Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Following systems are prerequisites for an incentive scheme:-
Correct Answer Sound system of accounting operators daily output , Good production
planning and control system , Good Inspection and quality control systemYour Answer
Efficient wage payment system , Good production planning and control system , Good Inspection and quality control system
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs and fixtures once provided will be able to maintain accuracy up to about ________ pieces.
Correct Answer 20000
Your Answer 20000
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Duration of project can be reduced if duration of an activity on ________ path is reduced.
Correct Answer Critical
Your Answer Critical
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the major repairs section because
of :-Correct Answer
Absence of the underground pitYour Answer
Absence of the underground pit
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be manufactured
from a hollow bored forging , Fastest delivery is requested
Your Answer A special cylinder is to be manufactured. , The item is to be manufactured
from a hollow bored forging , Fastest delivery is requested
Select The BlankQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The loss of consignment was ________.
Correct Answer Total
Your Answer Total
True/FalseQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the
component.Correct Answer
FalseYour Answer
False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Eagle Machine Company' : Cost of running Sally's department is Rs 3,70,000 per year. This is on account of :-
Correct Answer Salaries , Fringes , Expenses
Your Answer Salaries , Fringes , Expenses
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : The huge work table placed outside the machine shop can be used to carry out :-
Correct Answer
Filing work , Debarring work , Cleaning workYour Answer
Filing work , Debarring work , Cleaning work
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Autogears Private Limited' : The management is interested in the following :-
Correct Answer Improved method of working
Your Answer Improved method of working
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot of 500 kg material was
purchased from :-Correct Answer
A source who is not in the approved listYour Answer
A source who is not in the approved list
True/FalseQuestion
This question refers to case on Morbay Engineering Works (MEW).Overtime tend to reward more than incentive scheme.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The company is manned by :-
Correct Answer Professional managers
Your Answer Professional managers
Select The BlankQuestion
This Question refers to the case of 'Eagle Machine Company' : The purchase department is responsible only for buying and ________.
Correct Answer
ExpeditingYour Answer Expediting
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in completion of ________ would increase Project cost.
Correct Answer Project
Your Answer Project
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Fixed ________ are to be computed only when machines need to be purchased.
Correct Answer Overhead
Your Answer Overhead
Select The BlankQuestion
The question refer to the case on 'Kalpak Engineers' : Raw material in the form of bar stock is supplied by the ________.
Correct Answer Customer
Your Answer Customer
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Cost of reject above 5% machining rejection is borne by the vendor.
Correct Answer True
Your Answer True
Select The BlankQuestion
This question refers to 'Automotive Gears Private Limited' : The case study requires calculation of set up ________ for the job.
Correct Answer Cost
Your Answer Cost
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year :-
Correct Answer 1972
Your Answer 1972
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Geer Company' : The company had a small foundry until 1946. This was subsequently closed and the purchase of
ferrous castings were handled by :-Correct Answer
A man who had been a supervisor in the foundryYour Answer
A man who had been a supervisor in the foundry
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : This company was acquired by Das Group of Industries. Mr. Mohit Sen,(head of Business planning function in the corporate office) was visiting the factory
as its :-Correct Answer
Turn over was stagnatingYour Answer
Turn over was stagnating
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer Eliminative
Your Answer Eliminative
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The scheme shall apply to :-
Correct Answer Each and every employee
Your Answer Each and every employee
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'K.T Gears' : The groove cutting operation is performed by :-Correct Answer
Holding the gear blank on a mandrel in face plate , Cutting the groove by two tools , One tool is held in rear side and other held in front side
Your Answer Holding the gear blank on a mandrel in face plate , Cutting the groove by two
tools , One tool is held in rear side and other held in front side
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower
Your Answer New jigs and fixtures , Additional shift
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The responsibility of physical movement of material was assigned to :-
Correct Answer Helpers
Your Answer Helpers
Select The BlankQuestion
This Question refers to the case of 'Autogears Private Limited' : The task given is to redraw ________ activity chart for the improved method.
Correct Answer Multiple
Your Answer Multiple
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Suyog Udyog' : Balancing weights are
manufactured using facilities arranged in :-Correct Answer
Process type of layoutYour Answer
Process type of layout
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr Sharma, Production Engineer informed Mr. Kaul that :-
Correct Answer Material testing was done by a worker as Raw Material Inspector was
absent , Visual checking for cracks on sample basis was carried out , Heat treatment operator is a new one .
Your Answer Material testing was done by a worker as Raw Material Inspector was
absent , Visual checking for cracks on sample basis was carried out , Heat treatment operator is a new one .
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled by the development
department for :-Correct Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful
developmentYour Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful
development
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.': The contract with Kay Jee Hydraulics Ltd was agreed with following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's
confirmed order , Payment 60 days after dispatch of materialYour Answer
Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material
Match The FollowingQuestion
Correct AnswerYour Answer
Activity in CPMArrowArrow
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Critical PathProject durationProject duration
CPM/PERTProject planning/ scheduling techniqueProject planning/ scheduling technique
Cost overrunDelays in projectDelays in project
Multiple Choice Single AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost of buying :-
Correct Answer Transport costYour Answer
Transport cost
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout
activity affects following activities :-Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gaugeYour Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
True/FalseQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : The
organization has reputation for poor deliveries.Correct Answer
FalseYour Answer
True
True/FalseQuestion
This question refers to the case of 'Northern Machinery Ltd' : The company's suppliers are of all sizes and scattered across the country.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.':Parveen Kumar proposed to set up a :-
Correct Answer Cast Iron foundry
Your Answer Cast Iron foundry
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following is the information requirement for using CPM/PERT techniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the activities
Your Answer List of activities , Activity duration , Precedent relationship of the activities
True/FalseQuestion
This Question refers to the case of Narmada Electricals Ltd. Mr. Jain proposed that for accounting of material, and to carry out other task, two additional
clerks shall be recruitedCorrect Answer
TrueYour Answer
True
Select The BlankQuestion
This Question refers to the case of 'Kerson Automobiles' : The pedestal
grinder mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer Sparks
Your Answer Sparks
True/FalseQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the
last operation.Correct Answer
TrueYour Answer
True
Match The FollowingQuestion
Correct AnswerYour Answer
Anonymous letter received by M.D.Need to justifyNeed to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyersSeen in top hotels with suppliersSeen in top hotels with suppliers
Reason for failure to convince the Board of DirectorsNo material facts to support the argumentsNo material facts to support the arguments
Lot of items on the agendaNeed to be concise and to the pointNeed to be concise and to the point
True/FalseQuestion
This Question refers to the case of 'Artwood Products' : It is necessary to keep stock of standard furniture to cater to sudden requirement of the
customers.Correct Answer
TrueYour Answer
True
True/FalseQuestion
This Question refers to the case of 'The Irate Vendor' : The President knows that some changes in purchasing policy are being planned.
Correct Answer True
Your Answer True
at 12:53 AM 0 comments Links to this post
Labels: Cases in Operations Management
Cases in Operations Management - 4
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer Fastest delivery is requested , A special cylinder is to be manufactured. , The
item is to be manufactured from a hollow bored forgingYour Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company has well established machine shop having more than 150
machines and :-Correct Answer
A heat treatment shop , Metrology section , Packing sectionYour Answer
A heat treatment shop , Metrology section , Packing section
True/FalseQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The order has been finalized from a leading engineering firm.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately
Select The BlankQuestion
The question refer to the case on 'Kalpak Engineers' : The sawed off pieces from power hacksaw are then moved to ________ facing and centering
machine.Correct Answer Special- purpose
Your Answer Special- purpose
Select The BlankQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Allied Industries Pvt ltd is a small ________ concern with 25 workmen.
Correct Answer Proprietary
Your Answer Proprietary
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : As per union, fixation of time standards for the gauges will lead to large scale rejection.
