7TH & 8TH STREETS SAFETY PROJECTProject Goal
Informational Open HouseSeptember 22, 2016Bayanihan Community Center
Key Considerations
The goal of the 7th & 8th Streets Safety Project is to increase safety and comfort for everyone traveling on these corridors, including people on foot, on bike, in a vehicle, and on public transit. We plan to achieve this goal by:
» Reducing the potential for conflict» Addressing collision patterns» Implementing quickly and effectively» Planning for long-term solutions
We’re working on a phased approach to implementing safety improvements over time, starting with near-term measures and moving towards long-term streetscape measures. Schedule subject to change.
Open House
Near-Term Phase 1
Implementation(Market to Folsom)
Near-TermPhase 2
Implementation(Folsom to Townsend)
Long-Term Streetscape
Implementation
September 22, 2016
» Present project and implementation measures
» Solicit feedback
Construction Starting Spring 2017
» Parking-protected bikeway
» Painted safety zones
» Transit boarding islands
» Travel lane removal on 7th Street
Construction Starting Fall 2017
» Parking-protected bikeway
» Painted safety zones
» Transit boarding islands
» Travel lane removal on 7th & 8th Streets
Design Starting Spring 2018
» Street repaving
» Traffic islands
» Concrete bulbouts
» Transit boarding island upgrades
Community Vision, Recommendations, and Development GuidelinesThis project is guided by the vision expressed in the Eastern Neighborhoods Transportation Implementation Planning Study (EN TRIPS), a multi-year community planning process.
Vision Zero San FranciscoThe City and County of San Francisco adopted Vision Zero San Francisco as a policy in 2014, committing an effort to prioritize street safety and eliminate traffic deaths in San Francisco by 2024.
Mayor’s Directive On August 4, 2016, Mayor Ed Lee issued an executive directive on bicycle and pedestrian safety, explicitly calling for a focus on delivering near-term safety improvements on 7th and 8th Streets in the next nine months.
8th Street Today
PRESSING SAFETY NEEDSEvery year, 30 people are killed and 200 more are seriously injured in San Francisco traffic crashes. Vision Zero is our city’s commitment to end all traffic deaths and serious injuries by 2024.
Presidio
Golden Gate Park
Lake Merced
MissionBay
NorthBeach
Glen Park
Chinatown
BalboaPark
Haight
MissionDistrict
WesternAddition
BernalHeights
Hunter’sPoint
South ofMarket
RichmondDistrict
Twin Peaks
Presidio
Golden Gate Park
Lake Merced
MissionBay
NorthBeach
Glen Park
Chinatown
BalboaPark
Haight
MissionDistrict
WesternAddition
BernalHeights
Hunter’sPoint
India Basin
China Basin
SouthBasin
South ofMarket
RichmondDistrict
Twin Peaks
WestPortal
PotreroHill
SunsetDistrictSunsetDistrict
InglesideIngleside ExcelsiorExcelsior
MarinaDistrictMarinaDistrict
TenderloinTenderloin
7th Street and 8th Street are intersected by several streets on San Francisco’s High Injury Network, which are 12 percent of city streets that account for 70 percent of the city’s traffic collisions.
In the most recent five-year collision history available (April 1, 2011 through March 31, 2016), there were 198 injury or fatal traffic crashes combined on 7th and 8th Street between Market and Townsend. On June 22, 2016 another bicyclist lost her life at the intersection of 7th Street and Howard Street.
