A F T D R - Keep It Moving Dallas 4 - PLANO... · 2374-01-137: miller road to west of the kcs rr...

Preview:

Citation preview

TEXAS DEPARTMENT OF TRANSPORTATION

FAX (214) 739-0095

TEL (214) 346-6200

RICHARDSON, TEXAS 75081-2275

1201 NORTH BOWSER ROAD

PRELIMINARYFOR INTERIM REVIEW ONLY

P.E. NO. DATENAME

N.T.S.

P.E. NO. DATENAME

LEGEND:

DALLAS DISTRICT

TXDOT DALLAS DISTRICT

R

VERTICAL SCALE:

HORIZONTAL SCALE:

3020100 40

4003002001000

TEXAS COUNTY MAP

N.T.S.

LOCATION MAP

THESE DOCUMENTS ARE FOR INTERIM REVIEW AND

NOT INTENDED FOR REGULATORY APPROVAL, PERMIT,

BIDDING OR CONSTRUCTION PURPOSES. THEY WERE

PREPARED BY OR UNDER THE SUPERVISION OF:

MATTHEW G. CRAIG 69910

CHAD R. GARDINER 93793

EXISTING ROW

EXISTING PROPERTY LIMITS

POTENTIAL DISPLACEMENTS

PROPOSED ROW

PROPOSED EDGE OF PAVEMENT

PROPOSED PRELIMINARY NOISE WALL

PROPOSED BRIDGE BENT

PROPOSED BRIDGE ABUTMENT

EXISTING STORM SEWER

DIRECTION OF TRAVEL

PROPOSED CULVERT

PROPOSED BRIDGE

PROPOSED FRONTAGE ROAD

PROPOSED CROSS STREET

PROPOSED MAIN LANES

PROPOSED RAMP

EXISTING EASEMENT

PROPOSED SIDEWALK

PROPOSED ACCESS DENIAL

PAVEMENT / BRIDGE TO BE REMOVED

PROPOSED RETAINING WALL

PROPOSED MANAGED LANES

DALLAS COUNTY, TEXAS

GA

RL

AN

D

AV

E

CE

NTER

VILLE R

D

LA PR

AD

A

DR

TOWN EAST BLVD

GR

EE

NVI

LL

E

AV

E

SKILL

MA

N ST

PROPOSED CENTERLINE/BASELINE

EXISTING 100 YR FLOODPLAIN LIMITS

EXISTING BRIDGE TO REMAIN

EXISTING PLANIMETRIC FEATURES

EXISTING TOPOGRAPHIC CONTOURS (5-FT INTERVALS)

GENERAL NOTES:

TRAFFIC DIAGRAM

95% DRAFTPreliminary, Subject to Change

TYPICAL SECTIONS

12-12-2016

12-12-2016

HORIZONTAL ALIGNMENT DATA PROPERTY OWNERS

EXISTING ROADWAY TO REMAIN

STA 640+00

BEGIN CSJ: 2374-01-137

END CSJ: 2374-01-183

STA 468+00

CSJ: 2374-01-183

BEGIN IH 635 PROJECT

STA 1060+98

END CSJ: 2374-02-053

END IH 635 PROJECT

TEXAS DEPARTMENT OF TRANSPORTATION

FAX (214) 739-0095

TEL (214) 346-6200

RICHARDSON, TEXAS 75081-2275

1201 NORTH BOWSER ROAD

PRELIMINARYFOR INTERIM REVIEW ONLY

P.E. NO. DATENAME

N.T.S.

P.E. NO. DATENAME

DALLAS DISTRICT

TXDOT DALLAS DISTRICT

R

VERTICAL SCALE:

HORIZONTAL SCALE:

3020100 40

4003002001000

TEXAS COUNTY MAP

N.T.S.

LOCATION MAP

THESE DOCUMENTS ARE FOR INTERIM REVIEW AND

NOT INTENDED FOR REGULATORY APPROVAL, PERMIT,

BIDDING OR CONSTRUCTION PURPOSES. THEY WERE

PREPARED BY OR UNDER THE SUPERVISION OF:

MATTHEW G. CRAIG 69910

CHAD R. GARDINER 93793

DALLAS COUNTY, TEXAS

C 2016 by Texas Department of Transportation all rights reserved

ROYAL LN/MILLER RD

JAMES K. SELMAN, P.E., DISTRICT ENGINEER

GA

RL

AN

D

AV

E

CE

NTER

VILLE R

D

LA PR

AD

A

DR

TOWN EAST BLVD

GR

EE

NVI

LL

E

AV

E

SKILL

MA

N ST

STA 640+00

BEGIN CSJ: 2374-01-137

END CSJ: 2374-01-183

STA 468+00

CSJ: 2374-01-183

BEGIN IH 635 PROJECT

STA 1060+98

END CSJ: 2374-02-053

END IH 635 PROJECT

ROYAL LN/MILLER RD

C 2016 by Texas Department of Transportation all rights reserved

JAMES K. SELMAN, P.E., DISTRICT ENGINEER

STA 780+00

BEGIN CSJ: 2374-02-053

END CSJ: 2374-01-137

STA 780+00

BEGIN CSJ: 2374-02-053

END CSJ: 2374-01-137

TBPE FIRM #F-312

HALFF ASSOCIATES, INC.

P.E. NO. DATENAME

TBPE FIRM #F-312

HALFF ASSOCIATES, INC.

P.E. NO. DATENAME

12-12-2016

PARCEL ID100

PROPOSED ROW (BY OTHERS)

PROPOSED TRAFFIC BARRIER

PROPOSED DRAINAGE EASEMENT

TEMPORARY CONSTRUCTION EASEMENT

IH 30

E. OF US 75

TO S. OF IH 30

W. OF GUS THOMASSON RD

TO E. OF GALLOWAY AVE

SCHEMATIC ROLLS:

AVERAGE

EXISTING ACCESS DENIAL

11.2 MILES 2.1 MILES

EXISTING TELEPHONE / CABLE / FIBER LINE

EXISTING WATER LINE

EXISTING ELECTRIC LINE

EXISTING SANITARY SEWER LINE

EXISTING GAS / PETROLEUM LINE

TRAFFIC LEGEND:

YEAR 2022 ADT

YEAR 2042 ADT

YEAR 2052 ADT

SIGNALIZED INTERSECTION

XX,XXX

XX,XXX

PERPENDICULAR CURB RAMP

PARALLEL CURB RAMP

DIRECTIONAL CURB RAMP

* FRONTAGE ROAD, CROSS STREET, DIRECT CONNECTOR, AND RAMP

PROFILES FOUND ON ROLLS 11 THROUGH 24.

15 MPHTURNAROUNDS:

40 MPH

FRONTAGE ROAD CONNECTORS:

FRONTAGE ROADS/BYPASSES:

60 MPH

40 MPH

40 MPH

30 MPH

40 MPHLOCAL STREETS:

RAMPS:

DIRECT CONNECTORS:

MAIN LANES: 60 MPH

MANAGED LANES:

12-12-2016

12-12-2016

XX,XXX

12-12-2016

18 MPHSHARED USE PATHS:

IH 30

E. OF US 75

TO S. OF IH 30

W. OF GUS THOMASSON RD

TO E. OF GALLOWAY AVE

SCHEMATIC ROLLS:

11.2 MILES 2.4 MILES

* FRONTAGE ROAD, CROSS STREET, DIRECT CONNECTOR, AND RAMP

PROFILES FOUND ON ROLLS 11 THROUGH 24.

15 MPHTURNAROUNDS:

40 MPH

FRONTAGE ROAD CONNECTORS:

FRONTAGE ROADS/BYPASSES:

60 MPH

40 MPH

40 MPH

30 MPH

40 MPHLOCAL STREETS:

RAMPS:

DIRECT CONNECTORS:

MAIN LANES: 60 MPH

MANAGED LANES:

18 MPHSHARED USE PATHS:

TRAFFIC:

DAILY

2374-02-053

2374-01-137

2374-01-183

236,950 (2022)

224,200 (2022)

263,250 (2022)

318,600 (2042)

301,850 (2042)

353,550 (2042)

TRAFFIC:

DAILY

AVERAGE

2374-02-053

2374-01-137

2374-01-183

236,950 (2022)

224,200 (2022)

263,250 (2022)

318,600 (2042)

301,850 (2042)

353,550 (2042)

DESIGN SCHEMATIC

IH 635 LBJ EAST PROJECT - ULTIMATE DESIGN

FROM EAST OF US 75 TO SOUTH OF IH 30

DALLAS COUNTY, TEXAS

CSJ LIMITS:

2374-01-183: EAST OF US 75 TO MILLER ROAD

2374-01-137: MILLER ROAD TO WEST OF THE KCS RR

2374-02-053: WEST OF THE KCS RR TO IH 30

DECEMBER 2016

ROLL OF 24

DESIGN SCHEMATIC

IH 635 LBJ EAST PROJECT - ULTIMATE DESIGN

FROM EAST OF US 75 TO SOUTH OF IH 30

DALLAS COUNTY, TEXAS

CSJ LIMITS:

2374-01-183: EAST OF US 75 TO MILLER ROAD

2374-01-137: MILLER ROAD TO WEST OF THE KCS RR

2374-02-053: WEST OF THE KCS RR TO IH 30

DECEMBER 2016

ROLL OF 24

STA 47+00.00

BEGIN IH 30 IMPROVEMENTS

STA 47+00.00

BEGIN IH 30 IMPROVEMENTS

STA 155+60.68

END IH 30 IMPROVEMENTS

STA 155+60.68

END IH 30 IMPROVEMENTS

1. EXISTING FEATURES WERE NOT FIELD SURVEYED. SCHEMATICS ARE BASED

ON AERIAL SURVEYS DATED JANUARY 21, 2013 AND RECORD PLANS.

