Cambi Thermal Hydrolysis From Waste to Worth...Cambi cake is at the crossroads of strategic planning...

Preview:

Citation preview

Cambi Thermal Hydrolysis

From Waste to Worth

Polish Cities to Norway 14.09, 2016,

Lindum, Drammen

CAMBI is...

...Leading provider of technology for the conversion of sludge to renewable

energy and high-quality bio solids.

…World-leading in thermal hydrolysis and committed to quality in deliveries,

competence and expertise:

Since 1995 we have built 40 plants and have 16 plants under construction, in 21

countries

Total capacity to treat sludge and food waste from >53 mill. people, 1.55 million tons

DS/year.

…Disruptive and part of “Water Revolution”

The group had an outstanding performance in 2015 with several new

contracts and a solid order backlog.

CAMBI PLANT LOCATIONS

CAMBI SERVES A POPULATION OF MORE THAN

50 MILLION PEOPLE WORLD WIDE

SEOUL – DUBLIN – OSLO – BRUSSELS – ATHENS

SANTIAGO DE CHILE – EDINBURGH – CARDIFF – AND 20+ OTHER CITIES

BEIJING

LONDON

WASHINGTON DC

SINGAPORE

CambiTHP® IN UK

CambiTHP®

treats >30% of

UK’s sewage

sludge.

Minworth STW, Birmingham (2016), Cambi 3 x B6-4, Severn Trent Water

• 2.5 million people

• Better dewatering >30% DS – 22% DS today

• cake quantity will be greatly reduced

• Class A product gives them more security

• shut down their incinerator

• Lee odorous cake product

• Improved biogas yields

• More import capacity including glycerol – so

more biogas

• Integrated with Gas to Grid

Basingstoke (2016), Cambi 1 x B6-4, Thames Water

DAVYHULME, Cambi in a WWTP

CambiTHP®, “Turbo-charging” Biogas Plants for Sewage Sludge

(CAMBI XXL: DAVYHULME, UK, 91,000 t DS/year (1000 MLD)

Please

don’t

boil me

I’m feeling

the

pressure CambiTHP®

B12-4x5 reactors

8 x 7500 m3

digesters

MEDIUM; KAPUSCISKA WWTP, BYDGOSZCZ, POLAND

8000 t DS/y

Lindum, Sludge Centre

ADVANTAGES OF CAMBI THERMAL HYDROLYSIS

VS CONVENTIONAL ANAEROBIC DIGESTION

Cambi Thermal Hydrolysis pre-treatment - WWTP Integration

CAMBI THP – EFFECTS FROM PRESSURE COOKING SLUDGE

Dewatered

15% DS

Hydrolysed sludge

12-13% DS

Mix of digested

sludge and

hydrolysed sludge

to digester

7-8% DS

Digested sludge

6 %DS Dewatered cake

30-35% DS

NAESTVED (DK, 2000) – 8 MGD EXTENDED AERATION SLUDGE

Before CAMBI:

20,000 tpy, 20-22% DS,

Smelly, high level of pathogens

After :

10,000 tpy Cambi cake

30-33% DS

Low odour

Free of pathogens

EFFICIENT DEWATERING – Kapuciska, Poland

CAMBI SIGNIFICANTLY REDUCES CARBON FOOTPRINT

Oslo EGE: 10,000 t

CO2e/year

DCWATER/Blue

Plains:

From 47,000 - 73,000 t

CO2e/year

Davyhulme:

32,000 t CO2e/year

Bran Sands:

50,000 t CO2e/year

Cardiff + Afan:

37,000 t CO2e/year

“… [The] thermal

hydrolysis pretreatment

system at …

Davyhulme … will

reduce [United

Utilities’] carbon

footprint by 8% - the

equivalent of removing

270,000 cars off the

road for 30 years.”,

March-April 2009,

Worldwater

CAMBI EFFECT: END-PRODUCT QUALITY – ABERDEEN

16,5000 tons DS/year

Conventionally treated sludges :

99% pathogen removal

Enhanced treated sludges :

