5264.7464.6966.1467.0466.5667.2168.0169.6271.1170.8771.9772.6174.475.3574.8175.44
AVG. MARG. COST$/MWH32.5831.9331.7732.0432.3532.7333.1133.5633.9334.4234.6633.9234.434.935.535.8836.46
EXTERNAL COSTS$00000000000000000000
CUST. IMPACT COSTS$00000000000000000000
1.53
19992000200120022003200420052006200720082009201020112012201320142015
Peak Load267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929
Installed Capacity590546546546546546546546546586586616616616656656656
Peak Load + 2 Largest Unit Capacities393.212402.126410.586418.173426.664435.334446.475458.121471.187485.02492.714499.965507.641514.812524.323533.341542.752929
Peak Load + 1 Day In 4.5 Years LOLE Reserve Reqm't408.83436422.47278435.41658447.02469460.01592473.28102490.32675508.14513528.13611549.3006561.07242572.16645583.91073594.88236609.43419623.23173637.63198137
Year199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020
Low Estimate280.384272.594238.146252.951261.243264.941269.314273.417279.151284.731290.843296.843301.363305.443309.773313.609319.177324.234329.448929334.021464083340.3752436132346.1038961908352.022040388357.2692844784
Forecast280.384272.842267.212276.126284.586292.173300.664309.334320.475332.121345.187359.02366.714373.965381.641388.812398.323407.341416.752929425.532464083436.8612436132447.6168961908458.885040388469.5292844784
High Estimate280.384273.09283.494292.759303.279312.949326.549340.963359.179379.258402.559428.755440.522451.966464.125475.861490.754505.3520.609929535.554464083554.1042436132572.3498961908591.735040388610.8132844784
IWPS Status
Sheet1
PlantStation RatingDispatch Availability (MW)
Cabras 1 & 2132132
Cabras 3 & 478.668
MEC 8 & 98844
Tanguisson 1 & 25326.5
Total Baseload351.6270.5
Dededo C.T. 1 & 2 (23 MW + 22 MW)4522
Macheche C.T.220
Marbo C.T.167
Yigo C.T.2218
TEMES CT4040
Tenjo Disels (4.4 MW x 6 Units)26.426.4
Dededo Diesels (2.5 MW x 4 Units)105
MDI Diesels (5.3 MW x 2 Units)10.65.3
Talofofo Diesels (4.4 MW x 2 Units)8.88.8
Total Peaking200.8132.5
GRAND TOTAL552.4403
Sheet2
Sheet3
Overhaul/Outage Status
Sheet1
Goals & ObjectivesTarget Date
1.Full Implementation of GPA Environmental Compliance ProgramsOct-2004
2.Complete Implementation of the Cabras-Piti Fuel Switching RequirementDec-2004
3.On time submittal of all USEPA & GEPA reporting requirementsJun-2004
4.Produce a Facility Response Plan for Cabras Power PlantOct-2004
5.Emergency Spill Response and clean up in 24 hoursFeb-2004
6.Complete revision of the SPCC Plans for all GPA FacilitiesAug-2004
Sheet2
Project DescriptionPlantStatus / Target Completion
Major Turbine Overhaul of Dededo CT #1 by Nuovo PignoneDededo CTJan/Feb 2004
Repair of Macheche CT LM2500 main turbine set.Macheche CTBid (May 2004)
Major Overhaul of MDI diesel unitsMDI #1Unit #2 Completed, Unit #1 Ongoing (10% Complete-Feb 2004)
Second Year PIPs/CIPsCabras 1&2Dec-2004
Implement PMCCabras 3&4Oct-2004
Upgrade/Modify Main Engine Components to increase in-service time between overhauls beyond 8000 Running Hrs.Cabras 3&4Ongoing (Scheduled Maintenance)
Install Temporary Split AC Units in Control Room and procurement of replacement of AC Chiller Units.Cabras 3&4Bid Evaluation Ongoing (May 2004)
Planned installation of remote start/auto-sync systems at all peaking unit sites.Diesels / CTsSep-2004
Installation of remote start/auto-sync systems Mark V systems for CT 1&2CT 1&2Dec-2004
Upgrade Perimeter Fence, Gate & Lighting (Fuel Farm)Generation Admin
Construct New Office & Maintenance Building (Fuel Farm)Generation Admin
Upgrade Fire Protection & Smoke Alarm System at Diesel & C.T.Generation Admin
Construct Storage Facility for SPCC EquipmentGeneration Admin
Services for disposal of Hazardous Waste Oil Products at PitiGeneration Admin
Upgrade Sewage Systems (MDI )Diesel
Remove and Replace Fixed Window w/Awning Type, Install Ladder outside window, this will be utilized as a Fire ExitDiesel
Repair/Replace Breaching ducts @ Dededo PlantDiesel
Repair/Replace Smoke Stacks @ Talofofo PlantDiesel
Installation of Station Power KW Meter @ TalofofoDiesel
Building to house 10 mobil generators & equipmentWater Systems
Emergency Generator 750 kwCabras 3 & 4
Project DescriptionStatus / Target Completion
CENTRAL MAINTENANCE, WSD, & TRANSPORTATION
Repair of Damaged Gen Set units at various water well sites80% by Jun-2004 (bal. by Dec-2004)
Final Stages of Mongmong-Toto-Maite Spill CleanupBid Evaluation Completed (Jul-2004)
TRANSPORTATION- Implement Performance Management ContractMay-2004
Purchase of 30 new vehicles/heavy equipmentVehicles (Mar-2004) Hvy Equip (Jul-2004)
Fire Protection Upgrade & Smoke Alarm, Office & ShopTransportation
Repair Office Roof & RestroomsTransportation
Sheet3
No.Unit / Outage DescriptionAnticipated Return to ServiceComments
1Dededo CT #1 - Major Turbine OverhaulFeb 2004
2Tanguisson #2 - Scheduled OutageFeb. 15, 2004
3Macheche CT - Turbine Rotor RepairMay 2004Bid closing th
4Manenggon Diesel #1 - Major OverhaulMarch 2004
5Dededo Diesel #1 - Station Switchgear Cable ReplacementApril 2004
6Dededo Diesel #2 - PT Transformer Replacement / Turbocharger RefurbishmentApril 2004
7Talofofo 1&2 - Stack RepairsJuly 2004
Improvement Projects
Sheet1