2. TRAFFIC VOLUMES AND METHODOLOGY APPROVED BY TP&P ON

OCTOBER 12, 2016.

3. MEDIAN OPENINGS WERE DETERMINED IN COORDINATION WITH LOCAL

GOVERNMENT. FINAL LOCATION OF MEDIAN OPENINGS WILL BE DETERMINED

IN THE PS&E DEVELOPMENT PHASE IN COORDINATION WITH THE LOCAL

GOVERNMENTS.

4. SIDEWALK INTERSECTION ADA RAMP LOCATIONS ARE PRELIMINARY

AND SUBJECT TO CHANGE. FINAL LOCATIONS TO BE DETERMINED DURING

PS&E DEVELOPMENT.

5. DRIVEWAY LOCATIONS ARE PRELIMINARY. FRONTAGE ROAD DRIVEWAY

RETURN RADII ARE R=15' MINIMUM OR R=25' DESIRABLE UNLESS NOTED

OTHERWISE ON EACH SCHEMATIC ROLL. FINAL DRIVEWAY DESIGN TO BE

DETERMINED DURING PS&E DEVELOPMENT.

6. ACCESS DENIAL LIMITS ARE DETERMINED BY PROVIDING SAFETY TO

THE TRAVELING PUBLIC, MAINTAINING LEVEL OF SERVICE ON THE

FRONTAGE ROADS, AND MAINTAINING SAFE ACCESS TO ADJACENT

PROPERTY OWNERS. ACCESS DENIAL LIMITS MAY BE ADJUSTED BY

PROVIDING TRAFFIC IMPACT ANALYSIS (TIA) BY THE ADJACENT

PROPERTY OWNERS AND AVOIDING LANDLOCK ISSUES AS LONG AS

THE SAFETY TO THE TRAVELING PUBLIC IS NOT COMPROMISED.

7. EXISTING PAVEMENT/BRIDGES LOCATED WITHIN LIMITS OF PROPOSED

RECONSTRUCTION WILL BE REMOVED (UNLESS NOTED OTHERWISE).

8. SUPERELEVATION AXIS OF ROTATION IS ABOUT THE PGL.

9. CURBS ON FRONTAGE ROADS AND CROSS STREETS ARE TYPE II

(UNLESS NOTED OTHERWISE).

10. DIMENSIONS ARE TO THE EDGE OF PAVEMENT OR NOMINAL FACE OF CURB,

RAIL, BARRIER, OR WALL (UNLESS NOTED OTHERWISE).

11. APPROXIMATE 100 YEAR FLOODPLAIN LIMITS ARE BASED UPON FEMA

FLOOD INSURANCE RATE MAPS 48113C0345J AND 48113C0485J (2014).

12. EXISTING CULVERT LOCATIONS, SIZE, AND ELEVATIONS OBTAINED FROM

RECORD DOCUMENTS AND ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY.

13. CONVENTIONAL ROADWAY SIGNAGE (SMALL SIGNS) ARE NOT SHOWN AND

WILL BE DEVELOPED DURING THE PS&E PHASE OF THE PROJECT.

14. OWNERSHIP INFORMATION SHOWN ON SCHEMATIC OBTAINED FROM

DALLAS COUNTY APPRAISAL DISTRICT (JUNE 2016).

15. BUILDINGS ARE SHOWN AS POTENTIAL DISPLACEMENT IF THE PROPOSED

ROW PHYSICALLY INTERSECTS THE EXISTING BUILDING STRUCTURE.

ACTUAL DAMAGES TO THE BUILDING AND PROPERTY TO BE

DETERMINED DURING THE ROW ACQUISITION PROCESS.

16. ALL SUPERELEVATION RATES WERE CALCULATED BASED ON USING A MAXIMUM

SUPERELEVATION RATE OF 6%. SEE CHAPTER 2, SECTION 4 OF THE TXDOT

ROADWAY DESIGN MANUAL FOR REFERENCE.

17. LOW SPEED ROADWAYS HAVE A NC OF +/-2% AND HIGH SPEED MAIN

LANES HAVE A NC OF +/-2.5% UNLESS NOTED OTHERWISE ON EACH ROLL

IN THE SUPERELEVATION TABLES.

18. MINOR CROSS STREET CORNER RADII ARE R=25' UNLESS NOTED OTHERWISE

ON EACH SCHEMATIC ROLL.

19. MAJOR CROSS STREET CORNER RADII ARE R=50' UNLESS NOTED OTHERWISE

ON EACH SCHEMATIC ROLL.

20. U-TURNS WERE DESIGNED TO ACCOMMODATE A WB-67 DESIGN VEHICLE. CORNER

RADII VARY PER INTERSECTION DUE TO THE DIFFERENCES IN SKEW.

21. TRAVEL LANE WIDTHS SHOWN IN THE TYPICAL SECTIONS THAT ARE LESS THAN

10' WIDE ARE DUE TO TRANSITIONS TO/FROM EXISTING PAVEMENT AND NOT DUE

TO A DESIGN DEFICIENCY.

URBAN INTERSTATE URBAN INTERSTATE

2.0%1 1

LB

LN

11'

LN

11'

LN

11'

LN

11'

LN

11'

LN

11'

LN

11'

LN

11'

LN

EXP

11'

LN

EXP

11'5' 5'

3' 3'

L

PYLON PYLON

2.08% 1.56% 1.56% 2.08%

EX ROW VARIES 330'-884'

C IH635

SHSH

69'-84' EX PAVEMENT 69'-84' EX PAVEMENT

1 1

LN

AUX

LN

AUX

HS

4'

LN

14'

SH

8'

26'

NOTES:

4:1 MAX

6:1 DESIRABLE

3:1 MAX

4:1 DESIRABLE

1

2

3 4' DIAMETER BRIDGE COLUMN

EXI

ST

RO

W

EXI

ST

RO

W

PGL

(MIRROR FOR EB)

1-LANE RAMP

PROPOSED IH 635

STA 551+00 TO STA 812+00

EXISTING IH 635

WB MAIN LANES EB MAIN LANES

LN LN LNLN LN LN LN

10'

LN

10'

LN

10'

LN

10'

LN LN

10'10'

33'33' 15'

1' 2'1'2'

LNSW

EXI

ST

RO

W

10'-19'

SW

5'-32'23.5'-43' 23.5'-33'

VAR VAR

EXI

ST

RO

W

10'-25'

VAR VAR

62'

11'

LN

2.0%

1'2'24'

28'

SWUTURN

2.0%

2'

62'

11'

LN

1'11'

LN

11'

LN

61'

11'14'

LN

2.0%

1'

2.0%

11'

LN

2'2'24'

28'

UTURN

2.0%

LN

11'

LN

2'

61'

11' 14'

LN

1'11'

LN

2' 2'24'

28'

UTURN

2.0%

LN

11'

LN

2'11'

LN

11'

LN

1

1

1

PGL

LC PKIN

PGL

LC PJUP

10'

25'

5'

2.0% 2.0% 1

2'24'

28'

UTURN

2'

25'

10'

SW

5'

3

11'

LN

11'

LN

25'

SW

10'5'

25'

10'

SW

5'

3

12'

6'

LN

11'11'

LN

LN LN LNLN

11'

LN

11'

LN LN LN SW

6'

SW

6'

STA 17+83.92 TO STA 24+15.56

EXISTING JUPITER ROAD

STA 17+83.92 TO STA 24+15.56

PROPOSED JUPITER ROAD

LN

10'

LN LNLN

1.56% 1.56%

10'

44'44'

11'

LN

11'

LN

6'

LN LN

10'

1' 1'

SW

6'

SW

6' 10' 11'

1'

11'

1'0'-1'0'-1'

33'-44'

0'-1'0'-1'

33'-44' 10'-34'

EXI

ST

RO

W

VAR VAR

STA 24+15.56 TO STA 27+00.18

STA 14+00.44 TO STA 17+83.92

EXISTING JUPITER ROAD

LNLNLN

11'

LN LN LN LN

11'

LN

LC PJUP

PGL

LN

34'-61'

SW SW

0'-1'

LN

11'

LN

11'11'-14'

LN

0'-1' 0'-2'

15'-26'

EXI

ST/

PR

OP

RO

W 15'-19'

EXI

ST/

PR

OP

RO

W

STA 24+15.56 TO STA 27+00.18

STA 14+00.44 TO STA 17+83.92

PROPOSED JUPITER ROAD

1 1

LNLNLN LN LN LN LNLN

LC PKIN

PGL

6'-32'

LNSW SW

0'-1'

0'-14'

LN

0'-17'*

0'-15'

23.5'-62' 23.5'-73'

TYP

10'

PR

OP

RO

W

1 1

11' 11'

LN

EXI

ST/

PR

OP

RO

W

11'11'

0'-17'**

*17'

*17'

4'-34'

11'-14'

0'-2'

33.5'-72'

10'-40'

EXI

ST

RO

W

2.0% 2.0%

2.0% 2.0%

CTB

12' 12'

C PIH635L

12'10'

SH LN LN LN LN

12'

SH

10'

SH

10'

LNLN

12'

LN

12'

LN

12'

LN LN

10'

SHSH

10'12'

LNLN LN LN

12'

LN

12'

LN

12'

SH

10'0-12'

2'

11' 14'

1'2' 1'

11'14'

28'-39' 80'-92' 38'38'

6'

LNLNLN LNLNLN SWSW

6'

EXI

ST/

PR

OP

RO

W

EXI

ST/

PR

OP

RO

W

4' 4'

EB GEN PURPOSE LNS EB FRONT RDEB MAN LNSWB MAN LNSWB GEN PURPOSE LNSWB FRONT RD

15'

TYPTYP

15'

HS

HS

L LB PWB635GP B PEB635GPL B PEB635FRL

28'-39'4'

12' 12' 12'

80'-92'

0-12'

PGL

2.0%

2.5%(TYP)

