Una Società Finmeccanica
Ansaldo Nucleare &
i Laureati in Ingegneria Elettrica
Federico Fortunato Product Manager Electrical
and I&C Systems Genova, Sept. 13th, 2012
Una Società Finmeccanica
Main Italian Company in the nuclear sector
Sound presence in the new
international markets
50 years of nuclear know-how
Full-cycle responsibility for the nuclear
energy business
Una Società Finmeccanica
ANSALDO NUCLEARE HEADQUARTERS GENOVA
200 DIPENDENTI
135 DI QUESTI IMPIEGATI NELLO SVILUPPO PROGETTI ED INGEGNERIA
Una Società Finmeccanica
Ansaldo Nucleare nel Mondo
Nuclear Power Plants
Waste Facilities and Nuclear Research Center
Una Società Finmeccanica
Ansaldo Nucleare in Italia
Nuclear Power Plants
Waste Facilities and Nuclear Research Center
EUREX Saluggia Caorso NPP
Brasimone
Trino NPP
Casaccia
CISAM
Latina NPP Garigliano NPP
Trisaia (Rotondella)
Una Società Finmeccanica
The most flexible among
global players
Customer-driven approach
Partnerships in nuclear plants adopting different technologies
An innovative and reliable
business partner
Design, production, service and de-commissioning capabilities
Development of fourth generation nuclear programs
High technology & human touch
Una Società Finmeccanica
Ansaldo Nucleare offer: product lines
NEW NUCLEAR POWER PLANTS
(NPPs)
DECOMMISSIONING & RADIOACTIVE WASTE
MANAGEMENT
SERVICES TO NUCLEAR PLANTS
MARKETING & SALES
PROJECT MANAGEMENT
DESIGN & ENGINEERING
PROCUREMENT & CONTRACTING
FABRICATION
SITE IMPLEMENTATION
COMMISSIONING
Una Società Finmeccanica
Carbon-free power generation
Research on new generation nuclear technologies
Commitment to improving fuel efficiency & minimizing radwaste
Development of new, accident-proof
technologies & solutions
Upgrading of existing plants
with enhanced safety features
Safety assessment of new & operating plants & facilities
Una Società Finmeccanica
is devoted to the nuclear technology and provides its total, absolute and
unwavering commitment to nuclear safety, public transparency and
professional integrity. 9
Una Società Finmeccanica
Flexible Connections The system allows extending the concept of “Plug and Socket” to the Electrical Distribution System, at different voltage level (medium up to 11 kV, low up to 400 V) and with a large scale of available power up to 10 MVA
10
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica
Flexible Connections The system consists in the installation, on a remote position, identified as safe, of the connection point and of the panel that provides the interface between the plant electrical system and the external power source. This allows for a flexible management of external emergency power sources to cope with the post-accident required safety functions, by matching the limited power available with the most urgent needs in the optimal sequence.
11
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica
Ansaldo Nucleare Propose New Stand-by Diesel Generator stations complete with: • Buildings with cranes and ventilation • Mechanical & electrical auxiliary equipment • Engineering activities and documents • Construction and commissioning • Quality assurance and surveillance
Main Services: • Electrical engineering (design of the DG set control and power systems load- flow study, selectivity study, transient study) • Civil engineering (design of the new Diesel buildings) • Mechanical engineering (design of the DG set fluid circuits, general arrangements)
