View
2
Download
0
Category
Preview:
Citation preview
Drawing:Drawing no:Issue:Scale @ A3:Date:
Architectus Christchurch124 Peterborough StreetChristchurchCanterbury 8013christchurch@architectus.co.nz
0 5 10 15 20 25 50
m1717
Christ's College Sport Centre SK 0-20SITE AERIAL
June 2018
----1:1000@A3
Pre
par
ed fo
r:
Clie
nt N
ame
Dat
e:
May
13,
202
1
Prel
imin
ary
Des
ign
Chr
ist’s
Col
lege
Mul
ti-pu
rpos
e S
ports
& W
ellb
eing
Fac
ility
12820
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 00--3300PPRROOPPOOSSEEDD SSIITTEE PPLLAANN
1133//0055//2200221111993300
School HouseScienceGym
Avon River
Existing Pool
The Miles Warren Building
Open Air Block
Fine Arts & Technology
Library
Hare Memorial
Selwyn
12820
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 00--3300PPRROOPPOOSSEEDD SSIITTEE PPLLAANN
1133//0055//2200221111993300
1:500
NOTE: Indicative arrangement of site and rugby pitch to
be confirmed with survey information.
132 30
2450
6210 6460
177 00
58 600
34520
2660
34140
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 00--3311SSIITTEE PPLLAANN 11--225500
1133//0055//2200221111993300
Services & Storage TBC
NOTE: Indicative arrangement of site and rugby pitch to
be confirmed with survey information.1:250
TM Drawing:Drawing no:Issue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
PPrroojjeecctt NNaammee AA 00--3322UUnnnnaammeedd
0055//0055//2211ProjectNumber
Christ’s College Sports Centre | Preliminary Design | Architectus
Site Context - Christ’s College Campus
Concept Diagram
Christ’s College Sports Centre | Preliminary Design | Architectus
A 3-00
1
A 3-011
A 3-00
3
2A 2-00
A B C D E G H
1
2
3
4
5
6
6800
6800
6800
6800
6800
8250 8250 8250 8250 8250 8250 8250
3400
057750
1A 2-01
F
3750 15000 3750 15000 3750
1A 2-00
1382.77 m²SPORT COURTS
215.64 m²FITNESS CENTRE
102.17 m²ENTRY LOBBY
6.41 m²STORAGE
28.86 m²CHANGING ROOM
28.23 m²CHANGING ROOM
2.31 m²SLL
3.01 m²SLL
7.17 m²FIRST AID
17.29 m²RESTROOM/SHOWER
3.99 m²ACC TOILET
12.87 m²STORAGE
9.30 m²STORAGE
1.12 m²RISER
2950
2810
029
50
6.13 m²SHOWERS
6.13 m²SHOWERS
3.23 m²ACC TOILET
2.77 m²CLEANERS
2.31 m²SLL
1.90 m²TOILET
1.90 m²TOILETS
1.90 m²TOILET
1.80 m²TOILET
4.84 m²LIFT
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 11--0000
1133//0055//2200221111993300
A 2-00GROUND FLOOR PLAN TRAINING1
A 3-00
1
A 3-011
A 3-00
3
2A 2-00
A B C D E G H
1
2
3
4
5
6
6800
6800
6800
6800
6800
8250 8250 8250 8250 8250 8250 8250
3400
057750
1A 2-01
F
3750 15000 3750 15000 3750
1A 2-00
1382.77 m²SPORT COURTS
215.64 m²FITNESS CENTRE
102.17 m²ENTRY LOBBY
6.41 m²STORAGE
28.86 m²CHANGING ROOM
28.23 m²CHANGING ROOM
2.31 m²SLL
3.01 m²SLL
7.17 m²FIRST AID
17.29 m²RESTROOM/SHOWER
3.99 m²ACC TOILET
12.87 m²STORAGE
9.30 m²STORAGE
1.12 m²RISER
2950
2810
029
50
6.13 m²SHOWERS
6.13 m²SHOWERS
3.23 m²ACC TOILET
2.77 m²CLEANERS
2.31 m²SLL
1.90 m²TOILET
1.90 m²TOILETS
1.90 m²TOILET
1.80 m²TOILET
4.84 m²LIFT
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 11--0000FFLLOOOORR PPLLAANN GGRROOUUNNDD
