Abhay Kumar Singh,

Executive Director, NHPC Limited.

1

NHPC Limited.

2

NHPC PROFILE

3

Year of Establishment 1975

Authorized Share Capital Rs. 150000 million

Power Stations in Operation 24 (7071.2 MW)22 (5551.2 MW) - NHPC2 (1520 MW) - NHDC (JV)

Projects under Construction 6 (4934 MW)

Power Stations Commissioned on Deposit/Turnkey Basis- Completed outside India- Completed within India

5 (89.35 MW)2 (74.10 MW)3 (15.25 MW)

Projects under Clearance 13 (8211 MW)

Projects under Survey and Investigation stage 2 (1079 MW)

7071.2* MW

2810 +2124 (JV)

= 4934 MW

8211 MW

1079 MW

POWER STATIONS

Hydro-22 (6971.2MW)+

Wind-1 (50 MW)+

Solar-1 (50 MW)

PROJECTS UNDER

CONSTRUCTIONHydro - 2 (2800 MW)

RE – 1 (10 MW)+

Pakal Dul (1000 MW)**Kiru (624 MW)**

Teesta VI (500 MW)***

PROJECTS UNDER CLEARANCE

Hydro – 11 (8171MW)RE – 2 (40 MW)

PROJECTSUNDER S&IHydro – 2

TOTAL = 21295.20 MW• Including JV Mode (1520 MW)

• ** CVPP ( subsidiary)

• *** LTHPL (fully owned subsidiary)

NHPC PROFILE

4

❖ 24 POWER STATIONS

• HYDRO – 22

• WIND – 01

• SOLAR – 01

❖ 6 PROJECTS UNDER

CONSTRUCTION

• HYDRO – 05

• SOLAR – 01

❖ PROJECTS UNDER

CLEARANCE

• HYDRO – 11

• RE – 02

❖ 02 PROJECTS UNDER S&I

❖ 05 PROJECTS COMPLETED

DEPOSIT/TURNKEY BASIS

POWER MAP OF NHPC

5

6

NHPC PROJECTS PORTFOLIO

7

8

9

➢ NHDC Ltd. – JV with Govt. of Madhya Pradesh

➢Loktak Downstream Hydroelectric Corporation Ltd. – JV

with Govt. of Manipur

➢Bundelkhand Saur Urja Limited – JV with Uttar Pradesh

NEDA.

➢Chenab Valley Power Projects (P) Limited – JV with JKSPDC

and PTC India Limited.

➢ National High Power Test Laboratory (P) Limited – JV with

NTPC, PGCIL, CPRI and DVC

➢Lanco Teesta Hydro Power Limited – Wholly owned

subsidiary of NHPC for Teesta VI Project (500 MW) in Sikkim.

Current JV Companies

10

NHPC Key Capabilities

➢ Planning, Investigation, Design & Engineering and execution of Hydroelectric Projects from concept to commissioning

➢ Operation, Maintenance, Renovation and Modernization of all types & sizes of hydro plants

➢ Execution of underground works in any type of geological conditions.

11

12

EXPERTISE IN RCC DAM CONSTRUCTION

13

14

15

PROJECTS RECENTLY

COMMISIONED

KISHANGANGA HE PROJECT(330MW)

330 MW Kishanganga HE Project Dedicated to Nation on 19th

May 2018 by Hon’ble Prime Minister of India 16

KISHANGANGA HE PROJECT(330MW)

Hon’ble Minister of State (I/C) for Power and New & Renewable Energy

delivering welcome address on 19th May 2018 on dedication to Nation NHPC’s

330 MW Kishanganga HE Project (J&K)17

KISHANGANGA HE PROJECT(330MW)

View of Power House at Bandipora (J&K)18

KISHANGANGA HE PROJECT(330MW)

DAM & RESERVOIR AT GUREZ (J&K)19

Mangdechhu HE Project (720 MW), Bhutan

NHPC had prepared the DPR and provided Design and Engineering

consultancy services for implementation of Mangdechhu HEP in Bhutan. 20

Mangdechhu HE Project (720 MW), Bhutan

NHPC had prepared the DPR and provided Design and Engineering

consultancy services for implementation of Mangdechhu HEP in Bhutan. 21

SOLAR POWER PROJECT, TAMIL NADU (50MW)

Project Commissioned in March 2018 22

SOLAR POWER PROJECT, TAMIL NADU (50MW)

23Project Commissioned in March 2018

24

PROJECTS UNDER CONSTRUCTION

DAM D/S VIEW

PARBATI-II HE PROJECT(800MW)

