Broadway Street Reconstruction
July 14, 2015
BROADWAY RECONSTRUCTION
The project will improve approx. 1.7 miles of
Broadway Street between I-45 to Old Galveston
Road.
Overview
• Design is in progress for full reconstruction
• Seeking community input for design
• Construction expected 2018
Pavement condition
Drainage
Sidewalk accessibility
Project priorities
Intersection improvements
Pavement condition
Water, sewer and storm as needed
Pedestrian realm
The Plan
ROAD PAVEMENT
• Improve ride quality
• Lane shift – wider median with edge of pavement
closer to sidewalk
PEDESTRIAN REALM
• New and wider sidewalks
• Ramps to meet ADA requirements
• Improved pedestrian crossing at railroad
The Plan
The Plan
WATER, SEWER and STORM
• Replace storm drainage as needed
• Replace water and sewer as needed
The Plan
INTERSECTION IMPROVEMENTS
• New traffic signals at Hartford and Old Galveston Road
• Left turn lanes and other modifications added to select intersections
Broadway: I-45 to Hartford
Summary
• Wider medians and new sidewalk
• New left-turn lanes at Hartford
• New signals at Hartford
• Wheelchair ramps at every intersection
Broadway: Hartford to I-610
Summary
• Wider medians
• Left-turn lanes at medians
• New, wider sidewalks
• Wheelchair ramps at every intersection
Broadway: I-610 to Old Galveston Road
Summary
• New raised medians and sidewalk
• New signals at Galveston Road
• New pedestrian crossing devices
• New railroad crossing
Typical Cross Section
Seeking community input for Broadway Street,
I-45 to Old Galveston Road.
We want to hear from you
NEXT STEPS Broadway Street
Timeline subject to change
2015
Design
2018
Construction
2019
Construction
Complete
2012
Plan
THANK YOU