For the majority of people in the UK, tunnels are a brief but essential part of daily travel avoiding the surface congestion in our cities. Very few are aware of the full extent of the engineering excellence that goes on beneath their feet as workers undertake the tasks associated with the creation of the underground spaces for road, rail, water, sewers, utilities and many more applications.
Citation preview
BRITISH TUNNELLING SOCIETY
R e p r e s e n t i n g
8-17 20 Years of the Channel Tunnel
18-31 The Joseph Gallagher Group
32-43 Soprema UK
44-47 FP McCann
BRITISH TUNNELLING SOCIETYWritten by: Roger Bridge, Chairman
3
The entrance
hall at the
Associated
Society of the
Institution of
Civil Engineers
(ICE) where
BTS is based
4
BRIT ISH TUNNELLING SOCIETY
For the majority of people in the UK, tunnels are a brief but essential part of daily travel avoiding the surface congestion
in our cities. Very few are aware of the full extent of the engineering excellence that goes on beneath their feet as workers undertake the tasks associated with the creation of the underground spaces for road, rail, water, sewers, utilities and many more applications.
The recent TV coverage of Crossrail has given the public an insight of what ‘tunnelling’ is all about and the general feedback tends to be one of awe and amazement. We can easily become somewhat indifferent about the significance of our daily challenges and achievements and such coverage makes people realise what does go on beneath their feet and raises the profile of the industry.
We have a world-class heritage of tunnelling
Roger Bridge,
Chairman
The Thames Tunnel,
engineered in 1893 by Marc
and Isambard Kingdom Brunel,
is still operational today
Phot
o cr
edit:
Lar
s Pl
ougm
ann
/ Flic
kr
www.br i t i sh tunne l l ing .org .uk 5
BRIT ISH TUNNELLING SOCIETY C O N S T R U C T I O N
with the world’s first sub-aqueous tunnel built under the River Thames by Marc and Isambard Kingdom Brunel in 1843 and still operational today. Our extensive network of tunnels serving London Underground again bears testament to the ingenuity of tunnellers in the UK, as do the sewers built by Bazalgette and opened in 1865. More recently, we have had the Channel Tunnel, Heathrow Express, Jubilee Line, HS1 and the A3 Hindhead Tunnels.
It was my pleasure and an honour to take over from Damian McGirr as Chairman of the BTS in May this year. The BTS is an Associated Society of the ICE. With a current membership of over 700 individual members and in excess of 60 corporate members, it is one of the most vibrant gatherings of professional tunnellers in the world.
We are a forum to assist and encourage the dissemination of information relating to tunnelling
The Telford Theatre plays
host to BTS lectures
Phot
o cr
edit:
Eur
otun
nel
The Channel Tunnel Jubilee Line extension
6
and to act as a catalyst in the development of new technologies and standards that benefit the industry by improving knowledge, sustainability, efficiency, quality and safety in the construction and use of underground space. It is true to say that UK tunnelling is globally recognised and our standards and guidance are regularly adopted by projects around the world.
In recent years, the lack of Tunnel schemes in the UK has seen large numbers of skilled personnel leave for international projects. Now we have the prospect of increasing demands for tunnellers in the UK once again, there is a potential for a shortfall in capacity. One of the
Tunnel infrastructure of
the HST 1 network
C O N S T R U C T I O N
www.br i t i sh tunne l l ing .org .uk 7
society’s aims is the attraction of ‘new blood’ into the industry. Through our Young Members, we regularly attend schools, universities and career fairs, giving prospective tunnellers a taste of what the industry offers. A strength of the BTS is that we welcome all tunnelling personnel within the industry, giving a greater depth to the ability and knowledge available.
The society has strong ties with both TunnelSkills and TUCA; these bodies are the industry’s response to the potential shortfall of skilled and competent personnel to ensure its future capability to deliver.
As an industry we have probably never had such a promising period ahead of us, with a range of projects currently underway or in the pipeline, and there has never been a better time to embark on a career in tunnelling.
With numerous LUL contracts and National Grid Power Tunnels well underway and Crossrail recently passing the halfway mark, we are looking to the next phase of works. Hinkley, Shieldhall, Bank Station and Northern Line Extension are all due to begin soon; Tideway, Silvertown and HS2 will become a reality in the near future. I cannot begin to mention numerous small schemes for utilities that tend to go unnoticed in the press.
In summary, the UK tunnelling industry is in an excellent position and I look forward to the coming years and the challenging work ahead for all of us.
Association Information
A S S O C I AT I O N
T Y P E
A Learned Society. The
BTS is an Associated
Society of the Institution
of Civil Engineers (ICE).
L O C AT I O N
The Institution of Civil
Engineers, London, UK.
F O U N D E D
1971
K E Y P E O P L E
Chairman, Roger Bridge;
Vice Chairman, Mark
Leggett
NO. OF MEMBERS
In excess of 700
individual members and
60 corporate members
8
As the record breaking infrastructure project reaches another milestone, Eurotunnel’s UK Director of Public Affairs, John Keefe, discusses its past, present and future
E D ITE D BY: J O E L LE VY
Twenty years of the Channel Tunnel
INFRASTRUCTURE
99
As the record breaking infrastructure project reaches another milestone, Eurotunnel’s UK Director of Public Affairs, John Keefe, discusses its past, present and future
Twenty years of the Channel Tunnel
1 0
Caption to the image
ON DECEMBER 1 1990, British and
French tunnellers met in the centre
of the under-construction Channel
Tunnel, creating the first land junction
between the two nations since the ice
age.
The historic moment also marked
the half-way point of a six-year
construction some 200 years in
the making. This record-breaking
achievement of infrastructure has a
long history.