25

POWER HOUSE – OUTSIDE VIEW

PARBATI-II HE PROJECT(800MW)

26

POWER HOUSE - INSIDE VIEW

PARBATI-II HE PROJECT(800MW)

27

VIEW OF DAM

SUBANSIRI LOWER HE PROJECT(2000MW)

28

HEAD RACE TUNNEL

SUBANSIRI LOWER HE PROJECT(800MW)

29

POWER HOUSE

SUBANSIRI LOWER HE PROJECT(2000MW)

30

SUBANSIRI LOWER HE PROJECT (2000MW)

POWER HOUSE BACK HILL SLOPES RESTORED31

DOWNSTREAM PROTECTION WORK

SUBANSIRI LOWER HE PROJECT (2000MW)

32

SUBANSIRI LOWER HE PROJECT (2000MW)

DOWNSTREAM PROTECTION WORK33

SUBANSIRI LOWER HE PROJECT (2000MW)

DOWNSTREAM PROTECTION WORK34

Projects Under Construction in

Joint Venture (CVPPPL)

35

PAKAL DUL HE PROJECT(1000MW)

Foundation stone laid by Hon’ble PM Shri Narendra Modi on 19th May 201836

PAKAL DUL HE PROJECT(1000MW)

Construction of Main Access Tunnel (MAT) to Power House completed37

PAKAL DUL HE PROJECT(1000MW)

38Right Side slashing at PH cavern in progesss

PAKAL DUL HE PROJECT(1000MW)

39

Excavation of Adit to HRT 2 in progess

CONSULTANCY SERVICES

40

Major assignments in India and

neighboring countries like Bhutan,

Myanmar, Tajikistan and Ethiopia

CONSULTANCYSome of the important fields of expertise of NHPC are hereunder;

➢ River Basin Studies DPR stage

➢ Detailed Survey & Investigations

➢ Design & Engineering of

a) Tunnels (DBM/TBM)

b) Large Dams of Concrete/RF/CFRD

c) Underground Power House etc.

➢ Cost Engineering

➢ Tendering for the Civil / Mechanical /Electrical works

➢ Environmental Impact Assessment & Environmental Management Plans

➢ Equipment Planning & Management

➢ Construction Planning & Management

➢ Quality Control & Assurance

➢ Testing & Commissioning

➢ Operation & Maintenance

➢ Renovation, Modernization & Uprating (RM&U) of Hydropower Stations

➢ Dam Safety

42

➢ DEVIGHAT H.E. PROJECT (completed in

1984 in a record time of 3.5 years)

➢ NUWAKOT Rural Electrification covering 64

villages one year ahead of schedule

➢ NHPC Signs MOU with HIDCL Nepal for Joint

Hydro Development

➢ NHPC studying development of Garba

Tawaghat HE Project (630 MW on Kali river

near existing NHPC Project Dhauliganga)

43

➢ Declaring all Hydro as Renewable Energy Source

➢Hydro Purchase obligation (HPO) as a separate entity within Non

Solar Renewable Purchase Obligation (RPO)

➢Tariff rationalization to bring down tariff by increasing project life

to 40 years

➢Budgetary Support for Flood Moderation / Storage Hydro Electric

Projects.

➢Budgetary Support to cost of enabling infrastructure i.e; roads,

bridges.

NEW INITIATES OF GOI FOR HYDRO DEVELOPMENT

44

New model in Hydro Development in India

➢ Initiatives of GOI :

New Hydro policy ( RE / life etc )

Funding for Infrastructure/ flood moderation

➢ Initiates of State Govenments :

Waiver / deferral of Free Power

Exemption of state taxes

Looking Hydro Projets as Drivers of local / national Growth ( Make

in Country Initiative )

45

Major CSR Initiatives - Healthcare

46 46

❑ Spandan-Deployment of Mobile Medical Units in rural areas

• SPANDAN, a healthcare outreach programme,

• Deployed 20 Nos. Mobile Medical Units (MMU)/Vans in rural areas

during FY 2016-17 & FY 2017-18. District covered Dhemaji,

Lakhimpur, Sonitpur, Majuli & Biswanath

• NHPC has spent Rs. 11.86 Crores during FY 2016-17 (Rs. 6.43 Crore) &

FY 2017-18 (Rs. 5.43 Crore).

• During FY 2018-19, 10 No. MMUs deployed for Dhemaji, Lakhimpur &

Majuli

• During FY 2018-19, NHPC has spent Rs. 84.50 Lakh up to 27.07.2018.

