AGENDA

4

1. Schedule2. Summary of Work3. Concept Refinement4. The Big Ideas

PRESENTERS

5

TOM ROGERSSmithGroup

J BLUESmithGroup

BRENT SCHIPPERAsk Studio

SUPPORT TEAM

6

CONNOR NETTSmithGroup

LEON YOUNGERPROS Consulting

GREG ROTHV&K

SCHEDULE

7

Public Information Meeting 1Kick-off

September

Community Survey 1

Public Information Meeting 3

Draft Final Master Plan

5 – ADVISORY COMMITTEE MEETINGS

SITE DATA COLLECTION AND ASSEMBLY

October November December January February MarchAugust

Public Information Meeting 2

Community Survey 2

PREFERRED CONCEPT REFINEMENT

DEVELOPMENT OF CONCEPT ALTERNATIVES

ADVISORY COMMITTEE INPUT

Final Master Plan

SITE ANALYSIS

8

N

COMMUNITY INPUT – WHAT WE HEARD

9

REGIONAL CONNECTIONS

10

[CONNECT TO BIRDLAND PARK SPORTS COMPLEX

[CONNECTIONS THROUGH UNION PARK

[CENTRAL IOWA WATER TRAIL

[NEAL SMITH TRAIL

Watertown Town Square11 smithgroup.com11 smithgroup.com

CONFLUENCEDESIGN DRIVERS – WHAT DES MOINES TOLD US

1. Trails and Connections are key to the how you use and how you want to use Birdland

2. All forms of boating – power, quiet (canoe/kayak and rowing) are equally desired at the park

3. Socializing and community activity spaces are part of what has made this park special and needs to remain as part of the fabric of this park.

4. View, experiencing and enjoying the natural characteristics of this park set it apart from other parks in the river, so close to downtown.

5. Explore opportunities for Birdland Dr. and the Birdland Dr. Bridge

12

CONCEPT A – URBAN ESCAPE

N

Concept AParking Stalls - 210Marina Slips - 90

ExistingParking Stalls - 160Marina Slips - 63

CONCEPT B – LAGOON LOOP

13

N

Concept BParking Stalls -250Marina Slips - 140

ExistingParking Stalls - 160Marina Slips - 63

14

CONCEPT C – RIVER HUB

N

Concept CParking Stalls -200Marina Slips - 160

ExistingParking Stalls - 160Marina Slips - 63

CONCEPT A – URBAN ESCAPE WITH REFINEMENTS

15

N

RELOCATE BEACH TO ISLAND

ROWING CLUB ON THE RIVER

CENTRAL BOATHOUSE

RIVER OVERLOOK

BOAT LAUNCH

DRAFT PREFERRED CONCEPT

16

N

THE BIG IDEAS

17

N

1. BIRDLAND BOATHOUSE

2. RIVER GATEWAY

3. DESTINATION PLAY

BIRDLAND BOATHOUSE

18

N

Lagoon

TOWER PRECEDENTS

19

BOATHOUSE PRECEDENTS

20

BOATHOUSE PRECEDENTS

TAMPA RIVER CENTER BOSTON COMMUNITY ROWING BOATHOUSE

AUSTIN ROWING CLUB

UNIVERSITY COLLEGE BOATHOUSE, OXFORD

UW CONIBEAR SHELLHOUSE

21

BOATHOUSE1ST FLOOR PLAN

22

BOATHOUSE2ND FLOOR PLAN

23

RIVER GATEWAY

24

N

Lagoon

Marina

RIVER GATEWAY (THE BRIDGE)

25

N

RIVER GATEWAY (THE BRIDGE)

26

N

DESTINATION PLAY

27

N

Lagoon

Wetland

Wetland

SPLASHRESTROOM / PAVILION

PLAY STRUCTURE

FOREST PLAYLAGOON STEPS

SKATE RIBBON

DESTINATION PLAY (PLAY TOWER)

28

DESTINATION PLAY (SPLASH)

29

DESTINATION (PLAY POD)

30

DESTINATION PLAY (SKATE RIBBON)

31

MARINA

32

N

Lagoon

Marina

MARINA

33

BY THE NUMBERS: TRAILS

34

Trails (Miles)

EXISTING

1.2PROPOSED

3.1

BY THE NUMBERS: PARKING

35

Parking Stalls

EXISTING

200PROPOSED

VEHICLE

361PROPOSED

TRAILER

34

72

8270

20

50

42

25

9

25

BY THE NUMBERS: PLAY

36

Play Space (Square Feet)

EXISTING

12,800PROPOSED

40,300

BY THE NUMBERS: MARINA

37

MARINA SLIPS

EXISTING

63PROPOSED

150

BY THE NUMBERS: RESTORATION

38

RESTORATION (ACRES)

23.4 Fish Pier / Overlooks

3

DRAFT PREFERRED CONCEPT

39

N

SCHEDULE

40

Public Information Meeting 1Kick-off

September

Community Survey 1

Public Information Meeting 3

Draft Final Master Plan

5 – ADVISORY COMMITTEE MEETINGS

SITE DATA COLLECTION AND ASSEMBLY

October November December January February MarchAugust

Public Information Meeting 2

Community Survey 2

PREFERRED CONCEPT REFINEMENT

DEVELOPMENT OF CONCEPT ALTERNATIVES

ADVISORY COMMITTEE INPUT

Final Master Plan

QUESTIONS

Recommended