99,9999% pathogen removal

SAFE RECYCLING OF BIOSOLIDS TO FARMLAND (UK)

Cambi cake is at the crossroads of strategic planning of biosolids

Capital expenditure and operating costs directly linked

to cost of tonne of water evaporation (tWE)/disposal

Drying makes no sense for agriculture at most transport

costs –only if agriculture option is not available

Digested cake to agriculture based on stackable safe, non smelly , low volume product –

it’s a transport business

Digested cake

No agriculture

Landfill – normally much more

expensive than agriculture

Drying

1MWh/tWE

Drying size 1/2

Incineration

2MWh/tWE

Autothermic cake

agriculture

Lowest cost option

Cost/t transport and sales income

Less/no water to evaporate

with Cambi treatment

Less Biosolids Transport/disposal

with Cambi treatment

the future for sludge treatment:

WATER IS THE MAJOR COST OF SLUDGE DISPOSAL

THP

Cambi standardized models, B2, B6 and B12

LARGE PLANTS: BRAN SANDS, UK 40,000 tons DS/year

Cambi THP

B12-2x4 reactors

3 x 6300 m3

digesters

CAMBI THP AT BLUE PLAINS WWTP (390 MGD, 1400 MLD, 4

MILLION P.E.) WASHINGTON DC, 400 DRY TONS PER DAY.

174,000m3 designed originally 4 digesters, = 58,100 m3 (1/3 of traditional)

Saved $200 million CAPEX vs traditional

Saved >$20 mill in OPEX/year

PLANNED TRADITIONAL DESIGN CAMBI SOLUTION

NEW SOLUTION

CANCELLED TRADITIONAL DESIGN CAMBI PROCESS

RESOURCE RECOVERY AT BLUE PLAINS WWTP, WASHINGTON

DC

XIAOHONGMEN & GAOBEIDIAN FIRST 2 OF 5 CAMBI THP PROJECTS IN BEIJING

We need Compact & standardized solutions to cut

integration and engineering costs

Cambi B2 THP: Leigh (UU), UK, workshop + Installation

LEIGH

• Up to 20 metric tons DS/day

• 1 x 3,300 m³ digesters

• ~10% DS feed to digesters

• 2 x 527 kW + steam

• B2-4 reactor Cambi THP

• Cambi cake to agriculture

Cambi with drying: Psyttalia, Athens – 5 mill. p.e. plant, 720,000 m3/d

CambiTHP, treating all WAS from one

digestion line of 4 x 10,000 m³ digesters

Hydrolyzed sludge mixed with raw primary

prior to AD: 15,500 metric tonnes DS/year, 43

t DS/day

20% overall WWTP energy savings

15-20% expected increase in biogas

production.

Final product >28% DS, from current 22% DS

35% reduction in drying requirement

Financed on operating savings

BIOWASTE REFERENCES

Lillehammer plant 2001, cap. 14 000 t/a

Outputs: El/CHP, bio-fertilizer to farmers

Ecopro plant, 2008, cap. 30-40 000 t/a

Outputs: El/CHP, bio-fertilizer to farmers

Oslo biogas plant, 2012, cap. 50 000 t/a

Outputs: Upgraded biogas to vehicle fuel gas,

bio-fertilizer to farmers

ECOPRO, NORWAY

Processes organic waste and sludge

from 51 municipalities in mid-Norway

Started up March 2008

Cambi construction contract +

operations

Satisfies EU animal by-product

regulation

THE OSLO FOOD WASTE BIOGAS & FERTILIZER PLANT, BY CAMBI

AN YANG – CO DIGESTION PLANT SOUTH KOREA

THP type B12-4

Under construction

Design parametres

– 28 000 tDS/year

– 65% Biosolids

– 35% Biowaste

Start up 2016

Cambi THP

Full scale continuous THP in Amperverband In operation from 2009-2015

WAS only THP

21%DS -> 28%DS

Hydrolysate (soluble COD)

to digester

Sludge cake

40-60% DS

Steam

Biogas

+ 20-30%

SOLIDSTREAMTM IMPROVED DEWATERING AND BIOGAS PRODUCTION

CAMBI SOLIDSTREAM, SLUDGE CAKE REDUCTION

PROCESS SCHEME SolidStreamTM

AMPERVERBAND GERMANY 2015

60% Primary

40% Secondary

79% VS

To WWTP inlet

VSR = 68%

DSR = 53%

40-43% DS

4 000 t/yr Cake

HRT = 25d

4000 tDS/yr

Solid

Str

eam

55% VS

85-90% VS

+25% BIOGAS

60% LESS CAKE

Cambi SolidStream Cake

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Pla

nt

size

[t

DS

/yr

pro

cess

ed

]