SAFER STREETSInformational Open HouseSeptember 22, 2016Bayanihan Community Center
By mode:
By location and mode:
By primary collision factor:Project Area
29%
47%
23%
1%
Bike-Ped (2)
Vehicle-Vehicle (94)
Vehicle-Bike (45)
Vehicle-Ped (57)
Other
Ped R/W Violation
Auto R/W Violation
Pedestrian Violation
Unsafe Speed
Improper Turning
Traffic Signals & Signs26%
12%
9% 10%
13%
14%
16%
40
10
20
30
Bike-PedVehicle-VehicleVehicle-BikeVehicle-Ped
Mid
bloc
k
Mid
bloc
k
Mid
bloc
k
Min
na
Nat
oma
How
ard
Mid
bloc
k
Mid
bloc
k*
Mid
bloc
k*
Teha
ma*
Cle
men
tina*
Fols
om
Mid
bloc
k*
Mid
bloc
k*
Mid
bloc
k*
Rin
gold
*
Her
on*
Har
rison
Bry
ant
Bra
nnan
Mid
bloc
k
Mid
bloc
k
Mid
bloc
k
Mis
sion
Ste
vens
on
Mid
bloc
k
Mid
bloc
k
*intersection not shared by both corridors
For more information about Vision Zero, please visit www.visionzerosf.com.
High Injury CorridorsHigh Injury Intersections
PROPOSED NEAR-TERM IMPROVEMENTS
PROPOSED IMPROVEMENTSInformational Open HouseSeptember 22, 2016Bayanihan Community Center
19 P O L K 19 P O L K 19 P O L K19 P O L K
Bike
Con
nect
ion
Bear
ing
Agen
cies
Gina
Hot
elHa
iretic
s Sa
lon
Funk
y Fu
rnitu
re
Sigh
tgla
ss C
offe
e
Mer
cy H
ousi
ngFo
unda
tion
Tony
Bal
oney
’s
Wes
t Bay
Pili
pino
M
ulti-
Serv
ice
Cent
er
7 M
issi
on
Best
Wes
tern
Plu
s Am
eric
ania
The
Carri
age
Inn
Good
Hot
el
Subw
ay
US S
ocia
l Sec
urity
Adm
inis
tratio
nUn
ited
Sate
s Co
urt
of A
ppea
ls
San
Fran
cisc
o Fe
dera
l Bui
ldin
g
CVS
Phar
mac
y
Hone
y Bi
stro
City
Cen
ter I
nn &
Sui
tes
City
Cen
ter I
nn &
Sui
tes
Freg
osi &
Com
pany
Pain
ts
Rosy
Hee
ls
Rye
Proj
ect
Mr.
Smith
’s
Sout
h of
Mar
ket
Heal
th C
ente
r (SM
HC)
Post
mat
es
STEV
ENSO
N S
T
MIS
SIO
N S
T
MIN
NA
ST
NAT
OM
A ST
HO
WA
RD
ST
FOLS
OM
ST
MA
RK
ET S
T
7th
Str
eet
Prop
osed
*For
illu
stra
tive
purp
oses
onl
y
19 P O L K
19 P O L K
19 P O L K
Chas
e Ba
nk
PG&
E
Urba
n Ha
rves
t Mar
ket
Citiz
en’s
Band
Pink
ie’s
Bake
ry
8th
Stre
et L
aund
ry
Holid
ay In
n
Hote
l Whi
tcom
b
Trin
ity P
lace
Buzz
ell E
lect
ric W
orks
Flex
Inve
ntio
n La
bs
Thou
ghts
Sty
leCu
isin
e Sh
owro
om
Epis
copa
l Com
mun
itySe
rvic
es
Cano
n Ki
p Co
mm
unity
Hou
se
The
Sanc
tuar
ySh
elte
r
NAP
A Au
to P
arts
SF M
oto
BASI
S
Wic
ked
Grou
nds
Wis
er
SOM
A Ce
nter
D-Sc
hem
e St
udio
Unim
art
Gree
n215
701
Min
na S
treet
STEV
ENSO
N S
T
MIS
SIO
N S
T
MIN
NA
ST
NAT
OM
A ST
HO
WA
RD
ST
TEH
AM
A ST
CLE
MEN
TIN
A ST
FOLS
OM
ST
MA
RK
ET S
T
7th Street, Market to Folsom
8th Street, Market to Folsom
Red visibility curbs
Painted safety zones
Realign roadway markings
Transit boarding islands & shelters
Transit route & stop changes
Travel lane reduction
Parking-protected bikeway
Mixing zones
Two-stage turn box
Green pavement
Features:
Red visibility curbs
Painted safety zones
Realign roadway markings
Transit boarding islands & shelter
Parking-protected bikeway
Mixing zones
Two-stage turn box
Green pavement
Features:
A
B
C
D
E
F
G
H
I
A
B
C
D
E
F
G
AB
C DE
F
G
GH DE F
A
B
C
*for illustrative purposes only
H
J
I
J
H
ELEMENTS OF A PARKING-PROTECTED BIKEWAY
PROTECTED BIKEWAYInformational Open HouseSeptember 22, 2016Bayanihan Community Center
Two-Stage Turn Box Green two-stage turn boxes help clarify where bicyclists can turn to connect to other routes in the bicycle network. They also provide a waiting space and bring awareness to all road users of where cyclists can be expected.