Tunnel plans date back to
Napoleonic times, with various ideas
suggested since. Although popular
with industry, invasion threats delayed
matters until more peaceable times.
Even so, two previous digging
attempts were made, in the late 1870s
and more recently in 1974. Both were
halted for economic reasons, but both
were ultimately used in the modern
tunnel’s construction for surveying
work and transportation of materials.
Channel Tunnel car shuttle interior
INFRASTRUCTURE
F E AT U R E A R T I C L E S H O R T E N E D H E A D L I N E
1 1
Caption to the imageChannel Tunnel car shuttle interior
In the 1980s, Prime Minister
Margaret Thatcher and President
Francois Mitterand agreed that with a
peaceful Europe established, linking
England and France would boost
business both ways.
A competition was launched to find
an efficient, cost-effective and safe
model. Eurotunnel’s winning project
features two railway tunnels and one
central service tunnel giving access
along the full length of the 50km of
running tunnels and allowing efficient
maintenance access and emergency
evacuation.
Since economic difficulties ended
the 1974 attempt, private finance was
deemed a safer option. Money was
raised from shareholders and banks
with an original budget of £2.5bn.
It took three more years from first
contact to complete and link the two
railway tunnels, install the equipment,
terminals, track, maintenance
1 2
“Thirteen-thousand people worked
on the construction. The tunnelling
in total distance is 150km, done in
six years. The UK terminals are 150
hectares and in France 650 hectares
plus 100 hectares of development land
used for commercial zones.
“It uses continental high-speed rail
technology, an overhead catenary
power supply of 25,000 volts and an
automatic train protection system,
so instead of using signals it is all
automated and controlled from
duplicated control centres in the UK
and France.”
Reliability is another standout
buildings and more, taking the opening
date to May 6 1994.
Record-breakingNot just the time-scale impressed.
The tunnel has been recognised as the
greatest engineering achievement of
the 20th century, and one of the seven
wonders of the modern world.
Keefe said: “For a combination of
the scale of the engineering that went
into it, the time it took to build and the
economic impact it has had on its
region, it is one of the most significant
pieces of infrastructure built in the 20th
century.
Photograph taken during the initial construction phase of the Channel Tunnel at Shakespeare Cliff, Dover in 1988
INFRASTRUCTURE
T W E N T Y Y E A R S O F T H E C H A N N E L T U N N E L
1 3
feature. With every system in the
tunnel duplicated in the two nations:
drainage, ventilation, power supply,
railway control; in the event of
one system failing, the duplicate
steps up and runs the whole tunnel
independently.
Three challenges Despite its reputation as a
groundbreaking engineering project,
construction was not without
setbacks. Sir Alastair Morton
headed up an iron-willed leadership
driving development to completion,
overcoming several issues, identified
by Keefe, which ultimately saw costs
rise above £4.6bn.
“Firstly, the design wasn’t totally
finished when construction began,
and the regulatory body put in place
was a combination of French and
British regulation.
“The AGC kept applying new
regulations for safety and pushing
the standards further, so in the end
things like the rolling stock, which had
been specified at the beginning, had
to be modified during manufacture,
and additional safety fail-safe systems
put in. The additional cost added was
quite significant through that part of
the process.
“Combined with that, the British
railways board and SNCF made traffic
“For a combination of the scale of the engineering... it is one of the most significant pieces of infrastructure built in the 20th century”
Geological profile along the tunnel as constructed. For most of its length the tunnel bores through a chalk marl stratum (layer)
Typical tunnel cross section, with the service tunnel between twin rail tunnels. Shown linking the rail tunnels is a piston relief duct, necessary to manage pressure changes due to the movement of trains
TUNNEL FACTS
1 4
“The railway business, including high-speed passenger trains between London and Paris and freight trains from Scotland to southern Spain, is experiencing strong gains”
Channel Tunnel with Eurostar train
INFRASTRUCTURE
1 5
6.5 million
9.5 million
Passengers travelling from Folkstone to London since
2007
T W E N T Y Y E A R S O F T H E C H A N N E L T U N N E L
finalisation of the HS1 line from
Folkestone to St Pancras in 2007, high-
speed passenger levels have leapt
from 6.5 million to 9.5 million.
In freight, Eurotunnel’s incentive
scheme kick-started the market and
helps companies gain traction in the
rail freight market, which has grown 10
percent.
Eurotunnel will also expand the
reach from the initial coverage of
forecasts that were used to justify
the project, which unfortunately have
never proven to be accurate.”
Forecasts placed railway passenger
numbers at 20 million a year and
railway freight at 10 million tonnes a
year. In reality Eurotunnel counted just
10 million annual railway passengers
and 1.5 million tonnes of freight.
Revenue shortfalls meant higher
interest rates and a huge gap in
Eurotunnel’s finances, leading
to 2007’s brink-of-the-abyss
negotiations. Here, the company
renegotiated its contract with
creditors, wiping away half its debts
and hugely strengthening its position.
Brighter futureAnd things continue to improve. The
shuttle service between Folkestone
to Coquelles is carrying 1.4-1.5 million
trucks per year and 2.5 million cars,
with both markets growing, and Keefe
expects truck numbers to rise further
up to two million by 2020 as the UK
economy picks up.
The railway business, including
high-speed passenger trains between
London and Paris and freight trains
from Scotland to southern Spain,
is experiencing strong gains. Since
1 6
multi-modal containerised freight
to cover a far wider range of
manufactured goods, logistics chains
and heavy product.
Further boosting rail is the
recovering economy, leaving
consumers with more disposable
income, driving tourism and trade up,
and raising freight figures.
