APPENDIX A Project Charter - Shipbuilders Final Report... · NAVSEA SL720-AA-MAN-010 ... Department...

Preview:

Citation preview

APPENDIX A Project Charter

A‐1 

A‐2 

A‐3 

A‐4 

(This page intentionally blank.

APPENDIX B Progress Briefs

B1‐1  

B1‐2

B1‐3 

 

B1‐4

B1‐5 

 

B1‐6

B1‐7  

B1‐8

B1‐9  

B1‐10

(This page intentionally blank.)

B2‐1 

B2‐2

B2‐3 

B2‐4

B2‐5 

B2‐6

B2‐7 

B2‐8

B3‐1 

B3‐2

B3‐3 

B3‐4

B3‐5 

B3‐6

B3‐7 

B3‐8

B3‐9 

B3‐10

B3‐11 

B3‐12

(This page intentionally blank.)

B4‐1 

B4‐2

B4‐3 

B4‐4

B4‐5 

B4‐6

B4‐7 

B4‐8

B4‐9 

B4‐10

B4‐11 

B4‐12

B4‐13 

B4‐14

APPENDIX C

References

Instruction Number Title

COMFLTFORCOMINST 4790.3 Joint Fleet Maintenance Manual

NAVSEA SL720-AA-MAN-010 *Fleet Modernization Program Management & Operations Manual “One Book”

NAVSEA SL720-AA-MAN-030 *Alteration Installation Team Manual

OPNAVINST 4700K Maintenance Policy for U.S. Navy Ships

OPNAVNOTE 4700 Representative Intervals, Durations, & Repair Mandays for Depot Level Maintenance Availabilities

OPNAVINST 4709.16 Condition Based Maintenance

SECNAVINST 4790.1 Department of the Navy Maintenance & Material Management

OPNAVINST 4720.2G Fleet Modernization Program Policy

NAVSEA SL790-AC-SPN-010 Class Maintenance Plan Preparation for Surface Ships

*One Book & AIT Manual were incorporated into the NMP-MOM.

C‐1 

C‐2

(This page intentionally blank.)

D1‐1 

Appendix D1 Compliance Matrix

D1‐2

D1‐3 

D1‐4

D1‐5 

D1‐6

D1‐7 

D1‐8

D1‐9 

D1‐10

D1‐11 

D1‐12

D1‐13 

D1‐14

D1‐15 

D1‐16

D1‐17 

D1‐18

D1‐19 

D1‐20

D1‐21 

D1‐22

D1‐23 

D1‐24

D1‐25 

D1‐26

D1‐27 

D1‐28

D1‐29 

D1‐30

D1‐31 

.

D1‐32

D1‐33 

D1‐34

D1‐35 

D1‐36

D1‐37 

D1‐38

D1‐39 

(This page intentionally blank.)

Appendix D2 Effectiveness Matrix

D2‐1 

D2‐2

D2‐3 

D2‐4

D2‐5 

D2‐6

D2‐7 

D2‐8

D2‐9 

D2‐10

D2‐11 

D2‐12

D2‐13 

D2‐14

D2‐15 

D2‐16

D2‐17 

D2‐18

D2‐19 

D2‐20

D2‐21 

Appendix E Summary of Findings and Recommendations

FINDING RESPONSIBLE ENTITY(s)

CNRMC

TYCOM Finding #1 – Definitization NAVSEA

Finding #2 – Standardize Funding CNRMC

Finding #3 – Cost Estimates CNRMC

Finding #4 – CBA Accuracy NAVSEA

Finding #5 – NMP Phase Implementation NAVSEA

Finding #6 – SC Integration NAVSEA

Finding #7 – MMBP Accuracy CNSF

TYCOM

NAVSEA

CNRMC Finding #8 – Ship Check Requirements

RMCs

USFF

CNSF Finding #9 – JFMM Deficiencies CNRMC

Finding #10 – Rapid Availability Planning CNRMC

Finding #11 – MFOM CNSF

CNSF Finding #12 – Obsolete Assessments CNRMC

USFF Finding #13 – Modernization Governance NAVSEA

Finding #14 – SCD Decision Boards NAVSEA

Finding #15 – Decision Board Voting NAVSEA

Finding #16 – Decision Board Drumbeat NAVSEA

Finding #17 – SCD Interdependency NAVSEA

Finding #18 – AFOM NAVSEA

Finding #19 – SC Terminology NAVSEA

Finding #20 – ILS Policy NAVSEA Finding #21 – Ship Integration Working Group (SIWG) NAVSEA

Finding #22 – Maintenance Databases USFF

Finding #23 – Waterfront Maintenance IT CNRMC Finding #24 – Navy Data Environment (NDE) NAVSEA

