PG. 1 Page | 2.3-1
Appendix 2.7
• UPC Response on GF Pre-concept
Review Submission
• ISDM Model output Capabilities
• Sustainability Design Guidelines
o Construction Air Quality Management
o Construction and Demolition Waste
Management
o Erosion and Sedimentation Control
Plan
o Minimum Energy Performance
• Preliminary Estidama Scorecards
(Follow up tasks identified)
• Estidama Registration Form
• Response to GF Comments on Draft
Report
PG. 1 Page | 2.3-1
UPC Response on GF Pre-concept Review Submission
1
Project Details Building or Project Name: Global Foundries
From: Edwin Young
To: Name/ email Terri Va
cc. Name/ email
cc. Name/ email Heidi Brothers
cc. Name/ email Adi Afaneh
Note/ Comment In relation to the recent submission from the design team, we comment as followed in relation to the Estidama section of the documentation
1. In the meeting there was sufficient intent process of sustainable design and construction was being offered and followed
2. We confirm that the Ratings will require to be 2 Pearl as the project is Government led
3. Within the Concept Application th
documentation Planning for Estidama
4. We confirm that it is acceptable to rate the office building separate from the Fab facility, but the energy centre will be include with
5. We recommend that passive measures for peak cooling reduction be focused on before the use
of renewable technologies, but we support the use of solar thermal for hot water generation.
6. We will require a statement of intent in relation within all future applications
7. We would welcome ongoing participation with Global Foundriesduring the concept stage of the design to ensure synergy with the PRS program
------------------- End of Note ------------------------------------------------
Estidama File Note
File Note ID Number: EY
Estidama Project ID Number: Global Foundries- Pre-Concept Comments
Date: 29th
Global Foundries - Pre-Concept Submission
Edwin Young Edwin.Young@upc.gov.ae
Valiant
Heidi Brothers
Adi Afaneh
In relation to the recent submission from the design team, we comment as followed in relation to the Estidama section of the documentation
In the meeting there was sufficient intent shown by the design team and the client to confirm the process of sustainable design and construction was being offered and followed
We confirm that the Ratings will require to be 2 Pearl as the project is Government led
Within the Concept Application the design team should follow the guidance within the UPC documentation Planning for Estidama (copy attached) communities
We confirm that it is acceptable to rate the office building separate from the Fab facility, but the energy centre will be include within that rating
We recommend that passive measures for peak cooling reduction be focused on before the use , but we support the use of solar thermal for hot water generation.
We will require a statement of intent in relation to site wide construction wastewithin all future applications
ongoing participation with Global Foundries and its design team particularly during the concept stage of the design to ensure synergy with the PRS program
------------------------------------------------
Estidama File Note
File Note ID Number: EY-FN-001
roject ID Number: Global Concept Comments
th August 2010
Edwin.Young@upc.gov.ae
In relation to the recent submission from the design team, we comment as followed in relation to the
shown by the design team and the client to confirm the
We confirm that the Ratings will require to be 2 Pearl as the project is Government led
e design team should follow the guidance within the UPC
We confirm that it is acceptable to rate the office building separate from the Fab facility, but the
We recommend that passive measures for peak cooling reduction be focused on before the use , but we support the use of solar thermal for hot water generation.
site wide construction waste management
and its design team particularly during the concept stage of the design to ensure synergy with the PRS program
PG. 1 Page | 2.3-1
ISDM - Model output capabilities
ISDM – Model Output Capabilities
ISDM MODEL
1. ISDM MODEL – SUMMARY DASHBOARD
The ISDM model results are presented in a dashboard arrangement demonstrating a high level
summary of conservation measures applied for both Administration Building and FAB.
Figure 1 – ISDM Model Summary
ISDM – Model Output Capabilities
2. CONSERVATION SCENARIOS SUMMARY: ADMINISTRATION BUILDING
The model has the capability to assess up to 5 scenarios compared against the ‘Business as
Usual’ (BAU) case. The Figure below is indicative of the reduction targets that can be applied on
different model scenarios.
Figure 2 – Applied Reduction Factors
3. CONSERVATION MEASURES: ADMINSTRATIVE BUILDING
3.1. WATER
Water Conservation – Example
Various water conservation rates can be applied for each scenario to match Estidama credit
criteria for water reduction. The table below shows an example of reduction target of 15%
applied uniformly for all office water use types.