Correct Answer True
Your Answer True
Match The FollowingQuestion
Correct AnswerYour Answer
Anonymous letter received by M.D.Need to justifyNeed to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers
Seen in top hotels with suppliersSeen in top hotels with suppliers
Reason for failure to convince the Board of DirectorsNo material facts to support the argumentsNo material facts to support the arguments
Lot of items on the agendaNeed to be concise and to the pointNeed to be concise and to the point
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer Shift
Your Answer Shift
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Following are the characteristics of scalon plan:-
Correct Answer All employees receive a guaranteed time wage , Incentive bonus is based on reduction in labour to sales ratio , A standard for the ratio of labour cost to
the total sales value is set as an indexYour Answer
All employees receive a guaranteed time wage , Incentive bonus is based on reduction in labour to sales ratio , A standard for the ratio of labour cost to
the total sales value is set as an index
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'National Engineering Co.' : Mr. Kher, Material Manager, had talked to supplier who agreed to take back the 2200
kgs of 22 A/F En 1 in stock at :-Correct Answer
The rate he sold to themYour Answer
The rate he sold to them
Match The FollowingQuestion
Correct AnswerYour Answer
Equipment costCapital recovery factorCapital recovery factor
This question refer to the case on "Allied Industries Pvt Ltd." : Variable costPower costPower costFixed costSpace costSpace cost
ItemSealing pumpSealing pump
True/FalseQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management knew the activities involved, their durations and
interrelationship, still are not in position to tell when the project will be completed.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by :-
Correct Answer One buyer
Your Answer One buyer
Multiple Choice Multiple AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are planned:-
Correct Answer
Copying Lathe , Radial Drilling Machine , Thread Rolling machineYour Answer
Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Multiple Choice Multiple AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Copy turning , Thread Rolling , Drilling
True/FalseQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the
last operation.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Incentive scheme was finalized based on :-
Correct Answer Monthly salesYour Answer Monthly sales
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled by the development
department for :-Correct Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful
developmentYour Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful
development
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.':Parveen Kumar proposed to set up a :-
Correct Answer Cast Iron foundry
Your Answer Cast Iron foundry
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'K.T Gears' :To study the company's blanking operations to improve methods and fix labour performance
standards, the company has constituted :-Correct Answer
An industrial engineering departmentYour Answer
An industrial engineering department
True/FalseQuestion
This question refers to case on Morbay Engineering Works (MEW).Overtime tend to reward more than incentive scheme.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'K.T Gears' : The firm is :-Correct Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear
True/FalseQuestion
This Question refers to the case of 'Kerson Automobiles' : Some areas can not be used because of odour emanating from adjoining two painting bays.
Correct Answer True
Your Answer False
Select The BlankQuestion
This Question refers to the case of 'The Irate Vendor' : As per Jones, the new ________ procedures were sound.
Correct Answer Purchasing
Your Answer Purchasing
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'National Engineering Co.' : The GM instructed the Finance Manager that in the next meeting :-
Correct Answer Cutting tools should be analyzed , Stationery should be analyzed , Every one
should sit and devise the action plan to fix items in these groups & give a time bound specific program within next two days
Your Answer Cutting tools should be analyzed , Stationery should be analyzed , Every one
should sit and devise the action plan to fix items in these groups & give a time bound specific program within next two days
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Artwood Products' : The company is engaged in design and manufacture of wooden furniture. The critical factor
in acceptance of furniture is :-Correct Answer
QualityYour Answer
Quality
Select The BlankQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : It was observed that there was no ________ or any marking system to know
identification of the components, their status in terms of acceptance/rejection and quantity of the components in the bins.
Correct Answer Tag
Your Answer Tag
Select The BlankQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : A compromise was finally reached in which the supplier agreed to ________
the cancellation charges.Correct Answer
WithdrawYour Answer
Withdraw
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The table given in the case study gives details of activities and expected time for
the same. It requires construction of :-Correct Answer
Network diagram of the activitiesYour Answer
Network diagram of the activities
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : The process sheet involves selection of ________ time.
Correct Answer Cycle
Your Answer Cycle
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In
the manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Select The BlankQuestion
This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer Aggressive
Your Answer Aggressive
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Cost of reject above 5% machining rejection is borne by the vendor.
Correct Answer True
Your Answer False
True/FalseQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer False
Select The BlankQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' : NEL has plans for expanding its activities and shortage ________ was one of the major
constraints for its plans.Correct Answer
SpaceYour Answer
Space
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The item exhaust manifold is presently not ________.
Correct Answer ManufacturedYour Answer Manufactured
Select The BlankQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The agreement mentioned that Incentive amount will be paid along with ________.
Correct Answer Wages
Your Answer Wages
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Eagle Machine Company' : The company is facing following problem :-
Correct Answer Sales are declining
Your Answer Sales are declining
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : A substantial portion of its sales are special order items on which
manufacture is started :-Correct Answer
Only after the order has been received from the buyerYour Answer
Only after the order has been received from the buyer
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot of 500 kg material was
purchased from :-Correct Answer
A source who is not in the approved listYour Answer
A source who is not in the approved list
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts
and additional output.Correct Answer
TrueYour Answer
False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' : Production or Quality department decide when these become surplus/obsolete :-
Correct Answer Part , Component , Item
Your Answer Part , Component , Material
Select The BlankQuestion
This Question refers to 'Uday Electroplating Shop' :The owner finds it ________ to get part time employees when there is heavy work load.
Correct Answer Difficult
Your Answer Difficult
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer CPM , PERT , Network Analysis
Your Answer CPM , PERT , Network Analysis
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer
Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for he invoiced amount , Did not send the consignment by Hansa's
designated carrier
at 12:52 AM 0 comments Links to this post
Labels: Cases in Operations Management
Cases in Operations Management - 3
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery Limited' : The V.P.
asked Material Manager to prepare short report to be presented to board of directors about :-Correct Answer Buying policiesYour Answer
Buying policies
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : As per Materials Manager basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
True/FalseQuestion
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The company is manned by :-
Correct Answer Professional managers
Your Answer Professional managers
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Irate Vendor' : The old supplier :-Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bidYour Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bid
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : While making Make or Buy decisions, Buy indicator includes following costs :-
Correct Answer Raw material cost , Purchase cost , Fixed overhead cost
Your Answer Raw material cost , Purchase cost
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout
activity affects following activities :-Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gaugeYour Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer False
Your Answer False
Match The FollowingQuestion
Correct AnswerYour Answer
Activity in CPMArrowCircle
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Critical PathProject durationProject duration
CPM/PERTProject planning/ scheduling techniqueProject planning/ scheduling technique
Cost overrun
Delays in projectDelays in project
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Work sampling and production studies can be used to test viability of the
performance standards.Correct Answer
TrueYour Answer
True
True/FalseQuestion
This Question refers to the case of 'Eagle Machine Company' : The company buys a variety of material, ranging from a few ponds of rare metals to sizable
quantities of sheet metal.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The scheme shall apply to :-
Correct Answer Each and every employee
Your Answer Each and every employee
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs
Select The BlankQuestion
This Question refers to the case of 'Kerson Automobiles' : Battery charger placed on one end of table creates ________.
Correct Answer
NuisanceYour Answer
Nuisance
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Irate Vendor' : The President's memorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if his complaint
is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his complaint
is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is ________
numbers.Correct Answer
8000Your Answer
8000
Select The BlankQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover
Your Answer Turnover
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : In Scanlon Plan all employees receive guaranteed ________ wages.
Correct Answer Time
Your Answer Time
Select The Blank
Question This question refers to 'Automotive Gears Private Limited' : The case study
requires calculation of set up ________ for the job.Correct Answer
CostYour Answer
Cost
Multiple Choice Multiple AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following :-
Correct Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer True
Your Answer True
Select The BlankQuestion
This Question refers to the case 'Indus Foundries Ltd.' : Projected turnover in the first year itself is over ________ crore rupees.
