Advances in Auto-Identification
Deploying Auto ID in the Construction Industry
2 | www.AtlasRFID.com
Introduction
Paul MitchellAtlas RFID SolutionsVP of Business Development
20+ years’ experience in industrial construction
Field EngineerProject EngineerDepartment HeadDirector
Business SolutionsContinuous Improvement and Organizational Development
3 | www.AtlasRFID.com
Agenda
Auto ID Building BlocksValue Realization TimelineLessons LearnedQuestions
4 | www.AtlasRFID.com
Auto ID Building Blocks
Barcodes
Passive Active
TagsRFID GPS
5 | www.AtlasRFID.com
Gate Readers Vehicle MountedMobile Devices
ReadersAuto ID Building Blocks
Barcodes andPassive RFID or
Active RFID
Passive RFID orActive RFID Active RFID
6 | www.AtlasRFID.com
Auto ID Building BlocksSoftware
PCs with BrowsersMobile Software
GPS EnabledReaders
GPS Enabled
7 | www.AtlasRFID.com
Purchasing&
Expediting
Shipping&
Receiving
Storage
Field Installation Planning
Pick&
Stage
Deliver & Issue to Field
Staging Installation
Auto ID Building BlocksMaterial Control Process
Requesting
8 | www.AtlasRFID.com
Auto ID Building BlocksTeamwork
Home Office Indirects Supervisor Craftsman
9 | www.AtlasRFID.com
.
.
.
Auto ID Building Blocks
TechnologyEH&SCostScheduleQualityCompliance
Business DriversProcess
People
10 | www.AtlasRFID.com
Value Realization
Auto ID in Construction
Timeline
Feb2010
1st c
omm
ercia
l
deplo
ymen
t:
Spoo
l Tra
cking
11 | www.AtlasRFID.com
Spool Tracking
Job #: 001Power The Challenges
Large laydown yards with large quantity of spoolsProductivity and schedule impacts due to material readiness of spoolsRe-fabrication costs associated with lost spools
12 | www.AtlasRFID.com
Spool Tracking
Job #: 001Power The Solution
Tag spools on way in to laydown with active RFID tagsUse VMR and mobile devices to locate spoolsPC software for coordinator to provide pick tickets to warehouse crew
13 | www.AtlasRFID.com
Spool Tracking
Job #: 001Power The Results
Reduced MHS locating spoolsReduced re-fabrication costsReduced material readiness issues in the fieldReduced safety exposureJovix™ deployed on other projects for customer
14 | www.AtlasRFID.com
Auto ID in Construction
Timeline
Feb2010
1st c
omm
ercia
l
deplo
ymen
t:
Spoo
l Tra
cking
Jan2011
Site r
eceiv
ing
and r
eque
sting
Value Realization
15 | www.AtlasRFID.com
Site Material Control
Job #: 016Oil & Gas The Challenge
Module Facility with multiple projectsNo single material control IS systemLoss of visibility of material post issue to construction Productivity and schedule impacts due to material readinessLost and refabricated materials
16 | www.AtlasRFID.com
Site Material Control
The SolutionPreload fabricator spool list prior to receiving spoolsTag spools during receiving with barcodes and active RFID tagsTablet based receiving and O,S & DUse VMR and mobile devices to locate spoolsProvide engineers a tool to request materials from warehouseTrack spools to the “hook”
Job #: 016Oil & Gas
17 | www.AtlasRFID.com
Site Material Control
The ResultsReduced warehouse labor cost $700,000 annuallyStandardized material control processes across all projectsMaterial progress visible to installationReduced re-fabrication and re-procementReduced material readinenss impacts on directsReduced safety exposureSOP for facility today
Job #: 016Oil & Gas
18 | www.AtlasRFID.com
Value Realization
Auto ID in Construction
Timeline
Feb2010
1st c
omm
ercia
l
deplo
ymen
t:
Spoo
l Tra
cking
Jan2011
Site r
eceiv
ing
and r
eque
sting
Multi-
Site
Coor
dinat
ion
Sep2011
19 | www.AtlasRFID.com
Multi-Site Coordination
The ChallengeArea works contractor to provide modules and site erection services for second phase of large Oil Sands projectFour fabrication facilities across CASingle mod yard in EdmontonSite in Northern Alberta First phase lesson learned: control your destiny