HS2Looking forward, plans to link the
Tunnel to the UK’s much-debated
HS2 rail service via the existing HS1
line at London have stuttered, with the
HS2 Chairman recommending that
dropping the proposal would save
£700m.
Keefe however, believes this a
mistake, noting the huge economic
benefits high speed services can
bring.
“It would be folly not to link the two
together and there are a variety of
different routes you could use,” he
said. “Cutting the line half way up
makes London a barrier to trade with
the rest of the UK. It satisfies a group
of people in central London, but in
reality you’re cutting off the rest of the
UK from continental access. Another
route must be found and HS2 needs to
be linked to HS1.
“When the tunnel itself opened,
there was no high-speed track in the
UK, then half of HS1 was built so you
had speed but it slowed into Waterloo
and then eventually the second half
was built to St Pancras in 2007.
“From 1994 to 2007 you finally got
the complete run up to St Pancras, so
it was a very long time after the tunnel London’s St Pancras station
INFRASTRUCTURE
T W E N T Y Y E A R S O F T H E C H A N N E L T U N N E L
1 7
was completed before proper high-
speed services between London and
Paris operated and traffic numbers
jumped immediately.”
High-speed rail has cut journey
times from Folkestone, Kent, to
London to 37 minutes, transforming
opportunities for locals. Ashford,
another Kent town served by a high-
speed line has seen huge expansion
in industry and the housing market on
the back of its excellent connection to
the rest of the UK and the continent.
Keefe concluded: “If you look at
what has happened since the Channel
Tunnel was built, just in Kent, and
mirrored in the north of France, you
have a high speed line with all the
benefits that brings to the area, a
motorway and the M2 upgrade, and
international stations at Ashford
and Ebbsfleet, which because of
its excellent connections has been
nominated as the next new town in the
UK.
“A lot of industry has moved into
the area, including from overseas. It’s
made Kent an international business
centre. Economically that’s a very
powerful argument not only for the
Channel Tunnel, but the infrastructure
that goes alongside it.”
High Speed 1 (HS1) is a 108-kilometre (67 mile) high-speed railway between London and the Channel Tunnel. Plans to link the Tunnel to the UK’s much-debated HS2 rail service via the existing HS1 line at London have stuttered.
When the tunnel itself opened, there was no high-speed track in the UK.
UK HIGH SPEED RAIL LINKS TO THE CHUNNEL
The Joseph Gallagher Groupexpands into Middle-East after shrewd acquisitionsWritten by: Joel Levy Produced by: Richard Durrant
1 9
THE JOSEPH GALLAGHER GROUP
2 0
Specialist civil engineering contractor Joseph Gallagher is taking its ambitions to the next level after strengthening and
expanding its capabilities with key acquisitions in recent years and entering the booming Middle-East.
The Group has enhanced its services via the shrewd acquisition of four companies: crawler crane specialist N.R.C. Plant Ltd; hired tunnelling equipment expert Specialist Plant Associates; Iseki Microtunnelling; and Johnston Trenchless Solutions.
The latter pair have allowed the company not only to expand northward from its Orsett, Essex base, but has opened a path to new opportunities further afield.
Middle-EastTunnelling Director Richard Dexter said: “We have in the last four years, through the acquisition of Iseki and Johnston, started business in the Middle-East and now have offices in Bahrain and Kuwait. We operate up and down the GCC. Half the Iseki machine fleet is kept in the Middle-East and can be quickly brought back to the UK if required.
“The region has a massively growing population and huge oil and gas reserves. We do a lot of microtunnelling in oil and gas pipes, road crossings for the oil and gas industry, and with a growing population and a need to house and utility these people there’s significant capital
The ambitious company is forging a reputation for quality work across the region after adding several complementary businesses to strengthen and diversify its offering
www. josephga l lagher.co .uk 2 1
THE JOSEPH GALLAGHER GROUP
Iseki Micro Tunnelling: The fleet of microtunnelling equipment has installed over
80km of finished pipeline, most of it operated by the company’s own operators
investment in drainage. “With the amount of building development going
on there is the potential to forge ahead and build a reputation there, and we are doing this now.”
In a challenging market to break into, reputation counts, and with the company now approved in Bahrain as a tunnelling and microtunnelling contractor, it can bid with clients directly for work, and in the past four years, Joseph Gallagher has already forged a positive image.
While largely working as a subcontractor for larger builders, Gallagher’s ambitious management are keen to win more work as lead contractor. With more than three decades experience, it has the skills to do so.
Dexter said: “We have been principal contractor on several occasions but a ratio of
A typical project, sinking
a shaft onsite in Kuwait
+44 (0) 1302 329911 | mail@alanauld.co.uk | www.alanauld.co.uk
Alan Auld Engineering has worked with the Joseph Gallagher Group on many complex underground construction projects, providing engineering support from tender concept through to project completion.
In addition to tunnel design we are specialists in underground construction sequencing and temporary works, including tunnel worksite logistics.
Recent projects
Green Park Underground Station Upgrade – Temporary works & site setup logistics
Dorchester Hotel Annex Utilities Tunnel – Detailed design of tunnel and access shafts
Connaught Tunnel, Crossrail Project - Tunnel widening temporary works &
construction sequencing
Kilroot Salt Mine - Detailed design of 1200m long, 7m diameter,
1200m long shotcrete lined access decline
Underground Design and Technical Support Specialists
The company was formed in 1958 specialising in fabrication of bespoke steelwork and has progressed into the leading designer and manufacturer of purpose built steel formwork. Clients include most major contractors in the UK and Ireland. Projects include tunnel and shaft linings, sea defences, windfarm bases, bridge piers, columns, curved & straight walls, sewage tanks and precast moulds etc. Our CNC manufacturing equipment ensures the highest standards of quality and accuracy.