Correct Answer 20
Your Answer 20
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction the management purchased a ________.
Correct Answer Factory-building
Your Answer Factory-building
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : One of the following is not a variable overhead:-
Correct Answer Space
Your Answer Cutting oil
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer False
Select The BlankQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was looking ________.
Correct Answer Congested
Your Answer Congested
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor
quality of productsYour Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Geer Company' : Problems got created due to :-Correct Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of
inexperienced buyers
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapat informed that purchases
were made from :-Correct Answer Several sources
Your Answer Several sources
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : With the introduction of the scheme :-
Correct Answer The sales picked up
Your Answer The sales picked up
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : The V.P. informed the Material Manager that the anonymous letter was received by :-
Correct Answer M.D.
Your Answer M.D., with copy to all the directors
Multiple Choice Single AnswerQuestion
This Question refers to the case of Narmada Electricals Ltd.: In the existing method, the scarp generated in processes like machining was stored in :-
Correct Answer Scrap yard
Your Answer Scrap yard
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : This case is on make-buy decision for an item. Name of that item is one of the below :-
Correct Answer Exhaust Manifold
Your Answer Exhaust Manifold
True/FalseQuestion
This question refers to the case of 'Northern Machinery Ltd' : The company's suppliers are of all sizes and scattered across the country.
Correct Answer True
Your Answer True
Select The BlankQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor TrailerYour Answer Tractor Trailer
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool & process
equipment industriesYour Answer
Automobile industries , Printing machines , Machine tool & process equipment industries
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following are the activities involved in employee selection for WIPL :-
Correct Answer Release of advertisement , Finalize job profile , Selecting candidates
Your Answer Release of advertisement , Selecting candidates
Multiple Choice Single AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project duration also helps in the
following :-Correct Answer
Possibilities of reducing project duration
Your Answer Possibilities of reducing project duration
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' :The option of shifting the workshop to another location at the outskirts of the city was
shelved because :-Correct Answer
Company was likely to lose business of spare parts and service of old carsYour Answer
Company was likely to lose business of spare parts and service of old cars
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive scheme should not be regarded as a substitute for ________ wage structure.
Correct Answer Poor
Your Answer Poor
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-
Correct Answer Routing
Your Answer Routing
Match The FollowingQuestion
Correct AnswerYour Answer
Machine shop congested with semi-processed material kept in the bins and components lying on the floors all around.
Shortage of spaceShortage of space
This Question refers to the case of 'Classic Engineering Components Ltd.' : Measuring instruments like vernier calipers, micrometers or gauges
Shared by operatorsShared by operators
Unispected lotsProcessedProcessed
Responsibility of oiling /greasingMaintenance departmentMaintenance department
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Artwood Products' : As per study conducted by Mr. Tahil, it was observed that Artwood's profitability has :-
Correct Answer Eroded
Your Answer Eroded
Select The BlankQuestion
This Question refers to the case of 'The Geer Company' : The company decided to engage a consulting firm to aid in re-organizing the ________
operation.Correct Answer
PurchasingYour Answer Purchasing
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : As per consultants, problems are due to following reasons :-
Correct Answer Material flow (Cars) is not smooth , A major chunk of productive time is lost
in obtaining replacement of spares from stores. , Too often, helpers are found busy in transferring parts from work table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive time is lost
in obtaining replacement of spares from stores. , Too often, helpers are found busy in transferring parts from work table to a hand trolley.
True/FalseQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company received an order and finally authorized completion of the
forging and placed it in stock.Correct Answer
FalseYour Answer
True
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are
sizable.Correct Answer
FalseYour Answer
False
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following are the requirements:-
a)b)c)d)
New jigs and fixturesAdditional shift
Additional manpowerAdditional machinery
41.This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project
duration can always be reduced by deploying additional recourses.TrueFalse
at 12:48 AM 0 comments Links to this post
Labels: Cases in Operations Management
Cases in Operations Management - 2
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is not considered while calculating total cost of thread rolling in-
house :-Correct Answer Transport costYour Answer
Transport cost
True/FalseQuestion
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
True/FalseQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : Kay Jee dispatched the consignment as per the terms of the order.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer
TrueYour Answer
True
Select The BlankQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was looking ________.
Correct Answer Congested
Your Answer Congested
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Following is One apparent saving if the machining is done at the company's own plant:-
Correct Answer Sale of scrapYour Answer Sale of scrap
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Irate Vendor' : The President's memorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if his complaint
is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his complaint
is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for exhaust manifold provides following information:-
Correct Answer Jigs and fixtures required
Your Answer Jigs and fixtures required
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : The success of an incentive plan to a large extent depends on the following
factor:-Correct Answer
Quality of performance standardYour Answer
Quality of performance standard
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Irate Vendor' : The old supplier :-Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bidYour Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bid
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : One of the most popular and widely used incentive plan is called by following
name:-Correct Answer
Scanlon PlanYour Answer Scanlon Plan
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed in the gangway a couple of bins containing :-
Correct Answer Semi processed components
Your Answer Semi processed components
Multiple Choice Single AnswerQuestion
This Question refers to 'Uday Electroplating Shop' : It is a job order :-Correct Answer Production unitYour Answer
Production unit
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Geer Company' : Problems got created due to :-Correct Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of
inexperienced buyers
Select The BlankQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' : NEL has plans for expanding its activities and shortage ________ was one of the major
constraints for its plans.Correct Answer
SpaceYour Answer
Space
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Following are some of the shortcomings of scanlon plan:-
Correct Answer It rewards workers even if increase in sales is due to factor like price
increase , The plan does not recognize individual efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to
the workmenYour Answer
It rewards workers even if increase in sales is due to factor like price increase , The increase in labour cost due to wage agreement may result in
lesser incentive bonus to the workmen
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately
True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The
order has been finalized from a leading engineering firm.Correct Answer
FalseYour Answer
False
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : It is in the business of manufacturing of :-
Correct Answer Hydraulic pumps & equipment
Your Answer Hydraulic pumps & equipment
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Many incentives schemes fail in their ________ due to 'loose standards'.
Correct Answer Objectives
Your Answer Objectives
Match The FollowingQuestion
Correct AnswerYour Answer
Machine shop congested with semi-processed material kept in the bins and components lying on the floors all around.
Shortage of spaceShortage of space
This Question refers to the case of 'Classic Engineering Components Ltd.' : Measuring instruments like vernier calipers, micrometers or gauges
Shared by operatorsShared by operators
Unispected lotsProcessedProcessed
Responsibility of oiling /greasingMaintenance departmentMaintenance department
Multiple Choice Multiple Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-Correct Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricantYour Answer
Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Select The BlankQuestion
This Question refers to the case of 'The Irate Vendor' : As per Jones, the new ________ procedures were sound.
Correct Answer Purchasing
Your Answer Purchasing
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of National Engineering Co.Correct Answer
Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's
designated carrierYour Answer
Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's
designated carrier
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer CPM , PERT , Network Analysis
Your Answer CPM , PERT , Network Analysis
True/FalseQuestion
This Question refers to the case of 'Kerson Automobiles' : The decision to utilize gnagway space as "Service Bays" is good.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrelYour Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrel
Select The BlankQuestion
This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer Aggressive
Your Answer Aggressive
Match The FollowingQuestion
Correct AnswerYour Answer
Equipment costCapital recovery factorCapital recovery factor
This question refer to the case on "Allied Industries Pvt Ltd." : Variable costPower costPower costFixed costSpace costSpace cost
ItemSealing pumpThreaded nut
True/FalseQuestion
This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True
Your Answer True
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer True
Your Answer False
Select The BlankQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover
Your Answer Turnover
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : The V.P. asked Material Manager to prepare short report to be presented to board of
directors about :-Correct Answer Buying policiesYour Answer
Buying policies
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : As per union, fixation of time standards for the gauges will lead to large scale rejection.
Correct Answer True
Your Answer True
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : The ________ furniture is sold through distributors.