12
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica
Ansaldo Nucleare Propose New Stand-by Diesel Generator Design Concept: • Auxiliary Systems are designed, manufactured and qualified as single skid • Qualification process has been performed both by Analysys and by Test • Monitoring System with all the functional parameters of each Systems • Electrical Equipment with dedicated Oscilloperturbograph and Disturbance
Recording
Stand-by Diesel Generator Stations
13
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica L’ingegnere Elettrco in
Ansaldo Nucleare Ogni Impianto Nucleare o di trattamento rifiuti è prima di tutto un Impianto che produce e utilizza Energia Elettrica. Quindi In ognuno dei nostri impianti sono NECESSARI:
Studi di Rete, Corto Circuito, Load Flow, Selettività
Voltage Levels
500. kV132. kV22. kV6.6 kV0.38 kV
PowerFactory 13.2.336
Project: Graphic: Grid Date: 18-Feb-2010 Annex:
Load Flow BalancedNodesLine-Line Voltage, Magnitude [kV]Voltage, Magnitude [p.u.]Voltage, Angle [deg]
BranchesActive Power [MW]Reactive Power [Mvar]Current, Magnitude [kA]Loading [%]
External GridActive Power [MW]Reactive Power [Mvar]Power Factor [-]
G1
649.00 MW402.21 Mvar
19.93 kA100.00 %
G~
BD
-G1
-648.98 MW-402.20 Mvar
19.93 kA87.62 %
BD
-G1
649.00 MW402.21 Mvar
19.93 kA87.62 %
TP
-646.77 MW-295.51 Mvar
0.82 kA101.55 %
-1
TP
648.93 MW401.97 Mvar
19.93 kA101.55 %
-1
BD
2A-5
320
BD
2A-5
320
BD
1A-5
320
BD
1A-5
320
BD
2U-5
320
BD
2U-5
320
BD
1U-5
320
BD
1U-5
320
Ext Grid 132 kV
49.06 MW31.28 Mvar
0.84 Ext Grid 500 kV
-646.77 MW-295.51 Mvar
-0.91
BD
4-53
23
5.47
MW
3.26
Mva
r0.
56 k
A5.
72 %
BD
4-53
23
-5.47 MW-3.26 Mvar0.56 kA5.72 %
BD3-5323
2.58 MW1.59 Mvar0.26 kA2.70 %
BD3-5323
-2.58 MW-1.59 Mvar
0.26 kA2.70 %
BD3-5324
18.9
3 M
W10
.52
Mva
r1.
88 k
A19
.28
%BD3-5324
-18.93 MW-10.52 Mvar
1.88 kA19.28 %
BD2-5323
0.00 MW-0.00 Mvar0.00 kA0.00 %
BD2-5323
-0.00 MW0.00 Mvar0.00 kA0.00 %
BD2-5324
0.00
MW
-0.0
0 M
var
0.00
kA
0.00
% BD2-5324
-0.00 MW0.00 Mvar0.00 kA0.00 %B
D1-
5323
0.00
MW
-0.0
0 M
var
0.00
kA
0.00
%
BD
1-53
23
-0.00 MW0.00 Mvar0.00 kA0.00 %
Brk-MC-3-E
-2.35 MW-1.46 Mvar
0.24 kA0.00 %
Brk-MC-3-EBrk-MC-3-O
0.00 MW0.00 Mvar0.00 kA0.00 %
Brk-MC-3-O
TA 2
27.43 MW17.53 Mvar
0.14 kA94.35 %
1
TA 2
-27.27 MW-14.94 Mvar
2.72 kA94.35 %
1
TA 1
21.62 MW13.75 Mvar
0.11 kA74.23 %
1
TA 1
-21.52 MW-12.12 Mvar
2.14 kA74.23 %
1
TU 2
0.02 MW0.11 Mvar0.00 kA0.31 %
-1
TU 2
-0.00 MW0.00 Mvar0.00 kA0.31 %
-1
TU 1
0.02 MW0.11 Mvar0.00 kA0.31 %
-1
TU 1
-0.00 MW0.00 Mvar0.00 kA0.31 %
-1B
D4-
5324
21.80 MW11.69 Mvar
2.17 kA22.22 %
BD
4-53
24
-21.80 MW-11.69 Mvar
2.17 kA22.22 %
BD
1-53
24
0.00 MW-0.00 Mvar
0.00 kA0.00 %
BD
1-53
24
-0.00 MW0.00 Mvar0.00 kA0.00 %
Bus G122.1151.005
-22.946
Bus 22 kV22.1151.005
-22.947
Bus 500 kV500.0001.0000.000
Bus 132 kV132.000
1.0000.000
MC-3-OE6.5920.999-3.752
MC-3-E6.5920.999-3.752
MC-3-O6.6521.008-2.930
MC-4-E6.5920.999-3.752
MC-4-O6.6521.008-2.930
DIg
SILE
NT
Voltage Levels
500. kV132. kV22. kV6.6 kV0.38 kV
PowerFactory 13.2.336
Project: Graphic: MC-4 Date: 18-Feb-2010 Annex:
Max. 3-Phase Short-Circuit acc. to IECShort Circuit NodesInitial Short-Circuit Power [MVA]Initial Short-Circuit Current [kA]Peak Short-Circuit Current [kA]Short-Circuit Breaking Current [kA]
BranchesInitial Short-Circuit PowerInitial Short-Circuit CurreMax. Peak Short-Circuit CurMax. Breaking Current [kA]
EqL-5434 M..