Goals & ObjectivesTarget Date
1.Full Implementation of GPA Environmental Compliance ProgramsOct-2004
2.Complete Implementation of the Cabras-Piti Fuel Switching RequirementDec-2004
3.On time submittal of all USEPA & GEPA reporting requirementsJun-2004
4.Produce a Facility Response Plan for Cabras Power PlantOct-2004
5.Emergency Spill Response and clean up in 24 hoursFeb-2004
6.Complete revision of the SPCC Plans for all GPA FacilitiesAug-2004
Sheet2
Project DescriptionPlantStatus / Target Completion
Implement PMCCabras 3&4Oct-2004
Upgrade/Modify Main Engine Components to increase in-service time between overhauls beyond 8000 Running Hrs.Cabras 3&4Ongoing (Scheduled Maintenance)
Install Temporary Split AC Units in Control Room and procurement of replacement of AC Chiller Units.Cabras 3&4Bid Evaluation Ongoing (May 2004)
Emergency Generator 750 kwCabras 3 & 4Sep-2004
Planned installation of remote start/auto-sync systems at all peaking unit sites.Diesels / CTsDec-2004
Installation of remote start/auto-sync systems Mark V systems for CT 1&2CT 1&2
Upgrade Perimeter Fence, Gate & Lighting (Fuel Farm)Generation Admin
Construct New Office & Maintenance Building (Fuel Farm)Generation Admin
Upgrade Fire Protection & Smoke Alarm System at Diesel & C.T.Generation Admin
Construct Storage Facility for SPCC EquipmentGeneration Admin
Services for disposal of Hazardous Waste Oil Products at PitiGeneration Admin
Upgrade Sewage Systems (MDI )Diesel
Remove and Replace Fixed Window w/Awning Type, Install Ladder outside window, this will be utilized as a Fire ExitDiesel
Repair/Replace Breaching ducts @ Dededo PlantDiesel
Repair/Replace Smoke Stacks @ Talofofo PlantDiesel
Installation of Station Power KW Meter @ TalofofoDiesel
Building to house 10 mobil generators & equipmentWater Systems
Project DescriptionStatus / Target Completion
CENTRAL MAINTENANCE, WSD, & TRANSPORTATION
Repair of Damaged Gen Set units at various water well sites80% by Jun-2004 (bal. by Dec-2004)
Final Stages of Mongmong-Toto-Maite Spill CleanupBid Evaluation Completed (Jul-2004)
TRANSPORTATION- Implement Performance Management ContractMay-2004
Purchase of 30 new vehicles/heavy equipmentVehicles (Mar-2004) Hvy Equip (Jul-2004)
Fire Protection Upgrade & Smoke Alarm, Office & ShopTransportation
Repair Office Roof & RestroomsTransportation
Major Turbine Overhaul of Dededo CT #1 by Nuovo PignoneDededo CTJan/Feb 2004
Repair of Macheche CT LM2500 main turbine set.Macheche CTBid (May 2004)
Major Overhaul of MDI diesel unitsMDI #1Unit #2 Completed, Unit #1 Ongoing (10% Complete-Feb 2004)
Second Year PIPs/CIPsCabras 1&2Dec-2004
Sheet3
No.Unit / Outage DescriptionAnticipated Return to ServiceComments
1Dededo CT #1 - Major Turbine OverhaulFeb 2004
2Tanguisson #2 - Scheduled OutageFeb. 15, 2004
3Macheche CT - Turbine Rotor RepairMay 2004Bid closing th
4Manenggon Diesel #1 - Major OverhaulMarch 2004
5Dededo Diesel #1 - Station Switchgear Cable ReplacementApril 2004
6Dededo Diesel #2 - PT Transformer Replacement / Turbocharger RefurbishmentApril 2004
7Talofofo 1&2 - Stack Repairs
Sheet4
Project DescriptionPlant / SiteStatus / Target Completion
Implement Performance Management Contract (PMC)Cabras 3&4Oct-2004
Upgrade/Modify Main Engine Components to increase in-service time between overhauls beyond 8000 Running Hrs.Cabras 3&4Ongoing (Scheduled Maintenance)
Install Temporary Split AC Units in Control Room and procurement of replacement of AC Chiller Units.Cabras 3&4Bid Eval. Ongoing (May 2004)
Emergency Generator 750 kwCabras 3&4Sep-2004
Planned installation of remote start/auto-sync systems at all peaking unit sites.Diesels / CTsDec-2004
Building Upgrades and Stack RepairsTalofofo DieselJuly 2004
Modification for Dead Bus Synchronisation and Mark V Control Systems for CT 1&2CT 1&2July 2004
Upgrade Perimeter Fence, Gate & LightingFuel Farm
Construct New Office & Maintenance BuildingFuel Farm
Fuel Storage & SupplyResidual Fuel Oil No. 6 (HSFO/LSFO)Fuel deliveries approximately every 35 days to meet consumption requirements (8,000 bbls/day). Leased Storage Capacity (506,000 bbls.)Bulk Storage Capacity (536,000 bbls.)On-Site Storage Capacity (94,941 bbls.)Diesel Fuel No. 2Commercial Supply Contracts for all Diesel Fired Power Stations.MOBIL Oil GuamShell Oil Guam
Transmission & Distribution System StatisticsSubstation Capability29 Substations594.5 MVA Installed Capacity279.3 MVA Peak Load (53% Reserve Margin)
Transmission System29 Substations34.49 Miles of 115 kV Transmission Lines147.08 Miles of 34.5 kV Transmission Lines
Distribution System495 Miles of 13.8 kV Distribution Lines
Underground Improvements
Sheet1
GPA Underground ProjectsStatusPlanned FinishFundingEstimate (x $1,000)
Tumon 34.5 kV & 13.8 kV Underground Conversion Phase IIOngoingJun-04Tumon Beautification Bond Funds
P401 Underground Conversion to Guam Memorial HospitalFEMA ApprovedFY' 06FEMA 90%, GPA 10%1,200
P003 Underground Conversion to GPA Cabras FacilitiesFEMA ApprovedFY' 06FEMA 90%, GPA 10%700
Harmon to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,960
Tamuning to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,480
San Vitores to Macheche 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,520