Website www.formwork.co.uk
E-mail wdm@formwork.co.uk
Special Formwork A division of Mercian Weldcraft Ltd Stubbers Green Rd Aldridge W Midlands WS9 8BN
Video www.formwork.co.uk/video
Tel: 01922 451909 Fax: 01922 454520
Dorchester Hotel Service Tunnel, London
Whitelee Wind Farm, Scotland
Lyme Regis Sea Defences
Bridge Pier, Dublin Shaft Lining, Norfolk Fleetwood WWTW Forth Bridge Columns
THE JOSEPH GALLAGHER GROUP C O N S T R U C T I O N
www. josephga l lagher.co .uk 2 3
5:1 as a subcontractor. As our turnover hopefully increases to the £100m bracket over the next five years we will pick up more roles as principal contractor.
“The duration of our contracts over the last 10 years has increased from one-to-two months to one-to-two years, allowing us to attract and retain staff better because they become more settled and we can offer more stable positions.”
Dexter believes the acquired companies strongly complement each other, and that with their expansion of Joseph Gallagher’s capabilities, the decision to take on the existing liabilities of the Johnston business - both its equipment and skilled workforce – has been justified.
“We saw synergies in the business, so we could take on the roles played in-house without any additional costs, which reduced the cost-base of the company. We already had significant space for equipment and a head office and were able to reduce the office space costs.
“The company had some exceedingly good employees and we could integrate the business they had with our existing business and our previous acquisition of Iseki Microtunnelling and our desire to make inroads into the Midlands and northern England.”
Gaining Johnston’s directional drilling arm, equipment it had previously lacked, also gave Gallagher directional drilling and auger boring capability, where it had previously had to subcontract.
Key Personnel Joseph GallagherGroup Chairman
40 + years experience tunnelling & shaft sinking as Miner, Lead Miner and Foreman for most of the UKs major tunnelling contractors. Founder Joseph Gallagher Ltd, had involvement in almost every major UK tunnelling project as Plant Labour or sub-contract suppliers. Helped expand the business into RC frame construction which now forms 40% of turnover.
2 4
JOSEPH GALLAGAR
HistoryThese recent developments are just the latest step of a 32-year history. Eponymous founder Gallagher began his own company in 1982 after working for years as lead-miner and foreman for various large contractors. As the new venture grew, the company won its first major contract on the DLR Bank Station project in the late 1980s.
Successful completion of the Bank extension to the Docklands light railway laid the foundation of the Group’s reputation for competitive pricing and programme-achievement.
True to its background, the company has retained its core activities, including shaft sinking and specialist groundworks, while also expanding into all types of civil engineering and construction, like spray concrete and microtunnelling.
“We bring a variety of options to the table that many don’t, including very high regard to health and safety, a large engineering input, and an experienced tunnelling workforce”
– Richard Dexter, Tunnelling Director, The Joseph Gallagher Group Limited
Launch rings
www. josephga l lagher.co .uk 2 5
JOSEPH GALLAGAR C O N S T R U C T I O N
ProjectsBoasting a comprehensive set of skills in ground excavation, Joseph Gallagher remains involved in large-scale projects in the capital, including for Crossrail, for which it created five grout shafts at Bond Street C411 for Costain-Skanska, and the Connaught tunnel section of the Connaught passage for Taylor-Woodrow, a contract worth over £6 million. It is still working on the C360 Costain-Skanska Mile-End and Eleanor Street contract worth circa £10m.
Elsewhere, for the London Underground, Gallagher is building the Bond Street station upgrade for Costain-Laing O’Rourke for £15m and working on the National Grid London Power Tunnels for Costain-Skanska, valued at £20m over three years.
Another specialist area and key part of the business is Gallagher’s exceptional deep basement and zero pile work for private property developers working on multi-storey housing in central London.
Gallagher has also performed strongly in the mining sector for a decade, successfully delivering multiple projects for various clients, including a new mine in County Monaghan, Ireland in 2006 for a British Gypsum subsidiary.
The Group also recently completed a 1.2 kilometre, eight-metre tunnel for a private mine in Northern Ireland, demonstrating its specialist capabilities in design and construction of mine access tunnels.
Tunnel Construction
for Thameslink 2000
Key Personnel Richard DexterTunnelling Director
30 years experience tunnelling and shaft sinking for Cairo wastewater, Channel Tunnel, Jubilee Line extension, CTRL phases 1 & 2 and now Crossrail 315 & 360
FP McCann offers a complete range of Tunnel and Shaft solutions including our Smoothbore Shafts from 3.66m - 25m diameter, bespoke cover slabs made to specification, full range of Jacking Pipes from DN450 - DN2400 and Caisson Rings from DN2100 - DN4000.
Contact Stuart Carson on 07850 23413601455 290780 scarson@fpmccann.co.uk www.fpmccann.co.uk
Precast Concrete Solutions.
Odour Services International LimitedUnit 14, Morston Court, Kingswood Lakeside, Cannock , Staffordshire, WS11 8JB, UK
T: +44 (0) 1543 506855E: info@osiltd.comW: www.osiltd.com
OSIL are proud to be supporting Doosan Enpure with their Bellozanne project. Our in house process consultants
consider the initial odour issue,
the current legislative targets, legal
compliancy and the individuality of
the particular site. We then combine
our expert process knowledge and
product ranges to deliver the most
efficient cost effective solutions.
www. josephga l lagher.co .uk 2 7
Gallagher often works collaboratively with clients, performing soft ground tunnelling works before the customer takes over for the hard rock mining development, while Gallagher leaves a small crew on-site for additional drill and blast and other works. This provides a more cost-effective solution to customers’ needs.