EqL-5434 M..
EqL-5434 MC..
EqL-5434 D..
EqL-5434 D..
RESERVA-2
RESERVA-1
EqL-5434 M..
7121-PM3 Circ WP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~7121-PM2 Circ WP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~7121-PM1 Circ WP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~
EqL-5434 M..
EqL-5434 M..
EqL-5434 M..
M~4133 PM2
4133 PM1
0.57 MVA0.87 kA
112.76 kA45.80 kA40.40 kA
M~ M~4313 P103B
4313 P103A
2.51 MVA3.82 kA
105.90 kA43.01 kA37.94 kA
M~
ADMIN
3332 HTR4
3332 HTR2
3332 HTR5
3332 HTR3
3332 HTR1
M~7190 CPM4
M~7190 CPM3
EqL-T4O3
EqL-5434 M..
BUD 5324
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
BUD 5324
29.22 MVA44.39 kA102.52 kA42.52 kA36.63 kA
BUB 5324
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
BUB 5324
29.29 MVA44.50 kA102.44 kA44.50 kA37.72 kA
BU
C 5
324
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
BU
C 5
324
29.43 MVA44.72 kA
103.93 kA44.04 kA38.24 kA
BUA 5324
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
BUA 5324
29.35 MVA44.59 kA
103.88 kA42.19 kA37.22 kA
C_T
4E2
2.70 MVA0.24 kA
131.11 kA44.15 kA44.66 kA
C_T
4E2
C_T
4E1
0.00 MVA0.00 kA
131.71 kA44.35 kA44.86 kA
C_T
4E1
C_T
4O2
0.79 MVA0.07 kA
125.08 kA42.60 kA43.17 kA
C_T
4O2
C_T
4O1
3.26 MVA0.28 kA
124.53 kA42.42 kA42.99 kA
C_T
4O1
C_T
4O3
0.00 MVA0.00 kA
125.25 kA42.66 kA43.24 kA
C_T
4O3
T4E
2
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4E
2
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4O
2
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4O
2
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4E
1
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4E
1
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4O
1
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4O
1
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
0
T4O
3
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
1
T4O
30.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
1
Brk_PC 4-1
0.00 MVA0.00 kA
114.77 kA46.62 kA41.12 kA
Brk_PC 4-1
Brk_PC 4-2
0.00 MVA0.00 kA
106.39 kA45.08 kA39.14 kA
Brk_PC 4-2
BD
4-53
24
399.41 MVA34.94 kA88.11 kA29.67 kA30.01 kA
BD
3-53
24
397.73 MVA34.79 kA87.93 kA29.95 kA30.35 kA
C_4
321-
P10
1B
9.33 MVA0.82 kA
129.65 kA43.66 kA44.16 kA
C_4
321-
P10
1B
C_4
321-
P10
1C
9.32 MVA0.82 kA
123.19 kA41.96 kA42.52 kA
C_4
321-
P10
1C
C_4
321-
P10
1A
0.00 MVA0.00 kA
125.25 kA42.66 kA43.24 kA
C_4
321-
P10
1A
BD
2-53
24
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
C_4
323-
P10
2C
23.50 MVA2.06 kA
120.06 kA40.89 kA41.44 kA
C_4
323-
P10
2C
C_3
312-
PM
2
51.65 MVA4.52 kA
120.32 kA40.52 kA40.98 kA
C_3
312-
PM
2
C_3
312-
PM
3
51.16 MVA4.48 kA
113.95 kA38.81 kA39.33 kA
C_3
312-
PM
3
BD
1-53
24
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
C_3
312-
PM
4
51.59 MVA4.51 kA
120.33 kA40.52 kA40.99 kA
C_3
312-
PM
4
C_3
312-
PM
1
51.24 MVA4.48 kA
113.93 kA38.81 kA39.33 kA
C_3
312-
PM
1
C_4
323-
P10
2B
23.34 MVA2.04 kA
126.56 kA42.62 kA43.11 kA
C_4
323-
P10
2B
C_4
323-
P10
2A
0.00 MVA0.00 kA
125.25 kA42.66 kA43.24 kA
C_4
323-
