PNGBiomassJointVentureASustainableandHighValueCleanEnergyProjectin
PapuaNewGuinea
Lae ChamberofCommerceandIndustryJune2016
• Background
• Market
• ProjectOutline
• FuelSupply
• LandownerOpportunities
• PowerPlant
• Environmental,SocialandEnvironmental
• Timing
• BenefitsforMorobe
2
Contents
3
Background
• PNGBiomassJVisasustainablepowerbusinessownedbyOilSearchLtd(OSL,strategicinvestor,70%)andAlignedEnergyLtd(AEL,projectdeveloperandoperator,30%)
• WehavebeenworkingcloselywithDepartmentsofForestry,AgricultureandLands;EnergyandPublicEnterprise;CEPA;ICCC;PNGFA;MarkhamlandownersandPNGPowerLimited(PPL)forover5years.OuroperationsandLOengagementcommencedin2010.
• TheJV’sfoundationproject,MarkhamBiomassIndependentPowerProducer(IPP),hasrecentlybeenapprovedafteramulti-yearcompetitivetenderprocess-- PowerPurchaseAgreement(PPA): 25-yeartermwithstate-ownedutility,PPL,signedDec2015aftera4-yearnegotiation process,asPPLdeveloped its“LowestCostDevelopmentPlanfortheRamuGrid”,offering PPLthemostreliable,flexiblegenerationmixandlowestrisk
- BiomassIPP: 15- 30MW(second15MWcalloption byPPL)biomass-fuelled IPPintheMarkhamValleynearLae,PNG’slargestindustrial centre.Firstpowertargetedlate2019
- RamuGrid: LargestandfastestgrowinggridinPNG.BiomassIPPisoneofthreenewIPPsselectedbyPPLfor theRamuGrid(total50MW +)supported withPowerPurchaseAgreements.
- Ramu 2contractorsshortlisted.(120MW)- Gridupgradewelladvanced.
BiomassIPP:“Anall-insolution”Alowrisk,worldclass,sustainablepowerbusinessforPNG
4
• Sustainableenergyconcept- In2010weasked:whatwouldbeapowersolutionforPNGthatbenefits boththeenvironmentandPNG?
• Markhamidealsite:firsttreesplantedin2010
• Commitment toPNG- OilSearchendorsedthepowersolutionduetoitsclearPNGbenefits
• Jan2012- Landowneragreements, trialplantationsandservicesagreementwithPNGForestryResearchInstitute
• May2012- MOUsignedwithPPLtoconductaFeasibilityStudywithintenttomovetoaPPA
• Dec2012- PPLcommencedanopen tenderprocess
• PPLcompetitive tenderprocesscommencedDecember2012- PPLcallforEOIsfor30- 40MWatLae- EOIsubmitted- ShortlistedforLae30MWsolutioninMarch2012- March2013:EngineeringProcurementandConstruction (EPC)contractorsselected- Fulltechnicalandfinancial(PPA)proposalsubmitted30th May2013(sixbidders intotal)
• 2.5yearsofnegotiation withPPL- PPASignedinDecember2015
• 6monthsFEEDentrypreparation infirsthalfof2016
Journey:CompetitionandCollaboration
5
6
Market
* CompoundAnnualGrowthRate (CAGR) ofrenewable powerinvestment over 10-years. 27.8%10year CAGRofrenewable power investment inAsia-Pacific, fromUS$12.9Bnin2004toUS$139.4Bnin2014
Source: UNEP,UNRenewable Energy Secretariat (REN 21),2015
• Renewablesinvestmentindevelopingcountries:- Nowmatchesdevelopedcountries(cUS$140billion)
- Butgrowingtwiceasfast(31%versus15%CAGR)*
• RenewablesinAsia-Pacific:- Approx.50%ofglobalmarket(cUS$140billion)
- Fastestgrowthglobally(28%CAGR)
Asia-Pacificlargestandfastestgrowing
7
• PapuaNewGuinea(PNG)- LargestPacificisland
- Population over 8million; >850indigenouslanguages
- LongtermrealGDPgrowth6.0-8.0%pa
• Resourcerich- 7%ofglobalbiodiversity;14%ofglobaltunastocks;2.6%ofglobalgoldproduction
- Resources70%ofexportearnings:copper,gold,nickel,silver,gas,petroleum
• Developmentpoor- 156/187onHumanDevelopmentIndex
