ANASAGAR. Water Purification System The Lake water purification system by Aeration & floating fountains (4 Nos) were installed and is functioning since 23.01.2009. 10 more floating fountains have been installed in 2013 for beautification and aeration of Anasagar Lake. - PowerPoint PPT Presentation

Citation preview

ANASAGAR

Water Purification System The Lake water purification system by Aeration

& floating fountains (4 Nos) were installed and is functioning since 23.01.2009. 10 more floating fountains have been installed in 2013 for beautification and aeration of Anasagar Lake.

Water Purification System

Bio-Remediation Bio-remediation of drains terminating into Anasagar lake has been taken up since Feb-2013 for treatment of waste water flowing through drains before entering in to the lake. At present work is under Progress In 7 drains are as under : Nagphani(near Mahaveer colony) Ramnagar(near R.K marble)RamnagarKazi ka nallahShantipuraApsara Mension Choursiawas Drain

Bio-Remediation

CHAURASIAWAS DRAIN RAM NAGAR II (NEAR R.K. MARBLE)

KAZI KA NALLAH SHANTIPURA DRAIN

Jetty Platform & Walkway

The work of Jetty Platform near Chaupati and walkway along the hillock below the circuit house with lighting has been completed.

Jetty Platform near Chaupati & Walkway

Fixing of Steel Grill-Jali to check entry of Floating impurities into the Lake is

being done .

Grill at Shantipura Drain

Jali at Anasagar Lake

Fixing of Steel Grill-Jali

Grill at Ram Nagar II Drain

Grill at Chauarsiawas Drain

Different IEC has been taken up to create public awareness & participation which includes showcase of Jhanki of Anasagar lake on republic day function. Distribution of pamphlets and cards for awareness of lake conservation

WATER PURIFICATION

JALI FIXED AT ANASAGAR

Bio-Remediation

JETTY PLATFORM & WALKWAY

• The sanctioned desilting work of the lake in 2,15,000 cum has been completed, The work of Desilting in 20000 cum on Anted Nallah, Chaurasiyawas Nallah, Kazi ka Nallah & Bandi Nadi has been completed.

• Pucca works for construction work of a pilot channel with cement concrete bed in about 308 m length in Anted Nallah has been completed behind the Press club on the Gaurav Path.

WORKS PERFORMED UNDER NLCP- ANASAGAR LAKE

• The fencing and Afforestation in 206 Ha & construction of check dam 31 nos have been completed by the forest Dept.

• Water Quality Monitoring by testing of sample monthly is being done regularly in lake and drains.