E‐1  

USFF Finding #25 – IT Standardization NAVSEA

Finding #26 – Navy Maintenance Database (NMD) USFF

Finding #27 – Automated Work Notification (AWN) USFF

Finding #28 – AIT Integration CNRMC

Finding #29 - Master Specification Catalog (MSC) CNRMC

CNSF Finding #30 – Maintenance Team Training CNRMC

CNSF Finding #31 – Ships Force Training CNRMC

Finding #32 – TYCOM Training CNSF

Finding #33 – Maintenance Activity Training CNRMC

Finding #34 – Modernization Training NAVSEA

NAVSEA Finding #35 – IT Systems Training CNRMC

Finding #36 – RMC Manning CNRMC

Finding #37 – I-Level Ship Superintendant Manning CNRMC

Finding #38 – Port Engineer Workload CNSF

Finding #39 – RMC Standardized Workforce CNRMC

Finding #40 – RMMCO Standardization CNRMC

Finding #41 – RMC Integrated Logistics CNRMC

Finding #42 – Maintenance Milestones CNRMC

Finding #43 – Modernization Milestones NAVSEA

Finding #44 – Critical Evolutions CNRMC

USFF Finding #45 – Availability Scheduling CNRMC

USFF Finding #46 – CMAV Procedures COMPACFLT

Finding #47 – SCD Late Approval NAVSEA

Finding #48 – AIT Key Event Representation CNRMC

Finding #49 – Centralized Metrics Repository CNRMC

Finding #50 – MSMO/AIT Participation CNRMC

Finding #51 – NMP Metrics NAVSEA

Finding #52 – Pre-Availability Planning Metrics CNRMC

Finding #53 – Evolving Metrics CNRMC

E‐2

E‐3  

Appendix F

List of Acronyms

AFOM- Alteration Figure of Merit

AIM- Automated Industrial Management

AIT- Alteration Installation Team

AMCA- Automated Machinery Condition Analysis

AWN- Automated Work Notification

CBA- Cost Benefit Analysis

CEIRP- Continuous Estimating Incremental Planning Review Process

CMAV- Continuous Maintenance Availability

CNO- Chief of Naval Operations

CNRMC- Commander, Navy Regional Maintenance Centers

CNSF- Commander, Naval Surface Forces

CNSL- Commander, Naval Surface Force Atlantic

CNSP- Commander, Naval Surface Force Pacific

CoP- Community of Practice

CPF- Commander, Pacific Fleet

CPI- Continuous Process Improvement

DMAIC- Define, Measure, Analyze, Improve, Control

DMAT- Deck Maintenance Assist Team

DONCIO- Department of the Navy Chief Information Officer

EC- Engineering Change

ESC- Executive Steering Committee

FC- Field Change

FMP- Fleet Modernization Program

FRP- Fleet Review Panel

HMP- Hull Modernization Plan

HVAC- Heating, Ventilation, and Air Conditioning

ICMP- Integrated Class Maintenance Plan

IGE- Independent Government Estimate

F‐1

ILO- Integrated Logistics Overhaul

ILR- Integrated Logistics Repair

ILS- Integrated Logistic Support

ILSWG- Integrated Logistics Support Working Group

IMA- Intermediate Maintenance Activity

IPTD- Integrated Project Team Development

ISIC- Immediate Superior In Command

JFMM- Joint Fleet Maintenance Manual

KSN- Knowledge Sharing Network

LLC- Lesson Learned Conference (Former Hot Wash)

LMA- Lead Maintenance Activity

LOA- Letter of Authorization

LTD- Logistics Technical Documentation

MCA- Machinery Condition Analysis

MCIT- Maintenance Continuous Improvement Team

MESC- Milestone Executive Steering Committee

MFOM- Maintenance Figure of Merit

MMBP- Maintenance Modernization Business Plan

MMPR- Maintenance and Modernization Performance Review (Former Super Hot

Wash)

MSC- Master Spec Catalog

MSMO- Multi-Ship Multi-Option

MT- Maintenance Team

NDE- Navy Data Environment

NMD- Navy Maintenance Database

NMP- Navy Modernization Process

NMP-MOM- Navy Modernization Process- Management and Operations Manual

NMPT- Navy Modernization Process Team

NSA- Naval Supervisory Authority

NTCSS-A- Navy Tactical Command Support System

OMMS-NG- Organizational Maintenance Management System – Next Generation

F‐2

OSIC- On-Site Installation Coordinator

PACFLT- Pacific Fleet

PARM- Participating Acquisition Resource Manager

PB4M- Planning Board For Maintenance

PE- Port Engineer

PM- Project Manager

PMT- Performance Monitoring Team

PNA- Planned Not Authorized

PY- Planning Yard

QA- Quality Assurance

QISMS- Quarterly Installation Scheduling Messages

RCC- Request for Contract Change

RIE- Rapid Improvement Event

RMC- Regional Maintenance Center

RMMCO- Regional Maintenance and Modernization Coordination Office

SBS- Ship Building Specialist

SC- Ship Change

SCD- Ship Change Document

SEMCIP- Shipboard Electromagnetic Compatibility Improvement Program

SHIPSUP- Ship Superintendent

SID- Ship Installation Drawing

SIWG- Ship Integration Working Group

SMRT- SHIPMAIN Review Team

SPM- Ship’s Program Manager

SRD- Selected Record Drawing

SSR- Ship Selected Record

SSRI- Surface Ship Readiness Initiatives

ST- Sustainment Type

ST1- Surface Team One

SUPPO- Supply Officer

SURFMEPP- Surface Maintenance Engineering Planning Program

F‐3

F‐4

TAR- Technical Analysis Report

TASS Info- Tech Assist Support System

TAT- Technical Assessment Team

TDO- Type Desk Officer

TSRA- Total Ship Readiness Assessment

TYCOM- Type Commander

USFF- United States Fleet Forces

VMAT- Valve Maintenance Assist Team

WFD- Work Force Development

WOO- Window Of Opportunity

WPER- Work Planning Execution Review

Recommended