Commissioning Needs

Preview:

DESCRIPTION

Commissioning Needs. MOM (m. apollonio). RUN Schedule Dry Run DAQ / Detectors / Target Proton Absorber polarity inversion SHIFTERS ! Future MoM. Mom. shifter. MA. AA. GA. MP. Giorgio Cecchet - GC. HN. AA??. GC. the unkown shifter …. ?????. - PowerPoint PPT Presentation

Citation preview

1

Commissioning NeedsMOM (m. apollonio)

• RUN Schedule–Dry Run–DAQ / Detectors / Target

• Proton Absorber–polarity inversion

• SHIFTERS !• Future MoM

2

MA

Gio

rgio

Cec

chet

- G

C

GA

MP

HN

AA

Mom

shift

er

3

GC

????

?

AA

??th

e un

kow

n sh

ifter

This is Machine Physics!!! Do we want to do something?

4

Than

ks P

aul !

!!

cushion day / no run

5

• DRY RUN on Nov 2nd

– Verify procedures– Verify slow control (EPICS), with special regard to magnets – verify BLM (dummy trigger with gate generator)

• DAQ experts around … – JSG from Nov 1st, VV from Nov 3rd

• TARGET crew– Anyone around on Nov 3rd ?

• Proton Absorber– polarity inversion on Nov 29th: test again with + particles– Study effect of polyethilene multilayers

6

• SHIFTERS ! – Nov 3 : anyone ???– Nov [4,7]: Gail Hanson– Nov [8,12]: Milorad Popovic– Nov 13: Andri Alekou (?) – Nov [15,22]: Henry Nebrensky– Nov [22,26]: Andri Alekou (?)– Nov [26 …]: Unnamed Shifter …

7

• Moms (present & future)– […, Nov2] MA– [Nov2, Nov25] Giorgio Cecchet – [Nov26, Dec1] GC (check fund availability)– [Dec 2, Dec 20] No certain name … – January and beyond … ditto