Parking-Protected BikewayBicycle lanes paired with a lane of parked vehicles offer both safety and comfort benefits. They provide greater separation for pedestrians and bicyclists from moving traffic, while providing more room for bicyclists to pass other bicyclists without maneuvering into moving traffic. This design accommodates on-street parking and loading needs as well.
Mixing Zones The use of dashed green areas at driveways advise caution to all road users where travel modes can mingle. At intersections, yield “teeth” markings indicate to right-turning drivers they must yield to oncoming bicyclists.
Pedestrian Safety EnhancementsRed visibility curbs at intersections help increase the visibility of pedestrians waiting at the corner. Painted safety zones further emphasize this clear space and resembles a bulbout. Their potential future conversion to concrete bulbouts will provide all the benefits of a wider sidewalk.
Travel Lane ReductionOne travel lane is proposed to be removed from 7th Street to accommodate the upgraded bikeway. This design is already implemented on 8th Street. Minimal delays are anticipated.
Example from 13th Street
Typical Midblock Cross-Section Typical Far Side Cross-Section
10’sidewalk
10’sidewalk
62’-6”roadway
10’sidewalk
10’sidewalk
43’-6”parking & travel lanes
9’transit shelter
6’bike
4’
Image: Google
LONG-TERM STREETSCAPE OPPORTUNITIES
LONG-TERM STREETSCAPEInformational Open HouseSeptember 22, 2016Bayanihan Community Center
What’s your vision for the future of 7th Street & 8th Street? (comments welcome!)
Signal timing changes can provide pedestrians a head start on crossing the street, bicyclists dedicated phases, and drivers a longer phase to travel through intersections.
Corner bulb-outs extend the sidewalk at intersections to provide more space for pedestrians waiting to cross the street. They also shorten crossings distances, increase pedestrian visibility, and slow down turning vehicles.
Raised islands & landscaping can provide physical protection to bicyclists when on-street parking is not present. Landscaping may be incoporated as an added benefit to capture rainwater.
Widened sidewalks will provide more room for additional sidewalk amenities such as new trees, rain gardens, pedestrian-scale street lighting, street furniture, and public art.N
SOMA PLANS & PROJECTSInformational Open HouseSeptember 22, 2016Bayanihan Community Center
CENTRAL SOMA PLAN
Several streets in the vicinity of the Central SoMa Plan Area are being transformed by the City to support the Plan and our safety goals. Project improvements may include reconfiguring or repaving of right-of-way, upgrades to sidewalks, crosswalks, protected bicycle lanes, changes to transit boarding islands, among other improvements.
Key projects are identified on the adjacent map and listed below. Each project is in various stages of planning and conceptual design.
Project Spotlight: 6th Street Improvement Project
• Vision of a sustainable neighborhood that meets the needs of the present without compromising the ability of future generations to meet their own needs.