AdaptabilitySuch adaptability has made the company greater than the sum of its parts. While smaller in an industry of giants, Gallagher has punched above its weight, growing revenues fivefold in a decade from £12m to nearing £60m. Dexter believes the company’s ingenuity and attitude to risk has elevated it above many rivals.
He said: “We bring a variety of options to the table that many don’t, including very high regard to health and safety, a large engineering input, and an experienced tunnelling workforce. We can value-engineer a client’s scheme to make our input worth people’s faith in us and bring clever
Drummond Mine
Key Personnel Steve HarveyManaging Director
30 years experience micro-tunnelling, shaft sinking and utilities, early years micro-tunnelling and pipe jacking most of the UK contractors in the field. Managing Director 7 years Laserbore Far East, Project Director for Southern Water, Lewes plus multiple other schemes. Operations Director Brown McNicholas, EDF framework Operations Director for Laing O’Rourke
2 8 N o v e m b e r 2 0 1 4
THE JOSEPH GALLAGHER GROUP
Tunnel construction
Lowering equipment into the tower
C O N S T R U C T I O N
www. josephga l lagher.co .uk 2 9
THE JOSEPH GALLAGHER GROUP
Bottom of the tower
3 0
Vantage Tower
Staff are all directly employed
C O N S T R U C T I O N
www. josephga l lagher.co .uk 3 1
THE JOSEPH GALLAGHER GROUP
ideas to the table, such that we can take the client’s original scheme and make it more economic.
“We also bring various contract options. Unlike many, we supply labour on a contract basis. For example, half the national grid London power tunnels were labour-supplied for TBM Operations, but the other half was lump-sum work for shaft sinking and spray concrete access tunnels.
“There are some who do lump-sum contracting and several labour-only, but very few companies of our size can cope with the risk-profile on modern contracting jobs for high-profile clients.”
OpportunitiesA 500-strong workforce, many of whom have been at the company as long as 20 to 30-plus years, underpins the Group’s achievements, and a growing workload offers greater career opportunities.
With health and safety high on the company’s agenda, it is not just employees’ careers that are secure, but those that do choose to move on take away a wealth of on-site experience in various disciplines for a respected company, with the extensive work the Group undertakes.
Going forward, there are exciting prospects both for the staff, and the Group itself, as it forges an ever-growing reputation and expands its portfolio and Middle-East strategy.
Dexter concluded: “We want to further increase our credibility throughout the various authorities in the Middle-East amongst a lot of competition.
Company Information
I N D U S T RY
Construction
H E A D Q U A RT E R S
Essex, UK
F O U N D E D
1982
E M P L O Y E E S
500
R E V E N U E
£60m
P R O D U C T S /
S E R V I C E S
Civil Engineering and
Construction
The company has established itself as an industry-leader in the UK on the strength of a diverse, high performance range of roofing and waterproofing products, expert workforce and commitment to quality Written by: Joel Levy and Produced by: Richard Durrant
Soprema UK reinforces its reputation with high-profile projects
3 3
3 4
SOPREMA UK
International waterproofing specialist Soprema is winning large-scale work in the UK on the strength of a diverse
range of products, knowledgeable workforce and commitment to quality.
Having been specified on many high profile, extensive roofing and waterproofing projects such as IKEA, Sainsbury’s, and tunnel waterproofing for the Channel Tunnel rail link, Dublin Port Tunnel and Ramsgate Tunnel, the company has an impressive back-catalogue to complement its major ongoing projects including Crossrail and the London Underground station upgrades.
Soprema UK not only offers bituminous, cold applied liquid, synthetic and hot melt waterproofing systems to the roofing industry but also manufactures high performance waterproofing solutions for civil engineering projects, drinking water storage, swimming pools and surfacing applications.
The Soprema Group operates in 90 countries, has seven Research and Development
‘Soprema is winning large-scale work in the UK on the strength of a diverse range of products, knowledgeable workforce and commitment to quality’
Victoria Station
Shaft Pal 2
S U P P LY C H A I N
www.soprema.co .uk 3 5
SOPREMA UK
centres focused on sustainable development and 18 training centres, ensuring it is at the forefront of industry innovation.
It employs 5,200 people, has 34 manufacturing plants, 60 operating subsidiaries, including Italian single-ply manufacturer FLAG SpA, and some 4,500 distributors.
The Group was founded in 1908 by Charles Geisen, inventor of the Mammoth Membrane which paved the way for modern waterproofing membranes, and remains a family affair, with his grandson Pierre Etienne
The “Cut & Cover” portals at the Hindhead Tunnel
Soprema Research and
Innovation Centre Strasbourg
Palatinol® 10-P – The perfect match to ensure extraordinary durability for your products. The versatile plasticizer with anti-aging properties has two core benefi ts: excellent weathering and low fogging properties are complemented by an outstanding processing performance. BASF recommends Palatinol® 10-P for all outdoor applications, automotive interior and cable formulations, where low volatility, high UV stability and low odor are required.
More information: www.plasticizers.basf.com
Palatinol® 10-PAdd long life to your products
www.soprema.co .uk 3 7
S U P P LY C H A I NSOPREMA UK
Palatinol® 10-P – The perfect match to ensure extraordinary durability for your products. The versatile plasticizer with anti-aging properties has two core benefi ts: excellent weathering and low fogging properties are complemented by an outstanding processing performance. BASF recommends Palatinol® 10-P for all outdoor applications, automotive interior and cable formulations, where low volatility, high UV stability and low odor are required.
