ELETRONUCLEAR
Angra 3
Current status and challenges to
continue
Vienna
February 2017
ELETRONUCLEAR
Introduction – Brazilian Transmission Network
Manaus
Brasília
São Paulo Itaipu
Porto Alegre
Fortaleza
Salvador
Rio de Janeiro
Belo
Horizonte
Recife
Angra
4.000 km
Integrated electric power system: continental
dimensions
ELETRONUCLEAR
Introduction – Brazilian Energy Matrix 2015
Renovation of the Energy Matrix
o Uncertainties in a mainly hydropower driven system
o Need for secure energy supply and economic competitiveness
o Energy matrix based on a sustainable, diversified and competitive energy
o Increase the installed hydropower capacity (transmission lines, environmental challenges, low capacity factors…) is difficult
ELETRONUCLEAR
Nuclear Installed Capacity
ANGRA 1 - PWR
Installed Capacity: 657 MW
Technology: Westinghouse
Start of Operation: January 1985 ANGRA 2 - PWR
Installed Capacity : 1.350 MW
Technology : KWU/ Siemens (AREVA)
Start of Operation : February 2001
ANGRA 3 - PWR
Installed Capacity : 1.405 MW
Technology: KWU/ Siemens/ Areva
Start of Operation : December 2022
São Paulo
220km
Belo Horizonte
350km
Rio de Janeiro
130km
CNAAA
ELETRONUCLEAR
Angra 3
Grafenrheinfeld Initial Phase of the Project - 1975: Brazil – Germany Agreement (Pacific Use of Nuclear Power)
- Reactor type: PWR-1.350 MW / Power uprate to 1.405 MW
- Original Contract: 1976 (together with Angra 2)
- Original Reference Plant: Grafenrheinfeld
- Start of civil works: July-1984
- Construction suspension: June-1986
Original Design modernization - Konvoy series: Emsland / Neckarwestheim 2 / Isar 2
- Implementation of modernization: Angra 2 e Angra 3
Current design reference - Reference plant: Angra 2
- Angra 2 documentation: Partial use for Angra 3
- Base for the Angra 3 PSAR: Angra 2 FSAR
Neckarwestheim I s a r
Emsland
NeckarwestheimNeckarwestheim I s a rI s a r
EmslandEmsland
Angra 2
ELETRONUCLEAR
Angra 3
National Supplies - Market Guaranty Protocol: Main purpose: to develop the
national industry for the nuclear sector
- Valid for Angra 2 and Angra 3
Siemens/KWU (AREVA) - Scope: Technology transfer and basic and detailed design and supplies
for the nuclear and safety systems
- Supplies, Services and Guarantees for Angra 2 and Angra 3
Authorization for Project Resumption - Governmental decision in June 2007
- Civil works resumed in 2009
Agra 2
ELETRONUCLEAR
Angra 3
ANGRA 2
ANGRA 2: Reference Plant
ANGRA 3
Extensive use of the Angra 2 design documentation (~70%)
Executive
documents for
Angra 3
ANGRA 2 “AS-BUILT” +
Design Changes/Adaptations
• Foundation on rocks
• Design changes from Angra 2
• Digital I & C
D
E
S
I
G
N
ELETRONUCLEAR
Angra 3
When plant construction was stopped in the late 1980s, approximately US$
455M in costs had already been incurred (infrastructure, basic design and
detailed engineering, import and national equipment already delivered)
Effective preservation (proven techniques from Angra 2)
Around 13,500 tons of already
delivered components
Diesel Generators
Heavy components for the primary
circuit (RPV, SGs, RCPs, PRZ)
Part of the TG-Set components
Process equipment
Piping
Pumps
Valves
ELETRONUCLEAR
Angra 3
Note: The baseline for this Project Progress is of 30,34% in 2009 (Project Resumption – civil
