Bolivian experience with CDM projects

Preview:

DESCRIPTION

Bolivian experience with CDM projects. Gisela Ulloa NCDO Coordinator. NCDO Bolivia. “ In charge of fostering the implementation of CDM project s in Bolivia... ”, for which it develops activities in: Issuance of conformity reports for the Designated National Authority, Approval Process - PowerPoint PPT Presentation

Citation preview

Bolivian Bolivian experience with experience with

CDM projectsCDM projects

Gisela UlloaGisela UlloaNCDO CoordinatorNCDO Coordinator

NCDO BoliviaNCDO Bolivia““In charge of fostering the implementationIn charge of fostering the implementation of of

CDM projectCDM projectss in Bolivia... in Bolivia...”, for which it ”, for which it develops activities in:develops activities in:

• Issuance of conformity reports for the Issuance of conformity reports for the Designated National Authority, Approval Designated National Authority, Approval Process Process

• Promotion of the development of CDM projectsPromotion of the development of CDM projects• PProvide technical assistance for submission of rovide technical assistance for submission of

Projects to UNFCCCProjects to UNFCCC• Capacity building by training relevant Capacity building by training relevant

stakeholdersstakeholders

11.7

13

0.04

6.480.538

101.5

4.620.75

0.0164.1391.556

0.8523.687

0

20

40

60

80

100

120

Millons of tons of CO2 e

Rellen

o S

anitario

S

anta C

ruz

Hid

roeléctrica

San

ta Ro

sa

Min

i-Cen

tral H

idro

Yata 2

Hid

roeléctrica

Taq

uesi

lico R

ob

oré

San

tiago

de

Ch

iqu

itos

Secu

estro d

ecarb

on

oC

hap

are

Fo

restación

y refo

restación

In

qu

isivi

Projects

CDM Project Portfolio

Investment in millons US$

Specific concernsSpecific concerns

• Main Barrier for projects developers is

lack of finance for prefeasability study, PDD

• Aplicable Approved Methodologies reduces costs and time

• New methodologies analysis should be faster (concerns about the EB, meth panel, actual capacity)

• Sustainable criteria taking into account on every CDM project, the role of DOE.

Specific concernsSpecific concerns

• Pre cop meeting Quito, 28 , 29 October

– Instance of appealing to the EB

– More diversification in the composition of

the Meth Panel experts.

– Strengthening of the COP decisions over

the the EB reports making Parties pro

active in the process