P10
2A
C_7
121-
PM
3
29.55 MVA2.59 kA
125.19 kA42.16 kA42.64 kA
C_7
121-
PM
3
C_7
121-
PM
2
29.58 MVA2.59 kA
125.19 kA42.16 kA42.64 kA
C_7
121-
PM
2
C_7
121-
PM
1
29.65 MVA2.59 kA
118.70 kA40.43 kA40.97 kA
C_7
121-
PM
1
4321-P101B Cond ExtP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~4321-P101C Cond ExtP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~M~
4321-P101A Cond ExtP
4323-P102C Feed WP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~
3312-PM2 HT Main CircP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~
3312-PM3 HT Main CircP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~
C_T
4O3_
LV
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
C_T
4O3_
LV
14.28 MVA21.70 kA48.13 kA21.70 kA18.63 kA
EqL-5434 M..
M~7342 FM2
3312-PM4 HT Main CircP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~3312-PM1 HT Main CircP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~
76121
4313 P103C
2.51 MVA3.82 kA
102.52 kA42.52 kA36.63 kA
M~M~3481 CPM2
EqL-5434 MC..
EqL-5434 M..
M~3481 CPM1
7342 FM1
0.70 MVA1.06 kA
103.93 kA44.04 kA38.24 kA
M~
4323-P102B Feed WP
0.00 MVA0.00 kA0.00 kA0.00 kA0.00 kA
M~M~
4323-P102A Feed WP
PC 4-E-129.29 ..44.50 kA102.44..44.50 kA37.72 kA
PC 4-O-132.43 ..49.27 kA114.77..46.62 kA41.12 kA
PC 4-E-231.72 ..48.20 kA111.32..46.17 kA39.78 kA
PC 4-O-230.13 ..45.77 kA106.39..45.08 kA39.14 kA
Bus-T4O314.28 ..21.70 kA48.13 kA21.70 kA18.63 kA
MC-4-E597.06..52.23 kA131.71..44.35 kA44.86 kA
MC-4-O566.57..49.56 kA125.25..42.66 kA43.24 kA
DIg
SILE
NT
Una Società Finmeccanica L’ingegnere Elettrco in
Ansaldo Nucleare Ogni Impianto Nucleare o di trattamento rifiuti è prima di tutto un Impianto che produce e utilizza Energia Elettrica. Quindi In ognuno dei nostri impianti sono NECESSARI:
Switchgear / Power Center / Motor Control Center (media e bassa tensione)
Una Società Finmeccanica L’ingegnere Elettrco in
Ansaldo Nucleare Ogni Impianto Nucleare o di trattamento rifiuti è prima di tutto un Impianto che produce e utilizza Energia Elettrica. Quindi In ognuno dei nostri impianti sono NECESSARI:
Trasformatori
Una Società Finmeccanica L’ingegnere Elettrco in
Ansaldo Nucleare Ogni Impianto Nucleare o di trattamento rifiuti è prima di tutto un Impianto che produce e utilizza Energia Elettrica. Quindi In ognuno dei nostri impianti sono NECESSARI:
Generatori Diesel
Una Società Finmeccanica L’ingegnere Elettrco in
Ansaldo Nucleare Ogni Impianto Nucleare o di trattamento rifiuti è prima di tutto un Impianto che produce e utilizza Energia Elettrica. Quindi In ognuno dei nostri impianti sono NECESSARI:
Motori Elettrici (media e bassa tensione)
Una Società Finmeccanica
Chiediamo Ingegneri Elettrici Perché :
Portano le conoscenze fondamentali dell’Ingegneria associando competenze Meccaniche / Termodinamiche e Controllistiche
Hanno conoscenze multiple trasversali, mai focalizzate esclusivamente alla specializzazione di riferimento
Quando portiamo un quesito sul tavolo di tali Ingegneri, SAPPIANO TROVARCI SEMPRE UNA SOLUZIONE
