Carmel (Melay) V. Abao and Alma Maria O. SalvadorFaculty, ADMU Political Science Department

June 15, 2012Astoria Plaza, Pasig City

I. Project Design and ImplementationII. Survey ResultsIII. Validation of Survey ResultsIV. Reflections

Carmel V. AbaoJune 15, 2012

Astoria Plaza, Pasig City

Terms of Reference (TOR)Actual Project Design and Implementation

CSOs as broadly defined:◦ Non-governmental and non-profit◦ Interacts with the state

Guimaras

Aug1– Sept 15, 2011 Sept 16–Dec 15, 2011 Jan – Feb 2012

Workplan

Project Management

Lead Researchers Field Researchers

ANSA-EAP Team

Guimaras

Aug 1–Sept 15, 2011 Sept 16–Dec 15, 2011 Jan–Feb 2012

-Software Development-Data Encoding-Generation of Reports

Consolidation of Data and Initial Analysis

Actual Timeline of Activities

Actual Project Management

Lead Researchers

Field Researchers

EncodersANSA-EAP

Software Developers

Albay: Rowena Olayta (ALPRODEV)Cam Norte: Jimmy Molina (SPACFI)Cam Sur: Berns Gavino-gumba (Ateneo De Naga)Catanduanes: Ma. Cristina Rabulan (DVSAFI-PPP)Sorsogon: Aurora De Guzman (MALAYA KA)

Aklan: Aissa Amerila (Archbishop Gabriel M. Reyes Memorial Foundation, Inc.)Antique: Dean Christi Oliver An (Antique Federation Of Ngos, Inc.)Guimaras: Antonia G.Pelina Guimaras People’s Economic Foundation, Inc.Iloilo: Freddie Salvania (Iloilo Code)Capiz: Nelson Rose (Capiz Code)Negros Occidental: Renato Banas (Negros Organic Agriculture Movement)

Bukidnon: Yumer Caringas (ABAG KALAMBUAN, INC.)Misamis Oriental: El Cisco Jun Ramos (GROUP FoundationMisamis Occidental: Mary Jane Gangoso (ECOLINK Philippines)

Interns of Ateneo de Manila Department of Information Systems and Computer Science:◦ John Paul Contillo◦ Alipio Gabriel

Rogelio CasibangRio Sajetnel

to identify CSOs that engage with local governmentsto look into how they specifically engage governmentto look into the skills that they have/use in dealing with governmentto establish their context

Cam Norte 26Cam Sur 69Albay 53Sorsogon 47

Antique 47Aklan 18Capiz 40Guimaras 52Iloilo 53Negros Occ 44

Bukidnon 28Mis Occ 31Mis Or 37

TOTAL: 545

Cam Norte 9Cam Sur 31Albay 8Sorsogon 6

Antique 11 Aklan 2Capiz 7Guimaras 17Iloilo 11Negros Occ 6

Bukidnon 11 Mis Occ 9Mis Or 6

TOTAL: 134

Phase 1: Bidding◦ Step 1: Observation of the pre-bid conference◦ Step 2: Observation of the submission and opening of

sealed bids◦ Step 3: Observation of contract awarding

Phase 2: Contract Implementation◦ Step 1: Monitoring of the delivery of the goods or services

procured◦ Step 2: Monitoring of the implementation vis-à-vis bids

specifications◦ Step 3: Monitoring of the completion of projects (eg.

construction)

Thank you!