Calgary Transit LRT Network Plan

Citation preview

CalgaryCalgaryLRT

NetworkPlan

CalgaryLRT

NetworkPlan

OverviewOverview

These drawings provide an overview of Calgary’s CTrain (or LRT) Network plan. The drawingsThese drawings provide an overview of Calgary’s CTrain (or LRT) Network plan. The drawingsprovide information on existing lines and approved alignments, future station locations and parkprovide information on existing lines and approved alignments, future station locations and parkand ride lot requirements. and ride lot requirements.

Currently, the network consists of three legs – South, Northwest and Northeast. ConstructionCurrently, the network consists of three legs – South, Northwest and Northeast. Constructionof an additional three lines (West, Southeast and North Central) is required to complete theof an additional three lines (West, Southeast and North Central) is required to complete thenetwork and this is anticipated to occur before Calgary reaches a population of 1.5 million. network and this is anticipated to occur before Calgary reaches a population of 1.5 million. West LRT is underway and scheduled to open in 2012 while the timing of the Southeast and North West LRT is underway and scheduled to open in 2012 while the timing of the Southeast and North Central legs and other extensions not specifically noted below is dependant on future city growth andCentral legs and other extensions not specifically noted below is dependant on future city growth andavailable funding.available funding.

South LRTSouth LRT

South LRT opened in 1981; offering service between the downtown and Anderson Station.South LRT opened in 1981; offering service between the downtown and Anderson Station.This original line also included a downtown transit mall for LRT and buses on 7This original line also included a downtown transit mall for LRT and buses on 7thth Avenue S. Avenue S.After several extensions, South LRT now travels to Somerset Bridlewood station. Future After several extensions, South LRT now travels to Somerset Bridlewood station. Future extensions are planned to serve communities developing south of Marquis of Lorne Trail. extensions are planned to serve communities developing south of Marquis of Lorne Trail.

Northeast LRTNortheast LRT

Northeast LRT opened in 1987 connecting downtown with Whitehorn Station. In 2007, anNortheast LRT opened in 1987 connecting downtown with Whitehorn Station. In 2007, anextension to McKnight / Westwinds Station was opened. Northeast LRT shares 7extension to McKnight / Westwinds Station was opened. Northeast LRT shares 7thth Avenue Avenuetracks with the South / Northwest line. Design is now underway for a further extension totracks with the South / Northwest line. Design is now underway for a further extension toMartindale and Saddletowne scheduled to open in 2012. Future extensions are planned to serve Martindale and Saddletowne scheduled to open in 2012. Future extensions are planned to serve communities developing north of 80communities developing north of 80thth Avenue NE. Avenue NE.

Northwest LRTNorthwest LRT

Northwest LRT, an operating extension of South LRT, began operating in 1987 just prior toNorthwest LRT, an operating extension of South LRT, began operating in 1987 just prior tothe 1988 Winter Olympic Games. Since then, it has been extended three times - to Brentwood and the 1988 Winter Olympic Games. Since then, it has been extended three times - to Brentwood and Dalhousie Stations and recently to Crowfoot Station. A further extension to Tuscany is being Dalhousie Stations and recently to Crowfoot Station. A further extension to Tuscany is being designed and will be completed in 2014.designed and will be completed in 2014.

West LRTWest LRT

Funding for West LRT was approved in 2008 and construction is now underway with completion toFunding for West LRT was approved in 2008 and construction is now underway with completion to6969thth Street SW expected in 2012. This line will have six stations and two park and ride facilities Street SW expected in 2012. This line will have six stations and two park and ride facilitiesalong 8 kilometres of track. This project will involve unique elements for Calgary including analong 8 kilometres of track. This project will involve unique elements for Calgary including anelevated station in Sunalta and subway style stations at Westbrook and 69elevated station in Sunalta and subway style stations at Westbrook and 69thth Street SW. Street SW.

