ARCS2: Advanced Reservoir Characterization & Simulation
© I
FP
Reservoir Simulation
Introduction to ECLIPSE
2
© I
FP
Reservoir Simulation November 27th,
2008
Introduction to ECLIPSE Content
General informations Section header keywords Keywords in sections Datafile structure Running simulation Visualization of results Exercise
3
© I
FP
Reservoir Simulation November 27th,
2008
General Informations
ECLIPSE 100 is a fully-implicit, three phase, three dimensional, general purpose black oilblack oil simulator with gas condensate option.
ECLIPSE 100 can be used to simulate 1, 2 or 3 phase systems. Two phase options are solved as two component systems. In addition to gas dissolving in oil (variable bubble point pressure or gas/oil ratio), ECLIPSE 100 may also be used to model oil vaporizing in gas (variable dew point pressure or oil/gas ratio).
Both corner-point and conventional block-center geometry options are available in ECLIPSE. Radial and Cartesian block-center options are available in 1, 2 or 3 dimensions.
What is ECLIPSE 100?
4
© I
FP
Reservoir Simulation November 27th,
2008
General InformationsHow to start?
To run simulation you need an input file with all data concerning reservoir and process of its exploitation.
Input data for ECLIPSE is prepared in free format using a keyword system. Any standard editor may be used to prepare the input file. Alternatively ECLIPSE Office may be used to prepare data interactively through panels, and submit runs.
The name of input file has to be in the following format: FILENAME.DATA
5
© I
FP
Reservoir Simulation November 27th,
2008
General Informations
An ECLIPSE data input file is split into sections, each of which is introduced by a section-header keyword. A list of all section-header keywords is given in following, together with a brief description of the contents of each section and examples of keywords using in file code.
The keywords in the input data file (including section-header keywords) are each of up to 8 characters in length and must start in column 1. All characters up to column 8 are significant. Any characters on the same line as a keyword from column 9 onwards will be treated as a comment.
Note that all keywords in input file have to be in proper order.
Input data file
6
© I
FP
Reservoir Simulation November 27th,
2008
Section-header keywordsList of section-header keywords in proper order:
The sections must be specified in the shown order.
It is recommended that the body of sections which are not frequently changed be held in separate files which are included in the data using the INCLUDE keyword.
A data record has to be ended with a slash [/]
RUNSPEC
GRID
PROPS
REGIONS
SOLUTION
SUMMARY
SCHEDULE
EDIT
7
© I
FP
Reservoir Simulation November 27th,
2008
Section-header keywords
Status: REQUIRED
Title, problem dimensions, switches, phases present, components etc.
GRID Status: REQUIRED
RUNSPEC
The GRID section determines the basic geometry of the simulation grid and various rock properties (porosity, absolute permeability, net-to-gross ratios) in each grid cell.
8
© I
FP
Reservoir Simulation November 27th,
2008
Section-header keywords
Status: OPTIONAL
Modifications to calculated pore volumes, grid block centre depths and transmissibilities.
PROPS Status: REQUIRED
EDIT
Tables of properties of reservoir rock and fluids as functions of fluid pressures, saturations and compositions (density, viscosity, relative permeability, capillary pressure etc.). Contains the equation of state description in compositional runs.
9
© I
FP
Reservoir Simulation November 27th,
2008
Section-header keywords
Status: OPTIONAL
Splits computational grid into regions for calculation of: PVT properties (fluid densities and viscosities): PVTNUM
saturation properties (relative permeabilities and capillary pressures): SATNUM
initial conditions, (equilibrium pressures and saturations): EQLNUM
fluids in place (fluid in place and inter-region flows): FIPNUM
If this section is omitted, all grid blocks are put in region 1.
SOLUTION Status: REQUIRED
REGIONS
Specification of initial conditions in reservoir may be: calculated using specified fluid contact depths to give potential equilibrium
read from a restart file set up by an earlier run
specified by the user for every grid block (not recommended for general use)
This section contains sufficient data to define the initial state (pressure, saturations, compositions) of every grid block in the reservoir.