4
Customer Type Corporate
Officers R&D HR
Lease
Space Auditorium
Fitness
Center Cafeteria
Management
Retails (Warehouse) 15% 15% 15% 15% 15% 15% 15% 15%
Office (Admin) 15% 15% 15% 15% 15% 15% 15% 15%
Institute (Clean Office) 15% 15% 15% 15% 15% 15% 15% 15%
Service (Lab) 15% 15% 15% 15% 15% 15% 15% 15%
WATER USE REDUCTIONS3
SAVE END USE FIXTURES CLOSEApply Uniform
Reduction
ISDM – Model Output Capabilities
Water Efficient Fixtures
The table below shows how the reduction target can be achieved by using water efficient
fixtures for various water use types.
3.2. SOLID WASTE
Operational Solid Waste Reduction – example
Various waste reduction rates can be applied for each scenario to match Estidama credit
criteria. The table below shows an example of a reduction target of 15% applied uniformly for all
types of waste generated in the Administration Building.
3.3. ENERGY
Energy Load Reduction - example
Similarly to the water and waste conservation measures, various scenarios can be developed in
line with the Estidama credit requirements. The table below shows an example of an energy
load reduction target of 15% applied.
4
Customer Type Corporate
Officers R&D HR
Lease
Space Auditorium
Fitness
Center Cafeteria
Management
Engineering
& MTS
Maintenance
Technicians
WFTs Supplier
Facility
Customer
Facility
Contingency
Retails (Warehouse) 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
Office (Admin) 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
Institute (Clean Office) 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
Service (Lab) 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
MUNICIPAL SOLID WASTE REDUCTIONCLOSE
S3
Apply Uniform
ReductionSAVE SWM MANAGEMENT
ISDM – Model Output Capabilities
ISDM – Model Output Capabilities
4. CONSERVATION MEASURES – FAB
The following tables are indicative of the various scenarios that can be used when considering
energy and water conservation measures for the FAB Building (2 scenarios are shown). Please
note that ‘1’ indicates measures considered and ‘0’ measures excluded for each scenario.
FAB Conservation Measures - Scenario 1
FAB Conservation Measures - Scenario 2
FAB CONSERVATION MEASURES2
Technology Implemented
Use air handler fan energy to reheat air 1
Dual Temperature Chilled Water Plant Energy Reduction 1
Energy Savings Resulting From reduction of filter coverage from 25 to 20% 1
Use of Premium Efficiency motors (MAU) 1
Use of Premium Efficiency motors (secondary chiller pumps) 1
Variable frequency drives to improve energy / operational efficiency (MAU) 1
Variable frequency drives to improve energy / operational efficiency (secondary chiller pumps) 1
Air side economizer – Energy recovery from general exhaust to pre-cool air intake 1
Power Factor Improvement - include capacitors to improve to 0.95PF 1
Higher thickness of roof insulation for improved thermal resistance 1
Triple glazing 1
Desalination water sourced off site (Additional Cost) 0
Wastewater reclamation (Cooling Towers) 1
MAU Condensate Recover for reuse 1
S1 SAVE CLOSE
FAB CONSERVATION MEASURES3
Technology Implemented
Use air handler fan energy to reheat air 1
Dual Temperature Chilled Water Plant Energy Reduction 1
Energy Savings Resulting From reduction of filter coverage from 25 to 20% 1
Use of Premium Efficiency motors (MAU) 0
Use of Premium Efficiency motors (secondary chiller pumps) 0
Variable frequency drives to improve energy / operational efficiency (MAU) 1
Variable frequency drives to improve energy / operational efficiency (secondary chiller pumps) 1
Air side economizer – Energy recovery from general exhaust to pre-cool air intake 1
Power Factor Improvement - include capacitors to improve to 0.95PF 0
Higher thickness of roof insulation for improved thermal resistance 1
Triple glazing 1
Desalination water sourced off site (Additional Cost) 0
Wastewater reclamation (Cooling Towers) 1
MAU Condensate Recover for reuse 1
S2 SAVE CLOSE
PG. 1 Page | 2.3-1
Sustainability Design Guidelines
GLOBALFOUNDRIES Construction and Demolition Waste Management – Design Guidelines
1
Construction and Demolition Waste Management
GLOBALFOUNDRIES Construction and Demolition Waste Management – Design Guidelines
2
1. SECTION OVERVIEW
This section includes the waste management, disposal and all relevant documentation requirements and procedures to be implemented during construction.
