Bridge Enhancements 07/22/2013. Route 47 Missouri River Bridge. Bridgescape , LLC. Bridge Typical Section. Committee Design Goals (4/18/2013). Distinctive appearance so that bridge remains a symbol Stay within budget: “German Simple” Recognize views to bridge from downtown/riverfront - PowerPoint PPT Presentation

Citation preview

Bridge Enhancements07/22/2013

Route 47 Missouri River Bridge

Bridgescape, LLC

Bridge Typical Section

• Distinctive appearance so that bridge remains a symbol

• Stay within budget: “German Simple”

• Recognize views to bridge from downtown/riverfront

• Maintain views to downtown from the bridge

• Keep design subtle; historic feel with minimal detailing

• Light pedestrian/ bicycle trail but not entire roadway;

• Lighting should enhance structure, not draw attention to itself.

Committee Design Goals (4/18/2013)

Previous Committee Selections:

• Variable Depth Girders ** ** MoDOT Funded

• Pier Shape – Gothic Pier **

• One (1) Overlook Located at Pier 7 **

• Railing – 27” Concrete Wall with Vertical Railing Element

• Girder Lighting – Girder Wash Fade

• Pier Lighting

• Overhead Pier Element – Curved Truss w/ Sun Shade

• Low Level Trail Lighting

Previous Committee Prioritization:

Enhancement Priority

Decorative Railing 1

Girder Lighting 2

Pier Lighting 3

Overhead Element 4

Trail Lighting 5

View from Washington Riverfront Park(w/o Overhead Element)

View from Washington Riverfront Park

View from Washington Riverfront Park(w/ Three Overhead Elements)

View from Washington Riverfront Park(w/o Overhead Element)

View from Washington Riverfront Park

View from Washington Riverfront Park(w/ Three Overhead Elements)

Aerial View of Overlook

Aerial View of Overlook(w/o Overhead Element)

Aerial View of Overlook

View from Pedestrian/ Bicycle Trail(w/o Overhead Element)

View from Pedestrian/ Bicycle Trail

View from Pedestrian/ Bicycle Trail(w/ additional Overhead Elements)

View from Pedestrian/ Bicycle Trail

View from Northbound Traffic Lane (w/o Overhead Element)

View from Northbound Traffic Lane

View from Northbound Traffic Lanew/ additional Overhead Elements)

View From Northbound Traffic Lane

View from South Approach of Existing Bridge

View from South Approach of Existing Bridge(w/ additional Overhead Elements)

View from South Approach of Existing Bridge (w/ East Face Girder Lighting )

View from Trail Below Bridge

View from Trail Below Bridge

Preferred Enhancement Package Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting

Prioritization Enhancement Estimated Cost (4) Estimated Cost (4A)

1 Decorative Railing (Addition to MoDOT Credit) $120,000 $120,000

2 Girder Lighting – Fade (west face only) $587,000

Girder Lighting – Fade(east and west face) $1,133,000

3 Pier Lighting $172,000 $172,000

4 1 Overhead Element (w/ lighting) $225,000 $225,0005 Trail Lighting (full length) $137,000 $137,000

SUBTOTAL $1,241,000 $1,787,0003% Inflation for 3 years (9.27%) $115,000 $166,000

TOTAL $1,355,000 $1,953,000

Project Schedule

• Final Enhancement Commitment August 16, 2013

• Public Hearing (Right-of-Way) October 2013

• Final Enhancement Funds Secured August 2014

• Open Construction Bids September 2016

• New Bridge Open to Traffic Fall 2018

• Project Complete Summer 2019

Thank You for your Participation