• Provides opportunity to rethink how people get to move through the neighborhood. • Goal to provide safe and convenient transportation that prioritizes walking,
bicycling, and transit.• For more information, please visit: sf-planning.org/central-soma-plan
6th Street
Mis
sion
Str
eet
Stev
enso
n St
reet
Jess
ie S
tree
t
Min
na S
tree
t
Nat
oma
Stre
et
Teha
ma
Stre
et
How
ard
Str
eet
one-
way
two-
way
(MU
NI)
Mar
ket S
tree
t
Mis
sion
Str
eet
Stev
enso
n St
reet
Jess
ie S
tree
t
Min
na S
tree
t
Nat
oma
Stre
et
Teha
ma
Stre
et
How
ard
Str
eet
one-
way
two-
way
(MU
NI)
Mar
ket S
tree
t
widened sidewalk
widened sidewalk
widened sidewalk
widened sidewalk
P
P
Proposed Sidewalk Widening and Corner Bulbouts
ProposedStreet Section
ProposedIntersection Diagram
Proposed Road DietLEGEND
Existing Traffic SignalPlanned Traffic SignalExisting MUNI Bus StopProposed Vehicle Diversion
Proposed Removal of Peak Period Tow-Away Lanes
Proposed Corner BulboutsProposed Raised Crosswalk
Proposed Striped Buffer ZoneProposed Class II Bicycle Lane
Proposed New Crosswalk
P
P
FIGURE 6: PROPOSED PROJECT FEATURES (MARKET TO HOWARD STREETS)
SOURCE: SFMTA; SWCA/Turnstone Consulting
Sixth Street Pedestrian Safety Project2014.1010E
0 200
Feet
N
July 5, 2016 C
ase No. 2014.1010E
AD
MIN
ISTRA
TIVE D
RA
FT 20
Sixth Street Pedestrian Safety Project PM
ND
-1
Proposed Proposed
AT&TPark
NoeValley
Downtown/CivicCenter
FinancialDistrict
Mission
WesternAddition
South ofMarket
PotreroHill
Castro/UpperMarket
BernalHeights
ChinatownNorthBeach
Sanch
ez
Stein
er
Montgo
mery
Lagu
na Powell
Turk
Hyde Le
aven
worth
Taylo
r
Jone
s
Kearn
y
Mason
Stoc
kton
Grant
Bush
Octav
ia
12th St
Townsend
7th
St
Folsom
11th
St
6th
St
Duboce
tS dn2
Folsom
EllisEddy
Mcallister
20th St
23rd St
23rd St
21st St
22nd St
18th St
15th St
17th St18th St 15th St
Bryan
t
Bryan
t
Bryant Bryant
Mission
Churc
h
4th S
t
Terry
AFr
anco
is
Harris
on
Harriso
n
Harrison Harrison
Howard Howard
Pine
Rhode
Islan
d
Rhode
Islan
d
Page
Hamps
hire
York
York
Texa
s
Utah
Nelson Rising
Kansa
s
San B
runo
Caroli
na
Arkan
sas
Owens
Alab
ama
Alabam
a
Washington
Grove
Mission Bay North
Waller
Hermann
Indian
a
Trea
tShotw
ell
Shotw
ell
Capp
Capp Brannan Brannan
raepS
niaM
elaeB
14th St
14th St
Bluxome
Berry
Mission
Dolore
s
Division
tS ht9
Fran
klin
Geary
tS ht4
tS ht01
South
Van N
ess
6th
St
Cesar Chavez
16th St
16th St
Castro
Valen
cia
Potre
ro
Guerre
ro
Market
Mission
Fell
13th St
Market Market
King
TransitCenterDistrict
Railyard
Mission
Pier 70
MissionBay
NortheastEmbarcadero
Study
CentralWaterfront
EastSoMa
ShowplaceSquare/Potrero
Hill
Civic CenterSustainableDistrict
CentralCorridor
Market/Octavia
RinconHill
WesternSoMa
B
T
F/H
BMS
2
5
6
7/8
11
7/8
F/H
EEP
T
Central SoMa Plan Area
[Protected Bike Lane Design Completed
