© 2009 PETROLIAM NASIONAL BERHAD (PETRONAS)

All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.

MAKING IT HAPPENMAKING IT HAPPEN

MLNG/PLM/2010/0013PROVISION OF CONDITIONAL ASSESSMENT & REMAINING LIFE ANALYSIS FOR MODULE 2 BOILERS IN PETRONAS LNG COMPLEX

INTERNAL USE

Presented toBidder’s Site Visit on 17th May 2010ByZamsyari Bin MadhanMLNG

2MAKING IT HAPPENMAKING IT HAPPEN2

1. Objectives

2. General MLNG Boiler Arrangement

3. Scope of Inspections

Appendix I: PhotosAppendix II: Work Specification

Contents

3MAKING IT HAPPENMAKING IT HAPPEN

General MLNG Boiler Arrangement

3

4MAKING IT HAPPENMAKING IT HAPPEN

General MLNG Boiler Arrangement

4

5MAKING IT HAPPENMAKING IT HAPPEN5

To brief the bidder with on MLNG/PLM/2010/0013 Conditional Assessment & Remaining Life Analysis For Module 2 Boilers In PETRONAS LNG Complex.

Objectives

6MAKING IT HAPPENMAKING IT HAPPEN6

Scope Of Inspections

Test Conducted

1 Visual Inspection (VI) 8 Remote Field Electromagnetic Test (RFET)

2 Dye Penetrant Test (DPT) 9 Remote Visual Inspection (RVI)

3 Magnetic Particle Test (MPT) 10 In Situ Metallography (IM)

4 Ultrasonic Flaw Detection (UFD) 11 Hardness Testing (HT)

5 Ultrasonic Thickness Measurement (UTM) 12 Dimensional Measurement (DM)

6 Non Destructive Oxide Thickness Inspection (NOTI) 13 Metallographic Replication (MR)

7 Non Destructive Hydrogen Damage Inspection (NDHDI) 14 Deposit Collection (DC)

7MAKING IT HAPPENMAKING IT HAPPEN

Scope Of Inspections

7

DC &DM

Drums, Stack

DPT Drums, Headers & All weld joints

MPT Drums, Headers & all weld joints

UFD Headers , Drums

UTM Headers , Drums & Stack, MSL, PSH & SSH, DSH

NOTI PSH & SSH tubes

NDHDI Furnace wall tubes

RFET Boiler bank tubes, Furnace wall tubes

RVI Headers & Drums

IM Furnace wall tubes, PSH&SSH tubes

HT Headers, Drums & MSL

DM Headers, Drums & MSL, All tubes

MR Furnace wall tubes, PSH & SSH tubes

VI All pressured parts, insulation , Structure & Drums Supports

8MAKING IT HAPPENMAKING IT HAPPEN8

Photos

Visual Inspection (VI)

Mud Drum Steam Drum

9MAKING IT HAPPENMAKING IT HAPPEN9

Photos

Dye Penetrant Test (DPT)

Buckstay Steam Drum

10MAKING IT HAPPENMAKING IT HAPPEN10

Photos

Magnetic Particle Test (MPT)

SSH Header Steam Drum

11MAKING IT HAPPENMAKING IT HAPPEN11

Photos

Ultrasonic Flaw Detection (UFD)

Steam Drum Steam Drum

12MAKING IT HAPPENMAKING IT HAPPEN12

Photos

Non Destructive Oxide Thickness Inspection Service (NOTI)

Primary & Secondary Superheater

13MAKING IT HAPPENMAKING IT HAPPEN13

Photos

Non Destructive Hydrogen Damage Inspection (NDHDI)

14MAKING IT HAPPENMAKING IT HAPPEN14

Photos

Remote Field Electromagnetic Test (RFET)

Steam Drum Steam Drum

15MAKING IT HAPPENMAKING IT HAPPEN15

Photos

Remote Visual Inspection (RVI)

Primary Superheater Header

16MAKING IT HAPPENMAKING IT HAPPEN16

Photos

In Situ Metallography (IM)

Primary Superheater Outlet

17MAKING IT HAPPENMAKING IT HAPPEN17

Photos

Metallographic Replication (MR)

18MAKING IT HAPPENMAKING IT HAPPEN18

Thank You