ComBU Project rev0 - Yazaki Europe

Preview:

Citation preview

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 1

New ComBU Project Features

Cologne, February 2010Prepared by Torsten Gersmeier & Wendy Van Edom

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 2

Project Overview

See page 4 - 5

See page 6 - 7

See page 18 - 22 See page 8

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 3

Project Overview

Not used anymore, see page 18

See page 18 - 22

Collection of hyperlinks

SPR connected to the project

Currently not used by ComBU

Tracked project history

See page 13 - 17

Project members selected during SPR

See page 10

See page 11

List of Yazaki documents connected to the project

See page 12

See page 9

Currently not used by ComBU

Currently not used by ComBU

Currently not used by ComBU

Currently not used by ComBU

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 4

New Fields in project milestones

NEW FIELDS added to the TABs General and Project Milestones:Project price (General)Tool cost (General)Amortization (General)Concept due date (Project Milestones)Sourcing due date (Project Milestones)2D drawing due date (Project Milestones)

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 5

How to change project milestones

1. Push EDIT and a second screen willopen.

2. Select the Calendarfunction and pick yournew milestone date.

1.2.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 6

New tab: Project History

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 7

How to create a new project history

1.

1. Push Actions.. A second screen will open.

2.

2. Select the date, put in your comments and push create.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 8

How to have a look at the design objectives

1.

1. Go into the Design Objectives tab. 2. Push the printer icon and you will get the design objectives in a pdf file.

2.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 9

Dashboard

Dashboard with quick links to WBS etc.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 10

Folders

YPMS2 agreed folder structure to store project related documents

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 11

Lifecycle

Project lifecycle used by project management to change the projectstatus

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 12

Properties

Basic Project Information

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 13

The work breakdown structure

In the WBS you set the project timing and EMA gateways dates.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 14

How to edit the date settings1. Push ACTIONS and select EDIT.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 15

How to edit the date settings

1. Select the Calendar function and pick yournew milestone date.2. Push APPLY and the new timing due date is set.

1. Put in the number of dates you foresee for each milestone step.2. Push APPLY and the new timing due date is set.

OR

1.1.

2. 2.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 16

How to edit the date settings

1.

2.

1. Once all due dates are defined, put the project on ACTIVE.

1. Once starting a new project milestone step, close the previous (select completed) and 2. Put the next one on active.3. Push APPLY

1.

3.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 17

View of the WBS milestone steps

Push the printer icon and you get a pdf format.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 18

ComBU Parts / Yazaki Parts

ComBu-PartsIn prior Matrix project versions a so-called ComBu parts could be created and attached to the project.The creation of new ComBU-Parts is now deactivated, only existing ComBU parts linked to a project are shown under ComBu parts. As far as possible ComBu parts will be migrated to Yazaki parts.Yazaki-PartsFor new projects, Yazaki parts can be connected to a project. Automatically created containers can be used to store project and part related documents.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 19

How to connect a Yazaki part

Actions -> Connect Yazaki Part…

Insert Yazaki Part NumberAnd press “Find”

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 20

How to connect a Yazaki part

Tick Yazaki Part Numberand press “Connect”

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 21

Feature of a Yazaki part in ComBU project

For each part number connected to a project, several containers for document storage are created.A summery of all containers can be found under “All Related ComBu-Documents”The same containers can also be found under the listed folders related to the applicable subject.For „Cost“ and „Tooling“ no containers are available, please store related documents in the folder area of the project.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 22

Feature of a Yazaki part in ComBU project

Each container can be used to store documents, checkout and check in documents, make subscriptions etc.

2010 © COPYRIGHT BY YAZAKI EUROPE LTD. ANY REPRODUCTION OR DISCLOSURE IS PROHIBITED WITHOUT PRIOR WRITTEN CONSENT OF YAZAKI Page 23

Need help or have additional questions?

Please contact the Technical Service and Support Team:tss@yazaki-europe.comTel.: +49 221 59799235 or

+49 221 59799272

Help?

Recommended