works). The progress above reflects the General Executive Schedule (Rev 4), with the start of
commercial operation in December, 2022
Global Physical Progress = 61,4% (Dec/16)
Project Physical Progress
10,8%
75,8%
60,5%
10,8%
67,3%
77,5%
81,1%
61,4%
67,3%
80,4%
Eletromechanical Erection
(ANGRAMON + Steel
Containment)
Civil Works
Suppliers
Engineering
PROJECT
Planned until dec-16 Performed until dec-16
ELETRONUCLEAR
Angra 3 - Original Contracts (status 2014/15) – State Model
Import Supplies, Services, Warranty &
Guarantee
Civil Construction
National Supplies
Electromechanical
Erection
Engineering
Services
National Supplies
NEW BIDS RENEGOTIATED
CONTRACTS
A N G R A 3 MAIN CONTRACTS
Civil Design and Structures
Non-Nuclear Buildings
ELETRONUCLEAR
Angra 3
Limitations imposed to Eletronuclear´s cashflow due to the reduction of
Angra 1 and 2 tariffs, which led to a considerable revenue loss,
prevented the company from providing the required counterpayments
to make withdrawals from the external financing
Start of the “Lava Jato” operation
Due to the above, Eletronuclear was forced to take exceptional
measures:
Payment delays
Contract suspensions / Pace reduction
General Executive Schedule revision – start of commercial
operation in December 2022
Relevant Facts 2015
ELETRONUCLEAR
Angra 3
Several actions towards creating conditions to enable the
resumption of the Project:
Reevaluation of the Project time schedule;
Feasibility studies listing the main milestones that have to be
completed, in line with the revised time schedule;
Indepentent assessment of the Project Budget;
Technical note on the price of energy and tariff;
Evaluation of the cost to cancel the Project, as well as assessment
of the costs incurred from aspects not attributable to Eletronuclear
Relevant Facts 2016
ELETRONUCLEAR
Angra 3 New Model
Import Supplies, Services, Warranty &
Guarantee
Civil Construction
National Supplies
Civil Construction
Electromechanical
Erection
NEW BIDS
RENEGOTIATED
CONTRACTS
A N G R A 3 MAIN CONTRACTS
Civil Design and Structures
Non-Nuclear Buildings
NEW BIDS
Remaining Engineering
Services
Remaining National Supplies
ELETRONUCLEAR
Angra 3 – Main Challenges
Angra 3 New Model (still to be decided)
Definition of legal framework and business model for private partner
participation
Bidding process for private partner participation (or Inter-
Government Agreement)
New energy contractual model (tariff) to ensure private stakeholder
participation
Financial resources for Project completion (State funding or private
participation)
Engineering Works
Civil Construction, Eletromechanical Erection and Commissioning
Licensing and Enviromental commitments
Applicability of the new model to new NPPs
ELETRONUCLEAR
Angra 3 – Main Challenges
Angra 3 New Model (still to be decided)
Definition of scope for Eletronuclear (owner) and for the private
partner:
Eletronuclear to be the responsible for:
Plant commissioning and operation
Licensing activities
Design of the plant
Contracts with Areva (imported supplies and services)
Scope to be harmonized and defined, depending on the new model
Engineering support during construction and erection
Digital I&C (hardware)
Delivery of non-ordered national supplies