Correct Answer Standard
Your Answer Standard
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : This case is on make-buy decision for an item. Name of that item is one of the below :-
Correct Answer Exhaust Manifold
Your Answer Exhaust Manifold
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Success of wage incentive plans to a large extent depends on the ________ of
performance standards.Correct Answer
QualityYour Answer
Accuracy
True/FalseQuestion
This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer True
Your Answer True
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : The process sheet involves selection of ________ time.
Correct Answer Cycle
Your Answer Cycle
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : Khan had used a paper to deliver a talk to his senior buyers. This paper contained :-
Correct Answer Summary of purchases
Your Answer Summary of purchases
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are
sizable.Correct Answer
FalseYour Answer
False
Select The BlankQuestion
This Question refers to the case of 'Northern Machinery Limited' : The V.P. instructed Materials Manager to collect ________ information and evidence to
clarify that their system is foolproof.Correct Answer
RelevantYour Answer
Relevant
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction the management purchased a ________.
Correct Answer Factory-building
Your Answer Factory-building
Multiple Choice Multiple AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Copy turning , Thread Rolling , Drilling
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer
Kolhapur , Ahmedabad , CoimbatoreYour Answer
Kolhapur , Ahmedabad , Coimbatore
at 12:47 AM 0 comments Links to this post
Labels: Cases in Operations Management
Cases in Operations Management - 1
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion
This Question refers to the case 'Indus Foundries Ltd.' :Industrial relations climate at all the proposed locations is ________ for production.
Correct Answer Conductive
Your Answer Conductive
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool & process
equipment industriesYour Answer
Printing machines , Machine tool & process equipment industries , Automobile industries
True/FalseQuestion
This question refers to the case of 'Northern Machinery Ltd' : As per summary of purchases of the last year, Material cost as a proportion of sales
is 26%.Correct Answer
FalseYour Answer
False
Select The BlankQuestion
The question refer to the case on 'Kalpak Engineers' : Raw material in the form of bar stock is supplied by the ________.
Correct Answer Customer
Your Answer Customer
Multiple Choice Single AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project duration also helps in the
following :-Correct Answer
Possibilities of reducing project durationYour Answer
Possibilities of reducing project duration
Select The BlankQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover
Your Answer Turnover
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average efficiency on the other components currently being produced is around 75%.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : One of the following is not a variable overhead:-
Correct Answer Space
Your Answer Space
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs and fixtures once provided will be able to maintain accuracy up to about ________ pieces.
Correct Answer 20000
Your Answer 20000
Select The BlankQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Allied Industries Pvt ltd is a small ________ concern with 25 workmen.
Correct Answer Proprietary
Your Answer Proprietary
True/FalseQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management knew the activities involved, their durations and
interrelationship, still are not in position to tell when the project will be completed.
Correct Answer True
Your Answer True
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer False
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are
sizable.Correct Answer
FalseYour Answer
False
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.': The company is faced with following problems :-
Correct Answer Choice of Location
Your Answer Choice of Location
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : As per the MD, the company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics, as they do
not work at their place of work , Union leaders waste their timeYour Answer
Union leaders do not work , Lower efficiency of the mechanics, as they do not work at their place of work , Union leaders waste their time
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer False
Your Answer False
Select The BlankQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The agreement mentioned that Incentive amount will be paid along with ________.
Correct Answer Wages
Your Answer Wages
Match The FollowingQuestion
Correct AnswerYour Answer
Anonymous letter received by M.D.Need to justifyNeed to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers
Seen in top hotels with suppliersSeen in top hotels with suppliers
Reason for failure to convince the Board of DirectorsNo material facts to support the argumentsNo material facts to support the arguments
Lot of items on the agendaNeed to be concise and to the pointNeed to be concise and to the point
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is ________
numbers.Correct Answer
8000Your Answer
8000
Multiple Choice Multiple AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are planned:-
Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Your Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : Vice President ( Commercials) called the Materials Manager Mr. Khan and
informed him that an anonymous letter was received which mentioned :-Correct Answer
Corruption in purchase departmentYour Answer
Corruption in purchase department
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Eagle Machine Company' : Manufacturing Manager handles :-
Correct Answer Production , Inventory control , Receiving
Your Answer Production , Inventory control , Receiving
Select The BlankQuestion
The question refer to the case on 'Kalpak Engineers' : The sawed off pieces from power hacksaw are then moved to ________ facing and centering
machine.Correct Answer Special- purpose
Your Answer Special- purpose
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : A substantial portion of its sales are special order items on which
manufacture is started :-Correct Answer
Only after the order has been received from the buyerYour Answer
Only after the order has been received from the buyer
Select The BlankQuestion
This question refers to 'Automotive Gears Private Limited' : The company produces items for ________ manufacturers.
Correct Answer Automobile
Your Answer Automobile
Multiple Choice Multiple AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Copy turning , Thread Rolling , Drilling
True/FalseQuestion
This question refers to case on Morbay Engineering Works (MEW).Overtime tend to reward more than incentive scheme.
Correct Answer True
Your Answer
True
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In
the manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor
quality of productsYour Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : The huge work table placed outside the machine shop can be used to carry out :-
Correct Answer Filing work , Debarring work , Cleaning work
Your Answer Filing work , Debarring work , Cleaning work
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-
Correct Answer Routing
Your Answer Routing
Multiple Choice Multiple AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following :-
Correct Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
True/FalseQuestion
This Question refers to the case of Narmada Electricals Ltd. Mr. Jain proposed that for accounting of material, and to carry out other task, two additional
clerks shall be recruitedCorrect Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot of 500 kg material was
purchased from :-Correct Answer
A source who is not in the approved listYour Answer
A source who is not in the approved list
Select The BlankQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor TrailerYour Answer Tractor Trailer
Match The FollowingQuestion
Correct AnswerYour Answer
Activity in CPMArrowArrow
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Critical PathProject durationProject duration
CPM/PERTProject planning/ scheduling technique
Project planning/ scheduling techniqueCost overrun
Delays in projectDelays in project
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Irate Vendor' : The old supplier :-Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bidYour Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bid
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of National Engineering Co.Correct Answer
Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's
designated carrierYour Answer
Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's
designated carrier
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Success of wage incentive plans to a large extent depends on the ________ of
performance standards.Correct Answer
QualityYour Answer
Quality
Select The BlankQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The ________ supplier invoiced this company for a cancellation charge.
Correct Answer Original
Your Answer
Original
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer Shift
Your Answer Shift
True/FalseQuestion
This question refers to the case of 'Northern Machinery Ltd' : The company's suppliers are of all sizes and scattered across the country.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer Congested
Your Answer Congested
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After contracting Hansa raised a :-
Correct Answer Purchase OrderYour Answer
Purchase Order
Multiple Choice Single AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost of buying :-
Correct Answer Transport costYour Answer
Transport cost
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : Distance traveled every day, by a mechanic to get replacement from stores is :-
Correct Answer 4 to 6 miles
Your Answer 4 to 6 miles
Select The BlankQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of material was done on ________ basis.
Correct Answer Weight
Your Answer Weight
Select The BlankQuestion
This Question refers to the case of 'National Engineering Co.' : GM commented that every department in this company competes with others in
matter of ________.Correct Answer
InefficiencyYour Answer Inefficiency
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in execution of project leads to cost ________.