Existing Bike Network
Proposed Projects
Central SoMa Plan Area
7th/8th Streets Safety Improvement Project
11.5’Sidewalk
8’ParkingLane
12’NorthboundDrive Lane
10’NorthboundDrive Lane
10’SouthboundDrive Lane
82.5’ Public Right-of-Way
11’SouthboundDrive Lane
8’Parking
Lane
12’Sidewalk
15.5’Sidewalk
9’ParkingLane
5.5’BikeLane
5.5’BikeLane
11’NorthboundDrive Lane
11’SouthboundDrive Lane
9’ParkingLane
16’Sidewalk
82.5’ Public Right-of-Way
MARKET STREET TO HOWARD STREET
MARKET STREET TO HOWARD STREET
SOURCE: SFMTA; SWCA/Turnstone Consulting
FIGURE 2: MARKET STREET TO HOWARD STREET -EXISTING AND PROPOSED STREET SECTIONS (LOOKING SOUTH)
Sixth Street Pedestrian Safety Project2014.1010E
Existing Street Section (Looking South)
Proposed Street Section (Looking South)
July 5, 2016 Case No. 2014.1010E
ADMINISTRATIVE DRAFT 8
Sixth Street Pedestrian Safety Project PMND-1
11.5’Sidewalk
8’ParkingLane
12’NorthboundDrive Lane
10’NorthboundDrive Lane
10’SouthboundDrive Lane
82.5’ Public Right-of-Way
11’SouthboundDrive Lane
8’Parking
Lane
12’Sidewalk
15.5’Sidewalk
9’ParkingLane
5.5’BikeLane
5.5’BikeLane
11’NorthboundDrive Lane
11’SouthboundDrive Lane
9’ParkingLane
16’Sidewalk
82.5’ Public Right-of-Way
MARKET STREET TO HOWARD STREET
MARKET STREET TO HOWARD STREET
SOURCE: SFMTA; SWCA/Turnstone Consulting
FIGURE 2: MARKET STREET TO HOWARD STREET -EXISTING AND PROPOSED STREET SECTIONS (LOOKING SOUTH)
Sixth Street Pedestrian Safety Project2014.1010E
Existing Street Section (Looking South)
Proposed Street Section (Looking South)
July 5, 2016 Case No. 2014.1010E
ADMINISTRATIVE DRAFT 8
Sixth Street Pedestrian Safety Project PMND-1
Market to Howard Market to Howard
2nd Street Improvement Project2
Brannan Safety ProjectB
5th Street Streetscape Project5
6th Street Improvement Project6 7th/8th Streets Safety Project7/8
11th Street Streetscape Project11
Better Market Street ProjectBMSEmbarcadero Enhancement ProjectEEP
Folsom/Howard Streetscape ProjectF/H Townsend Bicycle Strategy ProjectT
For more information and links to project websites, please visit: sfmta.com/livablestreets
CENTRAL SOMA STREETSCAPE PROJECT COORDINATION
PROJECT TIMELINE
Near-Term Phase 2
Late 2018
• Design phase for the future streetscape project expected to begin
• Long-term streetscape to include upgraded transit boarding islands, traffic islands, corner bulbouts, traffic signal timing modifications, and more complex measures
Near-Term Phase 1 Long-Term Streetscape
This project began with a transportation vision established by the diverse communities of San Francisco’s Eastern Neighborhoods. After a comprehensive planning process, safety and comfort improvements are coming soon to 7th Street and 8th Street though the near-term implementation and long-term streetscape projects.