• Beneficiaries are approx. 6 Lakh

Major CSR Initiatives - Healthcare

47

▪ Augmenting Healthcare services by means of providing

Ambulances to District Hospitals of Faridabad, Sikkim &

Darjeeling

▪ Organizing Medical Camps

▪ Augmentation of healthcare infrastructure (Pathology Labs &

other Equipment)

▪ Cochlear Implant Surgery of Hearing Impaired children

Major CSR Initiatives – Drinking WaterProviding Safe Drinking Water Facilities in Rural Areas - ‘Kalash’

• MoU signed for 1620 locations with local bodies/ management

committees for implementation of the scheme in rural areas of Dhemaji,

Lakhimpur, Biswanath and Majuli districts in the state of Assam.

• Work has been completed at all 1620 locations.

• Total expected beneficiary from the scheme is 10 Lakhs approx.

• Expenditure incurred till date Rs. 14.55 Crores

48

Major CSR Initiatives – Drinking Water

49 49

Providing RO Based

Drinking Water &

Sanitation Complex

• 1000 LPH RO Plant with

estimated cost of Rs. 28.5 lakhs

each catering to around 300-400

families on daily basis at ten

locations.

• The facility has Sanitation

Complex & RO Plant.

• 10 No. RO Cum Sanitation

Complexes have been completed

at different places

• During 2017-18, a sum of Rs.1.60

Crore has been spent towards this

scheme.

❑ Hydro Engineering College at Bilaspur, Himachal Pradesh (H.P.)

• Rs. 37.5 Crore was contributed for setting up of the Hydro EngineeringCollege at Bilaspur, Himachal Pradesh during FY 2016-17.

❑ Darjeeling Engineering College, Takdah, Darjeeling, West Bengal

NHPC has contributed 13 Crore for establishment of DarjeelingEngineering College

Main Building of Darjeeling Engineering College, Takdah is underconstruction .

Major CSR Initiatives-Education

50

Major CSR Initiatives-Education• 13 nos. ITIs adopted by NHPC(J&K-7 nos,Uttarakhand-4 &

Arunachal-2).

• Rs. 2.02 Crore spent towards various up-gradation activities of ITIs

during 2014-18.

• Contributed 4.50 Cr. for infrastructural developmental works of ITI,

Chandey in Sikkim.

• Vivekanand Kendra Vidyalaya was constructed in Kolaptukar,

Subansiri Lower District, Arunachal Pradesh. Rs. 9.65 Crore has

been spent so far. Currently around 133 students are studying in the

School.

51

5252

Skill Development Initiatives

• For 3500 nos. unemployed youth

completed

• MoU with CIDC (Construction

Industry Development Council) and

NSDC (National Skill Development

Corporation) with F.I. of Rs. 8.68

Crore

• Area of Coverage - Arunachal

Pradesh, Assam, Sikkim, Himachal

Pradesh, West Bengal, Jammu &

Kashmir and Manipur

• Job Roles/ Courses

Plumber, Electrician, Mason, Site

Accountant, Land Surveyor,

Trainee Associate, Sewing Machine

Operator, Assistant Beauty

Therapist, Shaft Handloom Weaver,

Major CSR Initiatives – Skill Development

52

5353 53

Major CSR Initiatives – Skill Development

Name of Training Provider

No. of Candidates

Trained

No. of Candidates

Placed

NSDC 2500 1987

CIDC 1000 703

Total 3500 2690During FY 2018-19, the proposal for Vocational Training

for 3000 nos. unemployed youth through NSDC is under

process. MoU is to be signed shortly.

MAJOR CSR INITIATIVES –RURAL DEVELOPMENT

• 2 Food Processing Units setup in Alchi & Khaltsi Villages in Leh

District a cost of Rs. one crore.

• Development of agriculture and apiculture in the Project

Affected Areas of Kishanganga Project.

• Poly Green Houses to 445 Nos. locals in Gurez Valley

• Electrification of Hamlets in Alchi Village

• Permanent Restoration of kuls

54

• Construction of 7043 nos. toilets was undertaken in

34 Districts of 8 States against the target of 6802.

• Total F.I. was Rs. 105.70 Crore (incl. Rs. 23.17 Crore

by NHDC Limited, a JV of NHPC), during FY 2014-

15 & FY 2015-16.

55

MAJOR CSR INITIATIVES –SANITATION

MAJOR CSR INITIATIVES – WOMEN EMPOWERMENT

• Trained 75 local women in Assam in furniture making using

Lantana Kamara.

• Organized 350 women into Self Help Groups, through

motivational methods at village level and develop their

capacities to sustain during FY 2016-17

56

57

Clean Power for every home …

NHPC Limited.