- 25%ofchildrenunabletoattendschool- 75%dependentonsubsistenceagriculture
• Only13%ofpopulationhaveaccesstoelectricity*
ManypeopleinPNGdon’thaveelectricity
* AEL andPPLdatasuggest penetration couldbeas lowas 6%ofthepopulationSource: WorldBank; AEL
8
• PNGhasoneofthehighestpowertariffsglobally- Despitenaturalresources (hydro,biomass, sun,wind,oilandgas)
- Reliability ispoor
• Totalinstalledgenerationisonlyapproximately800MWfor8million+people- Threegrids:PortMoresby,Ramu,Gazelle
- Approximately50%ofgenerationisgridconnectedviaPNGPower
- Remainderoff-grid
• RamuGridisthelargestgridgeographicallyandhasthefastestdemandgrowth
Affordable,reliableelectricityrequired
Source: WorldBank; PNGPowerLimited(PPL);AEL
Generation InstalledCapacity(MW) Mix(%)
Hydro 148 19%HFO 281 36%Diesel 231 29%GasFired 75 9%Geothermal 56 7%Total 791 100%
9
10
BiomassisaProvenTechnology
In California:
• 25 Biomass Plants• Distributed in 20 Counties• Generation Capacity 565MWe
USA Renewable Energy Mix
• Growthdrivers
• Ongridgrowth- Residential: Currentlyalownumberofconnectionsduetoshortageofreliablepower
- Commercialandindustrial:MajorcentressuchasLae
- Resources:Majornewprojects
• Off-gridgrowth- Economically, itslikely30-40%ofthepopulationinremoteareasofPNGwillrequiremini-gridormicro-gridsolutions
- e.g.PVsolar,mini-hydro,cleanburningsolutions
PNGseeksatriplinginelectricitysupply
Source: PNGMedium termDevelopment Plan;ANZ, PoweringPNGintotheAsianCentury, 201511
ProjectnearLaewithPNG’slargestdemand
12
RamuGridcloseto50%ofPNG’spopulation
Source: AEL13 Confidential
14
ProjectOutline
• Integratedbusiness:fuelsupplyandpowerplant
• 25-yearpowerpurchaseagreement(PPA)inplacewithPNGPower
• 30MWnet(15MW+15MW)biomasspowerstationtoenergizetheRamuGridclosetoLae
• Reliable,sustainablebaseloadpowerfortheindustrialportcityofLae(notdependentonnewloadsorconnections)
• Non-subsidisedcompetitivelypricedpower
• Oneoftheregion’slargestrenewableenergyprojects
MarkhamValleyBiomass:sustainablepower
15
16
Currentunderutilisedkunaigrasslands
FlatalluvialplansintheMarkhamValley
Existinginfrastructure• SealedHighlandsHighway• Underneath132kVtransmissionlineforoperations;and22kVlineforconstruction
• NearErapswitchingstation• 60kmfromLae• ClosetoMarkhamRiver
Existingraintree(exoticweedtree)
Projectideallypositioned:“Allinsolution”Nootherexpenditure needed forgridconnection
17
FuelSupply
18
Successfultrialnurseriesandplantations
* NurseryphotoascaleIndonesianexample
• Newplantationsareunderdevelopment;335hectaresestablishedtodate
• Planfor16,000to18,000haofnewlygrown,dedicatedfuelwoodplantationsfor30MW(net)
• Shortrotationhighyieldingtreeplantations(EucalyptusandAcacia)
• InitialfuelfromexistingRainTree(introducedexoticweedthatPNGFAseektoremove)
• ForestOperationstobemanagedtoForestStewardshipCouncil- ForestManagementcertificationstandards
• LaeandlocalcommunitynurseriesdevelopedjointlywithPNGFRIandlocallandowners
ConstructionofCentralNursery
19
ConstructionofCentralNursery:
• Capacityof8,000,000plantsperannum
• ClonalPropagationusingimportedtechnology
20
EarlyFuelfromRaintree
Plantationafter18monthsPlantingoperations
Speciestrials
Plantationsafter2years(left)and3years(right)
Source: Aligned Energy; Poyrygrowthaudits