Correct Answer Overrun
Your Answer Overrun
True/FalseQuestion
This Question refers to the case of 'Artwood Products' : It is necessary to keep stock of standard furniture to cater to sudden requirement of the
customers.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to 'Automotive Gears Private Limited' : The company, for its various items, has recently introduced the concept of :-
Correct Answer Economic lot size
Your Answer Economic lot size
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' : Other material considered to be scrap/obsolete is :-
Correct Answer Packing material , Maintenance spares , Parts/components
Your Answer Packing material , Maintenance spares , Parts/components , Electric motors
True/FalseQuestion
This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a senior purchase manager, Mr. Sajid Durrani in the purchased department :-
Correct Answer In view of need to procure parts/components for development in time
Your Answer In view of need to procure parts/components for development in time
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Following was the solution conceived by the Production Manager to the need
of increasing production:-Correct Answer
Introduction of incentive schemeYour Answer
Introduction of incentive scheme
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer Eliminative
Your Answer Eliminative
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant ,
Fixed overheads
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by :-
Correct Answer One buyer
Your Answer One buyer
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the major repairs section because
of :-Correct Answer
Absence of the underground pit
Your Answer Absence of the underground pit
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts
and additional output.Correct Answer
TrueYour Answer
True
True/FalseQuestion
This Question refers to the case of 'The Geer Company' : During the period of rapid expansion, it became necessary to subcontract a significant volume of
machining operations.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'K.T Gears' : The groove cutting operation is performed at the :-
Correct Answer Capston latheYour Answer Capston lathe
Multiple Choice Single AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost of buying :-
Correct Answer Transport costYour Answer
Transport cost
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-
Correct Answer
Raw materials , Scrap , Foundry chemicalsYour Answer
Raw materials , Scrap , Foundry chemicals , Manpower
Match The FollowingQuestion
Correct AnswerYour AnswerCapacity cost
Unabsorbed overheadsUnabsorbed overheads
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Power costVariable over headVariable over head
Setup costFixed labour cost
Marginal costMaterial costDirect costDirect cost
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : As per Materials Manager basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P. ,
Case to case basis
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout
activity affects following activities :-Correct Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gaugeYour Answer
Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge , Manufacture hobbing fixture
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : As per the MD, the company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics, as they do
not work at their place of work , Union leaders waste their timeYour Answer
Union leaders do not work , Lower efficiency of the mechanics, as they do not work at their place of work , Union leaders waste their time ,
Unsatisfactory layout
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In
the manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer Congested
Your Answer Congested
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were completed by Kay Jee :-
Correct Answer Within the stipulated delivery period
Your Answer Within the stipulated delivery period
Select The BlankQuestion
This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out ________ and blows out
dust.Correct Answer
Sparks
Your Answer Sparks
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for exhaust manifold provides following information:-
Correct Answer Jigs and fixtures required
Your Answer Utilization of machine planned
Multiple Choice Single AnswerQuestion
This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw castings are procured by UTPL and given to machining to three vendors. If
UTPL has to manufacture Exhaust Manifold in house it would have to provide one of the following:
Correct Answer New jigs and fixtures
Your Answer New jigs and fixtures
Match The FollowingQuestion
Correct AnswerYour Answer
Mechanics going to clerk with requisitionGet the replacements authorizationGet the replacements authorization
This Question refers to the case of 'Kerson Automobiles' : Loss of productive time
Obtaining replacement of spares from storesObtaining replacement of spares from stores
Transfer of parts from work table to a hand trolley and pushing it out to the service bay
Blowing off parts clean with compressed airBlowing off parts clean with compressed air
Space for storage of seats inside the workshopAvoid wasteful movementsAvoid wasteful movements
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Irate Vendor' : The old supplier :-Correct Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bidYour Answer
Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to
discuss his bid , Is always asked his opinion about quantity to be ordered
True/FalseQuestion
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
True/FalseQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the
component.Correct Answer
FalseYour Answer
False
Select The BlankQuestion
This Question refers to the case of 'Northern Machinery Limited' : The V.P. instructed Materials Manager to collect ________ information and evidence to
clarify that their system is foolproof.Correct Answer
RelevantYour Answer
Relevant
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrelYour Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrel , Raise oil guard and switch on the machine
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor
quality of productsYour Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products , Non availability of skilled labour
Select The BlankQuestion
This Question refers to the case of 'K.T Gears' : The cycle time per piece to perform the set of activities listed adds up to ________.
Correct Answer 2.30 minutesYour Answer 2.30 minutes
Select The BlankQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover
Your Answer Turnover
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'National Engineering Co.' : As per GM, the route cause of this non-sensical situation is lack of :-
Correct Answer Co-ordinationYour Answer Co-ordination
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Geer Company' : The company had a small foundry until 1946. This was subsequently closed and the purchase of
ferrous castings were handled by :-Correct Answer
A man who had been a supervisor in the foundryYour Answer
A man who had been a supervisor in the foundry
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive plan can be considered as a tool for following:-
Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs ,
Increase sales
True/FalseQuestion
This question refers to 'Automotive Gears Private Limited' : The table given in the case study gives approximate machine hour rate for each indicated
machine.Correct Answer
TrueYour Answer
True
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture exhaust Manifild in-house additional capacity is required. Extra capacity can
be generated at UTPL by additional ________.Correct Answer
ShiftYour Answer
Shift
True/FalseQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that Hardening & Tempering was the
last operation.Correct Answer
TrueYour Answer
True
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'K.T Gears' : The firm is :-Correct Answer
A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear , Engaged in manufacture of cutting gears
Multiple Choice Multiple AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost
Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost
True/FalseQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen was informed by Mr. Ravikant, Materials Manager that counting is
not necessary at every stage as they count at the initial stage and since their workers and supervisors are experienced, they can easily identify the
components at each stage of production.Correct Answer
TrueYour Answer
True
True/FalseQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying additional recourses.
Correct Answer False
Your Answer False
at 6:32 AM 0 comments Links to this post
Labels: Cases in Operations Management (Set II)
Cases in Operations Management - 8
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion
This Question refers to the case of 'Northern Machinery Limited' : M.D. has asked for ________ from the Vice President.
Correct Answer Explanation
Your Answer Explanation
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : The ________ furniture is sold through distributors.
Correct Answer Standard
Your Answer Standard
Select The BlankQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The company has finalized the order for manufacture of a ________ driven gear.
Correct Answer SpeedmeterYour Answer Speedmeter
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'National Engineering Co' : As per Mr. Khanna( Planning Manager) sales plans are changed :-
Correct Answer Overnight
Your Answer Overnight
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer CPM , PERT , Network Analysis
Your Answer CPM , PERT
Select The BlankQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The loss of consignment was ________.
Correct Answer Total
Your Answer Partial
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer Shift
Your Answer Shift
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The consultant made following recommendations :-
Correct Answer Creation of industrial engineering department , Methods improvement &
fixation of performance standards , Introduction of incentive schemeYour Answer
Creation of industrial engineering department , Methods improvement &
fixation of performance standards , Introduction of incentive scheme
True/FalseQuestion
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Select The BlankQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was looking ________.
Correct Answer Congested
Your Answer Congested
Multiple Choice Multiple AnswerQuestion
This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Procurement cost per order is computed on the basis of following data:
Correct Answer Order cost , No of vendors , Frequency of ordering
Your Answer Order cost , No of vendors , Unit price of the item
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Coimbatore , Kolhapur , Ahmedabad
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Suyog Udyog' : Balancing weights are manufactured using facilities arranged in :-
Correct Answer Process type of layout
Your Answer Process type of layout
Match The FollowingQuestion
Correct AnswerYour Answer
Shop floor mangers pressurized to giveOvertimeOvertime
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Qualifying amount shall be raised with
Increase in sales priceIncrease in sales price
Incentive will be paid onBasic salary of each employeeBasic salary of each employee
Basis of payment onTotal output in terms of value of productionTotal output in terms of value of production
True/FalseQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying additional recourses.
Correct Answer
FalseYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Customers complaints were on the rise, mainly due to :-
Correct Answer Delay in deliveries
Your Answer Delay in deliveries
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Artwood Products' : Mr. Dilip Tahil who founded the company initially focused on :-
Correct Answer Custom built furniture
Your Answer Custom built furniture
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool & process
equipment industriesYour Answer
Automobile industries , Printing machines , Machine tool & process equipment industries
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Artwood Products' : The cost of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor
quality of productsYour Answer
Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of products
True/FalseQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : The organization has reputation for poor deliveries.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : The Scanlon plan for incentive payment is useful for the organizations of
following characteristic:-Correct Answer
Highly labour intensiveYour Answer
Highly labour intensive
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : In Scanlon Plan all employees receive guaranteed ________ wages.