10
© I
FP
Reservoir Simulation November 27th,
2008
Section-header keywords
Status: REQUIRED
Specification of data to be written to the Summary file after each time step. Necessary if certain types of graphical output (for example water-cut as a function of time) are to be generated after the run has finished. If this section is omitted no Summary files are created.
SCHEDULE Status: REQUIRED
SUMMARY
Specifies the operations to be simulated (production and injection controls and constraints) and the times at which output reports are required. Vertical flow performance curves and simulator tuning parameters may also be specified in the SCHEDULE section.
11
© I
FP
Reservoir Simulation November 27th,
2008
data checking only, with no simulation
Keywords in sections
TITLE title
DIMENS
OIL, WATER, GAS, VAPOIL, DISGASFIELD/METRIC/
LABWELLDIM
S
UNIFIN
UNIFOUT
START
NOSIM
number of blocks in X,Y,Z directions
the active phases present
unit convention
well and group dimensions
indicates that input files are unified
indicates that output files are unified
start date of the simulation
RUNSPEC sectionRUNSPEC section
12
© I
FP
Reservoir Simulation November 27th,
2008
Keywords in sections
TOPSdepths of top faces of grid blocks for the current box; data is taken from Structure map, and geological model from PETREL
DX, DY, DZ
PERMX, PERMY, PERMZ
PORO
X,Y,Z-direction grid block sizes for the current box; data is taken from Isopac map, and geological model from PETREL
X,Y,Z-direction permeabilities for the current box; data is taken from Isopac map, and geological model from PETREL
grid block porosities for the current box; data is taken from Isopac map, and geological model from PETREL
GRID sectionGRID section
13
© I
FP
Reservoir Simulation November 27th,
2008
reservoir fluidreservoir fluidproperties fromproperties from
PVT analysisPVT analysis
saturation tablessaturation tablesfrom specialfrom specialcore analysiscore analysis
Keywords in sectionsPROPS sectionPROPS section
SWFN
SOF3
SGFN
PVTO
DENSITY
water relative permeability and capillary pressure as functions of Sw
oil relative permeability as a function of So
in three phase system
gas relative permeability and capillarypressure as functions of Sg
FVF and viscosity of live oil as functions of pressure and Rs
stock tank fluid densities
PVTG
PVTW
FVF and viscosity of wet gas as functions of pressure and Rv
FVF, compressibility and viscosity of water
ROCK rock compressibility
NEXTREMOV
E
14
© I
FP
Reservoir Simulation November 27th,
2008
REGIONS sectionREGIONS section
Keywords in sections
FIPNUM fluid-in-place regions
SATNUM
EQLNUM
PVTNUM
saturation table regions
equilibration regions
PVT data regions
15
© I
FP
Reservoir Simulation November 27th,
2008
SOLUTION sectionSOLUTION section
Keywords in sections
EQUIL fluid contact depths and other equilibration parameters; data taken from well testing
RESTART
RPTSOL
name of the restart file
report switches for SOLUTION data
16
© I
FP
Reservoir Simulation November 27th,
2008
AquifersNumerical:WOC discretization
WOC
WOC
17
© I
FP
Reservoir Simulation November 27th,
2008
Modelling Aquifers
Gridding Numerical Aquifers
Closed Analytical Aquifers
Fetkovich Carter Tracy
Types of aquifer models
18
© I
FP
Reservoir Simulation November 27th,
2008
AquifersEclipse keywords: Numerical
RUNSPEC
In order to use the facility, the maximum number of numerical aquifer blocks and the maximum number of lines of connection data in AQUCON should be set using the RUNSPEC section keyword AQUDIMS.
GRID
AQUCON connects a numerical aquifer (declared using the AQUNUM keyword) to one or more reservoir cells. The connection to the reservoir is set up by an arbitrary box defined by lower and upper I, J and K indices.
19
© I
FP
Reservoir Simulation November 27th,
2008
AquifersEclipse keywordsNumerical
20
© I
FP
Reservoir Simulation November 27th,
2008
AquifersEclipse keywordsFetkovich
RUNSPEC
In order to use the facility, the maximum number of analytic aquifers and the maximum number of grid block connected to any single analytic aquifer should be set using the RUNSPEC section keyword AQUDIMS.