2. DEFINITIONS
Waste – Any substance or object the holder discards, intends to discard or is required to dispose of.
Land-Clearing Debris - Waste materials resulting from land-clearing that include pre-existing development materials and plant matter, but do not include soil.
Reused Waste - Waste materials that are reused at the construction site or sent to a location off-site (e.g. another construction project or product supplier) where they are used in their original form (i.e. without additional processing).
Recycled Waste - Waste materials that are sent off-site to a recycling facility where they are used to displace virgin materials as resource for manufacturing processes that create new products.
Landfill Waste - Waste materials that are sent to a landfill site for disposal
Hazardous Waste - comprise of residues or ash of different activities and operations containing properties of hazardous substances
Centre of Waste Management of Abu Dhabi (CWM) - Agency responsible for controlling and coordinating waste management activities throughout the Emirate. The Centre issues licenses License: Waste Transportation Vehicles and Companies, Temporary Waste Collection and Transportation Permits, Hazardous Waste Transportation Permit, Waste Handling Company Permit, Waste Charges for Trade Licenses of Industrial and Commercial Companies
Waste Service Provider - Companies holding licenses from Abu Dhabi Waste Management Centre for carrying and disposing waste in approved facilities. Registered Providers are posted on CWM website (http://www.cwm.ae/) and updated regularly.
3. REFERENCES
This Document should be revised to incorporate inputs from HSEIA or similar EHS study required for Globalfoundries to obtain an EHS ‘Permit to Establish’ and ‘EHS Permit for Construction’ by the Environment Agency of Abu Dhabi (EAD) and the Higher Corporation for Specialized Economic Zones (ZonesCorp).
The following guidelines shall be followed:
� ESTIDAMA 2010, The Pearl Rating System for Estidama (Building Rating System) – Design and Construction, V.1.0
� Environment Agency of Abu Dhabi, Technical Guidance Document for Construction Environmental Management Plan (CEMP), April 2010
� ZonesCorp Waste Management Requirements
4. OBJECTIVES
A 70 % (weight/volume) waste diversion rate from landfill for construction and demolition waste should be targeted to achieve credits under Estidama Building Rating System. The targeted credits to be obtained under the Estidama are shown on the table below:
GLOBALFOUNDRIES Construction and Demolition Waste Management – Design Guidelines
3
Diversion Rate Credit Targeted Total Points Targeted
70% (weight/volume) Estidama
� SM – R2: Basic Construction Waste Management
� SM-13 Credit: Improved
Construction Waste Management
Mandatory Credit + 2 Points (Optional Credit)
5. DESCRIPTION OF WORK
Identify, implement and document measures to achieve the waste management objectives listed above.
Follow a strategy based on the 3R’s hierarchy: Reduce the generation of waste materials at the project site, reuse waste materials at the construction site (when feasible) and Recycle waste materials as a resource for manufacturing new products. Waste Management and Disposal activities shall include but not be limited to:
� Preparing waste management documentation and submittals to summarize all transfers of waste materials from the project site
� Coordinating waste management tasks with subcontractors to ensure timely and orderly progress of the work
� Supervising on-site waste management activities on a daily basis
� Arranging waste segregation facilities within the project site boundaries and consider secondary waste segregation locations to encourage segregation at the source as practicable.
� Arranging waste management service agreements with waste service providers and waste receiving facilities
� Reporting waste management progress to the Consultant
6. ROLES AND RESPONSIBILITIES
6.1. DESIGN CONSULTANT
� Adopt design and procurement methods to minimise use of materials and waste
arisings as Best Practice
� Identify items to be recycled / salvaged and develop a log indicating activity/source
of the generated for each type of waste as well as estimated volume. Consider
materials such as concrete, brick, metal, wood, gypsum, plastic, cardboard etc.