Pre-investmentinnurseriesandplantations
21
22
LandownerOpportunities
• FormationofBusinessGroup,currentlybeingdevelopedwithLandownersandIPA
• EnablingActiveParticipationintheproject
• Rentalpaymentsbasedonarea
• Royaltypaymentstobebasedonharvesting
23
RentalandRoyalty
• Projectwillprovideaminimumof500directFTEjobs,themajorityforlocalstaff
• Projecttoprovidetrainingforestandpowerplantmanagement
• Businessopportunities- CommunityNurseries- Planting- Herbicide- LandPreparation- Maintenance- Harvesting- Transport
24
LocalEmployment
• PlantingCropsbetweentreesatestablishment
• Cropsinclude:- Melons- Cucumbers- Pumpkin- Maize
• IncreasedfoodsecurityfortheMarkham
• LocalBusinessOpportunities
• Example:- FromJanuarytoApril2016theGanef ClanmadePGK15,315(net)fromgrowingcucumber,watermelonandcassavafrom6haoftreeplantations
25
Intercropping/FoodSecurity
• PNGBiomassprovidesaplatformforlandownerstodevelopotherbusinessopportunities
• PNGBiomassworkingwith:- SPBreweries- Trukai
26
AgribusinessOpportunities
• Whentreesgettoacertainsize,typically18to24months,itispossibletograzecattleundertheplantations.
• KeepingthecattlefarminghistoryoftheValleyalive.
27
Grazing
• PNGBiomassisworkingwitharangeofproviderstoprovideoff-gridpowersolutionstoMarkhamValleyCommunities,theseinclude:- Biolite (stoves)- AfricanCleanEnergy(stove)- Dlight (solarlightandpower)- SunKing(solarlightandpower)
28
LocalOffGridPowerSolutions
29
PowerPlantTechnology
Powerplant:Lowrisktechnology
• 15MW(net,18MWgross)thermalpowerplantby2019,scalableto30MW(2x15MWnet,2x18MWMWgross)
• ProvenTechnology>93GWglobally*
• Plantationtruckstologyard,logschipped,mechanisedfuelhandlingandchipping,boilerandsteamturbine
• MeetWorldBankEmissionStandardsandcomplytolocalregulations
• Highreliability
• FinalstagenegotiationswithpreferredEPC(engineering,procurementandconstruction)contractorfromglobaltender
• EPCcontractbackedby7+yearoperationsandmaintenance(O&M)agreement
* UNEP,REN21Report,MarketandIndustryTrends,2014;93GWofbio-powercapacityfromsolid,liquidandgaseousbiomassfuels;ledbyUSA,Germany,China,BrazilandJapan
30
31
Technology
FlowDiagramClean,endorsedbyCEPA(Level2)
32
33
SteelErection
34
SteamTurbineGenerator
35
BoilerandTurbineBuildingErection
36
InstallingBoilerGeneratingBankTubes
37
TubularAirheater &EconomiserModules
38
ElectrostaticPrecipitatorErection
39
FinishedPlant
40
FuelHandlingandStorageChipperBuilding,InfeedDeck,KnuckleBoom
41
FuelStorageandReclaim
42
Environmental,SocialandEconomics
Sustainablepower:CO2 Cycle
• CO2 mitigation:190,000tonnesperannum;4,750,000tonnesoverProjectlife
• Targetingpremiumcarbonmarkets
• WorkingwiththeSouthPoleGrouponafour-phaseprojectdevelopment:- AnalysisofOptions (complete)- Twodrivers: fuelswitchandforestry increaseincarbonstock
- Auditofcurrentdatacollection- Projectregistration- Auditing process
• Environmentally,sociallyandeconomicallysustainable
• Highreputationprojectattractivetointernationalfinanciers(debtandequity)
43
• Properaccountingfortheimpactofotheremissions(NOx andSOx)showsthatemissionintensitiesforcoalandHFOaremuchhigherthannormallyquoted
• BiomassisaloweremissionintensityfuelregardlessofwhetherNOX impactsareincluded