PGL

11

1.5%

PGL

2.5%(TYP)

2.0%111.5%

PROP ROW VARIES 378'-545'

2'-34' 2'-18'

CTB

CTR CTR

RETAINING WALLRETAINING WALL(3)(3)

(1)

(1)

(2) (2)

3'

3

4'

3

4'3'

3

4'3' 4'

3

3'

0'-1'

STA 26+23.19 TO STA 33+45.79

STA 16+15.03 TO STA 19+21.08

EXISTING WALNUT HILL LANE/KINGSLEY ROAD

**OUTSIDE 17' LANE STRIPED OFF FOR FUTURE USE

*OUTSIDE 17' LANE STRIPED OFF FOR FUTURE USE

STA 26+23.19 TO STA 33+45.79

STA 16+15.03 TO STA 19+21.08

PROPOSED WALNUT HILL LANE/KINGSLEY ROAD

STA 19+21.08 TO STA 26+23.19

EXISTING WALNUT HILL LANE/KINGSLEY ROAD

EB GP PGL CONTROLS FROM STA 606+96 TO STA 655+21

FROM STA 721+63 TO STA 765+68

WB GP PGL CONTROLS FROM STA 602+53 TO STA 653+89

STA 752+21 TO STA 809+20

STA 689+34 TO STA 747+12

STA 642+27 TO STA 685+64

PROPOSED IH 635 CTB(1)

EB GP PGLWB GP PGL

CTB(1)

*OUTSIDE 17' LANE STRIPED OFF FOR FUTURE USE

STA 19+21.08 TO STA 26+23.19

PROPOSED WALNUT HILL LANE/KINGSLEY ROAD

B PWB635FR-A

12' 12'

C PIH635L

12'10'

SH LN LN LN LN

12'

SH

10'

SH

10'

LN

12'

LN

12'

LN

12'

LN LN

10'

SHSH

10'12'

LNLN LN LN

12'

LN

12'

LN

12'

SH

10'0-12'

2'

11' 14'

1'2' 1'

11'14'

28'-39' 80'-92' 38'38'

6'

LNLNLN LNLNLN SWSW

6'

EXI

ST/

PR

OP

RO

W

EXI

ST/

PR

OP

RO

W

4' 4'

EB GEN PURPOSE LNS EB FRONT RDEB MAN LNSWB MAN LNSWB GEN PURPOSE LNSWB FRONT RD

15'

TYPTYP

15'

HS

HS

L LB PWB635GP B PEB635GPL B PEB635FRL

28'-39'4'

12' 12' 12'

PGL

2.0% 11.5%2.0%1 1.5%

PROP ROW VARIES 378'-545'

CTB

CTR CTR

(1)

(2)(2)

WB GP PGLCTB

(1) CTB(1)

EB GP PGL

B PWB635FR-A

SH

14'

LN

8' 4'

HS

26'

2'

ACCESSMAN LN

80'4'

LIMITS SHOWN IN TYPICAL SECTIONS

(3) SEE PLAN VIEW FOR RETAINING WALL

CLEAR ZONE PROVIDED)

(CTR NOT REQUIRED WHEN UNOBSTRUCTED

(2) CTR: CONCRETE TRAFFIC RAIL

(1) CTB: CONCRETE TRAFFIC BARRIER

2'-28 2'-78'

22'-27'7'-21'

VARIES VARIES

6'-24'

CTR(2)

WB GP PGL CONTROLS FROM STA 721+63 TO STA 765+68

STA 747+12 TO STA 752+21

PROPOSED IH 635

550

555

565

570

575

575

575

575

575

575

575

580

580

580

580

580

580

580

580

580

580

580

580

580

580

580

580

580

580580

580

585

585

585

585

585

585

585

585

585585

585

585

585

585

585

585

585

585

585

585

585

585

585

585

585

585

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

590

595

595

595

595

595

595

595

595

595

595

595

595

595

595

595

595

600

600

600

600

600

600

600

600

600

600

600

600

600

600

605

605

605

605

605

605

605

605

605

605

610

610

610

610

610

610

610

610

Pool

Pool

Pool

Pool

Pool

Pool

PileD

irt

PileD

irt

PileD

irt

T

T

T

T

T

T

TT

TT

T

T

T

T

T

T

T

T

T

T TT

T

T

T

TT

T

T

T

TT

T

T T

T

T

T T

T

T

T

T

T

T

T

T

T

s

s s

s

s

ss

s

s

s

s

s

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODEN

O C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

NO C

ODE

192

215

190

216

213

217

191

207

199

218

198193

201

188

187

204

194

189

196

212

202

205

197

211

209

203

210

200

208

195

214

206

514

515

215

516

517

519

518

520

521

15+00

20+00

25+00

30+00

10+00

15+00

20+00

10+00

15+00

20+00

25+00

10+00

15+00

20+00

25+00

10+00

15+00

20+00

25+00

30

+00

10+00

15+00

10+0

0

15+0

0

10+00

15+00

10+00

15+00

25+00

10+00

15+00

20+00

10+00

15+00

20+00

695+00

700+00 705+00 710+00 715+00 720+00 725+00

730+00

735+00

740+00

745+00

750+00

755+00

760+00

765+00

695+00

700+00 705+00 710+00 715+00 720+00

725+00

730+00

735+00

740+00

745+00

750+00

755+00

760+00

765+00

700+00

705+00710+00

715+00720+00

725+00

730+00735+00

740+00

745+00

750+00

755+00

760+00765+00

770+00

695+00

700+00 705+00 710+00 715+00 720+00 725+00

730+00735+00

740+00

745+00

750+00

755+00

760+00

765+00

10+00

15+00

20+00

25+00

30+00

35+00

10+00

15+00

20+00

695+00

700+00

705+00

710+00

715+00

720+00

725+00

730+00

735+00

740+00

745+00

750+00

755+00 760+00

765+00

ESTATE LN

KIN

GSL

EY RD

AM

AN

DA LN

PE

GA

SU

S

ST

RD

S JUPIT

ER

KCS RAILROAD

WALN

UT

HIL

L LN

WIC

KERS

HA

M

RD

STA 746+73BEGIN BRIDGE

STA 752+15END BRIDGE

L

L

VPI STA = 723+00.00

EL = 602.03

(+)2.5

0%

(+)2.0

0% L = 200.00

K = 400

ex = -0.12'

VPI STA = 729+70.00

EL = 615.43

(+)2.0

0% (-)2.49%

L = 700.00

K = 156

ex = -3.93'

VPI STA = 737+85.00

EL = 595.11

(-)2.49% (+)3.0

0%

L = 750.00

K = 137

ex = 5.15'

VP

C

ST

A 726

+20.00

EL

=608.43

VP

T

ST

A 733

+20.00

EL

=606.70

VP

C

ST

A 734

+10.00

EL

=604.46

VP

T

ST

A 741

+60.00

EL

=606.36

599.53

601.90

604.03

606.03

608.03

609.82

610.99

611.51

611.39

610.63

609.23

607.19

604.71

602.51

601.04

600.31

600.31

601.03

602.50

604.69

607.56

610.56

613.55

614.15

611.15

EL

=599.53

VP

C

ST

A 722

+00.00

EL

=604.03

VP

T

ST

A 724

+00.00

STA 726+43BEGIN BRIDGE

STA 731+67END BRIDGE

VPI STA = 749+60.00

EL = 630.35

(+)3.0

0% (-)3.00%

L = 950.00

K = 158

ex = -7.12'

VP

C

ST

A 744

+85.00

EL

=616.10

VP

T

ST

A 754

+35.00

EL

=616.10

616.55

619.13

621.09

622.42

623.11

623.17

622.61

621.40

619.57

617.11

VPI STA = 759+00.00

EL = 602.15

(-)3.00% (+)0.87%

L = 550.00

K = 142

ex = 2.66'

VP

C

ST

A 756

+25.00

EL

=610.40

VP

T

ST

A 761

+75.00

EL

=604.54

608.35

606.23

604.81

604.10

604.09

604.76

605.63

606.50

607.37

PWB635GP STA 752+47.09, 24.00' RT

STA 27+62.28, EL. 620.80'=

WB RAMP MRWENWH

PWB635GP STA 726+18.00, 94.00' LT

STA 19+73.66, EL. 608.41'=

WB RAMP PRWXPLA

PWB635GP STA 752+11.73, 91.02' LT

STA 16+49.51, EL. 620.72'=

WB RAMP PRWEGAR

C PIH635 STA 721+49.47, EL. 599.91

SHIFT PIH635 PGL 52' LT TO PWB635GP PGL

B PWB635GP STA 721+63.00, EL. 598.60=

BEGIN PWB635GP PGL

L

C PIH635 STA 765+61.05, EL. 609.79

SHIFT PWB635GP PGL 52' RT TO PIH635 PGL

B PWB635GP STA 765+68.00, EL. 607.96=

END PWB635GP PGL

L

WB BRIDGE10.00' DEPTH

STEEL I-GIRDER

WB BRIDGE6.00' DEPTHSTEEL I-GIRDER

WB BRIDGE6.00' DEPTHSTEEL I-GIRDER

WB BRIDGE7.50' DEPTHSTEEL I-GIRDER

3:1

MI

N.

CL

R.

16'9"

700+00 705+00 710+00 715+00 720+00 725+00 730+00 735+00 740+00 745+00 750+00 755+00 760+00 765+00695+00

L

LL

L

C PKIN STA 23+03.11, EL. 579.18'

C PIH635 STA 727+89.57=

PROP KINGSLEY RDC PJUP STA 20+65.00, EL. 596.41'

C PIH635 STA 750+05.81=

PROP JUPITER RD

STA 725+72BEGIN BRIDGE

3:1

3:1

3:1

STA 752+80END BRIDGE

STA 730+80END BRIDGE

STA 747+53BEGIN BRIDGE

HW100 = 579.17

HW100 = 584.84

FL=571.48'

PROP 5-10'x5' MBC

PIH635 STA 723+69.40

PROP CULVERT DB2

FL=571.24'

PROP 2-10'x8' MBC

PIH635 STA 739+76.88

PROP CULVERT DB3

19'10"

MI

N.