Harmon to Tanguisson 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,550
Macheche to GAA 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%1,510
Agana to Tamuning and P202 Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,240
TOTAL INVESTMENT19,160
Sheet2
GPA System ImprovementsStatusPlanned FinishFundingEstimate (x $1,000)
Substation and Distribution Capacitor ProgramOngoingFY '04Revenue Funds867
T&D Asset Assessment & MappingOngoingFY '04Revenue Funds300
Relay Coordination StudyPlannedFY '04Revenue Funds250
Eng
GUAM POWER AUTHORITY
Engineering Capital Improvement Projects (CIP)
FY 2004 - FY 2023 (x $1,000)
RBTPriorityCapital Improvement Project NameEngineerStatusProjectTypeReasonFY98FY99FY00FY01FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13ProjectTotalAppearedCode 1Code 2Code Definitions
B1ICS Notification System Upgrade / Fuel Switching and MeteringJJC/SAMConstructionGenerationLegal1,686506005902,9262,92620001.11.2Code 1: X(1).X(2)Code 2: X(3).X(4)
B2Cabras 4 (Boat Ramp)JLQDesignGenerationLegal658740108504002,6582,65819981.12.2X(1): Funding TypeX(3): Status
B3Bulk Storage Tank Life ExtensionVJS/JGADesignGenerationLegal2202001805002,5002,0001,4207,0207,02020001.12.21: Bond1: Construction
B4Repair Condenser Inlet/Outlet Lines at Cabras 1 & 2YFDesignGenerationReliability1205001,8005803,0003,00020021.12.42: External2: Design
B5Upgrade Monitoring Equipment for Water QualityMCSDesignGenerationReliability38047085085020021.12.43: Revenue3: Planned
B6USN Fuel Oil Pipeline Assessment and UpgradeDesignGenerationReliability1001505030030020021.12.4X(2): Project TypeX(4): Reason
B7Spill Containment at Various PlantsFQDesignGenerationReliability20015035035020041.12.41: Generation1: Safety
B8Boiler Control Upgrade for Cabras 1 & 2JLQPlannedGenerationReliability3001,0001,3001,30020041.13.42: Substation/Transmission2: Legal
B9Cabras Miscellaneous ProjectsPlannedGenerationReliability24824824820041.13.43: Distribution3: Loading
B10Harmon 115/34.5 KV Substation ExpansionJLQConstructionTransmissionLoading1,9502,311554,3164,31620001.21.34: DSM4: Reliability
B11Upgrade Barrigada to Talofofo 34.5 KV LineConstructionTransmissionLoading5274073481,1131,9001,90020001.21.3
B12Harmon Substation Protection System UpgradeAMConstructionSubstationReliability21535109901,2501,25020011.21.4
B13Construction of 115 kV Tower Maintenance Road (Phase II)ConstructionTransmissionReliability9361,6602,5962,59620011.21.4
B14Marbo to Pagat 34.5 KV LineJLQDesignTransmissionReliability3503,1723,2253,22519991.22.4
B15Old Dededo Kaiser Hybrid, Phase IConstructionDistributionReliability48015023886886820011.31.4
E16Harmon to Tumon 34. 5 kV Underground Conversion-FEMADesignTransmissionReliability5337981,3312,6622,66220042.22.4
R17Harmon to Tumon 34. 5 kV Underground Conversion-GPADesignTransmissionReliability608814829629620043.22.4
E18Tamuning to Tumon 34.5 kV Underground Conversion-FEMADesignTransmissionReliability3515258751,7511,75120042.22.4
R19Tamuning to Tumon 34.5 kV Underground Conversion-GPADesignTransmissionReliability507412424824820043.22.4
E20P401 Underground Conversion to Memorial Hospital-FEMADesignDistributionReliability2563245401,1201,12020042.32.4
R21P401 Underground Conversion to Memorial Hospital-GPADesignDistributionReliability24366012012020043.32.4
E22P003 Underground Conversion to Cabras-FEMADesignDistributionReliability12618931563063020042.32.4
R23P003 Underground Conversion to Cabras-GPADesignDistributionReliability142135707020043.32.4
R24Underground Fuel Pipeline at NASDesignGenerationSafety40030070070020043.12.1
R25Talofofo Power Plant ImprovementsDesignGenerationReliability18018018020043.12.4
R26Substation and Distribution Capacitor ProgramConstructionSubstationLoading56710010010086786720043.21.3
R27Agana T-9 18 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3
R28Harmon T-21 30 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3
R29Pulantat Substation Grounding TransformerDesignSubstationReliability20020020020043.22.4
R30Substation Equipment Predictive MaintenancePlannedSubstationLegal2013015015020043.23.2
R31Merizo U/G RelocationDesignDistributionLegal12512512520043.32.2
R32U/G Reconstruction-Sinajana Phase IETFDesignDistributionReliability15020035035020043.32.4
R33Load StudyPlannedDSMLoading15010025025020013.43.3
B3434.5 kV Transmission Line Along Rt. 2ADesignTransmissionReliability73524598098020051.22.4
B35Old Dededo Kaiser Pole Hardening - Phase IIJGAPlannedDistributionReliability54036590590520051.33.4
B36Old Dededo Kaiser Pole Hardening - Phase IIIJGAPlannedDistributionReliability7003721,0721,07220051.33.4
B37Agana Heights Village Pole HardeningETFPlannedDistributionReliability1152201,3501,6851,68520051.33.4
B38Barrigada Village Pole HardeningPlannedDistributionReliability191,4441,4631,46320051.33.4
E39San Vitores to Macheche 34.5 kV Underground Conversion-FEMADesignTransmissionReliability6349511,5853,1703,17020052.22.4
R40San Vitores to Macheche 34.5 kV Underground Conversion-GPADesignTransmissionReliability7110517635235220053.22.4
E41Harmon to Tanguisson 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability6409581,5983,1963,19620052.23.4
