KORNERSTONE is engaged in design, consulting, and sales of DNV 2.7-1 offshoreaccommodation modules & on-shore modules.

The company management team members have many years offshore industryworking experience involved in marketing, technology, engineering, quality controland production.

The company can provide one package service solution to fulfill customerrequirement from product delivery to on-site commissioning for offshore modules.

Introduction

Main Products

DNV2.7-1 A60 Accommodation Modules• 2/4/8 man Living Cabin• Canteen / Galley Room• Laundry Room• Change / Locker Room

DNV2.7-1 A60 Engineering Cabins for Zone 2 Hazardous Area• Office Room• Mud Logging Cabin• Lab & Workshop cabin • ROV Control Room

Bespoke modules to suit individual customer requirements. 40ft, 32ft, 26ft, 20ft, 16ft, 12ft units in our range.

Service Areas

Semi-Submersible Platform TLPFixed Platform

FPSO Engineering Vessel Barge

Standard & Rule

Structural RequirementsFull Compliance with DNV 2.7-1&EN 12079DNV OS Rules 2010ABS MODU 2008-Part2,3ABS SVR 2011-Part 2NORSOK Standard

Architectural RequirementsIMO/FTP CodeILO C92/C133SOLAS 2012DNV/ABS RulesNORSOK Standard

Electrical RequirementsIEE Electrical Code and Reg..ABS MODU 2008-Part3,4ABS SVR 2011-Part3DNV OS Rules 2010DNV 2.7-2ATEX 97/9/ECIEC 60079-13NORSOK Standard

• Offshore modules are certified to very exacting industry standards,

All our modules are DNV 2.7-1 rated.

• HVAC system• Fire and gas detection system• Fire dampers• Sprinklers• PA/TV/Tel sockets and connections - all fitted as standard.

A fire and gas pressurisation panel can be added for Zone 2 hazardous area.

Standard Module Specifications

• Tests will be carried out throughout the modules building.

• Modules will be inspected by both customer representative and appointed certifiedsurveyor at the following stages.

Design stageDuring construction of steel work.InsulationOutfittingFinal certifying authority check.

• Full KORNERSTONE and Owner final check off sheets.

• Periodic inspections by customer at any time during construction

• Full QC/QA inspection, reporting and sign off procedures.

• A full data book supplied with each module in Hard copy and disk format.

Products Testing

A60 Accommodation Modules

• Modules before Blasting & Painting.

• Paint specification• Units blasted and painted to S.A 2.5• 3 coat paint system

Our A60 modules offer a safe and comfortable home offshore.

Module interiors are finished to a very high standard.

Our modules are of the ‘plug-in & play’ type.

Certified to DNV 2.7-1 / EN 12079.

A60 Accommodation Modules

A completed unit, signed off by DNV, awaiting delivery.

Delivery from Factory

A60 Accommodation Modules

Modules Transported to Vessel Grillage on deck 1st Module Lifted into Position

Accommodation Modules Hook up & Commissioning

4 Modules connected ISO corner block lock unit to grillage

Accommodation Modules Hook up & Commissioning

2nd Modules into level 2 3rd Modules connected to level 2

Accommodation Modules Hook up & Commissioning

Linked Accommodation Modules Proposal

Linked Accommodation Modules Proposal

Client: HERBOSCH-KIEREProject: GAVERLAND BargeLocation: Belgium (Europe)Module type: DNV certificated A60 DNV 2.7-1 4 man Accommodation Modules

Project Experience

Client: HERBOSCH-KIEREProject: GAVERLAND BargeLocation: Belgium (Europe)Module type: DNV certificated A60 DNV 2.7-1 4 Canteen /Galley Modules

Project Experience

Client: COSL & PEMEXProject: COSL 7 Modular Drilling Rig Location: Mexico Module type: 27 units ABS certified Accommodation Modules(100 POB)

Project Experience

Client: TransoceanProject: Arctic IIIType: DNV2.7-1 A60 4 men Accommodation Modules for 24POB

Project Experience

Client: Container World OffshoreLocation: West AfricaModule type: DNV2.7-1 A60 Ex Proof Office Cabin for Zone II

Project Experience

Client: Murphy MalaysiaLocation: KIKEH SPARModule type: DNV2.7-1 A60 Ex Proof Lab & Workshop Cabin for Zone II

Project Experience

Client: Lundin Petroleum MalaysiaLocation: FPSO IKDAMModule type: DNV2.7-1 A60 Ex Proof Lab & Workshop Cabin for Zone II