More information: www.plasticizers.basf.com
Palatinol® 10-PAdd long life to your products
Bindschedler currently Group Chairman.Soprema has since established itself
as a world-leader in the development and manufacture of waterproofing membranes, and maintains strong relationships with all project stakeholders including, architects, main contractors and specialist waterproofing contractors. Soprema owes its worldwide success to proactive research and development, its unique approach to waterproofing solutions and commitment to inventiveness.
“We continue to promote new and bold ideas, for the varied and ever changing demands of the construction industry, enabling us to offer roofing and waterproofing solutions for all construction projects, no matter the size or complexity,” said the company.
Production line
BASF is the world’s leading chemical company: The Chemical Company. Its portfolio ranges from chemicals, plastics, performance products and crop protection products to oil and gas. We combine economic success with environmental protection and social responsibility. Through science and innovation, we enable our customers in nearly every industry to meet the current and future needs of society. Our products and solutions contribute to conserving resources, ensuring nutrition and improving quality of life. We have summed up this contribution in our corporate purpose: We create chemistry for a sustainable future. BASF had sales of about €74 billion in 2013 and over 112,000 employees as of the end of the year. BASF shares are traded on the stock exchanges in Frankfurt (BAS), London (BFA) and Zurich (AN). Further information on BASF is available on the Internet at www.basf.com.
Website: www.plasticizers.basf.com
SUPPLIER PROFILEBASF SE
3 8
SOPREMA UK
SustainabilitySoprema’s R&D policy, which strongly promotes sustainable development, is focused on limiting its environmental impact, with the use of renewable resources in its production processes and in its factories, while fully integrating health and safety into its innovation policy. Soprema has always considered the safety of people, installations and buildings the highest priority and therefore continues to develop new sustainable waterproofing systems to meet the demands of today’s market.
In 1997 the company was awarded ISO 14001 certification, a sign of its commitment to continual improvement in terms of environmental management. Where possible, Soprema uses sustainable natural resources or recycled materials.
RoofingThis combined expertise and responsible approach has gained the company many key roofing and waterproofing projects. Soprema is
Soprema is a
world-leader in
the development
and manufacture
of waterproofing
membranes
‘We continue to promote new and bold ideas, for the varied and ever changing demands of the construction industry, enabling us to offer roofing and waterproofing solutions for all construction projects, no matter the size or complexity’
www.soprema.co .uk 3 9
SOPREMA UK
a key part of the IKEA supply chain, where it has waterproofed nine UK stores for the Swedish retailer, both new and refurbishment projects.
Other retail projects include the 16,000 sqm Sainsbury’s distribution centre in Charlton, an ongoing Palace Foods distribution warehouse in Dublin and the IBM headquarters refurbishment in Greenford, both 14,000 sqm.
A commitment to solidaritySoprema is continually securing a growing number of high-profile public and private sector supply chain agreements across the UK. This is
Soprema is a key
part of the IKEA
supply chain
Cha Technologies Group, a global manufacturer of technical textiles whose European operation, Cosmotec are engaged in the production of specialist geotextiles related to Civil Engineering Works and Construction related applications
Specialist Geotextile Solution Providers
Email: Peter.Matthias@ctgplc.com
Tel: +44 (0)161 242 7987
www.nonwovengeotextiles.co.uk
www.soprema.co .uk 4 1
S U P P LY C H A I NSOPREMA UK
achieved through its commitment to providing high quality, excellent value and durable roofing, waterproofing and surfacing products for long-lasting constructions. Soprema strives to offer excellent service and technical support to continue development of the business.
TunnellingUsing the synthetic products manufactured in FLAG SpA (Soprema Group’s Italian Headquarters and manufacturing plant near Milan) the company also has an impressive record in tunnel waterproofing in the UK. In the recent years it provided waterproofing systems to the cut and cover portals at the Hindhead
Shaft Pal 2 at Victoria Station for London Underground
Shaft Pal 2 wall
‘Soprema strives to offer excellent service and technical support to continue development of the business’
4 2
SOPREMA UK
tunnel in Surrey and the shotcrete lining sections of the new Tyne tunnel near Newcastle.
Soprema UK is also active in many current tunnelling projects in London in light of the substantial infrastructure investments, including Europe’s largest infrastructure project Crossrail and various Underground station upgrades.
“We have supplied waterproofing for the step-free access at Green Park station and are working on Crossrail Projects: C300 Fisher Street shaft, C305 Stepney Green Caverns, C310 Thames Tunnel Cross Passages, C360 Mile End shaft and C510 Whitechapel Station. We are also working towards C510 Liverpool Street station
Soprema technicians
working on site at
the Stepney Green
Caverns
S U P P LY C H A I N
www.soprema.co .uk 4 3
SOPREMA UK
and C435 Farringdon station,” the company said.
Unique ExpertiseIn order to meet the specific requirements of civil engineering projects, Soprema has created the Civilrock range, which offers products designed to support the demands of projects such as tunnels, bridges, car parks, underground and basements structures, basins, dams, lakes ponds and tanks.
Civilrock covers all of the activities connected to these structures, which were previously covered by the group’s different brands: SOPREMA, FLAG and ALSAN. This has given Soprema the chance to offer a more complete range which better matches the requirements of clients, project managers and contractors.
Experience and reliabilityThe company’s obvious success has been built on both the knowledge and experience of its staff and the resultant faith and confidence its customers have in the reliability of its products. It is a positive reputation many years in the making.
Soprema achieves its ambitions in accordance with the historical values that have enabled the company to gain the confidence of its customers from the start. These ethical values are recognised and supported by all employees, creating a positive and committed company culture.