Correct Answer Time
Your Answer Time
True/FalseQuestion
This Question refers to the case of 'Autogears Private Limited' : It takes 0.2 minutes to measure dimensions and set aside gear into the trolley.
Correct Answer True
Your Answer False
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are
sizable.Correct Answer
FalseYour Answer
True
Multiple Choice Single Answer
Question This Question refers to the case of 'Autogears Private Limited' : The
management is interested in the following :-Correct Answer
Improved method of workingYour Answer
Improved method of working
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals
Your Answer Raw materials , Scrap , Foundry chemicals
Select The BlankQuestion
This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer Aggressive
Your Answer Aggressive
Match The FollowingQuestion
Correct AnswerYour Answer
Responsibility for Monthly report on any rejected/obsolete/non-moving itemsProduction /Marketing departmentProduction /Marketing department
This Question refers to the case of 'Narmada Electricals Ltd.' : Decision whether material is obsolete or otherwise
Store ManagerStore Manager
Disposal of waste/obsolete materialOnce a yearOnce a year
Storage of scrap material in scrap yardWithout identification or any records of quantitiesWithout identification or any records of quantities
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is ________
numbers.Correct Answer
8000Your Answer
8000
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive schemes can not be considered to be a substitute of the following:-
Correct Answer Poor management
Your Answer Low productivity
True/FalseQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer False
True/FalseQuestion
This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year :-
Correct Answer 1972
Your Answer 1972
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Incentive scheme was finalized based on :-
Correct Answer Monthly salesYour Answer
Monthly production
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer Congested
Your Answer Congested
Multiple Choice Single AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : The company should continue current practice of subcontracting thread rolling operation
if :-Correct Answer
Cost to buy is lower than cost to makeYour Answer
Cost to buy is lower than cost to make
True/FalseQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the
component.Correct Answer
FalseYour Answer
False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be manufactured
from a hollow bored forging , Fastest delivery is requestedYour Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : The V.P. asked Material Manager to prepare short report to be presented to board of
directors about :-Correct Answer Buying policiesYour Answer
Buying policies
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Eagle Machine Company' : Manufacturing Manager handles :-
Correct Answer Production , Inventory control , Receiving
Your Answer Production , Inventory control , Receiving
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrelYour Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrel
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in execution of project leads to cost ________.
Correct Answer Overrun
Your Answer Overrun
Select The BlankQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Allied Industries Pvt ltd is a small ________ concern with 25 workmen.
Correct Answer Proprietary
Your Answer Proprietary
at 6:30 AM 0 comments Links to this post
Labels: Cases in Operations Management (Set II)
Cases in Operations Management - 7
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion
This Question refers to the case of 'Northern Machinery Limited' : M.D. has asked for ________ from the Vice President.
Correct Answer Explanation
Your Answer Explanation
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : The ________ furniture is sold through distributors.
Correct Answer Standard
Your Answer Standard
Select The BlankQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The company has finalized the order for manufacture of a ________ driven gear.
Correct Answer SpeedmeterYour Answer Speedmeter
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'National Engineering Co' : As per Mr. Khanna( Planning Manager) sales plans are changed :-
Correct Answer Overnight
Your Answer Overnight
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer CPM , PERT , Network Analysis
Your Answer CPM , PERT
Select The BlankQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The loss of consignment was ________.
Correct Answer Total
Your Answer Partial
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer Shift
Your Answer
Shift
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The consultant made following recommendations :-
Correct Answer Creation of industrial engineering department , Methods improvement &
fixation of performance standards , Introduction of incentive schemeYour Answer
Creation of industrial engineering department , Methods improvement & fixation of performance standards , Introduction of incentive scheme
True/FalseQuestion
This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Select The BlankQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was looking ________.
Correct Answer Congested
Your Answer Congested
Multiple Choice Multiple AnswerQuestion
This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Procurement cost per order is computed on the basis of following data:
Correct Answer Order cost , No of vendors , Frequency of ordering
Your Answer Order cost , No of vendors , Unit price of the item
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore
True/FalseQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : The organization has reputation for poor deliveries.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : The Scanlon plan for incentive payment is useful for the organizations of
following characteristic:-Correct Answer
Highly labour intensiveYour Answer
Highly labour intensive
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : In Scanlon Plan all employees receive guaranteed ________ wages.
Correct Answer Time
Your Answer Time
True/FalseQuestion
This Question refers to the case of 'Autogears Private Limited' : It takes 0.2 minutes to measure dimensions and set aside gear into the trolley.
Correct Answer True
Your Answer False
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are
sizable.Correct Answer
FalseYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Autogears Private Limited' : The management is interested in the following :-
Correct Answer Improved method of working
Your Answer Improved method of working
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals
Your Answer Raw materials , Scrap , Foundry chemicals
Select The BlankQuestion
This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer Aggressive
Your Answer Aggressive
Match The FollowingQuestion
Correct AnswerYour Answer
Responsibility for Monthly report on any rejected/obsolete/non-moving itemsProduction /Marketing departmentProduction /Marketing department
This Question refers to the case of 'Narmada Electricals Ltd.' : Decision whether material is obsolete or otherwise
Store ManagerStore Manager
Disposal of waste/obsolete materialOnce a yearOnce a year
Storage of scrap material in scrap yardWithout identification or any records of quantitiesWithout identification or any records of quantities
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is ________
numbers.Correct Answer
8000Your Answer
8000
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive schemes can not be considered to be a substitute of the following:-
Correct Answer Poor management
Your Answer Low productivity
True/FalseQuestion
This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer False
True/FalseQuestion
This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year :-
Correct Answer 1972
Your Answer 1972
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Incentive scheme was finalized based on :-
Correct Answer Monthly salesYour Answer
Monthly production
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer Congested
Your Answer Congested
Multiple Choice Single AnswerQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : The company
should continue current practice of subcontracting thread rolling operation if :-
Correct Answer Cost to buy is lower than cost to make
Your Answer Cost to buy is lower than cost to make
True/FalseQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the
component.Correct Answer
FalseYour Answer
False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be manufactured
from a hollow bored forging , Fastest delivery is requestedYour Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Northern Machinery Limited' : The V.P. asked Material Manager to prepare short report to be presented to board of
directors about :-Correct Answer Buying policiesYour Answer
Buying policies
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Eagle Machine Company' : Manufacturing Manager handles :-
Correct Answer Production , Inventory control , Receiving
Your Answer Production , Inventory control , Receiving
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Autogears Private Limited' : Work elements performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrelYour Answer
Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to mesh with cutter teeth , Unlock nut and remove gear from the
mandrel
Select The BlankQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in execution of project leads to cost ________.
Correct Answer Overrun
Your Answer Overrun
Select The BlankQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : Allied Industries Pvt ltd is a small ________ concern with 25 workmen.
Correct Answer Proprietary
Your Answer Proprietary
at 6:29 AM 0 comments Links to this post
Labels: Cases in Operations Management (Set II)
Cases in Operations Management - 6
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the
Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Did not send the consignment by Hansa's designated carrier , Dispatched the
consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Universal Fasteners Ltd.' : During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapat informed that purchases
were made from :-Correct Answer Several sources
Your Answer Several sources
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : One of the following is not a variable overhead:-
Correct Answer Space
Your Answer Space
True/FalseQuestion
This Question refers to 'Uday Electroplating Shop' : As per cost figures collected, Expected volume of work on special equipment next year is
10,000 Nos.Correct Answer
TrueYour Answer
True
Multiple Choice Single AnswerQuestion
This Question refers to the case of Narmada Electricals Ltd.: In the existing method, the scarp generated in processes like machining was stored in :-
Correct Answer Scrap yard
Your Answer Scrap yard
Match The Following
QuestionCorrect Answer
Your AnswerAnonymous letter received by M.D.