Calgary LRT Network Plan Calgary LRT Network Plan ... at a glance ... at a glance

Southeast LRTSoutheast LRT

An alignment for Southeast LRT has been approved from the downtown to the new communitiesAn alignment for Southeast LRT has been approved from the downtown to the new communitiesand South Hospital planned south of Marquis of Lorne Tr. The line will be over 26 kilometresand South Hospital planned south of Marquis of Lorne Tr. The line will be over 26 kilometreslong. LRT cars operating on this line will be low floor vehicles that will require minimal stationlong. LRT cars operating on this line will be low floor vehicles that will require minimal stationplatforms and allow for better community integration. The downtown section of the route will beplatforms and allow for better community integration. The downtown section of the route will belocated in a subway under 2located in a subway under 2ndnd Street SW. Calgary Transit launched a Southeast Bus Rapid Street SW. Calgary Transit launched a Southeast Bus Rapid Transit service in 2009 which travels along a similar alignment to SE LRT. This service features Transit service in 2009 which travels along a similar alignment to SE LRT. This service features articulated buses operating in mixed traffic aided by transit priority at intersections.articulated buses operating in mixed traffic aided by transit priority at intersections.

North Central LRTNorth Central LRT

Planning is underway for a North Central LRT line between the downtown and communities Planning is underway for a North Central LRT line between the downtown and communities developing north of Beddington Trail. The general concept for the North Central LRT developing north of Beddington Trail. The general concept for the North Central LRT alignment, approved by Council in 2006, will share a portion of the Northeast line from the alignment, approved by Council in 2006, will share a portion of the Northeast line from the downtown then travel along side the CPR railway located in the Nose Creek valley and then along downtown then travel along side the CPR railway located in the Nose Creek valley and then along Harvest Hills Boulevard north of 96Harvest Hills Boulevard north of 96thth Avenue N. Two other corridors will be evaluated: Avenue N. Two other corridors will be evaluated: Edmonton Trail and Centre Street. Public engagement is planned in 2011.Edmonton Trail and Centre Street. Public engagement is planned in 2011.

Downtown-8 Avenue SubwayDowntown-8 Avenue Subway Today, CTrain service on the South and Northwest legs operate as one continuous routeToday, CTrain service on the South and Northwest legs operate as one continuous route(Route 201). The Northeast leg (Route 202) terminates service at the west end of the downtown.(Route 201). The Northeast leg (Route 202) terminates service at the west end of the downtown.In 2012, the Northeast LRT will be linked with the West line when it opens and will operate as a In 2012, the Northeast LRT will be linked with the West line when it opens and will operate as a continuous service. continuous service.

The 7The 7thth Avenue transit mall is restricted to the operation of CTrains, buses and emergency Avenue transit mall is restricted to the operation of CTrains, buses and emergencyvehicles. Traffic signals are timed to facilitate CTrain operation (not preempted). Existingvehicles. Traffic signals are timed to facilitate CTrain operation (not preempted). Existingthree-car station platforms in the downtown are currently being replaced and these new stationsthree-car station platforms in the downtown are currently being replaced and these new stationsalong with station modifications along the rest of the network will permit the operation of 4 caralong with station modifications along the rest of the network will permit the operation of 4 cartrains by 2014.trains by 2014.

Early planning of the Calgary LRT network recognized the need to someday separate theEarly planning of the Calgary LRT network recognized the need to someday separate thecombined operation of the South / Northwest and Northeast lines that currently operate jointlycombined operation of the South / Northwest and Northeast lines that currently operate jointlyalong 7along 7thth Avenue. Separation of these routes will eliminate delays that occur at the entry point Avenue. Separation of these routes will eliminate delays that occur at the entry pointto the downtown where the lines must be switched onto a common piece of track. Provision hasto the downtown where the lines must be switched onto a common piece of track. Provision hasbeen made for construction of a future subway under 8been made for construction of a future subway under 8thth Avenue S to accommodate the South / Avenue S to accommodate the South / Northwest service. The Northeast / West route will remain on 7Northwest service. The Northeast / West route will remain on 7thth Avenue. Building the Avenue. Building the8thth Avenue Subway will allow for higher capacity services on both lines. Detailed functional Avenue Subway will allow for higher capacity services on both lines. Detailed functionalplanning for this subway is just starting (2010) and the work will include a design for the subwayplanning for this subway is just starting (2010) and the work will include a design for the subwayrequired for the Southeast line under 2required for the Southeast line under 2ndnd Street SW. Street SW.