R42Harmon to Tanguisson 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability7110617835535520053.23.4
E43Macheche to GAA 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability2714076791,3571,35720052.23.4
R44Macheche to GAA 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability31457515115120053.23.4
E45Agana to Tamuning and P202 Underground Conversion-FEMAPlannedDistributionReliability5828741,4562,9122,91220052.23.4
R46Agana to Tamuning and P202 Underground Conversion-GPAPlannedDistributionReliability659716232432420053.23.4
E47Umatac Substation Drainage Modification -FEMAPlannedSubstationReliability172440818120052.23.4
R48Umatac Substation Drainage Modification -GPAPlannedSubstationReliability1258820053.23.4
E49P087 Underground Conversion for GWA Water Wells-FEMAPlannedDistributionReliability2163245401,0801,08020052.33.4
R50P087 Underground Conversion for GWA Water Wells-GPAPlannedDistributionReliability24366012012020053.33.4
R51Andersen Substation Control System ReconstructionDesignSubstationReliability1901,1501,3401,34020053.22.4
R52Hagatna 34.5 kV Protection Refurbishment and UpgradeDesignSubstationReliability2159091,1241,12420053.22.4
R53Harmon to GIAT 34.5 kV Line ReconductoringPlannedTransmissionLoading5575581081020053.23.3
R54Orote Substation Control System ReconstructionPlannedSubstationReliability1991,2111,4101,41020053.23.4
R55Hagatna 115 kV Protection Refurbishment and UpgradePlannedSubstationReliability71071071020053.23.4
R56Harmon Substation Switchyard ReconstructionPlannedSubstationReliability603406001,0001,00020053.23.4
R57Hagatna-Tamuning Protection System UpgradePlannedTransmissionReliability364265062962920053.23.4
R58Piti-Anigua-Hagatna Protection System UpgradePlannedTransmissionReliability250500075075020053.23.4
R59San Vitores to Agana 34.5 KV LineFQPlannedTransmissionReliability100741084184120053.23.4
R60P-27 U/G ReconstructionDesignDistributionReliability5015014234234220053.32.4
R61Agat Village Pole HardeningPlannedDistributionReliability2507501,0001,00020053.33.4
R62U/G Reconstruction Latte Heights Phase IPlannedDistributionReliability20020020020053.33.4
R63U/G Reconstruction - Sinajana Phase IIETFPlannedDistributionReliability34034068068020053.33.4
R64Tiyan Substation UpgradePlannedSubstationLoading2602602,8683,3883,38820063.23.3
R65Tumon Sands to Harmon ReconductoringPlannedTransmissionLoading24148572672620063.23.3
R66Marbo to Yigo 34.5 KV LinePlannedTransmissionLoading8017817843643620063.23.3
R67Agana to Radio Barrigada ReconductoringPlannedTransmissionReliability70070070020063.23.4
R68Hagatna 115 kV and 34.5 kV Breaker ReplacementPlannedSubstationReliability87287287220063.23.4
R69P-330 Hardening and ReconductoringPlannedDistributionReliability34534534520063.33.4
R70U/G Reconstruction Latte heights Phase IIPlannedDistributionReliability20020020020063.33.4
R71U/G Reconstruction Sinajana - Phase IIIETFPlannedDistributionReliability30130130190390320063.33.4
R72Reconductor Harmon to Yigo 34.5 KV Line to 927 kcmil ALPlannedTransmissionLoading5007121,2121,21220073.23.3
R73Talofofo Substation 30 MVA UpgradeMCSPlannedSubstationLoading3190293393320073.23.3
R74Tamuning-Tumon Protection System UpgradePlannedTransmissionReliability22713235935920073.23.4
R75X143-X123 Pulantat to Talofofo UGXTMPlannedTransmissionReliability106215942,6565,3125,31220093.23.4
R76X006-X015 Piti to Cabras UGXTMPlannedTransmissionReliability11216928156256220093.23.4
R77X022/X037-X190 Piti/Apra to Tenjo Tap UGXTMPlannedTransmissionReliability99114872,4784,9564,95620093.23.4
R78X221-X150/X152 Dededo to Dededo CT UGXTMPlannedTransmissionReliability6910317334534520093.23.4
R79X039-X250 Apra to Umatac UGXTMPlannedTransmissionReliability235135275,87711,75511,75520093.23.4
R80P210 & P323 GCC/GW/UOG UGSchoolPlannedDistributionReliability71610731,7893,5783,57820093.33.4
R81X045-X055 Agana to R. Barrigada UGXTMPlannedTransmissionReliability87113062,1774,3544,35420103.23.4
R82X054-X246 Agana to Barrigada UGXTMPlannedTransmissionReliability6009011,5003,0013,00120103.23.4
R83X070-X161 Andersen to Yigo UGXTMPlannedTransmissionReliability5948901,4842,9682,96820103.23.4
R84X110-X024 Anigua to Piti UGXTMPlannedTransmissionReliability67910191,6973,3953,39520103.23.4
R85X134-X180 Macheche to Pagat UGXTMPlannedTransmissionReliability80312042,0064,0134,01320103.23.4
R86P221 Mt. Carmel/Sablan/Ocean View/South Christian UGSchoolPlannedDistributionReliability17132,5704,2838,5668,56620103.33.4
R87P223 Truman/Southern UGSchoolPlannedDistributionReliability3144727851,5711,57120103.33.4
R88P283 Agana Heights ES UGSchoolPlannedDistributionReliability3945909841,9681,96820103.33.4
R89P301 M.U. Lujan/St. Francis UGSchoolPlannedDistributionReliability3915879781,9561,95620103.33.4
R90P331 FBLG/Sanchez UGSchoolPlannedDistributionReliability6159211,5353,0713,07120103.33.4
R91P340 Merizo ES UGSchoolPlannedDistributionReliability4056081,0132,0262,02620103.33.4
R92X020-X035 Piti to Orote UGXTMPlannedTransmissionReliability4947421,2362,4722,47220113.23.4
R93X037-X022 Apra to Piti UGXTMPlannedTransmissionReliability99114872,4784,9564,95620113.23.4
R94X038-X124 Apra to Talofofo UGXTMPlannedTransmissionReliability12741,91131846,3696,36920113.23.4
