View
216
Download
2
Category
Tags:
Preview:
DESCRIPTION
RMH - CPEC PRESENTATION, JULY 14, 2011
Citation preview
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
A Vision for the Future of Richardson Memorial Hall
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
Project Goals and Aspirations
reaching out and engaging the community
reinforcing studio culture and collaboration
integrating designing and making
demonstrating creative site use and water management
promoting sensitive and innovative adaptation of an historic structure
serving as a model for sustainable design in hot and humid climates
LEED Platinum Certification
compliance with 2030 Challenge
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
Engaging Students, Faculty, and Staff The Occupancy Survey and Charrette
General Building Satisfaction:
41% Satisfied 26% Neutral 33% Dissatisfied
72% of Respondents Say Environmental Conditions Interfere With Their Work
Best Feature: Daylight
Inadequate Features: Information Technology, Artificial Lighting, Indoor Air Quality
VERY Inadequate Features: Thermal Comfort
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
Project Imperatives...
Facilities:Upgrade Building EnvelopeUpgrade All Building SystemsAddress Code DeficienciesMinimize Loyola NoiseImprove Information Technology
Program:Increase Informal CollaborationImprove Connections To CampusExpand Fabrication ShopMaintain Unique Character
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
Level 10' - 0"
Level 210' - 4 5/8"
Level 325' - 7 1/4"
Level 440' - 9 7/8"
Level 556' - 0 1/2"
acou
stic
barri
er
Making Connections...
among peopleto New Orleansto integrate functionsbetween the old and the newto harvest light and air
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
RAIN GARDENSTORM RETENTION
GREENROOF
RAINWATERHARVESTING
NATIVE/ ADAPTIVEPLANTINGS
PERMEABLEPAVING
BICYCLESTORAGE GREEN WALL
SITE
RAINWATERSTORAGE
Sustainability - Site
Stormwater Retention
50% increase
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
SPRAY FOAMINSULATION
EXTERIORSHADING
NATURALVENTILATION
DAYLIGHT DIMMING
CHILLED BEAMS
PHOTOVOLTAIC &SOLAR THERMALPANELS
GREENROOF
DAYLIGHTHARVESTING
TRIPLE-GLAZEDWINDOWSCEILING
FANS
ENERGY
Sustainability - Energy and Carbon
Energy Savings
50-60%
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
RAIN GARDENSTORM RETENTION RAINWATER
IRRIGATION
GREENROOF
RAINWATERHARVESTING
LOW FLOWFIXTURES
RAINWATERSTORAGE
WATER
Sustainability - Water
Water Savings
75-80%
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
NATURALVENTILATION
DAYLIGHT DIMMING
EXTERNAL SHADING
CHILLEDBEAMS
LOW VOCMATERIALS
GREENROOF
CEILINGFANS
DAYLIGHTHARVESTING
INTERIORSHADING
TRIPLE-GLAZEDWINDOWS
BICYCLESTORAGE
GREENWALL
INDOOR AIR QUALITY
HUMAN WELL BEING
Sustainability - Indoor Environment and Human Well Being
Comfort Improvement
100%
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
GREEN WALL
RAINWATERSTORAGE
NATURALVENTILATION
DAYLIGHTDIMMING
EXTERNAL SHADING
DURABLE ENCLOSURE
BUILDINGREUSE
SITE DRAINAGESTRATEGIES
BICYCLESTORAGE
CHILLED BEAMS
LOW VOC MATERIALS
CEILING FANS
INTERIORSHADING
DAYLIGHTHARVESTING
TRIPLE-GLAZEDWINDOWS
GREEN WALL
INDOOR AIR QUALITY
WATER
HUMANWELL BEING
SITE
ENERGY
MATERIALS & RESOURCES
SPRAY FOAMINSULATION
PHOTOVOLTAIC &SOLAR THERMALPANELS
GREENROOF
RAIN GARDENSTORM DETENTION
RAINWATERIRRIGATION
RAINWATERHARVESTING
ULTRA LOW FLOW FIXTURES
NATIVE/ ADAPTIVEPLANTINGS
PERMEABLEPAVING
BICYCLESTORAGE
Sustainability
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011 F X F O W L E
More collaborative work spaces for students.
Faculty more physically integrated with students.
Improved connection ofbuilding to campus.
More amenity spacesfor students.
Expanded shop anddigital facilities.
Improved egress and accessibility.
Programmatic Achievements - Site & Ground Floor
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011 F X F O W L E
More collaborative work spaces for students.
Faculty more physically integrated with students.
Improved connection ofbuilding to campus.
More amenity spacesfor students.
Expanded shop anddigital facilities.
Improved egress and accessibility.
Programmatic Achievements - Second Floor
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011 F X F O W L E
More collaborative work spaces for students.
Faculty more physically integrated with students.
Improved connection ofbuilding to campus.
More amenity spacesfor students.
Expanded shop anddigital facilities.
Improved egress and accessibility.
Programmatic Achievements - Third Floor
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011 F X F O W L E
More collaborative work spaces for students.
Faculty more physically integrated with students.
Improved connection ofbuilding to campus.
More amenity spacesfor students.
Expanded shop anddigital facilities.
Improved egress and accessibility.
Programmatic Achievements - Fourth Floor
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011 F X F O W L E
More collaborative work spaces for students.
Faculty more physically integrated with students.
Improved connection ofbuilding to campus.
More amenity spacesfor students.
Expanded shop anddigital facilities.
Improved egress and accessibility.
Programmatic Achievements - Fifth Floor
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
OPTION 1 - REMAIN IN RMH DURING CONSTRUCTION
+ relocation not required educational opportunity of proximity to construction site
- cost premium for phasing longer construction period dust and noise issues, risk to occupants multiple moves
OPTION 2 - RELOCATE TO OFFSITE SPACE DURING CONSTRUCTION
+ shorter construction period potential to get TSA out into community reduced risk to occupants simpli�ed logistics for LEED submittal
- cost for o�-site facility rental disconnection of students fom the campus increased distance to dormitories and other classes
fundraising biddesign construction
fundraising biddesign construction
Project Phasing
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
Concept Estimate
Renovation: 50,163 GSF @ $230 $ 11.5 M
New Construction: 17,363 GSF @ $300 $ 5.2 M
Site Improvements: 38,800 GSF @ $ 25 $ 1.0 M
Total Construction Cost: $ 17.7 M
Total Project Cost: Construction Cost x 1.35 $ 23.9 M
Construction Cost:Includes General Conditions, OH&P, Escalation to mid-point of construction, 10% ContingecyExclusive of soft costs, professional fees, FF&E, relocation expenses.
F X F O W L ERMH - CPEC PRESENTATION, JULY 14, 2011
The RMH Sustainable Strategies Project will...
Serve as a Demonstration Project/ Teaching Tool
Transform Architectural Education Attract the Best and Brightest Talent
Engage the New Orleans Community
Stimulate Research and Innovation
Enhance Leadership in Sustainability
Position Tulane at the Leading Edge
Recommended