SOLUTION
The aquifer properties (C, , Pi, depth, PI, etc.) should be defined using keyword AQUFETP, and the aquifer connections to one or more faces of the reservoir should be made through the keyword AQUANCON.
21
© I
FP
Reservoir Simulation November 27th,
2008
AquifersEclipse keywords: Fetkovich
22
© I
FP
Reservoir Simulation November 27th,
2008
AquifersEclipse keywords: Carter Tracy
RUNSPEC
In order to use the facility, the maximum number of analytic aquifers and the maximum number of grid block connected to any single analytic aquifer should be set using the RUNSPEC section keyword AQUDIMS.
PROPS
The aquifer should also be given a table number for the influence function table that it should use. Influence function tables may be supplied with the AQUTAB keyword in the PROPS section. Eclipse has a built-in default influence function table (# 1), which represents the constant terminal rate solution for an infinite aquifer as given by van Everdingen and Hurst.
SOLUTION
The aquifer properties (C, , Pi, depth, R, etc.) should be defined using keyword AQUCT, and the aquifer connections to one or more faces of the reservoir should be made using the keyword AQUANCON.
23
© I
FP
Reservoir Simulation November 27th,
2008
AquifersEclipse keywordsCarter Tracy
24
© I
FP
Reservoir Simulation November 27th,
2008
Keywords in sections
Fxxx Field quantities
Gxxx
Rxxx
Wxxx
Cxxx
Bxxx
Group quantities
Region quantities
Well quantities
Connection quantities
Block quantities
SUMMARY sectionSUMMARY section
25
© I
FP
Reservoir Simulation November 27th,
2008
Keywords in sections
FOPT Field or Well Oil Production Total
FOPR
FGOR
FWCT
FOE
FPR
FORFR
Field or Well Oil Production Rate
Field or Well Gas-Oil Ratio
Field or Well Water Cut
Field Oil Efficiency
Field PressureField Fraction Total Oil Produced by Rock Compaction
SUMMARY sectionSUMMARY section
WOPT
WOPR
WGOR
WWCT
FOIP
FORFE
FORFF
Field Oil in Place
FWIR WWIR Field or Well Water Injection Rate
FWIT WWIT Field or Well Water Injection Total
FORFWField Fraction Total Oil Produced by Water or Gas InfluxFORFGField Fraction Total Oil Produced by Oil Expansion or Gas ExpansionFORFS
Field Fraction Total Oil Produced by Free Gas Influx
26
© I
FP
Reservoir Simulation November 27th,
2008
Time of CPU Usage
Keywords in sections
WBHPWell Bottom Hole Pressure or Tubing Head Pressure
WBP5
WPI5
WOPRH
TCPU
Well 5 or 9-Point Pressure AverageWell Productivity Index Based on Value of WBP5 or WBP9Well Oil Production Rate or Oil Production Total History
Well Mode Control
SUMMARY sectionSUMMARY section
WMCTL
WTHP
WBP9
WPI9
WWCTH Well Water Cut or GOR HistoryWGORH
WOPTH
27
© I
FP
Reservoir Simulation November 27th,
2008
Keywords in sectionsSCHEDULE sectionSCHEDULE section
RPTSCHED
TUNING
WELSPECS
COMPDAT
WCONHIST
report switches to select which simulation results are to be printed at report times
time step and convergence controlsintroduces a new well, defining its name, the position of the wellhead, its bottom hole reference depth and other specification data
specifies the position and properties of one or more well completions; this must be entered after the WELSPECS
observed rates for history matching wells
WCONPROD
WCONINJE
control data for production wells
control data for injection wells
TSTEP or DATE
advances simulator to new report time(s) or specified report date(s)
NEXT
REMOVE
ARCS2: Advanced Reservoir Characterization & Simulation
© I
FP
Data review
Reservoir Simulation Modeling
29
© I
FP
Reservoir Simulation November 27th,
2008
In history Matching, observed average rates are known; controls are simple.
VFP tables are introduced at the end of history matching process to ensure the continuity between matching runs (set measured Q) and prediction runs (limit THP).