CL

R.

VPI STA = 695+75.00

EL = 578.71

(-)3.00% (+)2.1

0%

L = 700.00

K = 137

ex = 4.46'

VPI STA = 700+60.00

EL = 588.89

(+)2.1

0% (+)0.62%

L = 250.00

K = 169

ex = -0.46'

VPI STA = 711+00.00

EL = 595.33

(+)0.62% (-)1.11%

L = 300.00

K = 173

ex = -0.65'

VPI STA = 717+00.00

EL = 588.67

(-)1.11% (+)2.5

0%

L = 500.00

K = 139

ex = 2.26'

VPI STA = 727+65.00

EL = 615.30

(+)2.5

0% (-)2.50%

L = 800.00

K = 160

ex = -5.00'

VPI STA = 736+50.00

EL = 593.17

(-)2.50% (+)3.0

0%

L = 750.00

K = 136

ex = 5.16'

VPI STA = 749+50.00

EL = 632.17

(+)3.0

0% (-)3.00%

L = 950.00

K = 158

ex = -7.13'

VPI STA = 758+90.00

EL = 603.97

(-)3.00% (+)0.87%

L = 550.00

K = 142

ex = 2.66'

VPI STA = 767+00.00

EL = 610.99

(+)0.87% (+)

1.50%

L = 200.00

K = 315

ex = 0.16'

VP

T

ST

A 699

+25.00

EL

=586.05

VP

C

ST

A 699

+35.00

EL

=586.26

VP

T

ST

A 701

+85.00

EL

=589.66

VP

C

ST

A 709

+50.00

EL

=594.40

VP

T

ST

A 712

+50.00

EL

=593.67

VP

C

ST

A 714

+50.00

EL

=591.45

VP

T

ST

A 719

+50.00

EL

=594.92

VP

C

ST

A 732

+75.00

EL

=602.55

VP

T

ST

A 740

+25.00

EL

=604.42

VP

C

ST

A 744

+75.00

EL

=617.92

VP

T

ST

A 754

+25.00

EL

=617.92

VP

T

ST

A 761

+65.00

EL

=606.36

VP

C

ST

A 766

+00.00

EL

=610.12

VP

T

ST

A 768

+00.00

EL

=612.49

583.72

583.08

583.18

584.00

585.55

587.50

588.92

589.75

590.37

590.99

591.61

592.23

592.85

593.47

594.09

594.64

594.68

594.15

593.11

592.00

590.98

590.60

590.93

591.99

593.76

596.17

598.67

601.17

603.67

606.14

608.10

609.45

610.17

610.26

609.73

608.57

606.79

604.42

601.95

600.00

598.78

598.30

598.55

599.53

601.25

603.70

606.67

609.67

612.67

615.67

618.65

621.18

623.08

624.34

624.97

624.97

624.34

623.08

621.18

618.65

615.67

612.67

609.93

607.88

606.53

605.88

605.94

606.66

607.52

608.39

609.26

610.12

611.15

612.49

613.99

EL

=605.30

VP

C

ST

A 723

+65.00

B PKIN-U1 STA 12+96.65, EL. 580.43'

C PIH635 STA 726+33.40=

PROP KINGSLEY RD U-TURN

L

L

B PKIN-U2 STA 12+80.73, EL. 579.66'

C PIH635 STA 729+47.37=

PROP KINGSLEY RD U-TURN

EL

=605.30

VP

T

ST

A 731

+65.00

L

L

MI

N.

CL

R.

17'8"

MI

N.

CL

R.

21'6"

B PJUP-U1 STA 11+82.93, EL. 595.23'

C PIH635 STA 748+71.15

PROP JUPITER RD U-TURN

B PJUP-U2 STA 12+59.75, EL. 597.48'

C PIH635 STA 751+40.46=

PROP JUPITER RD U-TURN

L

L

L

L

22'2"

MI

N.

CL

R.

19'3"

MI

N.

CL

R.

577.6

578.8

580.6

582.7

585.0

587.0

588.6

589.4

590.1

590.7

591.3

592.0

592.5

593.3

593.8

594.3

594.6

594.2

593.2

592.1

590.9

589.8

588.6

587.6

586.5

585.4

585.2

585.9

587.6

590.2

593.1

596.1

593.8

589.2

596.3

601.7

601.8

601.0

599.9

598.4

596.9

595.4

594.0

593.5

593.9

595.2

597.4

600.4

603.4

606.4

609.4

612.2

614.5

616.2

616.5

598.8

612.1

616.6

615.4

613.5

611.2

608.6

606.2

604.6

604.2

604.6

605.4

606.6

607.6

608.5

609.5

610.4

611.5

612.4

613.8

PIH635 STA 747+12.33, 62.00' LT

STA 22+53.89, EL. 621.72'=

WB RAMP MRWENWH

PIH635 STA 736+20.93, 146.00' RT

STA 15+37.62, EL.594.49'=

EB RAMP PREXJUP

PIH635 STA 701+61.27, 143.00' LT

STA 15+43.75, EL. 585.92'=

WB RAMP PRWEKIN

PIH635 STA 711+40.13, 155.00' RT

STA 15+94.83, EL. 590.67'=

EB RAMP PREEPLA

146.00 RT

PIH635 STA 760+00.00,

STA 17+55.19, EL. 610.99'=

EB RAMP PREXGAR

EL

=612.22

VP

C

ST

A 756

+15.00

ML AND EB BRIDGE

7.50' DEPTH

STEEL I-GIRDER

ML AND EB BRIDGE

5.50' DEPTH

TX-54 GIRDERS

ML AND BRIDGE

10.00' DEPTH

STEEL I-GIRDER

ML AND EB BRIDGE6.00' DEPTH

STEEL I-GIRDER

ML AND EB BRIDGE6.00' DEPTH

STEEL I-GIRDER

ML AND EB BRIDGE7.50' DEPTH

STEEL I-GIRDER

MI

N.

CL

R.

17'10"

5,0506,8007,650

8,95011,95013,300

18,05023,75026,400

12,65016,400

18,250

63,45083,75093,000

10,10013,40015,000

22,75029,80033,300

12,650

16,40018,300

53,35070,35078,000

29,50039,60044,450

29,50039,60044,450

5,250

6,9008,000

72,400100,250111,200

5,6007,4508,300

4,550

6,0006,950

10,85014,350

16,300

16,35021,70024,450

62,950

87,550

96,950

14,550

19,35021,850

10,00013,35014,900

5,0506,8007,650

24,45032,80036,800

78,000107,700119,500 13,150

17,50019,400

IH-635

EXPRESS LANES

EXPRESS LANES

IH-635

IH-635

EXPRESS LANES

EXPRESS LANES

IH-635

WESTBOUND

[ IH635 STA. 700+00

PROPOSED OSB #10

WESTBOUND

[ IH635 STA. 705+18

PROPOSED COSS #32

WESTBOUND

[ IH635 STA. 713+20

PROPOSED COSS #34

WESTBOUND

[ IH635 STA. 732+50

PROPOSED COSS #36

WESTBOUND

[ IH635 STA. 753+00

PROPOSED COSS #39

WESTBOUND

[ IH635 STA. 759+85

PROPOSED OSB #11

EASTBOUND

[ IH635 STA. 696+40

PROPOSED COSS #31

EASTBOUND

[ IH635 STA. 706+41

PROPOSED COSS #33

EASTBOUND

[ IH635 STA. 732+81

PROPOSED COSS #37

TEXAS

78

Garland Rd

EASTBOUND

[ IH635 STA. 756+06

PROPOSED COSS #40

Northwest Hwy

¾ MILE

EASTBOUND

[ IH635 STA. 764+06

PROPOSED COSS #38

1,2001,050800

9,2508,3506,250

5,2504,7003,600

12,05010,8508,450

3,4503,2002,250

4,5504,0503,050

450400250

8,2507,5005,600

3,5003,1502,350

1,8001,3501,050

1,1501,050800 6,950

6,2504,700

5,2504,7003,600

450400250

2,0001,7001,350

22,65020,25015,250

11,95010,3508,000

8,7508,1506,250

5,2004,8003,450

12,50011,3508,450

7,0006,1004,700

7,2006,4504,850

5,7504,9003,750

2,8502,5501,900

13,60012,2009,150

14,25012,8509,550

16,65014,90011,250

4,6004,1503,100

AT PIH635 PGLEX GROUND

PROP PIH635 PGL

4

530

540

550

560

570

580

590

600

610

620

630

640

650

660

EXI

ST

EL.