� Identify potential Waste Service Providers to be appointed for each type of waste
and indicate location. Waste Service Providers must be licensed by the Abu Dhabi
Waste Management Center
GLOBALFOUNDRIES Construction and Demolition Waste Management – Design Guidelines
4
� Establish targets for diversion from landfill in compliance with Estidama diversion
rate of 70% of total waste generated during construction (weight/volume) or more
(to achieve additional points).
� Develop a Construction and Demolition Waste Management Plan (CDWMP). The
Plan shall include targets estimated and shall incorporate local regulatory
requirements and relevant approved documentation by Regulatory Authorities. The
CDWMP shall be included in the Project Specifications for contractors compliance
� Prepare required documentation for Credit review under Estidama rating system
6.2. CONTRACTOR
� All Contractors are responsible for the appointment of a Waste Management
Contractor approved by Abu Dhabi Waste Management Center (WMC).
� Contractors shall prepare and maintain required documentation prior to
construction commencement and during construction progress.
� All Contractors shall implement the guidelines specified within this document
(Construction Waste Management Plan) to ensure compliance with
EAD/ZonesCorp requirements and to achieve required credits Estidama
certification
� Implementation of the Construction Waste Management Plan (CWMP) may involve
activities performed by Subcontractors and Suppliers. All Main Contractors,
Subcontractors and Suppliers shall be responsible for segregating construction
waste into recyclable components, non-recyclable waste and hazardous wastes.
� Site Supervisors are responsible for coordinating the implementation, and
enforcement of the CWMP, as well as to ensure that the workforce, through
adequate and continuous training, complies with prescribed protocols
� Staff personnel will implement and follow the requirements of the CWMP
� Contractors are responsible of tracking waste being generated, recycled and
disposed off site to through the submission of waste tracking reports as specified
by the client.
6.3. ENGINEER / CLIENT REPRESENTATIVE
� The Engineer / Client Representative will oversee Contractors’ compliance with
DCWMP requirements.
7. CO-ORDINATION MEETINGS
Coordination Meetings should be undertaken between the Design Consultant, the Contractor (subcontractors when required) and the Engineer / Client Representative to review and monitor Waste Management and Disposal requirements. The meeting shall include a review of the following at a minimum:
� Waste Management and Disposal objectives
� Waste Management and Disposal requirements and procedures
� Waste Management and Disposal documentation and submittals
GLOBALFOUNDRIES Construction and Demolition Waste Management – Design Guidelines
5
8. SUBMITTALS
� Waste Description and Proposed Receiving Facilities (to include at a minimum)
� Waste Tracking Worksheet (Including receipts, invoices, letters and other documentation)
� Final Waste Diversion Report (Summary of Final results against target and receipts, invoices, letters and other documentation)
GLOBALFOUNDRIES Construction Indoor Air Quality Management – Design Guidelines
1
Construction Indoor Air Quality Management
GLOBALFOUNDRIES Construction Indoor Air Quality Management – Design Guidelines
2
1. OVERVIEW
Overview of indoor air quality management (including product/material selection) requirements and procedures
2. DEFINITIONS
Pollutant Source – Sources of indoor air pollutants on the construction site. Any construction activity or material that produces odour and/or dust is considered a source of air pollutants (e.g. paints, coats, generators, compressors, cutting tools, vehicles etc.)
Volatile Organic Compounds (VOCs) - Organic chemicals that produce vapors readily at room temperature and normal atmospheric pressure (e.g. gasoline, solvents, etc.)
3. REFERENCES
� Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA). IAQ Guidelines for Occupied Buildings Under Construction, 2007, 2nd Edition
� ASHRAE. ANSI/ASHRAE 52.2-1999: Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size.
� BS EN 779 2002 Particulate Air filters for general ventilation – determination of the filtration performance
4. OBJECTIVES
� Meet requirements to achieve Estidama LBi-3: Construction Indoor Air Quality Management and LEED IEQ Credit 3.1 on Construction Indoor Air Quality Management Plan (Construction) and LEED IEQ Credit 3.2 Construction Indoor Air Quality Management Plan (Before Occupancy).
� Meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning Contractors National Association (SMACNA) IAQ Guidelines for Occupied Buildings under Construction, 2007, 2nd Edition
� Protect construction workers and future building occupants from indoor air quality problems resulting from construction activities and building materials.
� Reduce the production and circulation of pollutants during construction.