1133//0055//2200221111993300
A 2-00GROUND FLOOR PLAN1 GROUND FLOOR PLAN - TRAINING ARRANGEMENT1:100
A 3-00
1
A 3-011
A 3-00
3
2A 2-00
A B C D E G H
1
2
3
4
5
6
1A 2-01
F1
A 2-00
6800
6800
6800
6800
6800
8250 8250 8250 8250 8250 8250 825034
000
57750
1382.77 m²SPORT COURTS
215.64 m²FITNESS CENTRE
102.17 m²ENTRY LOBBY
6.41 m²STORAGE
28.86 m²CHANGING ROOM
28.23 m²CHANGING ROOM
2.31 m²SLL
3.01 m²SLL
7.17 m²FIRST AID
17.29 m²RESTROOM/SHOWER
3.99 m²ACC TOILET
12.87 m²STORAGE
9.30 m²STORAGE
1.12 m²RISER
6.13 m²SHOWERS
6.13 m²SHOWERS
3.23 m²ACC TOILET
2.77 m²CLEANERS
2.31 m²SLL
1.90 m²TOILET
1.90 m²TOILETS
1.90 m²TOILET
1.80 m²TOILET
4.84 m²LIFT
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeSSKK77
0055//1133//221111993300
A 2-00GROUND FLOOR PLAN COMPETITION1
A 3-00
1
A 3-011
A 3-00
3
2A 2-00
A B C D E G H
1
2
3
4
5
6
1A 2-01
F1
A 2-00
6800
6800
6800
6800
6800
8250 8250 8250 8250 8250 8250 8250
3400
057750
1382.77 m²SPORT COURTS
215.64 m²FITNESS CENTRE
102.17 m²ENTRY LOBBY
6.41 m²STORAGE
28.86 m²CHANGING ROOM
28.23 m²CHANGING ROOM
2.31 m²SLL
3.01 m²SLL
7.17 m²FIRST AID
17.29 m²RESTROOM/SHOWER
3.99 m²ACC TOILET
12.87 m²STORAGE
9.30 m²STORAGE
1.12 m²RISER
6.13 m²SHOWERS
6.13 m²SHOWERS
3.23 m²ACC TOILET
2.77 m²CLEANERS
2.31 m²SLL
1.90 m²TOILET
1.90 m²TOILETS
1.90 m²TOILET
1.80 m²TOILET
4.84 m²LIFT
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeSSKK77
0055//1133//221111993300
A 2-00GROUND FLOOR PLAN COMPETITION1
A 3-00
1
A 3-011
A 3-00
3
2A 2-00
A B C D E G H
1
2
3
4
5
6
6800
6800
6800
6800
6800
8250 8250 8250 8250 8250 8250 8250
3400
057750
1A 2-01
F
3750 15000 3750 15000 3750
1A 2-00
1382.77 m²SPORT COURTS
215.64 m²FITNESS CENTRE
102.17 m²ENTRY LOBBY
6.41 m²STORAGE
28.86 m²CHANGING ROOM
28.23 m²CHANGING ROOM
2.31 m²SLL
3.01 m²SLL
7.17 m²FIRST AID
17.29 m²RESTROOM/SHOWER
3.99 m²ACC TOILET
12.87 m²STORAGE
9.30 m²STORAGE
1.12 m²RISER
2950
2810
029
50
6.13 m²SHOWERS
6.13 m²SHOWERS
3.23 m²ACC TOILET
2.77 m²CLEANERS
2.31 m²SLL
1.90 m²TOILET
1.90 m²TOILETS
1.90 m²TOILET
1.80 m²TOILET
4.84 m²LIFT
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 11--0000
1133//0055//2200221111993300
A 2-00GROUND FLOOR PLAN TRAINING1 GROUND FLOOR PLAN - COMPETITION ARRANGEMENT1:100
A 3-00
1
A 3-011
A 3-00
3
2A 2-00
A B C D E G H
1
2
3
4
5
6
1A 2-01
F1
A 2-00
6800
6800
6800
6800
6800
8250 8250 8250 8250 8250 8250 8250
3400
057750
239.69 m²FITNESS/ CIRCUIT ROOM
52.39 m²OPEN PLAN
68.17 m²CLASSROOM 24P
9.45 m²MEETING ROOM
9.92 m²MEETING ROOM
4.84 m²LIFT
67.74 m²CLASSROOM 24P
1.12 m²RISER
88.62 m²CIRCULATION
3.57 m²STORAGE
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 11--0011FFLLOOOORR PPLLAANN LLEEVVEELL 11
1133//0055//2200221111993300
1 : 100A 2-00FLOOR PLAN LEVEL 11 LEVEL 1 FLOOR PLAN 1:100
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
8000
1A 2-01
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
1A 2-01
MEETING ROOM MEETING ROOM FITNESS/ CIRCUIT ROOM
FITNESS CENTREFIRST AID STORAGE
LIFT
SLL
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 22--0000
