BSB JOP Project BSBEEP Black Sea Buildings Energy Efficiency Plan

Preview:

DESCRIPTION

BSB JOP Project BSBEEP Black Sea Buildings Energy Efficiency Plan Presentation of GA ’ s No 3: “ Integrated planning processes and approaches - Planning, implementation and training ” Second Meeting, Yerevan, Armenia December 2013. Alen Amirkhanian American University of Armenia - PowerPoint PPT Presentation

Citation preview

BSB JOP Project BSBEEPBlack Sea Buildings Energy Efficiency PlanPresentation of GA’s No 3: “Integrated planning processes and approaches - Planning, implementation and training”

Second Meeting, Yerevan, Armenia

December 2013

1

Alen AmirkhanianAlen AmirkhanianAmerican University of ArmeniaAmerican University of ArmeniaYerevan, ArmeniaYerevan, Armenia

5

GA’s role and position for the whole BSBEEP project

GA’s role and position for the whole BSBEEP project

Group of Activities 3 – Integrated planning processes and approaches - Planning, implementation and training

GA 3 – Specific Activities

Activity 3.1 – Planning and Implementation of actions for raising of awareness of local actors on energy issues in daily life

6

Deliverable: Three (3) educational material

booklets for training seminars addressing three target groups (approximately 15 pages each, i.e., 45 pages total) in seven languages

Deadlines: Months 9-12 (March to May 2014)

Target groups could include:• Civil servants• Builders/architects• Journalists

AUA can send:•Outline•Some content for you to translate•But you’d also need to localize the materials

7

Deliverables: • Seven (7) local action plans• Seven (7) campaigns for

awareness of local actors

Activity 3.2 – Identification and evaluation of proposed actions for the amelioration of the environmental performance – Action Plans elaboration

Deadlines: Months 17-20 (Oct 2014 to Jan 2015)

Local Actors: • Civil servants, journalists,

households, major energy users, builders/architects, …

Expectations: Better informed populations on energy

efficiency issues

8

Activity 3.3 – Implementation of Pilot Demonstration Project

Deliverable: Four (4) pilot demonstration projects:Cahul, Mikolayev, Samsun, Tekirdag

One (1) pilot demo project in Armenia (Municipality of Vayk)

Deadlines: Months 21-24 (March to May 2015)

Target groups could include:• Muni of Cahul • Muni of Mikolayev • Muni of Samsun • Muni of Tekirdag• Muni of Vayk

Expectations: • Leverage funds from outside of

project to implement pilot demo project

• Concrete results from pilot demo project (such as show improvement in performance, etc._

9

Activity 3.4 – Training sessions for various target groups

Deliverable: Seven (7) trainings for target groups

Deadlines: Months 21-24 (March to May 2015)

Target groups could include:• Municipal servants• Builders/Architects• Journalists

Contact detailsContact detailsAmerican University of ArmeniaAlen Amirkhanian, Project Manager for BSBEEP e-mail of contact person/s: alen@aua.am phone nr.: +374-21-50-39Skype address: blingbu

11

GA 3 -- Outputs

GA 3 -- Results

GA 3 -- Budget

14