th th

Calgary LRT Network Plan Calgary LRT Network Plan ... at a glance ... at a glance

South LRT

Southeast LRT

Northeast LRT

Northwest LRT

West LRT

NorthCentral LRT

Calgary North

SoutheastEmployment

Centre210 Avenue S

84 Street W

Tuscany

NE IndustrialLands

ProposedHigh Speed

Rail(Province)

Legend

LRT Station

Existing LRT Alignment

Future LRT Extensions

North Central LRT (Determined)

Southeast LRT

West LRT

Proposed High Speed Rail(Province of Alberta)

North Central LRT (Under Review)

Calgary LRT Network Plan

(250 P&R)

(1000 P&R)

Southland

Chinook

39 Avenue

Fish Creek Lacombe

Anderson

Somerset - Bridlewood

Silverado

210 Avenue S

(913 P&R)

(206 P&R)

(1130 P&R)

Shawnessy

(260 P&R)Canyon Meadows

(1750 P&R)

(650 P&R)

(557 P&R)Heritage

(320 P&R)

(229 P&R)

Legend

ExistingFunded

LRT Alignment, Stations &(Park and Ride Stalls)

Future

October 2010

Alignment, S

tation Locations & Park and Ride S

tallsSouth LRT

!!!!!!

!! ! ! ! ! ! ! ! ! !!!

!!!!!!!!!!!!!!!!!!!!

"2

"2

"2

"2 "2

"2

"2 "2 "2 "2

"2

"2

"2

"2

"2

"2

"2

"2"2

"2

"2

"2

"2

"2

"2

"2

(140 P&R)

McKnight /Westwinds

Franklin

Barlow/ Max Bell

Zoo

Chinook

Saddletowne

Martindale

Bridgeland/Memorial

Sunnyside

Whitehorn

Rundle

SAIT/ ACA&D

Lions Park

Banff Trail

University

Brentwood

(950 P&R)

128 Avenue N

96 Avenue N

Country Hills

(600 P&R)

(200 P&R)

11 Street W

Stoney(100 P&R)(shared)

(824 P&R)

(350 P&R)

(485 P&R)Marlborough

(578 P&R)

(50 P&R)

"2

"2

39 Avenue

Erlton/Stampede

Victoria Park/Stampede

³(200 P&R)(shared)

Legend

ExistingFunded

LRT Alignment, Stations &(Park and Ride Stalls)

Future! ! ! ! ! ! !"2"2

"2

JULY 2009

Alignment, S

tation Locations & Park and Ride S

tallsNortheast LRT

(50

0 P

&R

)

Fra

nklin

Ba

rlow

/ Max B

ell

Zo

o

Erlto

n/

Stam

ped

e

Vic

toria

Pa

rk/S

tamp

ede

Tu

sca

ny

Cro

wfo

ot

Brid

ge

land

/M

em

oria

l

Ma

rlbo

rou

gh

Su

nn

yside

Ru

nd

le

Wh

iteh

orn

Bre

ntw

oo

d

Un

iversity

Ba

nff T

rail

Lio

n's P

arkSA

IT/ A

CA

&D

Da

lho

usie

(13

40

P&

R)

11 S

tree

t W

Mc

Kn

igh

t/W

estw

ind

s

(74

0 P

&R

)

(13

81

P&

R)(78

0 P

&R

)