1133//0055//2200221111993300
1 : 100A 1-00SECTION AA2
1 : 100A 1-00SECTION BB1
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
8000
1A 2-01
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
1A 2-01
MEETING ROOM MEETING ROOM FITNESS/ CIRCUIT ROOM
FITNESS CENTREFIRST AID STORAGE
LIFT
SLL
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 22--0000
1133//0055//2200221111993300
1 : 100A 1-00SECTION AA2
1 : 100A 1-00SECTION BB1
Christ’s College Sport and Science Feasibility | Preliminary Design Report | Architectus
Section Perspective
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
2A 2-00
ABCDEGH F
1A 2-00
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
2A 2-00
A B C D E G HF
1A 2-00
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 33--0000EELLEEVVAATTIIOONNSS
1133//0055//2200221111993300
1 : 100A 1-00ELEVATION WEST1
1 : 100A 1-00ELEVATION EAST3
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
2A 2-00
ABCDEGH F
1A 2-00
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
2A 2-00
A B C D E G HF
1A 2-00
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 33--0000EELLEEVVAATTIIOONNSS
1133//0055//2200221111993300
1 : 100A 1-00ELEVATION WEST1
1 : 100A 1-00ELEVATION EAST3
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
123456
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 33--0011
1133//0055//2200221111993300
1 : 100ELEVATION SOUTH2
1 : 100A 1-00ELEVATION NORTH1
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
123456
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 33--0011
1133//0055//2200221111993300
1 : 100ELEVATION SOUTH2
1 : 100A 1-00ELEVATION NORTH1
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
123456
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 33--0011
1133//0055//2200221111993300
1 : 100ELEVATION SOUTH2
1 : 100A 1-00ELEVATION NORTH1
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
1 2 3 4 5 6
LEVEL GROUNDRL 16.423
LEVEL 1RL 20.423
123456
TM Drawing:Drawing no:IIssue:Date:Job no:
Scale @ A3: 00
UUnniittss iinn MMeetteerrss
CChhrriisstt''ss CCoolllleeggee SSppoorrttss CCeennttrreeAA 33--0011
1133//0055//2200221111993300
1 : 100ELEVATION SOUTH2
1 : 100A 1-00ELEVATION NORTH1
Christ’s College Sport and Science Feasibility | Preliminary Design Report | Architectus
1 Internal Render of Gymnasium
Interior View
Christ’s College Sport and Science Feasibility | Preliminary Design Report | Architectus
2 Internal Render of Gymnasium
Interior View
Christ’s College Sport and Science Feasibility | Preliminary Design Report | Architectus
Exterior Views
3
4 5 6
Field Elevation
Aerial 1 - South East Corner Aerial 2 - South West Corner Northern Gable End
Christ’s College Sport and Science Feasibility | Preliminary Design Report | Architectus
7 Exterior Render of North East Facade
North East Facade
Christ’s College Sport and Science Feasibility | Preliminary Design Report | Architectus
8 Exterior Render of South East Facade
South East Facade
Recommended