7-8 s.v

Preview:

Citation preview

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 1/10

SELECT SLIDES OF CLASSES 7&8

ECO (SV) –  PART IV (10 slides)

INDIAN ECONOMY

( Slides to read along with class notes)

Clarifications at sanjiv.verma@ymail.com

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 2/10

Right to Fair Compensation &

Transparency in Land Acquisition,Rehabilitation & Resettlement (SIA)

Rules 2014

Exit PolicyNCLT/NCLAT

Labour Reforms

Ease of doing Business

License Raj now Inspector Raj

Challenges going forward in Reforms

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 3/10

Negotiatedwages/Min Wages

Basic facilities

Visit oflabour/factory

Inspectors

Non termination ofservices

Right to be part ofTrade Union

Wages linked topresence atwork/Increment on

time scale

Mandatory Leaves

Right to go on astrike

Right to employment

Complex Labour Laws

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 4/10

EASE OF DOING BUSINESS.. NOT EASY..

Rank 142/189 countries by World Bank

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 5/10

INFRASTRUCTURE

Core sector (IIP 38%)

 Crude oil & GasRefinery throughput

Electricity generation (10%)

Coal, Steel & Cement

Fertilizers 

Railways

Ports

Civil aviation

Roads & Highways

Telecom services

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 6/10

2014

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 7/10

GOLDEN QUADRILATERAL PROJECT (5846 km)

Completed in June 2011 after 11 years

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 8/10

NS & EW CORRIDOR (7300 km)

JUNE 2015

JUNE 2013

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 9/10

BHARAT MALA PROJECT

7/23/2019 7-8 s.v

http://slidepdf.com/reader/full/7-8-sv 10/10

SAGARMALA PROJECT

Recommended