Leg

en

d

Existin

g

Fu

nd

ed

LR

T A

lign

me

nt, S

tatio

ns &

(Pa

rk an

d R

ide S

talls)

Fu

ture

Oc

tober 2

010

Alignment, S

tation Locations & Park and Ride S

tallsNorthwest LRT

(83

0 P

&R

)(4

20

P&

R)

Fra

nklin

Ba

rlow

/ Max B

ell

Zo

o

He

ritag

e

Ch

ino

ok

39 A

ven

ue

Erlto

n/

Stam

ped

e

Vic

toria

Pa

rk/S

tamp

ede

45 S

tree

t69

Stre

et

Su

na

lta

We

stbro

ok

Siro

cc

o

Brid

ge

land

/M

em

oria

l

Sh

ag

an

ap

pi

Po

int

(50

0 P

&R

)

Ma

rlbo

rou

gh

Su

nn

yside

Ru

nd

le

Wh

iteh

orn

Bre

ntw

oo

d

Un

iversity

Ba

nff T

rail

Lio

n's P

arkSA

IT/ A

CA

&D

Da

lho

usie

As

pe

nW

oo

ds

11 S

tree

t W

Mc

Kn

igh

t /W

estw

ind

s

Leg

en

d

Existin

g

Fu

nd

ed

LR

T A

lign

me

nt, S

tatio

ns &

(Pa

rk an

d R

ide S

talls)

Fu

ture

OC

TO

BER

20

10

Alignment, S

tation Locations & Park and Ride S

tallsWest LRT

(200 P&R)

(300 P&R)

(530 P&R)

(200 P&R)

(200 P&R)

(530 P&R)

(300 P&R)

(900 P&R)

Ramsay/ Inglewood

Franklin

Barlow/ Max Bell

Zoo

Southland

Heritage

Chinook

39 Avenue

Erlton/ Stampede

Victoria Park/ Stampede

Ogden

Lynnwood

Crossroads

Highfield

South Hill

Shawnessy

Fish Creek Lacombe

Canyon Meadows

Anderson

Somerset - Bridlewood

McKenzie Towne

Prestwick

Shepard

Douglas Glen

Hospital

Seton

Bridgeland/Memorial

Quarry Park(300 P&R)

MarlboroughSunnyside

(300 P&R)Auburn

+Mahogany(200 P&R)

Auburn Bay

+Mahogany(200 P&R)

11 Street W

Legend

ExistingFunded

LRT Alignment, Stations &(Park and Ride Stalls)

Future

OCTOBER 2010

Alignment, S

tation Locations & Park and Ride S

tallsSoutheast LRT

McKnight /Westwinds

Franklin

Barlow/ Max Bell

Zoo

Chinook

Bridgeland/Memorial

Sunnyside

Whitehorn

Rundle

SAIT/ ACA&D

Lions Park

Banff Trail

University

Brentwood

11 Street W

Marlborough

39 Avenue

Erlton/Stampede

Victoria Park/Stampede

HarvestHills

Coventry

150 Avenue N

Legend

ExistingFunded

LRT Alignment, Stations &(Park and Ride Stalls)

Future

JANUARY 2011

Future

(Determined)

(Under Review)

Alignment, S

tation Locations & Park and Ride S

tallsNorth Central LRT

!!!

!!!!!!!!!!!!!!!!!!!!!!!!!

!

"2

"2

"2

"2

"2"2

Vic

toria

Pa

rk/S

tam

pe

de

Brid

ge

lan

d/

Me

mo

rial

Su

nn

yside

SA

IT/ A

CA

&D

"21

1 S

tree

t W8

th A

ven

ue

Su

bw

ay

³

Le

ge

nd

Existin

g

Fu

nd

ed

LR

T A

lign

me

nt, S

tatio

ns &

(Pa

rk an

d R

ide

Sta

lls)

Fu

ture

!!!!!!!

"2 "2 "2

AU

GU

ST 2008

Downtown-8 Avenue Subway th

Recommended