5300 km
1700 km
> 13.000 islands
+/- 7000 inhabited
+/- 240 million population
> 110 million population unelectrified
> 32.000 villages unelectrified(remote, scattered and poor infrastructure)
Melati
(302 HH)
Alang
(76 HH)
Nagalema
(105 HH)
Telaga Nipah
(520 HH)
BATU TAGEPE
3 x 50 KW
Euro 1.6 million
fund needed to electrify 1003 HH
Village C (Taba)
Village B
Village D
Village EVillage A
= big power company = small (village/rural) power enterprise
Recent electric power system
IBEKA
PURPLE village, electrified (grid extension)
BLUE village, electrified (isolated grid)
RED village, unelectrified
500 kV grid
(a) Limited community (villagers) knowledge and capability
(b) High investment cost, no government and banking support
scheme for community based micro-mini hydro (village
energy) development
(c) Recent government policy on energy price subsidy, both on
electricity and fuel
BARRIERSCommunity Based Renewable Energy Development
IBEKA
GOALS
• utilizing local resources (small renewable energy)
• decreasing outsource supply dependency
• decreasing green house gas emission
• fulfilling local energy demand
• developing local capability.
• defending local community ownership.
• building self reliance and confidence.
• improving social justice balance by improving local community welfare.
• reinforcing local economy.
• improving demography structure.
• freedom from repressive economic condition (modern industrial and capitalistic economy).
IBEKA
Community based electric power system
= big power company = small (village/rural) power enterprise
Village C (Aih Nuso)Concentrate for industries
and urban area
Village B
Village A Village E
Village D
IBEKA
PURPLE village, electrified (grid extension)
BLUE village, electrified (isolated grid)
RED village, unelectrified
(Cinta Mekar)
all villages are grid connected
500 kV grid