PR

OP

PI

H635

PG

L

N

540

550

560

570

580

590

600

610

620

630

640

650

660

530

LC

SJ 2374-01-137

C

PI

H635

ST

A 695

+00

MA

TC

H

LI

NE

SH

EE

T 3

C

SJ 2374-01-137

MA

TC

H

LI

NE

SH

EE

T 3

ST

A 695

+00

C

SJ

CSJ 2374-01-137

MA

TC

H

LI

NE

SH

EE

T 5

ST

A 769

+00

C PIH635L

PIH635-16

B PWB635FR-AL

PWB635FR-A-28

PWB635FR-A-29

PRWEKIN-2

B PRWEKIN

PRWXPLA-1

B PWB635GPL

PWB635GP-15

C PKIN

L

PRWEGAR-3

C PJUPL

B PEB635GPL

PEB635GP-17

PEB635GP-19

B PREXINL

B PEB635FRL

PEB635FR-34

PEB635FR-40

PEB635FR-42

PREEPLA-1

PREEPLA-2

PREEPLA-3

PREEPLA-4

B PREEPLAL

L

B PREXGARL

PROP ROW

PROP ROW

PROP ROW

EX ROW

EX ROW

EX ROW

EX ROW

EX ROW

PJUP STA 20+65.00

PIH635 STA 750+05.81

(SIGNALIZED INTERSECTION)

PJUP STA 24+16.02

PWB635FR-A STA 749+92.47

(SIGNALIZED INTERSECTION)

PKIN STA 26+23.12

PWB635FR-A STA 732+51.96

L

L

L

L

PWB635GP-14

PREXIN-3

PREXIN-5

PEB635FR-33

PREXGAR-2

PREXGAR-3

PREXGAR-4

LB PRWXPLA

EX ROW

PRWEGAR-2PWB635FR-A-32

LC

SJ 2374-01-137

C

PI

H635

ST

A 769

+00

MA

TC

H

LI

NE

SH

EE

T 5

PROP ROW

PKIN-2

PKIN-1

PKIN-3

PKIN-4

PREXGAR-1

121650 121650

PKIN STA 23+03.04

PIH635 STA 727+89.57

PEB635FR-43

PEB635FR-45

PWB635GP-17

PWB635FR-A-30

PEB635FR-35

PEB635FR-41

PEB635FR-44

PRWEKIN-1

L

PRWEKIN-3

PRWEKIN-4

PRWXPLA-2

PRWXPLA-3

PRWXPLA-4

PRWEGAR-1

B PRWEGARL

B MRWENWHL

MRWENWH-1

MRWENWH-2

MRWENWH-3

MRWENWH-4

2-10'X8' MBC

PROP

2-10'X8' MBC

PROP

PR

OP

PW

B635

GP

PG

L

EASEMENT

PROP DRAINAGE

SUPERELEVATION

4-8.75'X3' MBC

REMOVE EXIST

5-10'X5' MBC

PROP

4-5'X3' MBC

REMOVE EXIST

3-5'X3' MBC

REMOVE EXIST

PROPOSED IH 635 MAINLANES (60 MPH)

PROP ROW

MREXJUP-3

(SIGNALIZED INTERSECTION)

PKIN STA 19+21.08

PEB635FR STA 723+12.06

(SIGNALIZED INTERSECTION)

PJUP STA 17+83.92

PEB635FR STA 750+10.98

L LC/B

SUPERELEVATION SIGN CONVENTION

(-)

(-)(+)

(+)

PJUP STA 22+07.56

PWB635GP STA 749+30.23

PKIN STA 23+92.28

PWB635GP STA 728+75.94

PWB635FR-A STA 759+97, 17' LT

DENIAL OF ACCESS

BEGIN PROPOSED

STA 697+86, 17' RT

PEB635FR

DENIAL OF ACCESS

BEGIN PROPOSED

PEB635FR STA 706+77, 17' RT

DENIAL OF ACCESS

END PROPOSED

PEB635FR STA 742+13, 30' RT

DENIAL OF ACCESS

BEGIN PROPOSED

28' RT

STA 743+64,

PEB635FR

ACCESS

DENIAL OF

END PROPOSED

28' RT

PEB635FR STA 743+95,

DENIAL OF ACCESS

BEGIN PROPOSED

4-6'X3' MBC

REMOVE EXIST

TO BE REMOVED

EX DRIVEWAY

S JUPITERKINGSLEY

WALNUT HILL

PROP 5-10'X5' MBC

PROP DRAINAGE EASEMENT

4

L28

MATCH EXISTING PAVEMENT

C PKIN STA 16+15.03

BEGIN CONSTRUCTION

KINGSLEY RD

E2

E2

E2

STA 706+00, 71' RT

PEB635GP

BEGIN PROP RET WALLPEB635GP STA 710+35, 71' RT

END PROP RET WALL

PREEPLA STA 14+00, 9' RT

BEGIN PROP RET WALL

PEB635GP STA 728+84, 83' RT

BEGIN PROP RET WALL

PEB635GP STA 738+50, 71' RT

BEGIN PROP RET WALL

71' RT

PEB635GP STA 748+58,

END PROP RET WALL

PREXGAR STA 21+00, 9' RT

END PROP RET WALL

PEB635GP STA 762+15, 71' RT

BEGIN PROP RET WALL

PEB635GP STA 765+85, 71' RT

END PROP RET WALL

PWB635GP STA 695+49, 83' LT

BEGIN PROP RET WALL

PRWEKIN STA 17+00, 9' LT

END PROP RET WALL

PWB635GP STA 718+40, 71' LT

BEGIN PROP RET WALL

PRWXPLA STA 14+00, 9' LT

BEGIN PROP RET WALL

PRWXPLA STA 19+97, 9' LT

END PROP RET WALL

PWB635GP STA 726+18, 71' LT

END PROP RET WALL

83' LT

PWB635GP STA 745+88,

END PROP RET WALL

9' LT

PRWEGAR STA 15+48

BEGIN PROP RET WALL

PRWEGAR STA 21+00, 9' LT

END PROP RET WALL

R=15'

PROP ROW

R=100'

R=30'

R=60'

R=100'

R=5'

ROW

PROP

R=100'

R=20'

ID # SITE ADDRESS OWNER OCCUPANT

188 10841 ESTATE LN SERVICE KING PAINT & BODY SERVICE KING

189 10921 ESTATE LN SHRI VISHNU CORPORATION MOTEL 6

190 99999 NO NAME ST KANSAS CITY SOUTHERN RR RAILROAD CORRIDOR

191 10925 ESTATE LN 10925 ESTATE LN LPPARK

LYNDON PLAZA CORPORATE

192 10805 WALNUT HILL LN HIGHLAND OAKS CHURCHCHRIST

HIGHLAND OAKS CHURCH OF

193 10949 WALNUT HILL LN WALNUT HILL ATTIC II LLC THETHE ATTIC MINI WAREHOUSE

194 11035 WALNUT HILL LNTHE

WALNUT HILL ATTIC III LLCVACANT

195 11011 ESTATE LNTHE

WALNUT HILL ATTIC III LLCVACANT

196 11085 WALNUT HILL LN DIVERSIFIED STORAGE FUND PUBLIC STORAGE

197 11111 WALNUT HILL LNLLC

WALNUT HILL ESTATE REALTYWALNUT HILL ESTATE SC

198 11100 WALNUT HILL LN SEDONA RIDGE PROPERTY LLC SILVERADO SPRINGS

199 99999 NO NAME ST KANSAS CITY SOUTHERN RR RAILROAD CORRIDOR

200 11110 LBJ FWY SEDONA RIDGE PROPERTY LLC VACANT

201 11363 AMANDA LN VVDT LLC VILLA VISTA

202 11383 AMANDA LN UH STORAGE DE LTD PS UHAUL MINI SELF STORAGE

203 11306 LBJ FWY VERTICAL REALITY LLC LBJ CROSSING PHASE II

204 11325 PEGASUS ST BADMUS TEXAS PROPERTIES 11325 PEGASUS ST

205 11312 LBJ FWY LBJ CROSSING LTD L B J CROSSING SC

206 11325 PEGASUS ST VERTICAL REALITY LLC LAND ONLY

207 11350 LBJ FWY ESHNAM HOSPITALITY INC RADISSON HOTEL

208 3702 W KINGSLEY RD DLS STORAGE PARTNERS LTD LAND ONLY

209 13015 JUPITER RD 13015 JUPITER & LBJ LP RETAIL STRIP W/ CHEVRON

210 11405 LBJ FWYREV LIV TR THE

SPANO ROBERT P & MARLENE MSHELL/7-11

211 11413 LBJ FWY DOBSON BOBBY W GREAT WESTERN FURNITURE

212 11421 LBJ FWY KUVM INVESTMENTS INC SUPER 8 MOTEL

213 11438 LBJ FWYLP

BROWN BROTHERS INVESTMENTSGATEWAY BUICK GMC

214 11900 LBJ FWYLP

BROWN BROTHERS INVESTMENTSVACANT

215 KANSAS CITY SOUTHERN RR RAILROAD CORRIDOR

216 11611 LBJ FWY JUPITER CHEVROLET PPTIES JUPITER CHEVROLET

217 11550 LBJ FWY FCA REALTY LLCJEEP

DALLAS DODGE CHRYSLER

218 11675 LBJ FWY CAR SON MAS GAR LP MASSEY CADILLAC

514A 10100 PLANO RD TEXAS UTILITIES ELEC CO EASEMENT

514B 11200 KINGSLEY RD TEXAS UTILITIES ELEC CO LAND ONLY

515 11200 KINGSLEY RD PRAMUKHRAJ ENTERPRISE LLC VACANT

516 3700 W KINGSLEY RD BLACKSTONE MINERALS UTILITY ROW

517 3536 W KINGSLEY RD JUPITER PARTNERS LTD KINGSLEY INN & SUITES

518 3231 S JUPITER RD AMERI PROPERTIES INC LAND ONLY

519 3220 S JUPITER RD LINCOLN JAMES ATRUCKS

ENTERPRISE COMMERCIAL

520 13001 JUPITER RD GABBAY DAVID VACANT

521 12993 JUPITER RD FOUNTAINS OF JUPITER LTD THE FOUNTAINS OF JUPITER

PWB635GP STA 768+80, 71' LT

END PROP RET WALL

83' RT

PEB635GP STA 719+30,

BEGIN PROP RET WALL

PREXJUP-2

B PREXJUP

PREXJUP-3

PREXJUP-4

PREXJUP-1

OSB #10

COSS #32

COSS #34

COSS #36

COSS #39

OSB #11

COSS #37

COSS #31

PEB635GP-18

PKIN-U1-1

PKIN-U2-1

PJUP-U1-1

PJUP-U1-2

PJUP-U2-2

PJUP-U2-1

PRWEKIN STA 17+40, 19' RT

BEGIN PROP RET WALL

PRWEKIN STA 18+94, 19' RT

END PROP RET WALL

PWB635GP (60 MPH)