R95X066-X071 Marbo to Andersen UGXTMPlannedTransmissionReliability2113175271,0551,05520113.23.4
R96P088 M. Ulloa/Santa Barbara/Benavente/Wettengel UGSchoolPlannedDistributionReliability8821,3242,2054,4114,41120113.33.4
R97P212 San Vicente School UGSchoolPlannedDistributionReliability18627946593093020113.33.4
R98P240/P244 JFK/Chief Brodie UGSchoolPlannedDistributionReliability15823839579179120113.33.4
R99P250 AJMS/OCP UGSchoolPlannedDistributionReliability5498231,3722,7442,74420113.33.4
R100P261 Notre Dame/Talofofo UGSchoolPlannedDistributionReliability3034547561,5131,51320113.33.4
R101P270 J.M. Guerrero ES UGSchoolPlannedDistributionReliability8212320541041020113.33.4
R102Piti - Agana X023-X043 UG ConversionPlannedTransmissionReliability1,0711,6062,6775,3545,35420123.23.4
R103Orote - Apra X033-X036 UG ConversionPlannedTransmissionReliability7291,0941,8223,6453,64520123.23.4
R104Agana - Anigua X040-X112 UG ConversionPlannedTransmissionReliability4957431,2372,4752,47520123.23.4
R105Agana - SV Tap - Harmon X042-X263-X080 UG ConversionPlannedTransmissionReliability1,0861,6292,7145,4295,42920123.23.4
R106GIAT - Agana (Open switch) X178-X041 UG ConversionPlannedTransmissionReliability1,2161,8233,0393,03920123.23.4
R107Agana - Tamuning X053-X209 UG ConversionPlannedTransmissionReliability4717061,1761,17620123.23.4
R108R. Barrigada - Marbo X056-X065 UG ConversionPlannedTransmissionReliability9711,4562,4272,42720133.23.4
R109Marbo - Dededo X067-X222 UG ConversionPlannedTransmissionReliability38557796296220133.23.4
R110Andersen - Harmon X073-X087 UG ConversionPlannedTransmissionReliability9441,4162,3612,36120133.23.4
R111Harmon - Yigo X082-X160 UG ConversionPlannedTransmissionReliability1,1471,7212,8682,86820133.23.4
R112Harmon - Dededo CT X088-X151/X154 UG ConversionPlannedTransmissionReliability50550550520133.23.4
R113Pulantat - Barrigada X140-X247 UG ConversionPlannedTransmissionReliability1,4431,4431,44320133.23.4
R114GAA - Barrigada X-173-X245 UG ConversionPlannedTransmissionReliability57157157120143.23.4
R115P-003 Piti UG ConversionPlannedDistributionReliability71371371320143.33.4
R116P-005 Piti UG ConversionPlannedDistributionReliability1,8501,8501,85020143.33.4
R117P-007 Piti UG ConversionPlannedDistributionReliability71471471420143.33.4
Issued by:JCF/AEB/MCL/JJC/PBT/JGAALL PROJECTSTotals:$658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386
Note:1. Project totals include previous fiscal year costs.
2. Only planning estimates are available for FY06 - FY13.REVENUE FUNDED PROJECTSTotals:$0$0$0$150$0$0$1,950$4,295$10,968$8,781$18,620$24,906$22,127$16,882$18,930$22,907$150,515
3. Fiscal totals do not include line extensions, blanket J.O.s, general plant items.
4. All dollars are FY03 dollars.BOND FUNDED PROJECTSTotals:$658$743$3,986$5,069$1,422$2,346$13,548$5,944$5,196$0$0$0$0$0$0$0$38,912
EXTERNALLY FUNDED PROJECTSTotals:$0$0$0$0$0$0$1,266$4,196$6,599$5,898$0$0$0$0$0$0$17,959
$658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386
CIP Stats
GUAM POWER AUTHORITY
Engineering Capital Improvement Projects (CIP)
FY 2004 - FY 2023 (x $1,000)
RBTPriorityCapital Improvement Project NameEngineerStatusProjectTypeReasonFY98FY99FY00FY01FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13ProjectTotal
B1ICS Notification System Upgrade / Fuel Switching and MeteringJJC/SAMConstructionGenerationLegal1,686506005902,92619532Generation
B2Cabras 4 (Boat Ramp)JLQDesignGenerationLegal658740108504002,65813743Substation
B3Bulk Storage Tank Life ExtensionVJS/JGADesignGenerationLegal2202001805002,5002,0001,4207,020120785Transmission
B4Repair Condenser Inlet/Outlet Lines at Cabras 1 & 2YFDesignGenerationReliability1205001,8005803,00053326Distribution
B5Upgrade Monitoring Equipment for Water QualityMCSDesignGenerationReliability380470850207386
B6USN Fuel Oil Pipeline Assessment and UpgradeDesignGenerationReliability10015050300
B7Spill Containment at Various PlantsFQDesignGenerationReliability200150350
B8Boiler Control Upgrade for Cabras 1 & 2JLQPlannedGenerationReliability3001,0001,300
B9Cabras Miscellaneous ProjectsPlannedGenerationReliability248248
B10Harmon 115/34.5 KV Substation ExpansionJLQConstructionTransmissionLoading1,9502,311554,316
B11Upgrade Barrigada to Talofofo 34.5 KV LineConstructionTransmissionLoading5274073481,1131,900
B12Harmon Substation Protection System UpgradeAMConstructionSubstationReliability21535109901,250
B13Construction of 115 kV Tower Maintenance Road (Phase II)ConstructionTransmissionReliability9361,6602,596
B14Marbo to Pagat 34.5 KV LineJLQDesignTransmissionReliability3503,1723,225
B15Old Dededo Kaiser Hybrid, Phase IConstructionDistributionReliability480150238868
E16Harmon to Tumon 34. 5 kV Underground Conversion-FEMADesignTransmissionReliability5337981,3312,662
R17Harmon to Tumon 34. 5 kV Underground Conversion-GPADesignTransmissionReliability6088148296
E18Tamuning to Tumon 34.5 kV Underground Conversion-FEMADesignTransmissionReliability3515258751,751
R19Tamuning to Tumon 34.5 kV Underground Conversion-GPADesignTransmissionReliability5074124248
E20P401 Underground Conversion to Memorial Hospital-FEMADesignDistributionReliability2563245401,120
