CMS rack system. Magnetic Stray Field in UXC. How to feed power to Racks. UXC. USC. Breaker + PLC. Power Supply. AC/DC converter. 400 Hz. 50 Hz. Rack Location - I. Rack Location - II. Rack Location - III. Rack Location - IV. Rack Standard Components. Power Cabinet. Power Cabinet. - PowerPoint PPT Presentation

Citation preview

June 2004 Andrea Gaddi, PH-CMI

CMS rack systemCMS rack system

QuickTime™ and aPhoto - JPEG decompressor

are needed to see this picture.

DSS

TS/EL Power distribution

RSS

TS/EL Bus

PLC

ST/MAAFDCIE

DCS

RSS loop

PDC breakers status

fire extinguisher (option)

from monitoring board

Premium PLC

thermal switch + crate monitoring

June 2004 Andrea Gaddi, PH-CMI

Magnetic Stray Field in UXCMagnetic Stray Field in UXC

June 2004 Andrea Gaddi, PH-CMI

How to feed power to RacksHow to feed power to Racks

QuickTime™ and aPhoto - JPEG decompressor

are needed to see this picture.

QuickTime™ and aPhoto - JPEG decompressor

are needed to see this picture.

USC UXC

50 Hz

400 Hz

PowerSupply

AC/DC converter

Breaker + PLC

June 2004 Andrea Gaddi, PH-CMI

Rack Location - IRack Location - I

June 2004 Andrea Gaddi, PH-CMI

Rack Location - IIRack Location - II

June 2004 Andrea Gaddi, PH-CMI

Rack Location - IIIRack Location - III

June 2004 Andrea Gaddi, PH-CMI

Rack Location - IVRack Location - IV

June 2004 Andrea Gaddi, PH-CMI

TurbinesPower Cabinet

Fan tray

Deflector Coolingmanifolds

Turbines

Power Cabinet

Electronics Crate

Heat Exchanger

Deflector

Cooling manifolds

Electronics Crate

Rack Standard ComponentsRack Standard Components

June 2004 Andrea Gaddi, PH-CMI

Power Distribution ControlPower Distribution Control

QuickTime™ and aPhoto - JPEG decompressor

are needed to see this picture.

DSS

TS/EL Power distribution

RSS

TS/EL Bus

PLC

ST/MAAFDCIE

DCS

RSS loop

PDC breakers status

fire extinguisher (option)

from monitoring board

Premium PLC

thermal switch + crate monitoring

June 2004 Andrea Gaddi, PH-CMI

Time ScheduleTime Schedule

Detector racks: from Sept 04

USC hand-over: 14 June 04USC infrastructures: Jul 04 to Feb 05USC control room racks: March to Jun 05USC control rooms crates: from July 05

UXC hand-over: 01 Nov 04UXC infrastructures: Jan to Dec 05UXC racks: Jan to March 06UXC crates: from Apr 06