Company Information
I N D U S T RY
Waterproofing
H E A D Q U A RT E R S
Essex, UK
F O U N D E D
1908 (Group)
E M P L O Y E E S
26 (UK)
P R O D U C T S /
S E R V I C E S
The development
and manufacture
of waterproofing
membranes
FP McCannachieves industry excellence through innovation and expertiseThe family business has expanded rapidly in recent years with precast concrete now a major focus in the UKWritten by: FP McCann Produced by: Richard Durrant
4 5
FP McCannachieves industry excellence through innovation and expertiseThe family business has expanded rapidly in recent years with precast concrete now a major focus in the UKWritten by: FP McCann Produced by: Richard Durrant
4 6
FP McCANN
T he beginnings of FP McCann Ltd were formed in Northern Ireland in the 1950s on the back of a small quarry and asphalt
surfacing operation. This family run business, established by Francis
Patrick McCann and now managed by son Eoin McCann (MD) and his five brothers and one sister, has grown over the years into a leading Northern Ireland civil engineering and asphalt surfacing company.
From roads and bridges, rail, sports complexes, public realm, landfill sites, and renewable energy projects, FP McCann has a wealth of experience in constructing and managing projects.
In precast concrete, from a standing start in 2000 at Knockloughrim in Northern Ireland, the acquisition of Hepworth Concrete Products in 2005 saw FP McCann spread across the water to see rapid growth on the UK mainland.
Helped further by the acquisition of Ennstone Concrete Products in 2009, and more latterly the former Tarmac Topfloor business, Charcon’s specialist precast facility in Cambridgeshire and in early 2014, the precast interests of the Eleco group, Bell & Webster and Milbury Systems.
A market leaderWith significant added investment in plant and machinery at a number of its production facilities, precast concrete now forms the core of FP McCann’s business.
This rapid growth, enhanced by many years
FP McCann
Precast Concrete
Easi Base 1200
C O N S T R U C T I O N
www. fpmccann.co .uk 4 7
FP McCANN
“In terms of shaft build, we are the UK’s market leading provider with a full range of segmental shafts from 3.6 metres up to 25 metres in diameter”– Stuart Carson,
Tunnelling Manager
of knowledge, skills and experience brought onboard via the acquisitions has seen FP McCann become one of the UK’s market leaders in the manufacture, supply and delivery of precast concrete products.
Products are manufactured and delivered through FP McCann’s series of modern manufacturing plants located nationwide.
This geographical spread gives the company an unrivalled ability to serve the construction industry throughout the UK and Ireland.
The operating divisions of the precast arm of FP McCann include: Drainage & Water Management; Railway; Power & Infrastructure; Shafts and Tunnels; Walling; Rooms Fencing; Flooring; Specialist Bespoke and Agriculture.
Precast concrete
shafts sections
C O N S T R U C T I O N
www. fpmccann.co .uk 4 9
FP McCANN
Innovative teamIn shafts and tunnels, within the last five years FP McCann has significantly developed its range and manufacturing capabilities and is now one of the sector’s main suppliers.
The company’s design and engineering team have developed its own concrete moulds which meet the latest British Tunnelling Society’s specification.
As a result, FP McCann is supplying shaft and tunnel segmental linings to J Murphy and Sons at New Cross, London, manufactured at its Cadeby production facility in Warwickshire.
FP McCann’s Tunnelling Manager Stuart Carson said: “In terms of shaft build, we are the UK’s market leading provider with a full range of segmental shafts from 3.6 metres up to 25 metres
Howard LloydXxxxxxxxxxxxx
Established since 1923, we are a UK based, world-class manufacturer of high-performance pipe seals for the pressurised and non-pressurised water industries. Today, we are proud to be the preferred seal supplier to a number of leading global pipe manufacturers operating in the ductile iron, clay, plastic and concrete pipeline market sectors. The company manufactures over 3,000 products, and has introduced many new proprietary products for pipeline applications, notably Viptyte, Viploc and Vipsleeve.
Website: www.vip-polymers.com
SUPPLIER PROFILEVIP POLYMERS
‘Our focus is on product modular- isation across all our precast divisions. Standardisation of design has greatly assisted our contractors, aiding the speed of on-site installations in a safe and cost efficient manner”– Andy Cooper, General
Manager
Tec
hn
ica
l Tu
nn
elli
ng
Co
mpo
nen
ts
www.ttcltd.org
Manufacturers and suppliers of quality assured segment accessories worldwide
dowelock• Connection• alignment• shear
bolting systems• Connection bolts• straight bolts & sockets• curved bolts
Grout/Lifting Sockets and Accessories• grout plugs• Non Return Valves• Hydrophilic Seals• extension tubes
segment packers and complementary products• Alignment Dowels• Guide rods• hole formers• segment spacers
Bespoke Solutions• In house design• Computer simulation• 3D modelling
3x3 Pop-Up Display_Layout 1 21/03/2014 12:25 Page 1
FP McCANN C O N S T R U C T I O N
www. fpmccann.co .uk 5 1
in diameter.“All shaft segments are pre-fitted with ethylene
propylene diene monomer rubber (EPDM) gaskets, which is the preferred choice of the miners in the UK.”
“Tunnel segments to New Cross are manufactured to the latest BTS specification, with no relaxation on the design. Independent testing is being carried out on tolerances and dimensions.
“We’re quite unique because our competitors tend to have to go out to steel mould suppliers which obviously increases costs and lead times.”
Staff ExpertiseFP McCann has industry-recognised experts in all its precast divisions, and despite only being
‘We’re quite unique because our competitors tend to have to go out to steel mould suppliers which obviously increases costs and lead times”– Stuart Carson
We are a welding & industrial supply company covering Shropshire, the West Midlands and mid Wales offering over 60,000 products suitable for use in all industries from engineering, construction, electrical, wood-work, automotive, decorating & gardening.