R21P401 Underground Conversion to Memorial Hospital-GPADesignDistributionReliability243660120
E22P003 Underground Conversion to Cabras-FEMADesignDistributionReliability126189315630
R23P003 Underground Conversion to Cabras-GPADesignDistributionReliability14213570
R24Underground Fuel Pipeline at NASDesignGenerationSafety400300700
R25Talofofo Power Plant ImprovementsDesignGenerationReliability180180
R26Substation and Distribution Capacitor ProgramConstructionSubstationLoading567100100100867
R27Agana T-9 18 MVA Power Transformer UpgradeConstructionSubstationLoading8080
R28Harmon T-21 30 MVA Power Transformer UpgradeConstructionSubstationLoading8080
R29Pulantat Substation Grounding TransformerDesignSubstationReliability200200
R30Substation Equipment Predictive MaintenancePlannedSubstationLegal20130150
R31Merizo U/G RelocationDesignDistributionLegal125125
R32U/G Reconstruction-Sinajana Phase IETFDesignDistributionReliability150200350
R33Load StudyPlannedSubstationLoading150100250
B3434.5 kV Transmission Line Along Rt. 2ADesignTransmissionReliability735245980
B35Old Dededo Kaiser Pole Hardening - Phase IIJGAPlannedDistributionReliability540365905
B36Old Dededo Kaiser Pole Hardening - Phase IIIJGAPlannedDistributionReliability7003721,072
B37Agana Heights Village Pole HardeningETFPlannedDistributionReliability1152201,3501,685
B38Barrigada Village Pole HardeningPlannedDistributionReliability191,4441,463
E39San Vitores to Macheche 34.5 kV Underground Conversion-FEMADesignTransmissionReliability6349511,5853,170
R40San Vitores to Macheche 34.5 kV Underground Conversion-GPADesignTransmissionReliability71105176352
E41Harmon to Tanguisson 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability6409581,5983,196
R42Harmon to Tanguisson 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability71106178355
E43Macheche to GAA 34.5 kV Underground Conversion-FEMAPlannedTransmissionReliability2714076791,357
R44Macheche to GAA 34.5 kV Underground Conversion-GPAPlannedTransmissionReliability314575151
E45Agana to Tamuning and P202 Underground Conversion-FEMAPlannedDistributionReliability5828741,4562,912
R46Agana to Tamuning and P202 Underground Conversion-GPAPlannedDistributionReliability6597162324
E47Umatac Substation Drainage Modification -FEMAPlannedSubstationReliability17244081
R48Umatac Substation Drainage Modification -GPAPlannedSubstationReliability1258
E49P087 Underground Conversion for GWA Water Wells-FEMAPlannedDistributionReliability2163245401,080
R50P087 Underground Conversion for GWA Water Wells-GPAPlannedDistributionReliability243660120
R51Andersen Substation Control System ReconstructionDesignSubstationReliability1901,1501,340
R52Hagatna 34.5 kV Protection Refurbishment and UpgradeDesignSubstationReliability2159091,124
R53Harmon to GIAT 34.5 kV Line ReconductoringPlannedTransmissionLoading55755810
R54Orote Substation Control System ReconstructionPlannedSubstationReliability1991,2111,410
R55Hagatna 115 kV Protection Refurbishment and UpgradePlannedSubstationReliability710710
R56Harmon Substation Switchyard ReconstructionPlannedSubstationReliability603406001,000
R57Hagatna-Tamuning Protection System UpgradePlannedTransmissionReliability3642650629
R58Piti-Anigua-Hagatna Protection System UpgradePlannedTransmissionReliability2505000750
R59San Vitores to Agana 34.5 KV LineFQPlannedTransmissionReliability1007410841
R60P-27 U/G ReconstructionDesignDistributionReliability50150142342
R61Agat Village Pole HardeningPlannedDistributionReliability2507501,000
R62U/G Reconstruction Latte Heights Phase IPlannedDistributionReliability200200
R63U/G Reconstruction - Sinajana Phase IIETFPlannedDistributionReliability340340680
R64Tiyan Substation UpgradePlannedSubstationLoading2602602,8683,388
R65Tumon Sands to Harmon ReconductoringPlannedTransmissionLoading241485726
R66Marbo to Yigo 34.5 KV LinePlannedTransmissionLoading80178178436
R67Agana to Radio Barrigada ReconductoringPlannedTransmissionReliability700700
R68Hagatna 115 kV and 34.5 kV Breaker ReplacementPlannedSubstationReliability872872
R69P-330 Hardening and ReconductoringPlannedDistributionReliability345345
R70U/G Reconstruction Latte heights Phase IIPlannedDistributionReliability200200
R71U/G Reconstruction Sinajana - Phase IIIETFPlannedDistributionReliability301301301903
R72Reconductor Harmon to Yigo 34.5 KV Line to 927 kcmil ALPlannedTransmissionLoading5007121,212
R73Talofofo Substation 30 MVA UpgradeMCSPlannedSubstationLoading31902933
R74Tamuning-Tumon Protection System UpgradePlannedTransmissionReliability227132359
R75X143-X123 Pulantat to Talofofo UGXTMPlannedTransmissionReliability106215942,6565,312
R76X006-X015 Piti to Cabras UGXTMPlannedTransmissionReliability112169281562
R77X022/X037-X190 Piti/Apra to Tenjo Tap UGXTMPlannedTransmissionReliability99114872,4784,956
R78X221-X150/X152 Dededo to Dededo CT UGXTMPlannedTransmissionReliability69103173345
R79X039-X250 Apra to Umatac UGXTMPlannedTransmissionReliability235135275,87711,755
R80P210 & P323 GCC/GW/UOG UGSchoolPlannedDistributionReliability71610731,7893,578
R81X045-X055 Agana to R. Barrigada UGXTMPlannedTransmissionReliability87113062,1774,354