TIMELINEInformational Open HouseSeptember 22, 2016Bayanihan Community Center
Evaluation
Mid 2018
• Evaluation of near-term measures to take course over a six-month period
January 2017
• Ongoing community outreach
• Refine conceptual design
• Begin and complete construction of near-term improvements on 7th and 8th Street between Market and Folsom in approximately five months
October 2017
• Ongoing community outreach
• Refine conceptual design
• Begin and complete construction of near-term improvements on 7th and 8th Street between Folsom and Townsend in approximately five months
Fall 2016• Planning and design
for near-term improvements on 7th and 8th Street between Market and Folsom
• Outreach to community stakeholders and groups regarding transportation safety concerns and curb management
May 2017
• Planning and design for near-term improvements on 7th and 8th Street between Folsom to Townsend
• Outreach to community stakeholders and groups regarding transportation safety concerns and curb management
IMPROVING TRANSITInformational Open HouseSeptember 22, 2016Bayanihan Community Center
TRANSIT IMPROVEMENTSThe 7th and 8th Streets Safety Project includes improvements to the 19 Polk route to make it safer and quicker to travel through SOMA & Civic Center.
7th St
7th St
Jones
Mint
Larkin
Larkin
Turk
Turk
Ellis
Harriso
n
Polk
8th St
6th St
5th St
11th St
Eddy
Eddy
McAllister
Hyde
Leavenworth
Mason
Folsom
HowardMiss
ion
Market
Grove
Civic Center Plaza
Civic Center Station
Stop Added/Moved
Stop Removed
Proposed Routing
Changed Routing
Transit Only Lane
19
19
Transit Priority Treatments• Bus lane between Mission and Market• Boarding islands reduce conflicts and delay
New boarding islands at bus stops on 7th and 8th Streets reduce bus-bike conflicts and reduce delays merging back into traffic.
For more information about the 19 Polk transit improvements, visit www.sfmta.com/7thand8th.
Market Street
Mission Street
N
19 Polk Reroute and Stop Changes (Northbound only)More direct routing saves time and improves safety by removing a difficult merge on 7th Street between Mission and Market.• Stops removed: Market/Hyde, Larkin/Grove, Larkin/McAllister• Stops added: McAllister/Hyde• Stops moved farside of intersection: 7th/Mission, 7th/Market
Improving Safety and Travel TimeCurrently, buses leaving the 7th/Mission bus stop conflict with vehicles turning right onto Mission, and must merge across four travel lanes (the dashed red arrow) in order to make a left turn onto Market.Relocating the 7th/Mission bus stop across the street reduces conflicts with right-turning vehicles and the reroute allows buses to continue straight (solid blue arrow) in a new transit-only lane between Mission and Market.
Mission
7th
19 Polk
Proposed Routing
Existing Routing
Stop Added/Moved
Stop Removed
Transit Only Lane
7th
Stre
et
N
CURB MANAGEMENT
CURB MANAGEMENTInformational Open HouseSeptember 22, 2016Bayanihan Community Center
19 P O L K 19 P O L K 19 P O L K19 P O L K
Bike
Con
nect
ion
Bear
ing
Agen
cies
Gina
Hot
elHa
iretic
s Sa
lon
Funk
y Fu
rnitu
re
Sigh
tgla
ss C
offe
e
Mer
cy H
ousi
ngFo
unda
tion
Tony
Bal
oney
’s
Wes
t Bay
Pili
pino
M
ulti-
Serv
ice
Cent
er
7 M
issi
on
Best
Wes
tern
Plu
s Am
eric
ania
The
Carri
age
Inn
Good
Hot
el
Subw
ay
US S
ocia
l Sec
urity
Adm
inis
tratio
nUn
ited
Sate
s Co
urt
of A
ppea
ls
San
Fran
cisc
o Fe
dera
l Bui
ldin
g
CVS
Phar
mac
y
Hone
y Bi
stro
City
Cen
ter I
nn &
Sui
tes
City
Cen
ter I
nn &
Sui
tes
Freg
osi &
Com
pany
Pain
ts
Rosy
Hee
ls
Rye
Proj
ect
Mr.
Smith
’s
Sout
h of
Mar
ket
Heal
th C
ente
r (SM
HC)
Post
mat
es
STEV
ENSO
N S
T
MIS
SIO
N S
T
MIN
NA
ST
NAT
OM
A ST
HO
WA
RD
ST
FOLS
OM
ST
MA
RK
ET S
T
7th
Str
eet
Prop
osed
*For
illu
stra
tive
purp
oses
onl
y
7th Street, Market to Folsom
What are your loading and curb usage needs? (please let us know!)