Need to justifyNeed to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyersSeen in top hotels with suppliers
No material facts to support the argumentsReason for failure to convince the Board of Directors
No material facts to support the argumentsNo confidence in Material manager and Senior buyers
Lot of items on the agendaNeed to be concise and to the pointNeed to be concise and to the point
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled by the development
department for :-Correct Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful
developmentYour Answer
Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful
development
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company has well established machine shop having more than 150
machines and :-Correct Answer
A heat treatment shop , Metrology section , Packing sectionYour Answer
A heat treatment shop , Metrology section , Packing section
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company also executes :-
Correct Answer Rush orders
Your Answer Rush orders
Select The BlankQuestion
This Question refers to 'Uday Electroplating Shop' :The owner finds it ________ to get part time employees when there is heavy work load.
Correct Answer Difficult
Your Answer Difficult
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In
the manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Multiple Choice Single AnswerQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for exhaust manifold provides following information:-
Correct Answer Jigs and fixtures required
Your Answer Jigs and fixtures required
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool & process
equipment industriesYour Answer
Automobile industries , Printing machines , Machine tool & process equipment industries
True/FalseQuestion
This Question refers to the case of 'Classic Engineering Components Ltd.' :
Mr. Sen noticed that each worker was provided with the drawing of the component.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'Eagle Machine Company' : Cost of running Sally's department is Rs 3,70,000 per year. This is on account of :-
Correct Answer Salaries , Fringes , Expenses
Your Answer Salaries , Fringes , Expenses
Select The BlankQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : After the introduction of scheme, shop floor manager has complained of pressure from
workmen for ________.Correct Answer
OvertimeYour Answer
Overtime
Match The FollowingQuestion
Correct AnswerYour Answer
Test of viability of standardsProduction studyProduction study
This question refers to case on 'Morbay Engineering Works (MEW)' : Guaranteed time wage
Scanlon PlanPredetermined Method Time standards
Base wage rateJob Evaluation
Work MeasurementFixation of Performance standard
Work MeasurementJob Evaluation
Select The BlankQuestion
This Question refers to the case of 'The Irate Vendor' : Jones had been brought in by a management consultant to ________ the department's buying
activities.Correct Answer
CentralizeYour Answer
Centralize
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year :-
Correct Answer 1972
Your Answer 1972
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be manufactured
from a hollow bored forging , Fastest delivery is requestedYour Answer
A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested
Select The BlankQuestion
This question refer to the case on "Allied Industries Pvt Ltd" : One of the assumptions of the case is- other incidental costs (e.g. paper work, Transport
charges for acquiring and regrinding thread roll) are ________.Correct Answer
NegligibleYour Answer
Low
Select The BlankQuestion
This Question refers to the case of 'Artwood Products' : The ________ furniture is sold through distributors.
Correct Answer Standard
Your Answer Standard
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Divgi Metalwares Private Limited' : It is a :-
Correct Answer Light engineering company
Your Answer Light engineering company
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average efficiency on the other components currently being produced is around 75%.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion
This Question refers to the case 'Suyog Udyog' : The process involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs and fixtures once provided will be able to maintain accuracy up to about ________ pieces.
Correct Answer 20000
Your Answer 20000
True/FalseQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer False
Your Answer True
True/FalseQuestion
This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Geer Company' : Problems got created due to :-Correct Answer
Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of
inexperienced buyers
Multiple Choice Single AnswerQuestion
This Question refers to the case 'Indus Foundries Ltd.': The company is faced with following problems :-
Correct Answer Choice of Location
Your Answer Choice of Plant machinery
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following is the information requirement for using CPM/PERT techniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the activities
Your Answer List of activities , Activity duration , Person responsible for activity
completion
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : The success of an incentive plan to a large extent depends on the following
factor:-Correct Answer
Quality of performance standard
Your Answer Production Planning and Control system
Multiple Choice Multiple AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Following systems are prerequisites for an incentive scheme:-
Correct Answer Good production planning and control system , Good Inspection and quality
control system , Sound system of accounting operators daily outputYour Answer
Good production planning and control system , Good Inspection and quality control system , Sound system of accounting operators daily output
Select The BlankQuestion
This Question refers to the case of 'K.T Gears' : The problem envisages determining the rate of ________ before and after improvement in the existing
method.Correct Answer
ProductionYour Answer
Speed
Multiple Choice Multiple AnswerQuestion
This Question refers to the case of 'The Geer Company' : The problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect ordering
quantitiesYour Answer
Delays in placing orders , Frequently late deliveries , Incorrect ordering quantities
Multiple Choice Single AnswerQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Following practice if prevalent, must be eliminated to guarantee success of
wage incentive scheme :-Correct Answer
OvertimeYour Answer
Encashment of leave
True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' : The
organization has reputation for poor deliveries.Correct Answer
FalseYour Answer
False
Multiple Choice Single AnswerQuestion
This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project duration also helps in the
following :-Correct Answer
Possibilities of reducing project durationYour Answer
Computing manpower requirement
Multiple Choice Single AnswerQuestion
The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-
Correct Answer Routing
Your Answer Scheduling
Multiple Choice Single AnswerQuestion
This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were completed by Kay Jee :-
Correct Answer Within the stipulated delivery period
Your Answer Within the stipulated delivery period
Select The BlankQuestion
This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out ________ and blows out
dust.Correct Answer
SparksYour Answer
Sparks
Select The BlankQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In machining Exhaust Manifold, no cutting oil is required as the material is ________.
