CA/NV AWWA Annual Fall ConferenceOctober 29, 2015

1

3

• Most filters are run to failure – Extend Filter Asset Life

• Filters are last barrier for particulate and microbial contamination• Filter media breaks down with time

– Restore & Improve Filter Performance• Proactive program for maintenance of filters

– Media cleaning is 3-10 years– Media replacement is 10-20 years

• Ability to spread cost for initial rehabilitation • Predictable fiscal budgeting

Why Filter Asset Management

4

5

6

7

The list is numerous and growing…◦ Primary and Secondary Drinking Water Standards Turbidity Inorganics (Arsenic, Iron, Nitrate, etc.) Organics (Coliform, Cryptosporidium, Dioxin, etc.) Emerging contaminants◦ IE&LT2SWTR Lower turbidity standards Remove microbial contamination Stricter monitoring and reporting◦ Stage 2 DBPR◦ And more to come…

– Condition assessment– Media sampling and analysis– Estimating the cost of renovations– Estimating the life expectancy– Developing a financial plan

9

Components for Developing a Filter Asset Management Plan

Basics of Plant Condition Assessment

10

FILTER PERFORMANCE INDICATORS SUMMARYParameter Characteristics Metrics

Filter Run TimesMono-media 24 hrs. to 72 hrs.

Dual Media or Multimedia 72 hrs. to 140 hrs.

Filtration RateOptimized

1.4 gpm/sf to4 gpm/sf

Surface filtration <1.4 gpm/sf

Filter Effluent Turbidity

Regulation <0.3 NTU 95% samples

Best practice ≤0.1 NTU

Optimized operations0.03 NTU to

0.05 NTU

• Physical Observations about filters– Media surface (mounds, cracks, craters, low

and high spots)– Mud ball diameter and appearance– Mud present on top of filters

11

Plant Condition Assessment

• Observe backwash for even flow and boils– Check if the troughs are level with even flow– Check surface sweep for smooth rotation – Check backwash flow rates

12

Plant Condition Assessment

• Observe the overall conditions of building– Paint, electrical, lighting, HVAC, flooring, I&C, concrete, windows,

doors– Clean filters do not help if the ceiling is falling in

13

Plant Condition Assessment

Filter Ceilings in “Bad” Shape

14

Filter Ceiling Debris

15

20

Filter Media Condition Assessment

Media Analysis– Strategic & representative media sampling– Lab analysis & evaluation

• Detect mudballs, odors, colors• Multiple advanced organic & inorganic tests

– Biomass via ATP & HPC, particulates, metals & mineral deposits– Confirm & quantify issues such as CaCO3, SRB’s, Giardia, etc.

• Bench-scale chemical cleaning with variety of products• Microscopic high-resolution pictures to document physical condition• Sieve analysis to measure ES & UC of each unique media for comparison to your design

specifications

– Lab Report with Customized Recommendations (clean or replace)• No “over cleaning” or premature replacement• Presented and discussed with your staff

21

Before After

22

Before After

23

Before After

24

Before After

25

Filter Cleaning

26

Chemical Cleaning– Custom-blend for each filter sampled– Only NSF-approved products– Chemical injection & agitation followed by

backwashing (multiple applications if needed)

– BW monitoring (pH & turbidity)– BW neutralization before disposal if

required– Disinfect media, and entire filter system and

piping

New media and materials match plant specifications Only NSF-approved products by AWWA guidelines Turnkey service◦ Remove and dispose old media & gravel◦ Full underdrain cleaning and inspection◦ Wall inspection and repair and/or repaint surfaces◦ Underdrain repairs and replacement◦ Filter System upgrades (e.g. media, equip.) Engineering & permitting as needed◦ Order & install new media & gravel◦ Bring online & assist with disinfection and Bac-T samples

27

28

Water Treatment PlantFilter Condition Assessment

Summary Report

Table of Contents Purpose ......................................................................................................................................................... 1

Executive Summary ...................................................................................................................................... 2

Condition Assessment Activities .................................................................................................................. 3

Condition Assessment Findings ................................................................................................................... 5

Filter 1 ....................................................................................................................................................... 7

Filter 2 ....................................................................................................................................................... 9

Filter 3 ..................................................................................................................................................... 11

Filter 4 ..................................................................................................................................................... 13

Filter 5 ..................................................................................................................................................... 15

Filter 6 ..................................................................................................................................................... 17

Condition Assessment Conclusion ............................................................................................................. 19

Condition Assessment Recommendations ................................................................................................ 20

Preliminary Scope of Work and Price Estimate ......................................................................................... 24

Exhibit 1 ....................................................................................................................................................... 28

• Initial Condition Assessment of your granular filtration system

• Schedule filter rehab and maintenance work over the chosen MP period

• Annual Condition Assessments throughout MP• Asset Management tool spreads and predicts cost

30

Developing a Financial Plan

38

• Upfront Renovations– Filter Components– Plant Components– Media Cleaning/Replacement

• Ongoing Maintenance– Pumps– Controls– Media Cleaning/Replacement

Spread the Cost or Lump Sum

Operation under Run to Failureor

Proactive Maintenance Program

Filter Maintenance Program – Benefits

• Restores and Improve Filter Performance• Extend Filter Asset Life• Responsible Asset Management through Condition Assessments• Rehabilitation to owners needs/wants/desires• Build future cost model for financial needs• Provides predictable fiscal budgeting

39

Questions?

Contact Info:Dawn Halpern

Water System Specialist Utility Service Group