721+63.00 2.50% 730+82.00 -2.50%

-2.50% 4.00%

4.00% 3.50%

PIH635 (EB) (60 MPH)

728+95.00 -2.50% 729+23.00 -2.60%

740+15.00 -2.60% 740+40.00 -2.50%

-2.50% 3.50%

PIH635 (WB) (60 MPH)

726+47.00 2.50% 729+87.00 -2.60%

739+25.00 -2.60% 743+90.00 2.50%

751+67.00 2.50% 752+34.00 3.50%

PRWEKIN (40 MPH) 15+44.00 2.50% 15+57.00 2.00%

PREEPLA (40 MPH) 15+81.00 -2.00% 15+94.00 -2.50%

PRWXPLA (40 MPH) 19+25.00 2.00% 19+73.00 0.02%

PREXJUP (40 MPH) 15+38.00 -2.60% 15+53.00 -2.00%

MRWENWH (60 MPH) 2.50% 27+62.00

PRWEGAR (40 MPH) 16+49.00 1.20% 16+69.00 2.00%

PREXGAR (40 MPH)17+56.00 3.50% 17+93.00 2.00%

21+98.00 2.00% 22+95.00 -2.00%

MARIA F. GUERRA MARIA F. GUERRA

13

14

15

L26

R17

R18

L27

R19

L29

L30

R20

R21

L31

L32

R22

R23

L33

PROPOSED TAPERSBASELINE

BEGIN TRANSITION

STA e STA

END TRANSITION

e

TURN BAY LENGTHS

ACCESS TO PEGASUS ST

PREVENT RAMP TRAFFIC

IMPLEMENT RAISED GORE TO

PROP PWB635GP PGL

PIH635-14

PIH635-15

PEB635GP-20PREXJUP STA 20+45, 9' RT

END PROP RET WALL

PEB635FR-36

PEB635FR-37

PEB635FR-38

9' RT

PREEPLA STA 19+00,

END PROP RET WALL

R=45'

PEB635GP STA 723+56, 83' RT

END PROP RET WALL

PEB635FR-39

PWB635FR-A-31

PWB635FR-A-33

PWB635GP-16

764+00.00 764+67.00

746+67.00 758+27.00

741+75.00 756+69.00

EXIST 1-24" RCP

PWB635FR-A STA 761+79, 17' LT

END PROPOSED DENIAL OF ACCESS

PWB635FR-A STA 762+23, 17' LT

BEGIN PROPOSED DENIAL OF ACCESS

PWB635FR-A STA 765+64, 17' LT

END PROPOSED DENIAL OF ACCESS

MREXJUP-4

PREXIN-4

STA 695+18, 19' RT

PEB635FR

DENIAL OF ACCESS

BEGIN PROPOSED

9' RT

PREXKIN STA 22+61,

END PROP RET WALL

STA 695+60, 18' RT

PEB635FR

DENIAL OF ACCESS

END PROPOSED

TO PREVENT RAMP TRAFFIC ACCESS TO NEARBY DRIVEWAYSIMPLEMENT RAISED MEDIAN AND STRIPING DELINEATION

PEB635FR STA 695+85, 17' RT

BEGIN PROPOSED DENIAL OF ACCESS

PEB635FR STA 696+31, 17' RT

END PROPOSED DENIAL OF ACCESS

PEB635FR STA 696+66, 17' RT

BEGIN PROPOSED DENIAL OF ACCESS

PEB635GP STA 697+75, 71' RT

END PROP RET WALL

STA 697+57, 17' RT

PEB635FR

DENIAL OF ACCESS

END PROPOSED

PEB635FR STA 704+71, 17' RT

BEGIN PROPOSED DENIAL OF ACCESS

17' RT

STA 700+50,

PEB635FR

DENIAL OF ACCESS

END PROPOSED

17' RT

STA 700+99,

PEB635FR

DENIAL OF ACCESS

BEGIN PROPOSED

17' RT

STA 704+42,

PEB635FR

DENIAL OF ACCESS

END PROPOSED

28' RT

PEB635FR STA 747+50,

DENIAL OF ACCESS

END PROPOSED

27+07.00 0.75%

PREXGAR STA 11+34, 10'.4 RT

BEGIN PROP RET WALL

PWB635FR-A STA 725+20, 12.5' LT

BEGIN PROP RET WALL

PWB635FR-A STA 730+97, 12.5' LT

END PROP RET WALLPWB635GP STA 731+52, 11' RT

BEGIN PROP RET WALL

83' LT

PWB635GP STA 732+75,

BEGIN PROP RET WALL

12.5' LT

PWB635FR-A STA 742+75,

BEGIN PROP RET WALL

11' RT

PWB635GP STA 735+50,

END PROP RET WALL

12.5' LT

PWB635FR-A STA 743+75,

END PROP RET WALL

PWB635GP STA 757+75, 71' LT

BEGIN PROP RET WALL

LC PJUP STA 27+54.50

END WIDENING

S JUPITER RD

TRANSITIONS FOR INTERSECTION GRADING

TURNAROUND CROSS SLOPE

FRONTAGE ROAD, CROSS STREET &

TO ASSIST WITH CALCULATION OF VERTICAL CLEARANCES AND U-TURN PROFILES.

CROSS SLOPE TRANSITIONS SHOWN ABOVE ARE PRELIMINARY AND WERE DEVELOPED

* NOTE: FINAL DETAILS FOR INTERSECTION GRADING TO BE DEVELOPED DURING PS&E.

MREXJUP

(60 MPH)

MREXJUP-3 29+69.11 4° 18' 24.19" (RT) 9000.00 338.41 676.50 S 57° 27' 12.87" E 676.34 26+30.70 33+07.20 S 59° 36' 24.96" E S 55° 18' 0.77" E

MREXJUP-4 33+33.65 0° 15' 8.42" (LT) 12014.00 26.46 52.91 S 55° 25' 34.98" E 52.91 33+07.20 33+60.11 S 55° 18' 0.77" E S 55° 33' 9.2" E

MRWENWH

(60 MPH)

MRWENWH-1 13+00.61 5° 33' 05.94" (RT) 6200.00 300.61 600.75 S 48° 39' 57.40" E 600.51 10+00.00 16+00.75 S 51° 26' 30.37" E S 45° 53' 24.43" E

MRWENWH-2 17+12.85 1° 25' 38.19" (LT) 9000.00 112.10 224.20 S 46° 36' 13.53" E 224.19 16+00.75 18+24.94 S 45° 53' 24.43" E S 47° 19' 02.63" E

MRWENWH-3 22+40.18 2° 13' 24.28" (RT) 12000.00 232.86 465.67 S 46° 12' 20.49" E 465.64 20+07.32 24+72.99 S 47° 19' 02.63" E S 45° 05' 38.35" E

MRWENWH-4 30+41.82 9° 07' 58.20" (LT) 3500.00 279.54 557.89 S 49° 39' 37.45" E 557.30 27+62.28 33+20.18 S 45° 05' 38.35" E S 54° 13' 36.55" E

PEB635FR

(40 MPH)

PEB635FR-33 693+83.42 4° 09' 43.38" (RT) 4100.00 148.98 297.83 S 57° 36' 36.72" E 297.76 692+34.44 695+32.27 S 59° 41' 28.41" E S 55° 31' 45.03" E

PEB635FR-34 704+90.81 3° 04' 43.60" (RT) 2000.00 53.75 107.47 S 53° 59' 23.23" E 107.46 704+37.06 705+44.53 S 55° 31' 45.03" E S 52° 27' 01.43" E

PEB635FR-35 705+96.25 2° 57' 44.73" (LT) 2000.00 51.72 103.41 S 53° 55' 53.80" E 103.40 705+44.53 706+47.94 S 52° 27' 01.43" E S 55° 24' 46.17" E

PEB635FR-36 712+41.39 3° 28' 16.78" (LT) 2000.00 60.60 121.17 S 57° 08' 54.56" E 121.15 711+80.78 713+01.95 S 55° 24' 46.17" E S 58° 53' 02.95" E

PEB635FR-37 713+60.52 3° 21' 17.92" (RT) 2000.00 58.57 117.11 S 57° 12' 23.99" E 117.09 713+01.95 714+19.06 S 58° 53' 02.95" E S 55° 31' 45.03" E

PEB635FR-38 717+07.13 3° 41' 36.52" (RT) 2000.00 64.49 128.93 S 53° 40' 56.77" E 128.90 716+42.65 717+71.57 S 55° 31' 45.03" E S 51° 50' 08.51" E

PEB635FR-39 718+34.03 3° 34' 37.66" (LT) 2000.00 62.45 124.87 S 53° 37' 27.34" E 124.85 717+71.57 718+96.44 S 51° 50' 08.51" E S 55° 24' 46.17" E

PEB635FR-40 722+13.02 11° 19' 09.44" (RT) 1000.00 99.10 197.56 S 49° 45' 11.45" E 197.24 721+13.92 723+11.48 S 55° 24' 46.17" E S 44° 05' 36.73" E

PEB635FR-41 724+74.06 18° 28' 05.84" (LT) 1000.00 162.58 322.33 S 53° 19' 39.64" E 320.94 723+11.48 726+33.81 S 44° 05' 36.73" E S 62° 33' 42.56" E

PEB635FR-42 731+17.60 16° 09' 28.75" (RT) 2000.00 283.89 564.02 S 54° 28' 58.18" E 562.15 728+33.70 733+97.72 S 62° 33' 42.56" E S 46° 24' 13.81" E

PEB635FR-43 742+46.60 4° 16' 22.29" (RT) 2000.00 74.61 149.15 S 44° 16' 02.66" E 149.12 741+71.99 743+21.14 S 46° 24' 13.81" E S 42° 07' 51.52" E