* = operating; **operating & expanded, (*) closed down (pilot/decommissioned), *? Uncertain operating status. All other under design/construction

CAMBI WORLDWIDE MARKET SHARE, THERMAL HYDROLYSIS >

85%

* = operating; **operating & expanded, (*) closed down (pilot/decommissioned), *? Uncertain operating status. All other under

design/construction

Cambi THP

Biothelys, Veolia

Exelys, Veolia

Lysotherm, Eliquo Water

TurboTec, Sustec

Chinese suppliers (4)

Haarslev

METRIC

Market share, by capacity (t DS/y)

Plant ex-

pansions

Cambi 1,576,360 86.6 % 53 71% 31 79% 4

Biothelys 72,400 4.0 % 7 9% 6 15% 0

Exelys 48,200 2.6 % 5 7% 2 5% 0

Lysotherm 10,000 0.5 % 2 3% 1 3% 0

Sustec 16,000 0.9 % 2 3% 1 3% 0

Haarslev 5,200 0.3 % 1 1% 1 3% 0

Chinese 91,250 5.0 % 5 7% 5 13% 0

TOTAL 1,819,410 100.0 % 75 100% 39 100% 4

Finished/Oper-ating,

By number

Total Plants, By

number

Cambi

Other

suppliers

Top 4 Reasons for Cambi

• Reduced Capital Cost • Cambi is less expensive than new

digesters

• Cambi likely less expensive than digester

refurbishment

• Reduced Operating Cost • Dramatic decrease in biosolids leaving

the plant + Class A

• Integrates well with on-site power and

use of heat from engines

• Reduces GHG emissions • DC Water 40% reduction in GHG

• Provides Security for Solids

Handling and Cost (Reduces

Risk) • Known and predictable capital and

operating cost

• Reduced volume of solids

• Class A product allows for more options

• Eliminates the risk of rapid (e-coli)

regrowth and odors

Power from the People – with CAMBI THANKS FOR YOUR ATTENTION! QUESTIONS?

BACK UP

Program Benefits with CambiTHP

advanced digestion at DC Water

Reduce biosolids quantities by more than 50%

Improve product quality (Class A and more)

Generate 13 MW (net 10 MW) of clean,

renewable power from the CHP

Cut GHG emissions by ~57,000 tonnes/yr

Save millions of dollars annually when the

facility begins operating in 2014

Reinventing Biosolids

41

Cake Blending and

Dilution

Thermal Hydrolysis

Digestion Digested Sludge

CHP Plant

Cake Reception

Electricity to

ASD and

RSTC Plant

Excess Electricity

Exported to ETW

Biogas

RSTC

Phase 1

RSTC

Phase 2

CAMBI INTEGRATION, LARGE SCALE (BRAN SANDS, TEES

VALLEY, ENGLAND)

Drivers impacting sludge treatment

Phosphorous Energy

Sustainability Fertilisers

CAMBI ORGANIZATION

Founded in Norway in 1989, Cambi has today more

than 125 employees and representatives, local

offices in 9 countries.

Cambi’s headquarter is in Asker, (Oslo), Norway.