� Protect equipment and absorptive materials stored and installed on-site from moisture, dust and dirt accumulation during construction.
� Prepare the building for occupancy following construction and prior to occupancy.
5. DESCRIPTION OF WORK
Indoor air quality management activities shall include:
� Preparing indoor air quality management documentation and submittals as detailed herein
� Identifying source of pollution and control measures
� Identifying, implementing and documenting measures to achieve the indoor air quality management objectives
� Supervising on-site indoor air quality management activities on a daily basis
GLOBALFOUNDRIES Construction Indoor Air Quality Management – Design Guidelines
3
� Coordinating indoor air quality management tasks with subcontractors to ensure timely and orderly progress of the work
� Conducting indoor air quality management inspections and making necessary repairs
� Maintaining an indoor air quality inspection log to document observations, deficiencies and corrective actions
� Reporting indoor air quality management progress to the Engineer / Client Representative
6. ROLES AND RESPONSIBILITIES
6.1. DESIGN CONSULTANT
� Develop an Indoor Air Quality Management (IAQ) Management Plan to address at a minimum: Source Control during construction, Building Flush Out and Resuming Normal Building Operation upon construction completion as per Estidama requirements
� Prepare IAQ Planning Checklists as per SMACNA IAQ Guidelines (Appendix C)
� Identify and evaluate proposed controls measures as per SMACNA IAQ Guidelines (Appendix C)
� Assess the duration of pre-occupancy flush-out per Estidama requirements
� Prepare documentation for Credit review under Estidama/LEED rating system
6.2. CONTRACTOR
� The Contractor will be responsible in developing and implementing a Construction IAQ Plan compliant with the requirements as stipulated herein.
� The Contractor should designate one person to be responsible for all aspects of Construction Indoor Air Quality coordination (during construction) related to indoor air quality management.
6.3. ENGINEER / CLIENT REPRESENTATIVE
7. THE ENGINEER / CLIENT REPRESENTATIVE WILL OVERSEE CONTRACTOR’S COMPLIANCE WITH THE CONSTRUCTION INDOOR AIR QUALITY PLAN COORDINATION MEETINGS
Coordination Meetings shall be held (Prior to mobilization on-site, the Contractor shall hold a kick-off meeting with the Engineer / Client Representative to review indoor air quality management requirements. This meeting shall include a review of:
� Indoor air quality management objectives
� Indoor air quality management requirements and procedures
� Indoor air quality management documentation and submittals
8. SUBMITTALS
� Detailed Construction Indoor Air Quality Management Plan
GLOBALFOUNDRIES Construction Indoor Air Quality Management – Design Guidelines
4
� IAQ Planning Checklists
� Submit IAQ Planning Checklists and evaluations of proposed control measures as per Appendix C of SMACNA IAQ guidelines for occupied building under construction
� IAQ Inspection Checklists
� Develop the IAQ inspection Checklists as per Appendix C of Smacna IAQ Guidelines
� Complete the log on a weekly basis. The log shall commence when the building is enclosed and carry through to building turnover.
� Summary Report
GLOBALFOUNDRIES Minimum Energy Performance – Energy Reduction Design Guidelines
1
Minimum Energy Performance – Energy Reduction
GLOBALFOUNDRIES Minimum Energy Performance – Energy Reduction Design Guidelines
2
1. SECTION OVERVIEW
This section includes a guide to establish Building Minimum Energy Performance and assist the building design decision making assessing various options to achieve minimum level of energy efficiency.
2. REFERENCES
ASHRAE/IESNA 90.1 – 2007: Energy Standard for Building except Low-Rise Residential Buildings
3. OBJECTIVES
� To establish minimum level of energy efficiency for the building and systems and demonstrate a minimum of 12% performance improvement compared to baseline building performance to comply with RE-R1 Credit: Minimum Energy Performance (Estidama Rating System)
� Achieve reduction in the building energy consumption against the Baseline Building Performance during operation to achieve RE-1 Credit Improved Energy Performance (Estidama Rating System) To obtain additional credits the following energy reduction must be achieved:
Energy Reduction % Estidama Additional Points
12% None (Required Credit)
14% 1
16% 2
18% 3
20% 4
22% - 22.5% 5 (22.5%)
24 – 25 % 6 (25%)
27.5 – 28 % 7 (27.5%)
30 % 8
32 – 32.5% 9 (32.5%)
34 - 35 % 10 (35%)
40 % 11
44 – 45% 12 (45%)
50% 13
55% 14
60% 15
4. DESCRIPTION OF WORK
GLOBALFOUNDRIES Minimum Energy Performance – Energy Reduction Design Guidelines
3
� Develop an Energy simulation model to calculate building energy consumption and identify the most cost effective energy efficiency measures. The model should comply with ANSI/ASHRAE/IESNA Standard, 2007.