Well controls: history matchMain Controls
30
© I
FP
Reservoir Simulation November 27th,
2008
Imposed Flow rate Oil, Water, Gas, Liquid, Reservoir voidage
Imposed pressure Tubing Head Flowing pressure Bottom Hole flowing pressure
Well controls: forecastingMain Controls
31
© I
FP
Reservoir Simulation November 27th,
2008
Flow rates Economic limits Rates upper limit per phase Maximum ratios (Wcut, GOR, WGR)
Pressures BHP and THP limit (lower for a producer, upper for an
injector) Maximum drawdown
Well controls: forecastingSecondary Controls
VFP tables are used to relate bottom hole to well head pressuresVFP tables are used to relate bottom hole to well head pressures
32
© I
FP
Reservoir Simulation November 27th,
2008
Well Constraints
Technical (well and/or surface facilities) Economical For the simulator:
Pressure Target: Maximum or imposed WHP/BHP minimum for producer – maximum for injector maximum for some layers
Rate Target: surface: Qo, Qg, QL
bottom: Qt (history match)
Secondary constraints: WCT, GOR, P limits Monitoring: actions when a constraint is offended
33
© I
FP
Reservoir Simulation November 27th,
2008
Group of well Constraints
Hierarchy: Wells, Groups, Platforms, FieldWells, Groups, Platforms, Field Constraints:
On rates for main phase (economical, contracts, capacity) On rates for secondary phase (capacity of flaring, water treatment)
and gas lift rate X-dependency: Qproduction = f(Qinjection), Pressure maintenance
Monitoring: Opening of waiting wells Shut-in of most water flooded well
34
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsWell definition & controls: SCHEDULE Section
SCHEDULE
--restart resultsRPTRST
--well specification and completionWELSPECSCOMPDAT
--production constraintsWCONPROD
--timestep management and tolerance criteriaTUNING
DATES1 'AUG' 2008 //END
35
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsWell definitions
WELSPECS-- 1 2 3 4 5 6 --name group i j BHP_ref_dep phase ‘P1’ 'PROD' 20 7 2500 'OIL' //
Well P1 belongs to group PROD Well head is at i=20, j=7 BHP reference depth of 2500. Defaults to depth of top-most
connection OIL is the preferred phase (used only for PI output) Other items can usually be defaulted
WELSPECS: General specification data for wells
36
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsWell completions
COMPDAT-- 1 2 3 4 5 6 7,8 9 10 11 --name i j k1 k2 status diameter skin ‘P1’ 20 7 3 8 'OPEN' 2* 0.15 1* 2 //
Well P1 is completed in layers 3 to 8 of colum i=20, j=7 The well bore diameter is 0.15 m and the skin is +2 Eclipse will compute the connection factor using the Peaceman
formula: for a vertical well using kh values of the completed cells
COMPDAT: Well completion specification data
37
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsWell completions
COMPDAT-- 1 2 3 4 5 6 7 8 9 10 11 12 13--name i j k1 k2 status CF diam kh skin direction ‘P1’ 20 7 3 3 'OPEN' 1* 23.47 0.15 / ‘P1’ 20 7 4 4 'OPEN' 1* 6.14 0.15 / ‘P1’ 20 6 4 4 'OPEN' 1* 8.25 0.15 / ‘P1’ 20 6 5 5 'OPEN' 1* 94.70 0.15 520.3 2 1* Z //
P1 is a deviated well crossing columns (20,7) and (20,6) completed in layers 3 to 5
The CF have been calculated in SCHEDULE application and input in item 8
the well bore diameter must be given kh, skin and direction of penetration may be given for information as in
the last line above
38
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsProduction Well Controls
WCONPROD-- 1 2 3 4 5 6 7 8 9 10 11 --name status control Qos Qws Qgs Qls Qfond BHPlim THPlim VFP ‘P1’ 'OPEN' 'ORAT' 500 300 1000 1* 1* 50 15 1 //
Well P1 has a target oil rate of 500, subject to: Maximum water rate of 300. Maximum gas rate of 1000. Minimum BHP of 50. Minimum THP of 15
VFP table 1 applies to this well.
