CADLink CAD Interface system that connects your design information to. PLEX Online. ECN Manager Ties...
Preview:
Citation preview
- Slide 1
- Slide 2
- CADLink CAD Interface system that connects your design
information to. PLEX Online. ECN Manager Ties your ERP Solution CAD
information with your Engineering change process.
- Slide 3
- QBuild began in 1995 with a simple AutoCAD ERP link. Today
CADLink integrates ERPs to leading CAD & PDM systems,
including: SolidWorks SolidWorks EPDM EPDM WindChill WindChill
AutoCAD AutoCAD NX NX Inventor Inventor Pro-E Pro-E Many more..
Many more..
- Slide 4
- L INKING P LEX AND CAD D ATA
- Slide 5
- Slide 6
- o Zero software cost o Error Prone o Time Consuming o Small
engineering departments o Manufacturing of simple, repetitive
products
- Slide 7
- o Cheap and Cheerful o Slightly Faster than Brute Force o Often
requires massaging data in both CAD and PLEX o Small engineering
departments o Manufacturing of simple, repetitive products
- Slide 8
- Features o Direct link to: PLEX Online o Push PLEX description
onto the drawing o Push revision information to CAD and PLEX Online
o Update items, bills of material, and operations directly from
your CAD system o Tie critical dimensions to PLEX ERP BOM
quantities
- Slide 9
- Reduce non value-added engineering activities Double and triple
data entries are eliminated Reduce scrap Improve purchasing
accuracy Eliminate wrong build situations Improve on time shipments
Reduce engineering costs Improve accuracy from engineering to
production
- Slide 10
- 8 Eng x 1 hour per day = 2000 hours BOM Data Entry 1 scrapped
part per year 12 late shipments per year Shop Floor ConfusionTotal
savings of 65,000 a year
- Slide 11
- Slide 12
- Bill Of Material information is pulled from Models or Drawings
and displayed for the Engineer in this grid. Discrepancy between
CAD and PLEX Data are highlighted
- Slide 13
- Multi Level Bill Of Material
- Slide 14
- Shows the discrepancy between CAD and PLEX Data. Allows
engineering to select the correct one
- Slide 15
- Class Code table is taken directly from PLEX Online
- Slide 16
- Group Code table is taken directly from PLEX Online
- Slide 17
- PLEX Raw Material data is accessible directly from CADLink
- Slide 18
- PLEX Routing data created directly from within CADLink
- Slide 19
- Engineering can select the specific operation for each assembly
component
- Slide 20
- Bill of Material Changes Summary shows only the BOM changes
that will be made to PLEX
- Slide 21
- CAD Properties for the entire assembly conveniently summarized
in a single tab
- Slide 22
- CADLink can be configured to suit your requirements
- Slide 23
- BOM Data Entry 8 Eng X 1 hour per day = 2000 hours Cost
Justification Shop Floor Confusion 1 scrapped part per year 12 late
shipments per year Total Savings of $65,000 per year
- Slide 24
- Contact for Sales and Consulting: Geovanna Pazmino Applications
Engineer QBuild C O R P O R A T I O N 145 Renfrew Drive, Unit 140 |
Markham, ON L3R 9R6 | CANADA Phone +1 905 479 7811 EXT 224 Fax +1
905 479 2636 Email:
geovanna.pazmino@qbuildsoftware.comgeovanna.pazmino@qbuildsoftware.comwww.qbuildsoftware.com