Biogas is our business
Biogas project fundamentals(large or small)
By
Eric Camirand, President Electrigaz Technologies Inc.
Board member & president of AQPER biogas committee
Feedstock
Energy
Technologies
Digestate
$$$
Fundamentals
Leadership!
•It starts and stops here!
•Feedstock quantity, quality and composition are a function of the collection program
Feedstock
2018
2023
2028
2033
2038
0
2000
4000
6000
8000
10000
Tonnage mensuel ROTS (t hum./mois)
•Solid fraction: composting or not
•Water treatment capacity for NHx
Digestate
Energy client/contract
•Electricity: FIT/OPA•Thermal: client proximity 24/7•Network RNG: Dawn+transport+carbon (~$7/GJ)•Renewable CNG: ~$20/GJ•Renewable LNG: ~$23/GJ
Energy
•CAPEX: Subsidy, equity, debt
•OPEX: Cost of organic treatment ($/t)
•Debt service•O&M•(Revenue)•Digestate disposal
$$$
Simple mass balance(wet digestion)
Simple mass balance(dry digestion)
•Neighbours (odours, truck traffic, safety)
•Energy network
•Wastewater network
•Land contamination
•Geotechnical properties
Siting
•Preliminary studies: 8 months
•Design: 8 months
•Procurement: 8 months
•Build: 14 months
•Commission: 6 months
Timeline(without poilitical interference)
•Verify your fundamentals
•Find a site & social acceptance
•Hire good looking and knowledgeable professionals
•Determine realisation scheme
•Design, procure, build, commission and operate
Conclusion
•Specialized biogas engineers (exclusively)
•Independent (no equipment to sell)
•Over 10 years of experience in US and Canada
•Worked for dozens of municipalities to study, plan and execute their projects
About Electrigaz
Eric Camirand, Ing.Electrigaz Technologies Inc.
Trois-Rivières (Québec) Canada G9B 7Y6
T/F: 819-840-3589 E: info@electrigaz.comW: www.electrigaz.com
Thank you for your attention!