CBL has an experienced sales force on hand just
waiting to take your call: 01952 5818721AT
www.cblsupplies.co.ukBranches in Telford TF7 4PL and Coleshill B46 1AT
Tyler Bros would like to wish FP McCann every future success. We look forward to our continued relationship
over various future projects.
At Tyler Bros (Sutton-in-Ashfield) Ltd, we offer a comprehensive range of services. Our expertise extends across all our operations, from milling and turning to fabrication and assembly. We also work with a trusted network of associates to provide additional services such as anodising, plating, heat treatment and painting - with the benefit of single source responsibility.
info@tybro.co.uk www.tybro.co.uk
FP McCANN C O N S T R U C T I O N
www. fpmccann.co .uk 5 3
involved the tunnelling industry for the past five years, the company boasts a wealth of knowledge and skills.
Some of the people working for the company have more than 30 years’ experience in the industry including, Tunnelling Engineer Lesley Parker, Tunnelling Contracts Manager Howard Lloyd, Tunnelling Estimator Colin Timmins and Precast Group Quality & Materials Manager Colin Richards.
Key Personnel
Lesley ParkerTunnel Engineer
Stuart Carson Tunnelling Manager
Andy CooperGeneral Manager
Knockloughrim Quarry, Magherafelt
C Y P R U S B U I L D I N G& R O A D C O N S T R U C T I O N
National Theatre,Kingdom of Bahrain
Simple solutions, beautiful resultsinfo@cybroc.com.bhT: +973 (0)172 75787 • F: +973 (0)172 62744
Cyprus Building & Road Construction Co. WLLPO Box 15954, Manama, Kingdom of Bahrain
Steel Stockists Reinforcing Coil Reinforcing Bar Threaded Bar
Reinforcing Mesh Drawn Wire
Bar Reinforcement High Tensile Steel
Mild Steel Stainless Steel
Galvanised Wire Cut and Bent Service
Welding Mig Welding Arc Welding Tig Welding
Spot Welding Multi Welding Butt Welding
Other Services 2D/3D Bending Scaffold Guards
Fabrication Pre-fabrication
Mesh fabrication Section Welding
Surface Finishes Hot Dipped Galvanizing
Electroplating Hot dipped Plastic Coating
Sherardizing
Budden Road, Coseley, West Midlands WV14 8JZ Web: www.hickmanandlove.co.uk
email: sales@hickmanandlove.co.uk Tel: 0121 557 2191 Fax: 0121 520 3020
CONCRETE ADMIXTURESCONSTRUCTION FIBRESREPAIR COMPOUNDS
www.oscrete.co.uk
For more information contact:
Oscrete Construction Products, Rutland St., Bradford, UK.
Tel: 01274 393286.
Email: info@oscrete.co.uk
FP McCANN C O N S T R U C T I O N
www. fpmccann.co .uk 5 5
Continuing with staff development, the company has embarked on apprenticeship programmes and the offer of student gap year placements to further their training and knowledge within the industry.
FP McCann has adopted a philosophy of encouraging people to develop their skills and in turn, nurture them through to senior positions, which is perfectly illustrated today by many of its current management staff.
Competitive EdgeWhat underpins FP McCann as a market leader is its extensive stock holding of core products across all its precast divisions. The ability to
FP McCann is the UK’s
market leader in the
manufacture, supply
and delivery of precast
concrete drainage
products
5 6
Aerial view of facility
“Precast concrete works because it is modular in nature and by design. You simply take it to the site and plug it in...”-Andy Cooper
service its customers’ demands while ensuring consistency and speed of delivery.
The pioneering precast concrete solutions provider is continually developing new and innovative off-site products that are safer, quicker to install and offer a higher quality finish to traditional construction methods.
A good example of this can be seen in its proprietary Easi-Base precast concrete manhole system. All water authorities have now adopted this with its inclusion within ‘Sewers for Adoption seventh edition’.
Speaking of the future, and the challenges that lie ahead, FP McCann’s General Manager Andy Cooper said: “We will always come up against companies with a variety of materials competing against concrete.
FP McCANN
C O N S T R U C T I O N
www. fpmccann.co .uk 5 7
“Our main challenge is to try and keep concrete very much at the forefront in terms of durability, proven performance, cheaper installation costs and extensive design life.
“Precast concrete works because it is modular in nature and by design. You simply take it to the site and plug it in, you don’t have to do a lot of formation work on site with associated wet trades.
“Our focus is on product modularisation across all our precast divisions. Standardisation of design has greatly assisted our contractors, aiding the speed of on-site installations in a safe and cost-efficient manner.”
Precast concrete can offer significant carbon reductions compared with traditional build methods: It is very durable with a proven in service life in excess of 100 years; uses recycled aggregate and is highly recyclable; can be quickly installed in a safe and efficient manner and is cost-effective compared with other materials and traditional methods of construction.
Company Information
I N D U S T RY
Construction, civil
engineering, precast
concrete products
H E A D Q U A RT E R S
Knockloughrim,
Northern Ireland
F O U N D E D
1950s
E M P L O Y E E S
810
R E V E N U E
£100m
P R O D U C T S /
S E R V I C E S
Precast concrete
solutions, shaft & tunnel
segments; drainage;
water management
Precast concrete tunnels
FP McCANN
BRITISH TUNNELLING SOCIETY
1 Great George Street, London, SW1P 3AA
Tel. 020-7665-2229
bts@britishtunnelling.org.uk
www.britishtunnelling.org.uk
Recommended