A1A LAP Project

Preview:

DESCRIPTION

A1A LAP Project. Master Plan Steering Committee Walking Tour Impressions April 2010. Recommendations: Objectives. Consistent Design / Concepts throughout LBTS Master Plan Concept Integration Long-term Implementation Schedule (Integrate with CIP Planning Effort) - PowerPoint PPT Presentation

Citation preview

Master Plan Steering Committee Walking Tour Impressions

April 2010

Consistent Design / Concepts throughout LBTS

Master Plan Concept Integration Long-term Implementation Schedule

(Integrate with CIP Planning Effort) Prioritize Projects with Community

Collaboration (Citizen’s Charrette) Consider Time Limitations (30% by June)

Benches / Street Furniture Bus Stops / Shelters Street Lights Crosswalks Ocean Entrances/Portals Town Entrance Signs Central Landscaped Medians Special Enhancement Areas

Consistent Design (see ocean portals)

Master Plan Example

Better signs for Bus & Pelican Hopper

Explore potential Broward County Program for Bus Stops.

Design PaversLandscapeBenches

S.E. 15th StreetS.E. 19th Street

Consider the DOT Right of Way when evaluating design options

Publix

LBTS Example Crosswalks

Consider stamped / colored concrete Options

Increase Awareness

LBTS Landmark

Signage

Landscape

Benches

Water Spout

Right of Way Issue?

LBTS

A1A Fort Lauderdale

$50,000 - $100,000 (per small medians)

$30,000-$60,000

Center median sign may not be permissible due to clear zone requirements. North entrance no media. South entrance there is a median with sign.

Private Property Owner / Commercial Property

Grant Program (Other cities may have model)

Recommended