Job #: 031Oil & Gas
20 | www.AtlasRFID.com
Multi-Site Coordination
The SolutionTrack pipe spools from detailing to installationTag all spools at end of fabricationEach fab shop to provide laydownMobile devices and gate readers at each fab shopGate readers, devices and VMR at mod yard and siteAll parties have access to system
Job #: 031Oil & Gas
21 | www.AtlasRFID.com
Multi-Site Coordination
The ResultsEliminated unnecessary paperworkIncreased payment cycle timesReduced material readiness impacts to productivity and scheduleReduced spool warehouse crew at mod yard on Phase 1 from:
3 supervisors12 craft3 cherry pickers
To:1 supervisor3-4 craft1 cherry picker
Job #: 031Oil & Gas
22 | www.AtlasRFID.com
Value Realization
Auto ID in Construction Experiments
Feb2010
1st c
omm
ercia
l
deplo
ymen
t:
Spoo
l Tra
cking
Jan2011
Site r
eceiv
ing
and r
eque
sting
Multi-
Site
Coor
dinat
ion
Sep2011
Inter-
site-
CCC
China
/ Tha
i/ Job
site
Jun2012
Work
Pa
ckag
ing
Aug2012
Logis
tics a
nd
Trace
abilit
y
Jan2013
23 | www.AtlasRFID.com
Logistics and Traceability
Job No: 052Power
The Challenges:Consortium between technology provider and EPCs Single owner Two projectsLack of expediting visibility from vendorsLack of visibility from Port of Import to sitesStringent quality and traceability requirements
24 | www.AtlasRFID.com
Logistics and Traceability
Job No: 052Power
The Solution:Receive overseas shipments at POI, tag crates and track shipments to jobsiteCapture engineering shipment releases to vendor and track shipments and materials from vendor to siteStatus materials by inspectionTrack spools and steel with activeValves, cable, rebar, instruments, etc. with barcodes
25 | www.AtlasRFID.com
Logistics and Traceability
Job No: 052Power
The Results:Visibility across many companies increased with a “single source of truth”Improved planning due to more reliable and available expediting informationImproved visibility and control on non-conforming materialsReduced cost and schedule impacts due to material readinessReduced safety exposure
26 | www.AtlasRFID.com
Realization
RFID in Construction
Timeline
Feb2010
1st c
omm
ercia
l
deplo
ymen
t:
Spoo
l Tra
cking
Jan2011
Site r
eceiv
ing
and r
eque
sting
Multi-
Site
Coor
dinat
ion
Sep2011
Inter-
site-
CCC
China
/ Tha
i/ Job
site
Jun2012
Work
Pa
ckag
ing
Aug2012
Logis
tics a
nd
Trace
abilit
y
Jan2013
1st M
id-siz
e con
tracto
r
deplo
ymen
t
May2013
27 | www.AtlasRFID.com
Mid-Size Contractors
Job No: 063Waste Water
The Challenges:Engineers, Superintendents and Warehouse using shared spreadsheetsLack of work planning, expediting and material visibility
The Solution:Jovix with tablets, barcodes
The Results:Looking favorable
28 | www.AtlasRFID.com
Value Realization
Auto ID in Construction
Timeline
Feb2010
1st c
omm
ercia
l
deplo
ymen
t:
Spoo
l Tra
cking
Jan2011
Site r
eceiv
ing
and r
eque
sting
Multi-
Site
Coor
dinat
ion
Sep2011
Inter-
site-
CCC
China
/ Tha
i/ Job
site
Jun2012
Work
Pa
ckag
ing
Aug2012
Logis
tics a
nd
Trace
abilit
y
Jan2013
1st M
id-siz
e con
tracto
r
deplo
ymen
t
May2013
Oct2013
Moving Forward
29 | www.AtlasRFID.com
Moving Forward
Global construction will require global tracking
SuppliersFabricators and Module Yards
Larger projects will require more stakeholders
Need for transparency across multiple systemsBetter planning requires better informationEH&S risk minimized through working smarterBetter quality and regulatory compliance
30 | www.AtlasRFID.com
Lessons LearnedImplement a solution, not a technologyAlignment of all stakeholders is critical Start small and build on successThe better the plan, the better the resultsLearn from othersSuccess is realized through people
31 | www.AtlasRFID.com31 | www.AtlasRFID.com
Questions?