HEAT E XCHANG ERS F OR A WORLD
8/10/2019 Bwe Aphggh
3/20
O F ENERGY
8/10/2019 Bwe Aphggh
4/20
BURMEISTER & WAIN ENERGY A/S .......It all began in 1843
The first Ljungstrm Air Preheater from 1920
Burmeister & Wain Energy A/S is a Danish company with manyyears of experience as a supplier of high-tech solutions for thepower generation industry.
The company dates back to a period when Denmarks industrialdevelopment had not yet gained momentum. The history of thecompany began in 1843 when a young and enterprising engineer,Hans Heinrich Baumgarten, was awarded a royal license toestablish a machine shop in Copenhagen.
In 1846 he went into partnership with Carl Christian Burmeister.Baumgarten retired in 1861 and was succeeded in 1865 by WilliamWain, and the company Burmeister & Wain was finally founded in1872 soon becoming the largest and most important enterprise in
the iron industry of Denmark.
In 1980 Burmeister & Wain Energy A/S (BWE) was established asan independent company, and in 2002 it was acquired by the Italiancompany STF SpA.
The history of the regenerative heat exchangers in BWE startedin 1958 when the company acquired a licence for Ljungstrmheaters. Fredrik Ljungstrm was a Swedish engineer who inventedthe process in 1920.
The licence agreement was in force until 1984 and when it cameto an end BWE continued to develop and design the heaters asown technology and today these heaters are marketed as BWEregenerative heaters.
BWE supplied the first Air Preheater in 1961 for a 195 MWe powerplant in Denmark and the first Gas-Gas Heater was supplied in1987 for an FGD plant in Holland.
Up to now BWE has supplied more than 135 units successfully andhas an extensive experience with the technology.
8/10/2019 Bwe Aphggh
5/20
Vision
To remain a leading supplier of boiler and
environmental technology through technology
supply and engineering services to national
and international clients.
To be a signicant international player in
the upgrading of existing boilers for higher
efciencies, lower emissions or for conversion
to alternative fuels.
To be a signicant European player providing
services and maintenance to utilities directly
or through alliances.
. this to ensure andenjoy a better future
Advanced Clean Technology in
Boiler Design
Fossil fuels and especially coal will be themain energy source to cover the increased
demand for power generation for many years
to come in a growing world.
The BWE Advanced Clean Technology in
boiler design is an important factor in meeting
the worlds CO2reduction target.
By introducing the best available technology
both in new power plants and when retrotting
existing, the plant efciency is increased and
consequently the CO2emissions are reduced.
The BWE Ultra Super Critical Flex Boiler is
a solution to utilize fossil and biomass fuels
in USC boilers maximizing efciency, fuel
exibility and use of renewables.
The rst step to make Carbon Capture and
Storage (CCS) viable is to maximize efciency.
The BWE USC Flex boiler and its
high efciency makes the subsequent
implementation of the CCS technology
feasible.
BWE benefits from being part of the history ofpower generation in Denmark
Since the energy crisis of the early 70s, Danish power industry has been focusing on the
environment, fuel flexibility and efficiency.
The collaboration of BWE with local utilities has allowed our company to acquire direct
experience with different fuels, biomass combustion, co-combustion, high efficiency and load
flexibility.
BWE exports the Danish example in power generation to the worldwide market.
8/10/2019 Bwe Aphggh
6/20
8/10/2019 Bwe Aphggh
7/20
for new plants and for rehabilitation of
existing plants
BWE has developed and designed both Air Preheaters and Gas-GasHeaters as a proprietary technology since 1984.
BWE designs and builds Air Preheaters and Gas-Gas Heaters tominimize the leakage and maximize the thermal efficiency.
BWEs design calculations for Air Preheaters and Gas-Gas Heatersare impressively precise. BWE is able to design the machines in such
a way that the performance corresponds exactly to the calculations.
BWEs proven measures regarding improved efciencies can almostalways be built into existing Air Preheaters & Gas-Gas Heaters.
BWEs Air Preheaters and Gas-Gas Heaters are simple in theirstructures and therefore extremely easy to service.
BWEs Gas-Gas Heaters are easy to protect against corrosion dueto their simple structure and due to corrosion protection beingincorporated in the design.
8/10/2019 Bwe Aphggh
8/20
8/10/2019 Bwe Aphggh
9/20
8/10/2019 Bwe Aphggh
10/20
8/10/2019 Bwe Aphggh
11/20
BWE can offer to modernize and improve the performance of existingheaters regardless of make.
