CB4Formation Architects

SK(0)28_rev02 - Phasing Plan

R2

S1

O13

O14

O15

O16O17

4+1

8+16+1

O9

O10

O11

4

4

O12

T1T2

R7

450 parking spaces for NR100 additional parking spaces

328 cycle parking spaces

96 cycle parking spacesHotel

Freightliner

Office Quarter (O8 - O17)

Tree-lined pedestrian / cycle path

Residential Buildings (R1 - R7)

Boulevard

78 Cycle parking spacesStudent Accommodation (S1-S5)

Station squareNew Chesterton station

WATER WORKS

CAMBRIDGEBUSINESS PARK

WATER WORKS

LAFARGE

Access to Lafarge site

Tree-lined boulevard with open drain between lanes

Guided bus drop offCanopy

Guided bus turning circle

NR storage area

CHESTERTON

5+1

5+1

HOTEL

Family Quarter (T1 - T8)

4

4

O8

4

4

4

4

4

4

R3

4+1

R44+1

R54+1

R6

4+1

S2

5+1

S3

5+1

S4

5+1S5

T3T4

T5T6

T7T8

Pedestrian/cycle link Nature

Reserve

Shirley School

Allotments

Central Park

Pedestrian/cycle link to River Cam

Phase 1 - End 2016

Phase 2 - End 2017

Phase 3 - End 2018

Phase 4 - End 2019

Phase 5 - End 2020

Key:

CSR office (35,000sqft)(4+1 floors)140 CSR parking spaces

Potential 20m easement for trunk sewer

Recommended