PEB635FR-44 746+14.04 3° 16' 00.00" (LT) 2000.00 57.03 114.03 S 43° 45' 51.52" E 114.01 745+57.01 746+71.04 S 42° 07' 51.52" E S 45° 23' 51.52" E

PEB635FR-45 763+37.27 32° 55' 56.94" (LT) 4570.00 1350.77 2626.75 S 61° 51' 49.99" E 2590.74 749+86.50 776+13.25 S 45° 23' 51.52" E S 78° 19' 48.46" E

PEB635GP

(60 MPH)

PEB635GP-17 695+98.74 4° 11' 54.74" (RT) 9000.00 329.90 659.50 S 57° 30' 43.54" E 659.36 692+68.84 699+28.35 S 59° 36' 40.91" E S 55° 24' 46.17" E

PEB635GP-18 721+58.92 0° 59' 16.42" (LT) 12000.00 103.45 206.90 S 55° 54' 24.38" E 206.90 720+55.47 722+62.37 S 55° 24' 46.17" E S 56° 24' 02.59" E

PEB635GP-19 734+01.48 11° 18' 24.24" (RT) 6048.00 598.70 1193.51 S 50° 44' 50.47" E 1191.58 728+02.78 739+96.29 S 56° 24' 02.59" E S 45° 05' 38.35" E

PEB635GP-20 765+30.61 34° 46' 36.36" (LT) 4252.00 1331.55 2580.83 S 62° 28' 56.53" E 2541.40 751+99.06 777+79.89 S 45° 05' 38.35" E S 79° 52' 14.71" E

PIH635

(60 MPH)

PIH635-15 734+70.14 10° 19' 7.82" (RT) 6100.00 550.79 1098.60 S 50° 15' 12.26" E 1097.11 729+19.35 740+17.94 S 55° 24' 46.17" E S 45° 05' 38.35" E

PIH635-16 765+35.97 34° 46' 36.36" (LT) 4200.00 1315.27 2549.27 S 62° 28' 56.53" E 2510.32 752+20.71 777+69.98 S 45° 05' 38.35" E S 79° 52' 14.71" E

PJUP

(40 MPH)

-- 10+00.00 -- -- -- -- -- -- -- -- -- N 0°49'13.50" W

-- 31+59.39 -- -- -- -- -- -- -- -- N 0°49'13.50" W --

PJUP-U1

(15 MPH)

PJUP-U1-1 10+78.60 94° 14' 3.33" (LT) 73.00 78.60 120.06 N 46° 17' 48.17" E 106.98 10+00.00 11+20.06 S 86° 35' 10.17" E N 0° 49' 13.5" W

PJUP-U1-2 14+56.51 25° 03' 52.1" (LT) 326.00 72.46 142.61 N 13° 21' 9.55" W 141.48 13+84.05 15+26.66 N 0° 49' 13.5" W N 25° 53' 5.6" W

PJUP-U2

(15 MPH)

PJUP-U2-1 10+71.81 24° 50' 41.08" (RT) 326.00 71.81 141.36 N 13° 14' 34.04" W 140.26 10+00.00 11+41.36 N 25° 39' 54.58" W N 0° 49' 13.5" W

PJUP-U2-2 14+74.23 93° 33' 44.9" (RT) 78.00 83.01 127.37 N 45° 57' 38.95" E 113.68 13+91.22 15+18.59 N 0° 49' 13.5" W S 87° 15' 28.6" E

PKIN

(40 MPH)

PKIN-1 16+77.50 6° 02' 4.68" (LT) 1000.00 52.71 105.32 N 86° 04' 24.06" E 105.28 16+24.79 17+30.11 N 89° 05' 26.4" E N 83° 03' 21.72" E

PKIN-2 17+81.56 5° 53' 26.28" (RT) 1000.00 51.45 102.81 N 86° 00' 4.86" E 102.77 17+30.11 18+32.92 N 83° 03' 21.72" E N 88° 56' 48" E

PKIN-3 29+47.99 6° 29' 30.27" (RT) 1000.00 56.71 113.30 S 87° 48' 26.86" E 113.24 28+91.27 30+04.58 N 88° 56' 48" E S 84° 33' 41.73" E

PKIN-4 30+61.43 6° 30' 27.52" (LT) 1000.00 56.85 113.58 S 87° 48' 55.49" E 113.52 30+04.58 31+18.16 S 84° 33' 41.73" E N 88° 55' 50.75" E

PKIN-U1

(15 MPH)PKIN-U1-1 14+69.12 101° 46' 52.39" (LT) 78.00 95.95 138.56 N 38° 03' 21.81" E 121.05 13+73.18 15+11.74 N 88° 56' 48" E N 12° 50' 4.39" W

PKIN-U2

(15 MPH)PKIN-U2-1 11+06.77 107° 42' 7.51" (RT) 78.00 106.77 146.62 N 35° 05' 44.25" E 125.97 10+00.00 11+46.62 N 18° 45' 19.51" W N 88° 56' 48" E

PREEPLA

(40 MPH)

PREEPLA-1 10+67.40 7° 20' 42.64" (LT) 1050.00 67.40 134.61 S 59° 12' 6.35" E 134.52 10+00.00 11+34.61 S 55° 31' 45.03" E S 62° 52' 27.67" E

PREEPLA-2 12+03.07 7° 27' 41.51" (RT) 1050.00 68.47 136.74 S 59° 08' 36.92" E 136.64 11+34.61 12+71.35 S 62° 52' 27.67" E S 55° 24' 46.17" E

PREEPLA-3 17+66.16 3° 42' 11.28" (LT) 5300.00 171.33 342.55 S 57° 15' 51.81" E 342.49 15+94.83 19+37.38 S 55° 24' 46.17" E S 59° 06' 57.45" E

PREEPLA-4 20+60.22 3° 42' 11.28" (RT) 3800.00 122.84 245.60 S 57° 15' 51.81" E 245.56 19+37.38 21+82.98 S 59° 06' 57.45" E S 55° 24' 46.17" E

PREXGAR

(40 MPH)

PREXGAR-1 15+72.72 9° 58' 55.53" (LT) 2100.00 183.40 365.86 S 50° 44' 2.26" E 365.40 13+89.32 17+55.19 S 45° 44' 34.49" E S 55° 43' 30.02" E

PREXGAR-2 19+86.36 6° 05' 22.5" (LT) 4346.00 231.17 461.91 S 58° 46' 11.27" E 461.69 17+55.19 22+17.09 S 55° 43' 30.02" E S 61° 48' 52.52" E

PREXGAR-3 23+72.41 3° 46' 7.84" (RT) 1050.00 34.55 69.07 S 59° 55' 48.6" E 69.06 23+37.86 24+06.93 S 61° 48' 52.52" E S 58° 02' 44.68" E

PREXGAR-4 24+81.98 8° 10' 35.08" (LT) 1050.00 75.05 149.84 S 62° 08' 2.22" E 149.71 24+06.93 25+56.77 S 58° 02' 44.68" E S 66° 13' 19.76" E

PREXJUP

(40 MPH)

PREXJUP-1 12+25.90 8° 36' 45.51" (RT) 3000.00 225.90 450.96 S 49° 40' 20.98" E 450.53 10+00.00 14+50.96 S 53° 58' 43.74" E S 45° 21' 58.22" E

PREXJUP-2 14+93.89 0° 55' 41.91" (LT) 5300.00 42.94 85.87 S 45° 49' 49.18" E 85.87 14+50.96 15+36.83 S 45° 21' 58.22" E S 46° 17' 40.13" E

PREXJUP-3 23+17.61 8° 54' 42.25" (RT) 1050.00 81.82 163.32 S 41° 50' 19.01" E 163.15 22+35.79 23+99.10 S 46° 17' 40.13" E S 37° 22' 57.89" E

PREXJUP-4 24+42.63 4° 44' 53.63" (LT) 1050.00 43.53 87.02 S 39° 45' 24.7" E 86.99 23+99.10 24+86.12 S 37° 22' 57.89" E S 42° 07' 51.52" E

PREXKIN

(40 MPH)

PREXKIN-3 22+19.20 3° 09' 31.58" (RT) 3800.00 104.78 209.50 S 58° 01' 55.12" E 209.47 21+14.43 23+23.92 S 59° 36' 40.91" E S 56° 27' 9.33" E

PREXKIN-4 23+90.11 7° 12' 49.24" (RT) 1050.00 66.19 132.20 S 52° 50' 44.71" E 132.11 23+23.92 24+56.12 S 56° 27' 9.33" E S 49° 14' 20.09" E

PREXKIN-5 25+13.82 6° 17' 24.94" (LT) 1050.00 57.70 115.28 S 52° 23' 2.56" E 115.22 24+56.12 25+71.40 S 49° 14' 20.09" E S 55° 31' 45.03" E

PRWEGAR

(40 MPH)

PRWEGAR-1 16+92.27 0° 56' 27.31" (RT) 5300.00 43.52 87.04 S 44° 56' 44.48" E 87.04 16+48.75 17+35.79 S 45° 24' 58.13" E S 44° 28' 30.82" E

PRWEGAR-2 20+01.68 4° 09' 24.04" (LT) 3800.00 137.90 275.68 S 46° 33' 12.84" E 275.62 18+63.78 21+39.46 S 44° 28' 30.82" E S 48° 37' 54.86" E

PRWEGAR-3 23+25.55 9° 02' 09.76" (LT) 1050.00 82.97 165.59 S 53° 08' 59.74" E 165.42 22+42.58 24+08.17 S 48° 37' 54.86" E S 57° 40' 04.61" E

PRWEGAR-4 24+46.25 4° 09' 12.45" (RT) 1050.00 38.07 76.12 S 55° 35' 28.39" E 76.10 24+08.17 24+84.29 S 57° 40' 04.61" E S 53° 30' 52.17" E