� Ensure that the proposed design (Building envelop and systems) complies with baseline requirements as per the specified sections ASHRAE/IESNA 90.1 – 2007: Energy Standard for Building except Low-Rise Residential Buildings (Sections 5.4, 6.4, 7.4, 8.4, 9.4, 10.4)
� Compare energy efficiency measure and optimized performance against baseline energy performance
� Develop and submit Energy Model Template and calculations summarizing the model results as per Estidama Design and Construction Submission requirements
5. ROLES AND RESPONSIBILITIES
5.1. DESIGN CONSULTANT
� The Design Consultant is responsible for developing the building envelope and systems design to meet credit requirements
� Develop, in conjunction with the Modeling Consultant, a series of energy conservation measures to be considered for the simulation exercise
� Provide with all energy costs associated with the Energy Performance
� The Design Consultant shall manage the Energy Modeling process to comply with Estidama requirements and referenced standards in coordination with the modeling consultant
� The Design Consultant is responsible of ensuring that the required documentation is maintained and submitted as needed to achieve the required credits under the Estidama rating systems.
5.2. MODELING CONSULTANT
� Develop and run simulation model and maintain all required documentation for the purpose of the credit submissions
� The Modeling consultant in conjunction with the Design Consultant shall identify the most cost effective measures to be considered during the modeling exercise.
6. CO-ORDINATION
Coordination Meetings shall be held between the Design and the Modeling Consultant on a regular basis to establish modeling requirements, identify cost effective energy reduction measures, review model results, credit submission requirements etc.
7. SUBMITTALS
The following documentation will be developed and submitted as part of the credit submission as per Estidama requirements:
� Documentation of the all the measures considered that reduce process loads and energy load savings
� Energy Cost Calculations
GLOBALFOUNDRIES Minimum Energy Performance – Energy Reduction Design Guidelines
4
� Energy Model Template, calculations and narrative summarizing the model results
8. METHODOLOGY
Methodology of the Energy Model Template should be compliant with Estidama Credit Calculation requirementsand ASHRAE/IESNA 90.1 – 2007
GLOBALFOUNDRIES Erosion and Sedimentation Control – Design Guidelines
1
Erosion and Sedimentation Control (ESC)
As mentioned in Section 7.4 ESC measures reflect LEED credit requirements, whereas similar controls compliant with Estidama requirements are expected to be included in the Construction Environmental Management Plan (CEMP). It is understood that the CEMP will be prepared by the appointed Environmental Consultant on behalf of GF. This is expected to fulfill the Estidama Credit IDP – 3 (Construction Environmental Management Plan).
GLOBALFOUNDRIES Erosion and Sedimentation Control – Design Guidelines
2
1. REFERENCES
� U.S. Environmental Protection Agency, Office of Water. “Chapter 3: Sediment and Erosion Control” and Chapter 4: Other Controls”. Document No. EPA 832-R-92-005 Storm Water Management for Construction Activities, 1992
� Environment Agency of Abu Dhabi, Technical Guidance Document for Construction Environmental Management Plan (CEMP), April 2010
2. OBJECTIVES
� Prevent the loss of soil from the construction site resulting from storm water runoff, wind erosion, and construction activities.
� Prevent the sedimentation of storm sewers and receiving waters.
� Prevent air pollution caused by dust and particulate matter.
� Meet or exceed the requirements of LEED-NC Version 3.0 Sustainable Sites Prerequisite 1 “Erosion & Sedimentation Control” which specifies compliance with 2003, EPA Construction General Permit (Provisions for Phase I and Phase II of the National Pollutant Discharge Elimination System Programme), or local erosion and sedimentation control standards and codes, whichever is more stringent.