R82X054-X246 Agana to Barrigada UGXTMPlannedTransmissionReliability6009011,5003,001
R83X070-X161 Andersen to Yigo UGXTMPlannedTransmissionReliability5948901,4842,968
R84X110-X024 Anigua to Piti UGXTMPlannedTransmissionReliability67910191,6973,395
R85X134-X180 Macheche to Pagat UGXTMPlannedTransmissionReliability80312042,0064,013
R86P221 Mt. Carmel/Sablan/Ocean View/South Christian UGSchoolPlannedDistributionReliability17132,5704,2838,566
R87P223 Truman/Southern UGSchoolPlannedDistributionReliability3144727851,571
R88P283 Agana Heights ES UGSchoolPlannedDistributionReliability3945909841,968
R89P301 M.U. Lujan/St. Francis UGSchoolPlannedDistributionReliability3915879781,956
R90P331 FBLG/Sanchez UGSchoolPlannedDistributionReliability6159211,5353,071
R91P340 Merizo ES UGSchoolPlannedDistributionReliability4056081,0132,026
R92X020-X035 Piti to Orote UGXTMPlannedTransmissionReliability4947421,2362,472
R93X037-X022 Apra to Piti UGXTMPlannedTransmissionReliability99114872,4784,956
R94X038-X124 Apra to Talofofo UGXTMPlannedTransmissionReliability12741,91131846,369
R95X066-X071 Marbo to Andersen UGXTMPlannedTransmissionReliability2113175271,055
R96P088 M. Ulloa/Santa Barbara/Benavente/Wettengel UGSchoolPlannedDistributionReliability8821,3242,2054,411
R97P212 San Vicente School UGSchoolPlannedDistributionReliability186279465930
R98P240/P244 JFK/Chief Brodie UGSchoolPlannedDistributionReliability158238395791
R99P250 AJMS/OCP UGSchoolPlannedDistributionReliability5498231,3722,744
R100P261 Notre Dame/Talofofo UGSchoolPlannedDistributionReliability3034547561,513
R101P270 J.M. Guerrero ES UGSchoolPlannedDistributionReliability82123205410
R102Piti - Agana X023-X043 UG ConversionPlannedTransmissionReliability1,0711,6062,6775,354
R103Orote - Apra X033-X036 UG ConversionPlannedTransmissionReliability7291,0941,8223,645
R104Agana - Anigua X040-X112 UG ConversionPlannedTransmissionReliability4957431,2372,475
R105Agana - SV Tap - Harmon X042-X263-X080 UG ConversionPlannedTransmissionReliability1,0861,6292,7145,429
R106GIAT - Agana (Open switch) X178-X041 UG ConversionPlannedTransmissionReliability1,2161,8233,039
R107Agana - Tamuning X053-X209 UG ConversionPlannedTransmissionReliability4717061,176
R108R. Barrigada - Marbo X056-X065 UG ConversionPlannedTransmissionReliability9711,4562,427
R109Marbo - Dededo X067-X222 UG ConversionPlannedTransmissionReliability385577962
R110Andersen - Harmon X073-X087 UG ConversionPlannedTransmissionReliability9441,4162,361
R111Harmon - Yigo X082-X160 UG ConversionPlannedTransmissionReliability1,1471,7212,868
R112Harmon - Dededo CT X088-X151/X154 UG ConversionPlannedTransmissionReliability505505
R113Pulantat - Barrigada X140-X247 UG ConversionPlannedTransmissionReliability1,4431,443
R114GAA - Barrigada X-173-X245 UG ConversionPlannedTransmissionReliability571571
R115P-003 Piti UG ConversionPlannedDistributionReliability713713
R116P-005 Piti UG ConversionPlannedDistributionReliability1,8501,850
R117P-007 Piti UG ConversionPlannedDistributionReliability714714
Issued by:JCF/AEB/MCL/JJC/PBT/JGAALL PROJECTSTotals:$658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386
Note:1. Project totals include previous fiscal year costs.
2. Only planning estimates are available for FY06 - FY13.REVENUE FUNDED PROJECTSTotals:$0$0$0$150$0$0$1,950$4,295$10,968$8,781$18,620$24,906$22,127$16,882$18,930$22,907$150,515
3. Fiscal totals do not include line extensions, blanket J.O.s, general plant items.
4. All dollars are FY03 dollars.BOND FUNDED PROJECTSTotals:$658$743$3,986$5,069$1,422$2,346$13,548$5,944$5,196$0$0$0$0$0$0$0$38,912
EXTERNALLY FUNDED PROJECTSTotals:$0$0$0$0$0$0$1,266$4,196$6,599$5,898$0$0$0$0$0$0$17,959
$658$743$3,986$5,219$1,422$2,346$16,764$14,435$22,763$14,679$18,620$24,906$22,127$16,882$18,930$22,907$207,386
Sheet3
FY'04 - FY'13
(X $1,000)
Total Number of Projects117
Total Estimated Cost$207,386
Revenue Funded$150,515
Bond Funded$38,912
Externally Funded$17,959
Generation Projects$19,532
Substation Projects$13,743
Transmission Projects$120,785
Distribution Projects$53,326
System Improvements(Revenue Funded)
Sheet1
GPA Underground ProjectsStatusPlanned FinishFundingEstimate (x $1,000)
Tumon 34.5 kV & 13.8 kV Underground Conversion Phase IIOngoingJun-04Tumon Beautification Bond Funds
P401 Underground Conversion to Guam Memorial HospitalFEMA ApprovedFY' 06FEMA 90%, GPA 10%1,200
P003 Underground Conversion to GPA Cabras FacilitiesFEMA ApprovedFY' 06FEMA 90%, GPA 10%700
Harmon to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,960
Tamuning to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,480
San Vitores to Macheche 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,520
Harmon to Tanguisson 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,550
Macheche to GAA 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%1,510
Agana to Tamuning and P202 Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,240
Sheet2
GPA System ImprovementsStatusPlanned FinishBenefitsCost (x $1,000)
Substation and Distribution Capacitor ProgramOngoingFY '04- Improved Voltage Delivery- Reduced System Losses Improved Power Quality867