Angra 3 Simulator
ELETRONUCLEAR
Angra 3 – National Packages (still to be contrated)
15
1 M 219 Air Blowers 1 10
2M307 / M308 / M309 / M316 /
M317 / M341 / M351
H3 Cranes - Travelling Cranes and Electric Crabs, Auxiliary Travelling Crane,
Transport Trolley for Waste Drums 7 24
3 I009AElectrical and Electronic Equipment for the Commissioning and I&C Cold Workshop -
Part A1 4
4 I009BElectrical and Electronic Equipment for the Commissioning and I&C Cold Workshop -
Part B1 4
5 I009CElectrical and Electronic Equipment for the Commissioning and I&C Cold Workshop -
Part C1 4
6 I010 Pressure Measuring Equipment for the Cold Workshop Commissioning 1 3
7 I011 Tools for Commissiong of the Cold Workshop 1 3
8 I012 Workbench for the Commissioning of the I&C Coldworkshop 1 4
9 I015 Modernization of the Automation of Angra 2 Demineralizing System (GC system) (*) 1 8
10M405 -Cast Iron Pipes and
ConnectionsCast Iron Pipes and Connections 1 12
PENDING BIDDING PROCESSES
- THE TECHNICAL DOCUMENTATION IS AVAILABLE
BRAZILIAN SUPPLY BIDDING PROCESSES - GENERAL SITUATION SE.T (STATUS: SEPTEMBER 2016)IT
EM
PACKAGE SCOPEQUANTITY OF
PACKAGES
SUPPLY
DEADLINE
(months)
ELETRONUCLEAR
Angra 3 – National Packages (still to be contrated)
15
11 M151 Filter Exchange Machine (repair) 1 18
12 M191 Hot Laundry 1 6
13 M192 Cold Workshop 1 10
14 M193 Hot Workshop 1 12
15 M198 Electrolytic Cell Bank 1 6
16 M302 / M318 / M334b / M336 Locks Sealing Wall, Stand Rods, Guide Rods, Radiation Sample Holder, Lifting Eyes
of the Precast Elements of the Pool, RPV Sample Holder5 24
17 M342 Radiation Sample Holder 1 12
18 M360 Crabs 1 18
19 M399 Cranes and Beams of the Turbine Building 1 18
20 M602A / M603A Metering Pumps 2 12
PENDING BIDDING PROCESSES
- THE TECHNICAL DOCUMENTATION IS BEING PREPARED
BRAZILIAN SUPPLY BIDDING PROCESSES - GENERAL SITUATION SE.T (STATUS: SEPTEMBER 2016)IT
EM
PACKAGE SCOPEQUANTITY OF
PACKAGES
SUPPLY
DEADLINE
(months)
ELETRONUCLEAR
Angra 3 – National Packages (still to be contrated)
Cont.
21 M420A/M497 Welded Piping and Special Supports 2 24
22 M420B/M401 Special Piping Parts and Rectangular Lugs 2 24
23 M492 Special Supports of the Fixed Points for the Piping Penetrations at the Containment
Sphere - UJA and UJB1 24
24 M178A / M372 / M340 / M311B Decontamination Room Lining + Special Doors (former M 178A) 4 18
25 M176 Decontamination Basins 1 18
26 M607A Interconnection duct between the buildings UKA and UKH - Ventilation System 1 12
27 E 026 Expansion of the Radio System 1 8
28 E 060 Drying Ovens, Benches and Others 1 5
29 E 070 IP CCTV System for the Operation, Radiation Protection and KPC 1 12
BRAZILIAN SUPPLY BIDDING PROCESSES - GENERAL SITUATION SE.T (STATUS: SEPTEMBER 2016)
ITE
M
PACKAGE SCOPEQUANTITY OF
PACKAGES
SUPPLY
DEADLINE
(months)
ELETRONUCLEAR
Angra 3 – National Packages (still to be contrated)
24
30 M 612 A/AFM Fire Protection System + SCOPE OF THE ERECTION COMPANY M502/507/514B 1 12
31 M 613 A, B and C Hand Fire Extinguishers and Firefighting Trailers 3 12
32 M 617 A Furniture of the Cold Laboratory 1 8
33 M 617 B Furniture of the Hot Laboratory 1 8
34 M 617 C Reagents and Glassware 1 -
35 M 620 Oil Separator 1 12
36 M 701 Consumables for the Commissioning 1 -
37 M174 Primary Coolant Purification System 1 24