PRWEKIN

(40 MPH)

PRWEKIN-1 11+04.01 3° 08' 8.88" (LT) 3800.00 104.01 207.97 S 57° 39' 26.31" E 207.95 10+00.00 12+07.97 S 56° 05' 21.88" E S 59° 13' 30.75" E

PRWEKIN-2 13+75.89 3° 37' 45.44" (RT) 5300.00 167.92 335.72 S 57° 24' 38.03" E 335.66 12+07.97 15+43.69 S 59° 13' 30.75" E S 55° 35' 45.32" E

PRWEKIN-3 19+52.51 6° 24' 45.03" (LT) 1050.00 58.82 117.52 S 58° 48' 7.83" E 117.45 18+93.69 20+11.21 S 55° 35' 45.32" E S 62° 00' 30.35" E

PRWEKIN-4 20+69.71 6° 22' 43.05" (RT) 1050.00 58.51 116.89 S 58° 49' 8.82" E 116.83 20+11.21 21+28.10 S 62° 00' 30.35" E S 55° 37' 47.3" E

PRWXPLA

(40 MPH)

PRWXPLA-1 10+58.58 6° 23' 12.99" (RT) 1050.00 58.58 117.05 S 52° 26' 10.8" E 116.99 10+00.00 11+17.05 S 55° 37' 47.3" E S 49° 14' 34.3" E

PRWXPLA-2 11+71.38 5° 55' 25.98" (LT) 1050.00 54.33 108.56 S 52° 12' 17.29" E 108.51 11+17.05 12+25.61 S 49° 14' 34.3" E S 55° 10' 0.28" E

PRWXPLA-3 21+65.31 4° 08' 24.14" (RT) 5300.00 191.57 382.96 S 53° 05' 48.21" E 382.88 19+73.74 23+56.70 S 55° 10' 0.28" E S 51° 01' 36.14" E

PRWXPLA-4 24+51.95 2° 52' 17.26" (LT) 3800.00 95.24 190.44 S 52° 27' 44.77" E 190.42 23+56.70 25+47.15 S 51° 01' 36.14" E S 53° 53' 53.4" E

PWB635FR-A

(40 MPH)

PWB635FR-A-28 695+40.76 3° 58' 37.67" (RT) 15000.00 520.81 1041.21 S 57° 37' 06.13" E 1041.00 690+19.95 700+61.16 S 59° 36' 24.96" E S 55° 37' 47.30" E

PWB635FR-A-29 734+63.95 6° 52' 02.04" (RT) 8500.00 510.00 1018.77 S 52° 11' 46.28" E 1018.16 729+53.95 739+72.72 S 55° 37' 47.30" E S 48° 45' 45.26" E

PWB635FR-A-30 750+74.13 6° 52' 10.66" (RT) 5100.00 306.11 611.48 S 45° 19' 39.93" E 611.11 747+68.03 753+79.50 S 48° 45' 45.26" E S 41° 53' 34.60" E

PWB635FR-A-31 755+66.39 2° 17' 43.32" (LT) 2000.00 40.07 80.12 S 43° 02' 26.26" E 80.12 755+26.33 756+06.45 S 41° 53' 34.60" E S 44° 11' 17.92" E

PWB635FR-A-32 763+64.36 22° 46' 13.37" (LT) 2800.00 563.83 1112.77 S 55° 34' 24.61" E 1105.46 758+00.53 769+13.30 S 44° 11' 17.92" E S 66° 57' 31.29" E

PWB635FR-A-33 774+82.85 14° 21' 21.78" (LT) 3530.00 444.57 884.48 S 74° 08' 12.18" E 882.17 770+38.28 779+22.76 S 66° 57' 31.29" E S 81° 18' 53.08" E

PWB635GP

(60 MPH)

PWB635GP-14 693+33.75 4° 11' 38.80" (RT) 12052.00 441.31 882.22 S 57° 30' 35.57" E 882.02 688+92.44 697+74.66 S 59° 36' 24.96" E S 55° 24' 46.17" E

PWB635GP-15 739+53.82 12° 24' 18.82" (RT) 9300.00 1010.73 2013.56 S 49° 12' 36.76" E 2009.63 729+43.09 749+56.65 S 55° 24' 46.17" E S 43° 00' 27.35" E

PWB635GP-16 758+89.27 18° 31' 08.35" (LT) 3400.00 554.30 1098.94 S 52° 16' 01.53" E 1094.16 753+34.97 764+33.91 S 43° 00' 27.35" E S 61° 31' 35.70" E

PWB635GP-17 771+03.66 18° 20' 39.01" (LT) 4148.00 669.76 1328.05 S 70° 41' 55.21" E 1322.38 764+33.91 777+61.95 S 61° 31' 35.70" E S 79° 52' 14.71" E

CURVE

ROLL 4

BASELINE P.I. STA DELTA RADIUS (FT) TANGENT

LENGTH (FT)

CURVE LENGTH

(FT)CHORD BEARING CHORD

LENGTH (FT)P.C. STA P.T. STA BACK TANGENT AHEAD TANGENT

PEB635FR (PKIN)722+31.00 -2.00% 722+67.00 -1.15%

724+38.00 -1.15% 724+66.00 -2.00%

PWB635FR (PKIN)730+40.00 2.00% 731+54.00 -1.50%

734+25.00 -1.50% 735+71.00 2.00%

PEB635FR (PJUP)748+44.00 -2.00% 748+70.00 -1.50%

750+53.00 -1.50% 750+85.00 -2.00%

PWB635FR (PJUP)

748+77.00 2.00% 749+26.00 0.50%

750+53.00 0.50% 751+27.00 2.20%

752+00.00 2.20% 752+09.00 2.00%

PKIN (LT)16+63.00 2.00% 19+42.00 -2.00%

24+97.00 -2.00% 27+80.00 2.00%

PJUP (LT)

17+90.00 2.00% 18+62.00 1.00%

19+45.00 1.00% 20+17.00 2.00%

23+50.00 2.00% 23+76.00 1.65%

24+76.00 1.65% 25+02.00 2.00%

PJUP (RT)14+98.00 -2.00% 17+50.00 1.50%

21+69.00 1.50% 24+21.00 -2.00%

PKIN-U110+08.00 -2.00% 11+32.00 2.00%

13+81.00 2.00% 15+05.00 -2.00%

PKIN-U210+07.00 2.00% 11+31.00 -2.00%

15+08.00 -2.00% 15+24.00 -1.50%

PJUP-U110+07.00 -2.00% 11+31.00 2.00%

13+87.00 2.00% 15+11.00 -2.00%

PJUP-U210+16.00 2.00% 11+40.00 -2.00%

13+88.00 -2.00% 15+12.00 2.00%

BASELINEBEGIN TRANSITION END TRANSITION

STA e STA e

LEFT TURN BAY LENGTHS

RIGHT TURN BAY LENGTHS

LENGTH

TAPER

L26 50' 275' 115' 390'

L27 50' 275' 263' 538'

L28 100' 196' 100' 296'

L29 100' 275' 255' 530'

L30 50' 275' 169' 444'

L31 50' 275' 284' 559'

L32 65' 275 341' 611'

L33 50' 275 248' 523'

R17 50' 228' 30' 258'

R18 50' 266' 30' 296'

R19 50' 264' 30' 294'

R20 50' 275' 165' 440'

R21 50' 275' 208' 483'

R22 50' 203' 30' 233'

R23 50' 187' 30' 217'

LANE

TURN

LENGTH

DECEL

LENGTH

STORAGE

LENGTH

TOTAL

13 PEB635GP 711+55.47, 12.00' LT 717+55.47, 0.00' 50:1

14 RAMP MERGE PIH635 734+62.12, 30.00' LT 740+59.51, 41.98' LT 50:1

15 FRONTAGE ROAD MERGE PEB635FR 755+59.62, 36.00' LT 758+91.55, 25.00' LT

LOCATION TYPE BASELINE BEGIN END TAPER RATE

COSS #33

COSS #40

(1)

(3)

(1)

(1)

(1)

(1)

(2)

(2)

C PJUP STA 14+00.44

BEGIN WIDENING

S JUPITER RD

MATCH EXISTING PAVEMENT

C PJUP STA 14+77.66

BEGIN CONSTRUCTION

END WIDENING

S JUPITER RD

L

C PKIN STA 31+33.21

END WIDENING

KINGSLEY RD

L

MATCH EXISTING PAVEMENT

C PKIN STA 31+09.54

BEGIN WIDENING

END CONSTRUCTION

KINGSLEY RD

MATCH EXISTING PAVEMENT

C PJUP STA 27+00.18

BEGIN WIDENING

END CONSTRUCTION

S JUPITER RD

COSS #38

(4)

(4) FOR BASELINES WITHOUT CURVES, BEGINNING AND ENDING STATION IS PROVIDED. BASELINE TANGENT SHOWN IN BACK AND AHEAD TANGENT COLUMN.

(3) WB GP HORIZONTAL CURVE REQUIRES SUPERELEVATION. PGL AND AXIS OF ROTATION LOCATED AT THE PIH635 CENTERLINE. SEE SUPERELEVATION TABLE.

(2) EB GP HORIZONTAL CURVE REQUIRES SUPERELEVATION. PGL AND AXIS OF ROTATION LOCATED AT THE PIH635 CENTERLINE. SEE SUPERELEVATION TABLE.

(1) HORIZONTAL CURVE REQUIRES SUPERELEVATION. PGL AND AXIS OF ROTATION LOCATED AT THE RESPECTIVE CENTERLINE/BASELINE. SEE SUPERELEVATION TABLE.

NOTE:

AUX LANE MERGE

27:1

3:1 3

:1

95%

DRAFT

Prelimi

nary,

Subj

ect to C

hang

e

16 18

1715

15

16

17

18