The work can comprise:
installation of new improved sealing systems modication of existing air heaters for SCR application new cleaning systems delivery of new heating surface in mild or corten steel or with vitreous
enamel coating
general repair and maintenance work
Advantages:
Higher Efciency Lower maintenance costs Larger ROI Implementation of improved sealing system Renovation of rotor grate and casing Improvement of design and supply of new heating elements Modernization of soot blowers Performance tests Service at site
Rehabilitation and improvement
of APH & GGH
New enamelled baskets installedduring the rehabilitation of an old
APH
New circumferential seal
8/10/2019 Bwe Aphggh
12/20
8/10/2019 Bwe Aphggh
13/20
The shape of the rotor changes from cold to hot condition due to thetemperature difference between the hot upper part of the rotor andthe cold bottom part. In order to retain a fixed minimum gap between
the sector seal plate and the rotor, the sector seal plates must beadjusted according to the actual shape of the rotor.
The purpose of BWEs sensor controlled sealing system is to performthe adjustment automatically and continuously.
Being insensitive to fly ash, water, gypsum etc, a major advantageof the inductive position principle is the ability to operate in dirtyenvironments
Measuring Sensor
Measuring sensor devices measure the distance between the sectorplate and the rotor flange continuously. The sensor uses threemagnetic inductive coils installed in a sensor unit. The sensing coilis an open core coil which produces a magnetic flux according tothe distance between the coil and the rotor flange. The reference coilis a closed core coil for temperature compensation. The drive coilgenerates the magnetic field. The coils are able to work continuouslyat temperatures up to 420 C.
Control Panel
The signal from the sensor is amplified and linearized in a transmitterplaced inside the local control panel. The actual distance, as well asthe status of the system, is shown on the screen of the panel and onthe DCS of the plant. The control panel also includes a PLC whichcompares the gap information to a set value and if necessary anactuator will move the sealing plate in order to maintain the correctgap distance.
Active leakage control
Installation of Active Leakage Control in existing
units
By installing Active Leakage Control System in existing Air Preheatersand Gas-Gas Heaters instead of a fixed sealing system or a manuallyadjustable system it is possible to:
reduce the leakage to an absolute minimum
save power consumption for the fans
increase the overall plant efciency
8/10/2019 Bwe Aphggh
14/20
The BWE soot blower is a multi cleaning media type with a fullyretractable lance. The cleaning media are air (pressure range 6-20 bars)and water (pressure range 80-100 bars).
Advantage of a BWE soot blower:
No shut down periods of main boiler unit due to soot blowermalfunctions
The lance and nozzles can be serviced/repaired/changed while theGas Gas Heater is still in operation
The lance and nozzles are not in contact with the aggressive andabrasive flue gas when the soot blower is in standby-mode
No need for internal lance support structures
BWE Soot Blower for GGH
8/10/2019 Bwe Aphggh
15/20
Equipment:
All elements in ue gas contact are made of resistant materials,
such as Hastelloy and Teflon
High pressure nozzles provide solid stream (0 degree spread) tosecure an optimal penetration of the narrow space between theheating elements
The seal box is equipped with a labyrinth seal giving the lance alarge freedom of movement
Air knife for lance deposit removal (optional)
Seal air is applied to the seal box and, to avoid clogging of nozzles, tothe high pressure nozzles during low pressure cleaning and to the lowpressure nozzles during high pressure cleaning.
The soot blower operates in a Go-Stop-Go mode which secures a fullcoverage of the rotor surface.
8/10/2019 Bwe Aphggh
16/20
8/10/2019 Bwe Aphggh
17/20
8/10/2019 Bwe Aphggh
18/20
8/10/2019 Bwe Aphggh
19/20
8/10/2019 Bwe Aphggh
20/20
STFS.p.A.Via Robecco, 2020013 Magenta (MI) ItaliaTel: +39 02 972091Fax: +39 02 9794977
www.stf.ite-mail: stf@stf.it
BWE
Burmeister & Wain Energy A/SLundtoftegrdsvej 93ADK-2800 Kgs. Lyngby - DenmarkTel: +45 39 45 20 00
Fax: +45 39 45 20 05www.bwe.dke-mail: info@bwe.dk
BWE Energy India Pvt. LtdNo. 43, KB Dasan RoadTeynampetChennai - 600 018TamilNadu, India
Tel: +91 44 24 32 8101/2Fax: +91 44 24 32 8103e-mail: info@bweenergy.in
Recommended