Advanced Technology for Progressing India's Underground Coal Mining
Lisa Duncan
August 2014
We are:
The largest publicly traded independent
group of mining technical experts in the world.
• 18 Office Globally• 45+ Years Experience• 118 Countries• 5000 software installs• 14,000 Studies• $Billions value added
Solution Offering
We are:.
The clear market leader in production simulation, scheduling and costing solutions to resource companies globally
Production Simulation
Production Scheduling
Project Costing & Budgeting
Software Solutions
BLASTING SOLUTIONS BY DFPCL
Mine Planning Scheduling Horizons
BLASTING SOLUTIONS BY DFPCL
Agenda
• The Story Today
• Introducing Coal Solutions
• Case Study
• Simulation
• Summary
7
The Story Today
Todays Mining Landscape• High demand on local coal
• Focus on increasing production
• Land access issues
• Resources remain static
• Mining methods constant
• An interest in innovation
Why Is It Challenging?
• Resources are getting deeper
• Resources are complex
• Demand is increasing
• Planning considered difficult
Urgent Planning Issues
Common urgent issues include:
• Smaller properties
• Overlying constraints
• Open cast and underground mines in same vertical plane
• Geological disturbances
• Land and rehabilitation
• Skilled manpower
Why is Good Planning Currently a Challenge?• Complexities such as
• Multiple seams• Fire• Water• Gas
• Surface constraints
• Old mine workings
• Planning is often done while mining progresses
• Mines may not be optimised
• Geological and geotechnical data is complex and sometimes inaccurate
Technology?
• Software available, but often not used
• Medium and short term schedules not created to optimise the operation
• Testing of how the operation works prior to production not possible
• Software must be easy to use
13
Introducing Coal Solutions
Application of Technology
This conference will give you:
• Many good ideas• An awareness of what is new• What other mining operations are trying
This presentation will help you consider:
• How to combine new ideas and technologies
• How things can be improved at your mining operation
• The benefits effective use of software will bring
We are:
The largest publicly traded independent
group of mining technical experts in the world.
• 18 Office Globally• 45+ Years Experience• 118 Countries• 5000 software installs• 14,000 Studies• $Billions value added
Effective Mine Planning
New software concept – Coal Solutions• Advanced, robust, interactive
scheduling tools• Designed to be easy to learn• Designed to be easy to use• Commodity specific• Mining method specific• Process driven• Intuitive• Fast• Accurate
Understand what your mine is capable of.
Sophistication Without Complexity
• Integration of all schedule components: • Mining • Haulage• Processing • Dump construction
• Components “aware” of each other with continual, seamless data flow
• Easy to rapidly incorporate changes to underlying data
• Scheduling that is interactive - change something, see the impact immediately
More advanced and accurate models• Engineers can analyse many scenarios
quickly
• Scenarios run so quickly, scheduling becomes interactive
• Users will:• Retain focus• Concentrate longer• Absorb and remember changes• Understand deeply
• Engineers will learn what the mine is capable of
Training Fast and Easy
• Engineers require minimal training time
• New staff up to speed quickly
• Learning curve very fast
• High and fast user effectiveness
• Skills easily transferred
• Models quickly understood
Case Study
Case Study – Planning OptionsThis planning exercised considered:
• Production• Resource recovery• Tonnes per development metre• Principle stress direction• Depth• Surface constraints• Access• Spontaneous combustion• Gas• Ventilation• Many more
Option 1Results of the long term plan:Y20:• 4,268,825t • 4,630m• 921.99 t/m
Based on tonnes per metre, this seems the better result
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20
t 357,481 355,286 3,252,989 3,043,214 4,768,960 4,674,854 5,168,491 4,225,434 3,920,444 4,241,888 4,399,216 3,660,464 3,664,215 3,081,912 4,709,076 4,826,273 4,719,843 5,214,277 4,427,146 4,268,825
m 12,705 12,502 13,382 12,516 12,327 5,666 6,538 6,203 6,414 9,301 13,121 12,717 12,394 13,396 11,881 6,407 6,446 6,268 6,853 4,630
Option 2Y20:• 5,578,814t• 11,549m• 483.06 t/m
However, considering all constraints this option is:• Safer• Has better product quality• Geotechnically achievable• Less likely to have gas issues
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Y20
t 348,599 1,665,714 2,822,213 3,524,013 3,588,261 4,641,357 4,290,687 4,219,578 4,078,608 2,040,981 1,847,042 3,739,506 3,766,801 3,813,387 4,299,845 5,307,393 4,073,231 4,161,575 5,565,775 5,578,814
m 12,352 13,621 13,906 12,779 12,483 11,356 7,844 6,969 6,641 8,216 3,910 5,842 5,531 6,029 11,892 11,061 11,099 5,542 9,731 11,549
24
Simulation
Common Modelling Issues
Equipment / fleet• Productivity improvements• Cycle times• Justification of new equipment• Delays
Mining constraints• Congestion• Changing variables • Changed mine design
Discrete Event Simulation• With the dynamic nature of mining,
simulation is required
• True – “discrete event simulation” requires a link to both planning and execution:• Evaluate plans and enable scenarios and
capital configuration to be tested prior to production
• Real time data from the operation feeds assumptions in the simulation model.
• The simulation model is always ‘learning’ from actual production data
• These learnings are then feed back into the plans – ongoing better planning
Plans will continuously be more accurate and achievable.
Targets are more likely to be met.
What simulation is possible?HAULSIM is a powerful tool to model, analyse, visualise and optimise your haulage network• Accurately model mine haulage• Visualise impact of changes• Quantify design improvements• Validate assumptions• Make informed decisions
TALPAC is a simulation tool for evaluating the efficiency, productivity and economics of the mine• work out the size of fleet• which equipment is the most compatible• investigate and compare time-period
productivity
New Mine Layout
Problem We are regularly not meeting production goals. Will changing the longwall design help to increase production? Questions• Will the change help improve production?• How will the change impact the surface
fleet?• Will the capacity of my conveyor network
keep up with the production change?• Will there be bottlenecks?
The answers to these questions can now be easily found and communicated and the right decisions made by doing a simulation
A 3D simulation solution for analysis of entire mining systems so users can accurately determine and test key system measurers.
• Improve equipment system efficiency
• Accurately test safety and/or production gain initiatives
• Quickly build simulation models and run scenarios
• Determine whether capital expenditure is required
• Dynamic dashboard reporting for instantaneous results
• Integration with RPM applications to simulate an entire mine plan including higher level costings
Summary
RPM’s XPAC Solutions
• Process driven, rules based schedules
• Models updated automatically as the mine evolves
• The best, most sophisticated tool set to build your model, making it fast and easy to get results
Solutions have taken away the “good model” vs “bad model” problem.
Now, they are all good.
HAULSIM value
• Visualise ‘what if’ scenarios• Test haulage options prior to production• Explore multiple scenarios• Visualise the impact of changes in
minutes
Incorporating HAULSIM into your software suite will help you to:
• Justify new equipment expenditure• Reduce 3rd party consulting expense• Use past data to improve future
production• Operate more efficiently• Maximise production
Can you imagine?
Now that you know about coal solutions, and also the value of simulation. Imagine if you could combine the two?!
• Share parameters from the schedule into the simulation
• Make a change in the schedule, and immediately test the impact it will have
• Determine if your schedules are realistic
• Understand how likely your targets are to be achieved
Advanced Technology for Progressing India's Underground Coal Mining