Correct Answer Cast iron
Your Answer Plastic
Select The BlankQuestion
This question refers to case on 'Morbay Engineering Works (MEW)' : Success of wage incentive plans to a large extent depends on the ________ of
performance standards.Correct Answer
QualityYour Answer
Quality
True/FalseQuestion
This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer True
Your Answer True
True/FalseQuestion
This question refers to the case of 'Northern Machinery Ltd' : As per summary of purchases of the last year, Material cost as a proportion of sales
is 26%.Correct Answer
FalseYour Answer
True
True/FalseQuestion
This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer True
Your Answer True
Select The BlankQuestion
This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is ________
numbers.Correct Answer
8000Your Answer
8000
True/FalseQuestion The question refer to the case on 'Kalpak Engineers' : Set up time for the machines is not more than an hour in the case.Correct Answer TrueYour Answer True
True/FalseQuestion This question refers to case on "Qualipumps Ltd." :In Qualipumps stores space utilization is very high.Correct Answer FalseYour Answer False
Select The BlankQuestion This question refers to case on 'Electro Mechanical Engineers Private Limited(EMEPL)' : Efficiency of workmen can be improved by ________ supervision.Correct Answer BetterYour Answer Effective
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Divgi Metalwares Private Limited' : The company is manned by :-Correct Answer Professional managersYour Answer Professional managers
True/FalseQuestion This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen noticed that each worker was provided with the drawing of the component.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Eagle Machine Company' : Cost of running Sally's department is Rs 3,70,000 per year. This is on account of :-Correct Answer Salaries , Fringes , ExpensesYour Answer Salaries , Fringes , Expenses
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Autogears Private Limited' : The management is interested in the following :-Correct Answer Improved method of workingYour Answer Improved method of working
Select The BlankQuestion This Question refers to the case of 'National Engineering Co.' : GM commented that every department in this company competes with others in matter of ________.Correct Answer InefficiencyYour Answer Inefficiency
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Falcon Industries Ltd (FIL)' : Following were the factors not favourable for Creative Engineers Pvt Ltd as a supplier of bonnet stud:-Correct Answer High price , Inadequate skilled personnel in Quality , Lack of experience in salt bath type heat treatment processYour Answer High price , Inadequate skilled personnel in Quality , Lack of experience in salt bath type heat treatment process
Select The BlankQuestion This Question refers to the case of 'Hansa Tractomotive Ltd.' : The loss of consignment was ________.Correct Answer TotalYour Answer Total
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Ralhon Group Of Industries(RGI)' : Poor production scheduling in an organization can be noticed by following situations:-Correct Answer Frequent job split-up , Need to employ often overtime to
complete job , Poor resource utilizationYour Answer Frequent job split-up , Need to employ often overtime to complete job , Poor resource utilization
Select The BlankQuestion This question refers to case on 'Falcon Industries Ltd (FIL)' : One of the performance requirement is stated as - Bonnet stud should not ________ till one year after installation.Correct Answer CrackYour Answer Crack
Multiple Choice Single AnswerQuestion This question refers to case on 'Pacific Machine Shop(PMS)' : Following was the type of material of scrap sold by the foreman every month:-Correct Answer Brass and copperYour Answer Brass and copper
Multiple Choice Single AnswerQuestion This question refers to case on 'Pacific Machine Shop(PMS)' : The case is about the following:-Correct Answer Method of scrap disposalYour Answer Method of scrap disposal
Multiple Choice Single AnswerQuestion The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-Correct Answer RoutingYour Answer Routing
Match The FollowingQuestion Correct Answer Your Answer
Conditional Acceptance When goods have minor fault which do not affect product performance Acceptance of material of a supplier on the condition to take corrective action
This question refers to case on 'Vijay Engineering Works (VEW)' : Segregation 100 percent inspection to identify and keep separately accepted and rejected material 100 percent inspection to identify and keep separately accepted and rejected material
Rectification Carry out additional processes to make good non conforming material Goods have minor defects which can not be easily noticed by the customer
Outright rejection When goods can not be used without affecting performance of the product When goods can not be used without affecting performance of the product
Multiple Choice Single AnswerQuestion The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-Correct Answer Cylindrical grinderYour Answer Cylindrical grinder
Multiple Choice Multiple AnswerQuestion This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following :-Correct Answer Regrinding charges on thread roll , Power cost , Cost of a pair thread rollYour Answer Cost of a pair thread roll , Regrinding charges on thread roll
True/FalseQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction, ready factory building was purchased.Correct Answer TrueYour Answer True
True/FalseQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management knew the activities involved, their durations and interrelationship, still are not in position to tell when the project will be completed.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion This question refers to case on 'Vijay Engineering Works (VEW)' :
Following material is not considered by Disposal cell :-Correct Answer Material at no inspection stageYour Answer Rejected material at defined stages of production
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Falcon Industries Ltd (FIL)' : Following are the common causes of breakage/cracks in bonnet stud :-Correct Answer Poor quality of raw material , High hardness , Improper machiningYour Answer Poor quality of raw material , High hardness , Improper machining
Multiple Choice Single AnswerQuestion The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-Correct Answer Cylindrical grinderYour Answer Cylindrical grinder
Select The BlankQuestion This question refers to case on "Qualipumps Ltd." :Only on rare occasions production at the company suffered due to ________.Correct Answer StockoutsYour Answer Stockouts
Multiple Choice Multiple AnswerQuestion This question refers to 'Automotive Gears Private Limited' : The spline Grinding machine is used for operation :-Correct Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline Grind (section'CC')Your Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline Grind (section'CC')
Multiple Choice Single AnswerQuestion This question refers to case on 'Harvey Company' : After trial of Jackson chuck for three weeks Eddie, the buyer of the company received requisition to purchase Benson chuck as a replacement of Jackson chuck. Eddie was convinced that the production personnel has seen to it that the Jackson chuck would not work satisfactorily. Following is the reason for Eddie's above opinion:-
Correct Answer Eddie checked the Jackson chuckYour Answer Eddie checked the Jackson chuck
Multiple Choice Multiple AnswerQuestion The question refer to the case on 'Arctic India Ltd (AIL)' : To address the issue of gifts by supplier to the buyers following are the approaches:-Correct Answer Put restrictions in acceptance of gifts in Purchase policy manual , Increase the salary of Purchase Managers so that there is no temptation to accept the gifts , Delegate the job of awarding long term contract or capital purchase to a committee rather than an individualYour Answer Put restrictions in acceptance of gifts in Purchase policy manual , Increase the salary of Purchase Managers so that there is no temptation to accept the gifts , Delegate the job of awarding long term contract or capital purchase to a committee rather than an individual
Select The BlankQuestion This question refers to case on 'Harvey Company' : Eddie was convinced that the boys in the shop had seen to it that the Jackson-460 had not operated ________.Correct Answer SatisfactorilyYour Answer Properly
Multiple Choice Multiple AnswerQuestion This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-Correct Answer Raw materials , Scrap , Foundry chemicalsYour Answer Raw materials , Scrap , Foundry chemicals
Select The BlankQuestion This question refers to case on 'Hindustan Engineering' : Confidence level refers to the ________ that the result of the study shall be within permissible limits of error.Correct Answer ProbabilityYour Answer Probability
True/FalseQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Installation of machine should follow recruitment of workmen.Correct Answer TrueYour Answer True
Select The BlankQuestion This question refers to case on 'Auto Gears Limited(AGL)' : The item exhaust manifold is presently not ________.Correct Answer ManufacturedYour Answer Manufactured
True/FalseQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction, ready factory building was purchased.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Northern Machinery Limited' : As per Materials Manager basis of awarding contract is :-Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Hindustan Engineering' : In the work sampling study 'machine working' includes the following situations:-Correct Answer Time during which machine is on and engaged in production , Time during loading/unloading of jobs , Cleaning of jigs/fixtureYour Answer Time during which machine is on and engaged in production , Time during loading/unloading of jobs , Cleaning of jigs/fixture
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Universal Fasteners Ltd.' : The General Manager gets the news that the Studs supplied them have broken :-Correct Answer While assemblingYour Answer While assembling
Select The BlankQuestion This Question refers to the case of 'The Geer Company' : The company decided to engage a consulting firm to aid in re-organizing the ________ operation.
Correct Answer PurchasingYour Answer Manufacturing
True/FalseQuestion The question refer to the case on 'Arctic India Ltd (AIL)' : Most of the Purchase Managers feel that the only way to weed out such corruption among the buyer is to offer a sufficiently high salary so that the temptation to accept the gifts could be avoided.Correct Answer TrueYour Answer False
True/FalseQuestion This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Anonymous letter received by M.D. Need to justify Need to justify
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers Seen in top hotels with suppliers Seen in top hotels with suppliers
Reason for failure to convince the Board of Directors No material facts to support the arguments No material facts to support the arguments
Lot of items on the agenda Need to be concise and to the point Need to be concise and to the point
Select The BlankQuestion This question refers to case on 'Pacific Machine Shop(PMS)' : The metal supplier would give credit equal to ________ price of the scrap.Correct Answer MarketYour Answer Market
Multiple Choice Single AnswerQuestion This Question refers to 'Uday Electroplating Shop': It's Annual sales is :-
Correct Answer Rs. 1 LakhYour Answer Rs. 1 Lakh
Multiple Choice Single AnswerQuestion This question refers to case on 'Morbay Engineering Works (MEW)' : The success of an incentive plan to a large extent depends on the following factor:-Correct Answer Quality of performance standardYour Answer Quality of performance standard
Select The BlankQuestion This Question refers to the case of 'The Irate Vendor' : Jones had been brought in by a management consultant to ________ the department's buying activities.Correct Answer CentralizeYour Answer Centralize
True/FalseQuestion This question refers to the case of 'Northern Machinery Ltd' : As per summary of purchases of the last year, Material cost as a proportion of sales is 26%.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Kay Jee took following actions :-Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrierYour Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
True/FalseQuestion This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts and additional output.Correct Answer TrueYour Answer True
Recommended