• Coalcontains(evenifclean)muchmoresulphurthanotherfuels,andhasSOx emissionsordersofmagnitudeabovenaturalgasorbiomass
44
Impact:Biomassisveryclean,andrenewableLowemissionsofSOxandNOx
Impact:Governmentpolicy
• PartofasustainableandlowcostpowerportfoliosolutionfortheRamuGrid
• TheprojectwillmeetadditionalkeyStatePolicyobjectives- NationalClimateChangeCompatibleDevelopmentManagementPolicy- Materialeconomic,socialandsustainabilitybenefitsforlocalcommunitiesintheMarkhamValley,creating~500ongoingjobsintheproject(~5,000nationally)
• StrongsupportandcompliancewithPNGGovernmentPolicyforcreatingruralemployment- Increasesinruralprosperity- Improvementsinagriculturalsector
• TheproposedIPPprojectstronglysupportsthreeofthesevenpillarssetoutinthePNGVision2050:- EnvironmentalSustainabilityandClimateChange- HumanCapitalDevelopment,Gender,YouthandPeopleEmpowerment- WealthCreation
45
Parameter Benefit (first30-40MW)
Destinationoffuelpayments Biomass- mostfuelcostsgointothePNGeconomyHFO/Diesel- mostfuelcostsgooffshore
ConstructionphasebenefitstoPNGeconomy K100+Million
OperatingphasebenefitstoPNGeconomy K67millionperyear
Landownerandcommunitybenefits:DirectpaymentsIncludingmultiplierimpactsLocalemploymentboost
Including health,education,roads,power:K6millionperyearK24millionperyear850FTEjobs
PowerpricecostsavingsforCustomers(Over10years)comparedtodiesel/PPLgeneralsupplytariff K900million
Operationsphaseemploymentimpacts:DirectNational(includingmultiplierimpact)
480DirectFTEpositions created intheMarkham4,750FTEpositionscreated(mostlyinMorobeandLae)
CO2 mitigation - peryearoverprojectlife(25years)
190,000 tonnes4,750,000tonnes
Diesel/HFOconsumption avoidedoverprojectlife 10+ millionBarrels
InternationalSustainabilitycertification GovernmentandStakeholderReputationBenefits
Engagement ofmarginalisedgroups JVhashiredwomen,youthsandlandownersforemploymentandparticipation;positivemediaprofile
Source: EconomicsConsultingServices;40MW.30MWIPPreduceslightly,butemploymentremainsatthelevelsforecast
Impact:Social,economicandenvironmental500jobs,Kinapricing,rental,royalties,localbusinessdevelopment
46
Timing
47
Timing
48
Front End Engineering and Design AUGUST 2016
Design and Final Cost JANUARY 2017
Final Investment Decision MARCH 2017
Construction Commences JULY 2017
Construction 24 to 26 MONTHS
Plant on Grid JULY 2019
BenefitsforMorobe
49
• Cheapersustainablebaseloadpower- Pricesnotimpactedbyfuturecarbontaxes- Pricesnotimpactedbyfuelimportcostincreases- PricelargelyKinabased
• LongTermLocaljobs>500direct>4000indirect
• LandownerOpportunities
• Foodsecurity(intercropping,cattle)
• Associatedvalueaddedindustries(eg woodproducts)
• BusinessAdvantagebyhavinggreenpower
• ConstructionandSupplyChainOpportunities
50
BenefitsforMorobe
• Major Construction Equipment- 1 x 235-ton crawler (5 to 6 months)- 1 x 75-ton crane (6 to 7 months)- 2 x All terrain forklifts (6 to 7 months)- 2 x Man Lifts (6 to 7 months)- 1 x Air Compressor- 1 x Lot Scaffolding- 2 x Gas/Diesel Welders & (2) 8-pack Welders
• 1 x Jobsite Trailer
• 2 x 40 ft. Tool Trailers• Ablutions• 120 peak accommodation plus transport and meals• Consumables
• Boiler start up chemicals• Seismic and water drilling• Foundation drilling and civils• Labour
• Transport and Logistics
51
ConstructionOpportunities