Una Società Finmeccanica Ai Nuovi Ingegneri
• ENTUSIASMO • CREATIVITA’ • PROFESSIONALITA’ • FLESSIBILITA’ • DISPONIBILITA’
Chiediamo…
Una Società Finmeccanica Ai Nuovi Ingegneri
• Una società giovane, dinamica e trasparente
• Un ambiente stimolante per la crescita professionale
• Una società che ha fatto del “know how” il proprio patrimonio di eccellenza
• Una Società costruita sull’ECCELLENZA del Fattore Umano
Offriamo…
Una Società Finmeccanica Opportunità Professionali In Ansaldo Nucleare
• TECHNICAL LEADER,
• PRODUCT MANAGER,
• PROJECT ENGINEER
• PROJECT MANAGER,
Una Società Finmeccanica Opportunità Professionali In Ansaldo Nucleare
TECHNICAL LEADER
•Assicurare la supervisione tecnica sulle attività di progettazione
•Garantire la qualità dei contenuti tecnici del prodotto
•Assicurare la programmazione operativa delle attività
•Proporre al Responsabile di Unità i percorsi di crescita per le
risorse assegnate
Una Società Finmeccanica Opportunità Professionali In Ansaldo Nucleare
PRODUCT MANAGER
• Predispone i piani di sviluppo dei singoli prodotti, mirati a
migliorarne la competitività in termini di tempi, costi e qualità,
• Coordinamento, nell’elaborazione delle offerte tecniche, recependo e armonizzando i contributi delle Unità tecniche coinvolte
• “Follow Up” tecnico delle offerte, fino all’acquisizione dell’ordine e il successivo congelamento del progetto concettuale
Una Società Finmeccanica Opportunità Professionali In Ansaldo Nucleare
PROJECT ENGINEER
• Coadiuvare il Responsabile di Prodotto per congelare il progetto
concettuale • Definire i programmi e i preventivi operativi di ingegneria, e
successivi aggiornamenti e varianti da sottoporre al Project Manager
• Coordinare le attività relative alla commessa in modo ottimale per il raggiungimento degli obiettivi tecnico-gestionali
• Supportare il Project Manager nell’interfaccia tecnica con il Cliente e, ove ricorra, con le Autorità di Sicurezza
Una Società Finmeccanica
PROJECT MANAGER
• Gestire i contatti con i committenti e/o gli Enti finanziatori
nell’ambito di ciascun Progetto • Gestire contatti con Partner e Soci consortili per le attività di
competenza • Garantire la supervisione delle attività di realizzazione in
sito/cantiere • Assicurare il raggiungimento degli obiettivi economici, qualitativi
e temporali del Progetto
Opportunità Professionali In Ansaldo Nucleare
Una Società Finmeccanica
VOGLIAMO INGEGNERI CAPACI DI ACCETTARE SFIDE INTERNAZIONALI
VOGLIAMO INGEGNERI A VISIONE INTEGRATA DI
OGNI PROBLEMA
VOGLIAMO INGEGNERI CAPACI DI ACCETTARE LA SFIDA PER COSTRUIRE ANCHE DA NOI UNA SOCIETA’ FONDATA SUL PRODOTTO INNOVATIVO ED AD ALTA
TECNOLOGIA
VOGLIAMO INGEGNERI CHE CREDANO NELLA RICERCA DI BASE ED APPLICATA
PER QUESTO SCEGLIAMO L’ Ingegnere Elettrico
Una Società Finmeccanica
is devoted to the nuclear technology and provides its total, absolute and
unwavering commitment to nuclear safety, public transparency and
professional integrity. 28
Una Società Finmeccanica
Thank you for your attention !
Recommended