WCONPROD : Control data for production wells
39
© I
FP
Reservoir Simulation November 27th,
2008
WECON : Economic limit data for production wells
Eclipse keywordsWell Economic Constraints
WECON-- 1 2 3 4 5 6 7--name Qomin Qgmin maxWCT maxGOR maxWGR action ‘P1’ 50 1* 0.8 1* 1* ‘CON’ //
Well P1 is subject to: A minimum oil rate of 50 sbpd: connections of P1 will be closed if this
rate cannot be met. A maximum water cut of 0.8: the connections with the highest WCT will
be closed
40
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsInjection Constraints
Injectors are controlled by: Target rate: surface or reservoir rate of the injected fluid.
(target rate subject to minimum BHP) Fixed pressure: BHP or THP
(target BHP subject to maximum rate)
ECLIPSE will always honour the most constraining limitECLIPSE will always honour the most constraining limit
41
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsInjection Well Controls
WCONINJE-- 1 2 3 4 5 6 7 8 9--name phase status control Qs Qres BHPlim THPlim VFP ‘I1’ 'WATER' 'OPEN' THP 1000 1* 300 40 2 //
Well I1 injects water at THP = 400 bar, subject to: Maximum rate of 1000 sm3/d. Maximum BHP of 300 bar.
VFP table 2 applies to this well.
WCONINJE : Control data for injection wells
42
© I
FP
Reservoir Simulation November 27th,
2008
WELOPEN: Opens and closes both wells and completions.
Eclipse keywordsOther well controls
WELOPEN--name action ‘P1’ 'OPEN' / opens P1, does not alter completions 'P2' 'STOP' / closes P2 but allows cross-flow ‘P3’ 'OPEN' 0 0 0 / opens all completions in P3 ‘P4’ 'SHUT' 0 0 2 / closes all completions in P4 in layer 2 ‘P5’ 'SHUT' 0 0 0 4 6 / closes completion 4, 5 and 6 of P5/
Opening a well and its completions requires 2 lines. Possible well status: OPEN, SHUT, STOP or AUTO Possible completion status: OPEN, SHUT or AUTO
43
© I
FP
Reservoir Simulation November 27th,
2008
WEFAC: Defines well activity or efficiency factor (downtime).
Eclipse keywordsOther well controls
WEFAC-- 1 2 --name efficiency ‘P1’ 0.95 //
The well P1 is 95% of the time on production, for example to model shut-down of 1 day each month.
Well rates and pressures are calculated using full rate, group rates and all cumulatives account for the efficiency factor.
44
© I
FP
Reservoir Simulation November 27th,
2008
Eclipse keywordsConcluding remarks Output complete information about well connections to the
PRT file:RPTSCHEDWELSPECS /
The basic Eclipse well model is: Usually acceptable for vertical and deviated wells. Acceptable for horizontal wells if frictional losses in the drain are
negligible: use the well-bore friction option. Not usually acceptable for complex, multi-branch wells: use the
Multi-segmented Well (MSW) option. Always try to calibrate simulated well productivity against
measured or calculated values ATENTIONATENTION: Setting a large CF to avoid problems often leads to
convergence problems
45
© I
FP
Reservoir Simulation November 27th,
2008
TUNING: Sets simulator control parameters.Record 1: Time stepping controlsRecord 2: Time truncation and convergence controlsRecord 3: Control of Newton and linear iterations
Eclipse keywords
TUNING 1 50 0.1 / Timestep = 1 day, upper limit of next timestep = 50 days, and
minimum length of all timesteps
/1* 1* 25 / Minimun & maximum number of Newton iteration defaulted,
and maximum number of linear iteration = 25
Timestep management and convergence
NEXTSTEP: Sets a maximum length of the next time step (useful when opening a well)
46
© I
FP
Reservoir Simulation November 27th,
2008
Datafile structure
In the data following a keyword, asterisks may be used to signify repeat counts. A data quantity can be repeated a required number of times by preceding it with the required number and an asterisk.