Cambi’s manufacturing site is in, Congleton,

(Manchester),UK

PRINCIPLES OF CAMBI HYDROLYSIS

Batch heat sterilization

Meets all known safety standards worldwide, USEPA alternate 1 time/temp Class A batch – no reactivation

Destruction of Extra Cellular Polymer – ECP

Sludge becomes compressible for dewatering (10% DS% gain) and less viscous (10% hydrolysed =~ 5% conventional)

Hydrolysis of insoluble COD

30-50% solubilisation enables very rapid digestion, 10 days HRT, 60% VSR

Steam disintegration of particulate matter

Increases digestion rate and reduces viscosity further

THE CAMBI VALUE PROPOSITION FOR MUNICIPAL SLUDGE AND ORGANIC WASTE

Reduce or eliminate residual

waste disposal. Recover nutrients and

produce Class A Fertilizer.

Generate clean,

renewable energy from

waste.

Cut greenhouse emissions

dramatically.

Save millions in annual costs for the

cities.

THE GREAT CITIES OF THE PRESENT WERE

BUILT AROUND NATURAL RESOURCES

THE GREAT CITIES OF THE FUTURE ARE

BUILT AROUND HUMAN RESOURCES

H U M A N R E S O U R C E S D E M A N D

C L E A N C I T I E S

For a City to remain great, it

needs to attract Human

Resources.

As cities attract more and

more people, a strategy is

needed for dealing with

Human Waste.

The sewer is the conscience

of the city

PEOPLE DEMAND CLEAN

WATER, AIR, AND CITIES.

THE CHALLENGE IS THAT PEOPLE GENERATE WASTE AND

REQUIRE INCREASING AMOUNTS OF WATER AND ENERGY.

THE CAMBI SOLUTION TURNS

PROBLEMS INTO PRODUCTS:

FROM WASTE TO WORTH

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

United Kingdom& Ireland

United States Europe West andMiddle East

Scandinavia andEurope Central

Iberia/LatinAmerica

China India Russia, Baltics, E-Europe & Balkans

S-Korea, Japan,Australasia

2010, 2020, 2030

Cambi Analysis: WORLD SLUDGE PROUDCTION TRENDS M

illio

n tons d

ry s

olid

s/y

ear

APAC: South Korea, Japan, Australasia (Singapore, Thailand, Burma, Vietnam, Indonesia, Malaysia, Philippines

not yet mapped)

Odour

Biogas

Carbon

Footprint

Critical Decision Making Criterias For Biogas Plants

Product

Quality

Disposal

Costs O&M

Costs

Digester

Volume

Plant

Footprint

Plant

payback

Odour

Cambi THP Positively

Impacts all of them

Cambi THP plant range

2 reactor compact

B – 2 (2 m³ reactor) B – 6 (6 m³ reactor) B – 12 (12 m³ reactor)

Small size projects

- Standardised package unit

- pre-assembled & pre-tested

- containerized unit

Medium-large size projects

- Standardised package unit

- Pre-assembled skids

Extra large size projects

- custom-made

- on-site construction

5 – 20 tDS/day 20 – 80 tDS/day 60 – 500 tDS/day

Second Generation THP - Summary of performance by Thames

Water

55

Parameter Units Conv AD THP SAS only

THP

I-THP

VSR % 44% 59% 55% 65%

Gas Yield m3/TDS 339 454 421 503

Gas yield MWh/TDS 2.16 2.90 2.69 3.21

Elec Efficiency (gross) % 15.3% 20.6% 19.1% 22.8%

Elec Efficiency (net) % 12.3% 14.4% 12.9% 16.6%

Electrical Output MWh/TDS 0.72 0.97 0.90 1.07

Support Fuel MWh/TDS - 0.28 - -

Digester volume m3 46,350 14,300 26,250 29,000

THP Size % - 100% 40% 60% Dewaterability

(min/max) %DS 21 \ 30 32 \ 45 28 \ 35 34 \ 48?

Cambi Converts Sludge to Dry and Compost-like Class-A

Product

Reduce volume to land Increase value recovery

Dewatered cake after Cambi

THP at Thames Water

Agriculture is the backbone of the DCWATER biosolids

program – 90% of material is land applied

57

DC Water and Sewer Authority Biosolids

Reuse Program

WITH BIOSOLIDS: -Drought resistance

-N+P and micronutrients

WITHOUT

BIOSOLIDS

(chemical fertilizer)

Recommended