*for illustrative purposes only
19 P O L K
19 P O L K
19 P O L K
Chas
e Ba
nk
PG&
E
Urba
n Ha
rves
t Mar
ket
Citiz
en’s
Band
Pink
ie’s
Bake
ry
8th
Stre
et L
aund
ry
Holid
ay In
n
Hote
l Whi
tcom
b
Trin
ity P
lace
Buzz
ell E
lect
ric W
orks
Flex
Inve
ntio
n La
bs
Thou
ghts
Sty
leCu
isin
e Sh
owro
om
Epis
copa
l Com
mun
itySe
rvic
es
Cano
n Ki
p Co
mm
unity
Hou
se
The
Sanc
tuar
ySh
elte
r
NAP
A Au
to P
arts
SF M
oto
BASI
S
Wic
ked
Grou
nds
Wis
er
SOM
A Ce
nter
D-Sc
hem
e St
udio
Unim
art
Gree
n215
701
Min
na S
treet
STEV
ENSO
N S
T
MIS
SIO
N S
T
MIN
NA
ST
NAT
OM
A ST
HO
WA
RD
ST
TEH
AM
A ST
CLE
MEN
TIN
A ST
FOLS
OM
ST
MA
RK
ET S
T
8th Street, Market to Folsom
CURB MANAGEMENT
CURB MANAGEMENTInformational Open HouseSeptember 22, 2016Bayanihan Community Center
What are your loading and curb usage needs? (please let us know!)
*for illustrative purposes only
CURB MANAGEMENT TOOLKIT
CURB MANAGEMENTInformational Open HouseSeptember 22, 2016Bayanihan Community Center
Need/Issue Management Tool Options Considerations
• Double parking by delivery vehicles
• Businesses need freight loading/unloading access
• Double parking by short-term customers
• Shops need quick-stop parking (dry cleaning, coffee, ATM, etc.)
• Customers cannot find parking nearby
• Shops and restaurants need customer parking
• Double parking for drop-off and pick-up
• Businesses need patron drop-off/pick-up (theaters, day care centers, religious facilities, instriutions/centers, etc.)
• Residents unable to find parking near residence
• Commuter drivers parking on residential blocks
• People with disabilities cannot find parking
• Need parking for people with disabilities
• Bicycles are locked to poles, trees, railings, etc.
• Customers who ride bikes need more official bike parking
Yellow curb (commercial loading zone)
Green curb (10 minute limit)
Meters (generally 2 hour limit)
White curb(passenger loading zone; 5-minute limit)
Residential Permit Parking (Area U for majority of project area)
Blue curb (Placed at curb ramps)
Bike racks
• Yellow curb (no meters)
• Yellow-cap meters
• Red-cap meters (for 6-wheel trucks)
• Green curb (no meters - 10 minute limit)
• Green meters (extends to 15-30 minute limit)
• Meters with demand-responsive pricing
• Can be overlaid with white zone or yellow zone for special use part of day
• White curb (no meters)
• White curb with meters, can be overlaid with yellow zone and/or meters for special use for designated times
• Expanded enforcement hours (e.g., Monday-Saturday)
• Flexible/lowered time limits (e.g., 1 hour for non-permitted vehicles)
• Racks installed on sidewalks (typically 1-4 racks per location)
• Bike corrals installed in on-street parking lane (typically 8-12 racks per location)
Meters allow general meter parking after loading hours
Generally only operate Monday-Saturday 9 AM - 6 PM
Typically operate during set timesUsed for general parking other times
Operates Monday-Friday 8 AM - 9 PM2 hour limit for non-permitted vehicles
Blue curb regulations supersede other management tools
Bike corrals may fit in locations where on-street parking cannot
Recommended