38 M196 Injection and Spray Nozzles GN 1 12
39 M197 Sludge Filter GN 1 12
40 M226 Plastic Pumps GN 1 12
PENDING BIDDING PROCESSES
- THE TECHNICAL DOCUMENTATION PREPARATION HAS NOT STARTED YET
BRAZILIAN SUPPLY BIDDING PROCESSES - GENERAL SITUATION SE.T (STATUS: SEPTEMBER 2016)
ITE
M
PACKAGE SCOPEQUANTITY OF
PACKAGES
SUPPLY
DEADLINE
(months)
ELETRONUCLEAR
Angra 3 – National Packages (still to be contrated)
41 M228 Metering Pumps GN 1 12
42 M227 Circulation Pumps GN 1 12
43 M229 Agitator of the Tank for Preparation of Flocculant GN 1 12
44 C 001 Shielding Doors 1 18
45 C 002 Common Steel Doors 1 18
46 C 003 Turnstiles 1 6
47 I001 Electronic Transmitters (GN System) 1 3
48 I002 Manometers (GN System) 1 3
49 I003 Orifice Plates (GN System) 1 4
50 I006 Control System (PLC) (GN System) 1 6
51 I007 Signal Distribution Module (GN System) 1 3
TOTAL: ~ R$ 140.000.000,00 (US$ 38.888.888,88 - US$1,00 = R$ 3,60)
BRAZILIAN SUPPLY BIDDING PROCESSES - GENERAL SITUATION SE.T (STATUS: SEPTEMBER 2016)IT
EM
PACKAGE SCOPEQUANTITY OF
PACKAGES
SUPPLY
DEADLINE
(months)
ELETRONUCLEAR
Schedule CEG_Rev4 – (55 months)
ELETRONUCLEAR
Schedule CEG_Rev4 – (55 months)
Current Critical Path Primary Circuit
UJA Completion / Pool Lining Erection
Containment Sphere
Erection and Commissioning of the Polar Crane
Positioning of the Components and Primary Circuit Erection
Cleaning / Commissioning / Tests
Sub-Critical Path
Erection and Commissioning of the Control Room
Erection of the Simulator
Start of commercial operation in December 2022
Critical and Sub-Critical Path
ELETRONUCLEAR
Budget
Project Estimated Costs – Financial Progress (status Dec-16)
ITEM Estimated (MR$) executed Until October-
2016 (MR$) % executed
Environmental Licensing 142,4 6,8 4,76%
Environmental Impacts 368,5 99,4 26,98%
National Engineering 1244,2 464,2 37,31%
Foreign Engineering 2795,1 953,9 34,13%
National Supplies 1363,8 647,6 47,49%
Imported Supplies 5160,6 1546,0 29,96%
Civil Construction 3193,3 1406,1 44,03%
Eletromechanical Erection 3947,0 366,8 9,29%
Pre-Operating Costs 30,0 0,0 0,00%
Other Payments 1162,0 396,8 34,15%
Contingency 873,8 0,0 0,00%
First Fuel Load 770,4 478,8 62,14%
TOTAL (Direct Costs) 21.051,1 6.366,2 30,24%
ELETRONUCLEAR
Angra 3 – Corporate Challenges
Company Challenges at Corporate Level
Company restructuring
Cultural changes / Integration of different areas
Compliance initiatives
Personnel replacement and training
Two sucessive retirement incentive programs
Preservation of company technical knowledge
New management model (mixed management team, supervision over
the private partner, centralized management towards a single
contractor... – to be defined)
ELETRONUCLEAR
Angra 1
Angra 1 Challenges
Complete ageing management program
implementation (LTO)
License renewal Project
Modernization Project
Power uprate
Extended operation cycle
Obsolecense Management
Increase spent fuel sorage capacity
ELETRONUCLEAR
Angra 2
Angra 2 Challenges
Implementation of ageing management program
Modernization Project
Power uprate
Efforts for operatation experience exchange with
remaining SIEMENS/KWU plant operators
Obsolecense Management
Technical support from NPP vendor and original
suppliers
Increase spent fuel sorage capacity