Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge...

Preview:

Citation preview

Coast

Construction & Design

Challenges• Challenge One

– Staffing & Collaboration

• Challenge Two– Design

• Challenge Three– Execution

Staffing• Construction

– Project Executive• Scott Davis

– Project Manager• Dustin Crowell

– Project Superintendent• Danielle Dorsey

• Design– Principal Architect

• Philip Stott

– Lead Designer• Matthew Calvey

– Specialist Coordinator• Valerie Morin

Staffing

Collaboration

Support Services

Estimating Accounting

Purchasing Safety

Scheduling IT

Design Phase

Construction Phase

Valerie MorinSpecialist Coordinator

Stationed On-Site During Construction

Marine Biological Laboratory

Owner

Coast C & DDesign Build Firm

ConstructionDesign

Matthew CalveyLead Designer

Frank HoodProject Manager

Philip StottPrincipal Architect

Dustin CrowellProject Manager

Scott DavisProject Executive

Jessica WileyProject Engineer

Danielle DorseyArea Superintendent

Mike HassettSenior EstimatorMatt Crown

Technical Assistant

Joe SgambatoQuality Manager

John HuesSafety Manager

Ben ThibaultArea Superintendent

Rich McMahonOffice Engineer

MEP Specialists

LEED Specilaists

Communication Technologies Specialists

Design Approach-Integrated Practice

-Building Integrated Modeling (BIM)

- Design for Change -adaptability / expansion

- Professional InteractionBreak down the barriers – connectivity

-Permanent structures-Utilize existing grid

Architectural Integration -Integrated Practice (BIM)

-Client/designer/builder-reduce cost & Time-Higher quality

-Design Flexibility-Extensive Module Integration-Spatial Customization-Future expansion

Architectural Integration -Professional Interaction

-Increase Chance encounters-Extend production through connection

-Permanent Structure-building envelope-Independent utilities

New England Lab - Casework and furniture systems.

-3 Major Zones-Auditorium-Laboratory -Office/ Conference Space

-Sustainability-Social-Architectural

-Integrated Practice-Building Information Modeling

Flexibility

Flexibility

• Mechanical, Electrical and Plumbing

• Sustainable Strategies

Integration of systems

HVAC • 3 systems for 3 functions

• Zoning - Module - special requirements

Plumbing • Salt water supply

• High water quality - filtration systems - Thermal regulation

• Stormwater Management

• Water efficient landscaping

• Renewable energy

Sustainable Strategies

Challenge Three• Estimate

– Collaboration

– Extensive database

Challenge Three• Schedule

– Long lead items

– SIPS

– Closeout

Challenge Three• Site Logistics

– Storage Units– temporary facilities– Lay-Down Area– Permits– Parking

Challenge Three• Quality Control

– On-site Quality control manager

– Tagging Process

Challenge Three• Safety

– Safety Manager

– S.T.O.P. Program

Conclusion• We are the Right Team for the job

– Experience

– Collaboration