T&D Asset Assessment & MappingOngoingFY '04- Aid in System Planning/Improvements- Inventory Asset Management- Timely Trouble Call Response300
Relay Coordination StudyPlannedFY '04- Improve System Stability- Eliminate Island Wide Blackouts- Improve System Reliability250
Sheet3
10 Year Capital Improvement Project Plan
Sheet1
GPA Underground ProjectsStatusPlanned FinishFundingEstimate (x $1,000)
Tumon 34.5 kV & 13.8 kV Underground Conversion Phase IIOngoingJun-04Tumon Beautification Bond Funds
P401 Underground Conversion to Guam Memorial HospitalFEMA ApprovedFY' 06FEMA 90%, GPA 10%1,200
P003 Underground Conversion to GPA Cabras FacilitiesFEMA ApprovedFY' 06FEMA 90%, GPA 10%700
Harmon to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,960
Tamuning to Tumon 34.5 kV Underground ConversionFEMA ApprovedFY' 06FEMA 90%, GPA 10%2,480
San Vitores to Macheche 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,520
Harmon to Tanguisson 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,550
Macheche to GAA 34.5 kV Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%1,510
Agana to Tamuning and P202 Underground ConversionPending FEMA ApprovalFY '07FEMA 90%, GPA 10%3,240
Sheet2
GPA System ImprovementsStatusPlanned FinishFundingEstimate (x $1,000)
Substation and Distribution Capacitor ProgramOngoingFY '04Revenue Funds867
T&D Asset Assessment & MappingOngoingFY '04Revenue Funds300
Relay Coordination StudyPlannedFY '04Revenue Funds250
Eng
GUAM POWER AUTHORITY
Engineering Capital Improvement Projects (CIP)
FY 2004 - FY 2023 (x $1,000)
RBTPriorityCapital Improvement Project NameEngineerStatusProjectTypeReasonFY98FY99FY00FY01FY02FY03FY04FY05FY06FY07FY08FY09FY10FY11FY12FY13ProjectTotalAppearedCode 1Code 2Code Definitions
B1ICS Notification System Upgrade / Fuel Switching and MeteringJJC/SAMConstructionGenerationLegal1,686506005902,9262,92620001.11.2Code 1: X(1).X(2)Code 2: X(3).X(4)
B2Cabras 4 (Boat Ramp)JLQDesignGenerationLegal658740108504002,6582,65819981.12.2X(1): Funding TypeX(3): Status
B3Bulk Storage Tank Life ExtensionVJS/JGADesignGenerationLegal2202001805002,5002,0001,4207,0207,02020001.12.21: Bond1: Construction
B4Repair Condenser Inlet/Outlet Lines at Cabras 1 & 2YFDesignGenerationReliability1205001,8005803,0003,00020021.12.42: External2: Design
B5Upgrade Monitoring Equipment for Water QualityMCSDesignGenerationReliability38047085085020021.12.43: Revenue3: Planned
B6USN Fuel Oil Pipeline Assessment and UpgradeDesignGenerationReliability1001505030030020021.12.4X(2): Project TypeX(4): Reason
B7Spill Containment at Various PlantsFQDesignGenerationReliability20015035035020041.12.41: Generation1: Safety
B8Boiler Control Upgrade for Cabras 1 & 2JLQPlannedGenerationReliability3001,0001,3001,30020041.13.42: Substation/Transmission2: Legal
B9Cabras Miscellaneous ProjectsPlannedGenerationReliability24824824820041.13.43: Distribution3: Loading
B10Harmon 115/34.5 KV Substation ExpansionJLQConstructionTransmissionLoading1,9502,311554,3164,31620001.21.34: DSM4: Reliability
B11Upgrade Barrigada to Talofofo 34.5 KV LineConstructionTransmissionLoading5274073481,1131,9001,90020001.21.3
B12Harmon Substation Protection System UpgradeAMConstructionSubstationReliability21535109901,2501,25020011.21.4
B13Construction of 115 kV Tower Maintenance Road (Phase II)ConstructionTransmissionReliability9361,6602,5962,59620011.21.4
B14Marbo to Pagat 34.5 KV LineJLQDesignTransmissionReliability3503,1723,2253,22519991.22.4
B15Old Dededo Kaiser Hybrid, Phase IConstructionDistributionReliability48015023886886820011.31.4
E16Harmon to Tumon 34. 5 kV Underground Conversion-FEMADesignTransmissionReliability5337981,3312,6622,66220042.22.4
R17Harmon to Tumon 34. 5 kV Underground Conversion-GPADesignTransmissionReliability608814829629620043.22.4
E18Tamuning to Tumon 34.5 kV Underground Conversion-FEMADesignTransmissionReliability3515258751,7511,75120042.22.4
R19Tamuning to Tumon 34.5 kV Underground Conversion-GPADesignTransmissionReliability507412424824820043.22.4
E20P401 Underground Conversion to Memorial Hospital-FEMADesignDistributionReliability2563245401,1201,12020042.32.4
R21P401 Underground Conversion to Memorial Hospital-GPADesignDistributionReliability24366012012020043.32.4
E22P003 Underground Conversion to Cabras-FEMADesignDistributionReliability12618931563063020042.32.4
R23P003 Underground Conversion to Cabras-GPADesignDistributionReliability142135707020043.32.4
R24Underground Fuel Pipeline at NASDesignGenerationSafety40030070070020043.12.1
R25Talofofo Power Plant ImprovementsDesignGenerationReliability18018018020043.12.4
R26Substation and Distribution Capacitor ProgramConstructionSubstationLoading56710010010086786720043.21.3
R27Agana T-9 18 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3
R28Harmon T-21 30 MVA Power Transformer UpgradeConstructionSubstationLoading80808020043.21.3
R29Pulantat Substation Grounding TransformerDesignSubstationReliability20020020020043.22.4
R30Substation Equipment Predictive MaintenancePlannedSubstationLegal2013015015020043.23.2
R31Merizo U/G RelocationDesignDistributionLegal12512512520043.32.2
R32U/G Reconstruction-Sinajana Phase IETFDesignDistributionReliability15020035035020043.32.4
R33Load StudyPlannedDSMLoading15010025025020013.43.3
Recommended