There must be no intervening blank spaces next to the asterisk on either side. For example, the two following cases are equivalent:
Repeat counts
RPTSCHED 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 /
RPTSCHED 11*0 2 2*0 2 /
Any lines beginning with the two characters ‘--’ are treated as comments, and will be ignored by ECLIPSE. Comment lines (and blank lines also) may be inserted anywhere in the data file. Comments may also be added to the end of lines of data by beginning the comment with the two characters ‘--’, but in this case the comments must not contain any quotes.
Comments
-- VARIATION OF INITIAL RS WITH DEPTH---- DEPTH RSRSVD 8200 1.270 8500 1.270 /
47
© I
FP
Reservoir Simulation November 27th,
2008
Datafile structure
Certain items of data can be defaulted to a built-in default value. The keyword description will indicate when defaults can be applied. There are two ways of setting quantities to their default values:
1. by ending a data record prematurely with a slash (/) the quantities remaining unspecified will be set to their default values.
2. selected quantities positioned before the slash can be defaulted by entering n* where n is the number of consecutive quantities to be defaulted. For example, 4* will cause the next FOUR quantities in the keyword data to be given their default values. There must be no blank space between the number and the asterisk. If there is only one item at a time to be defaulted, then 1* must be entered (an asterisk by itself is not sufficient).
Default values
WCONPROD 'PRODUCER' 'OPEN' 'ORAT' 20000 4* 1000 //
48
© I
FP
Reservoir Simulation November 27th,
2008
Running simulationThere are two ways to launch simulation:
49
© I
FP
Reservoir Simulation November 27th,
2008
Running simulation The simulation will start. While the model is running, status
reports will be written to the file FILENAME.PRT. If input file was not prepared properly the simulation would stop and then you can check for errors on FILENAME.PRT file and try to correct them.
When the run is finished, your folder contains the following files:
FILENAME.DBG FILENAME.EGRID FILENAME.PRT FILENAME.INIT FILENAME.SMSPEC FILENAME.UNRST FILENAME.UNSMRY FILENAME.RSSPEC FILENAME.INSPEC
Next step is visualization of obtained results
50
© I
FP
Reservoir Simulation November 27th,
2008
Visualization of results
FILENAME.PRT Script file with errors report
FILENAME.SMSPEC
FILENAME.EGRID
FILENAME.INIT
Field, well, block performances in OFFICE application
3D view in FLOVIZ application
Output filesOutput files
51
© I
FP
Reservoir Simulation November 27th,
2008
Output filesOutput files
Visualization of resultsOFFICE
Field, well, block performances in OFFICE application
52
© I
FP
Reservoir Simulation November 27th,
2008
Output filesOutput files
Visualization of resultsFLOVIZ 3D view in FLOVIZ application
53
© I
FP
Reservoir Simulation November 27th,
2008
ECLIPSE exerciseObjectives
Simulate the behavior of a development well Optimize its location Data review Flow simulations
54
© I
FP
Reservoir Simulation November 27th,
2008
ECLIPSE exerciseItems to be investigated
Production mecanisms: natural depletion, gas cap drive, water influx and water injection
Well's location: 9 possible locations for producer and 2 possible locations for injector
55
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exercise
Top of the reservoir
56
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exercisex-z cross section geometry
57
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exercisePossible wells location
58
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exerciseReservoir layering
59
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exerciseOil PVT functions
60
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exerciseGas PVT functions
61
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exerciseWater – oil Special Core Analysis
62
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exerciseGas – oil Special Core Analysis
63
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exerciseTasks
Look at the ECLIPSE data file Simulate different scenarii and visualize results: 2D,
3D Compare at each case: oil recovery, water
breaktrough, water cut, GOR and pressure. Check the ECLIPSE data: Initial fluids in place (check
material balance) and calculate the well PI and the expected drawdown at the well.
64
© I
FP
Reservoir Simulation November 27th,
2008
Rhombo exercise
Fluids: Calculate oil and gas compressibility in reservoir conditions.
Saturation functions: Calculate water oil & gas oil mobility ratio at saturation pressure
Initial state: Give the original fluids in place (oil, gas & water) in reservoir and stock
conditions. Are they compatible with PVT and SCAL data.
Natural depletion: Calculate the contribution of rock compaction & fluid expansion to
reservoir voidage (if there is no aquifer).
Well performance: Calculate the well productivity assuming a skin of 7.