3. DESCRIPTION OF WORK
Develop a detailed Erosion and sedimentation control plan to include activities such as:
� Identifying construction activities potentially causing dust generation, soil erosion and sedimentation as well as applicable mitigation measures
� Develop a Drawing showing erosion and sedimentation control measures as described in this Section
� Installing erosion and sedimentation control products
� Supervising on site erosion and sedimentation control activities on a daily basis
� Coordinating erosion and sedimentation control tasks with subcontractors to ensure timely and orderly progress of the work
� Conducting erosion and sedimentation control inspections and making necessary repairs
� Maintaining an erosion and sedimentation control inspection log to document observations, deficiencies and corrective actions
� Preparing erosion and sedimentation control documentation and submittals as detailed herein
� Reporting erosion and sedimentation control progress to the Consultant
4. ROLES AND RESPONSIBILITIES
GLOBALFOUNDRIES Erosion and Sedimentation Control – Design Guidelines
3
4.1. DESIGN CONSULTANT
� Identify Construction Activities with potential soil erosion and sedimentation impacts
� Carry out an analysis of site limitations and constraints such as slope, surface water streams, soil erodability etc.
� Develop an Erosion and Sedimentation Control (ESC) Management Plan to prevent soil erosion and stormwater runoff during construction in compliance with LEED and local regulatory requirements
� Prepare required documentation for Credit review under Estidama/LEED rating system
4.2. CONTRACTOR
� Contractors will be responsible in developing and implementing a project specific ESC Management Plan in compliance with GF requirements
� Each contractor should designate one or more persons (depending on scale and risk of the construction activities) to be responsible for all aspects of LEED coordination (during construction) related to erosion and sedimentation control.
� Each Contractor shall design, document and implement the erosion and sedimentation control measures during construction to meet LEED requirements.
4.3. ENGINEER / CLIENT REPRESENTATIVE
� The Engineer / Client Representative will oversee Contractors’ compliance with the Erosion and Sedimentation Control requirements as stipulated herein
5. COORDINATION MEETINGS
Coordination meetings with the Design Consultant, the Contractor (in conjunction with the Engineer / Client Representative) and subcontractors when required to review erosion and sedimentation control requirements. This meeting shall include a review of:
� Erosion and sedimentation control objectives
� Erosion and sedimentation control requirements and procedures
� Erosion and sedimentation control documentation and submittals
6. SUBMITTALS
GLOBALFOUNDRIES Erosion and Sedimentation Control – Design Guidelines
4
� Site Drawing with specifications that detail the specifications of the erosion/sedimentation controls to be followed (The drawing shall also show: project site, the nearest stormwater drain, areas of soil disturbance and areas that will not be disturbed, Materials or equipment storage areas, waste handling areas, stormwater discharge locations, areas where stabilization is likely to occur etc.)
� List of activities likely to generate soil erosion/sedimentation and/or soil/water pollution; List of the specific control measures to be applied with a Brief Description (Best Management Practices ‘BMPs’)
� Inspection and Photograph Checklist
� At the end of construction or prior to removal, whichever comes first Submit the completed checklist
PG. 1 Page | 2.3-1
Preliminary Estidama Scorecards
Pearl Building Rating System
Credit Section Credit Points Available (Yes)
Credit Points
(Maybe)
Credit Points
IDP - Integrated Development Process 13 10 3
Project Name GF NS - Natural Systems 12 2 0
Project ID Administration Building LB - Livable Buildings 36 21 11
Pearl Rating Stage PW - Precious Water 43 15 19
Date 1/10/2010 RE - Resourceful Energy 44 13 15
SM - Stewarding Materials 28 6 17
IP - Innovating Practice 3 2 1
Project Summary
Project Details
IP - Innovating Practice 3 2 1
Total 69 66
Total Credit Points Pearl Rating
Required credits only 1
60 2
85 3
115 4
140 5
Pearl Rating Levels
Design Pearl Rating 2
Construction Pearl Rating 1
Pearl Building Rating System
Project Name GF
Project ID Administration Building
Pearl Rating Stage
Date 1/10/2010
Credit Points Summary
Yes Maybe NoMaster
Plan
Building
DesignConstr. Phase
IDP
IDP-R1 Integrated Development Strategy Required X
Integrated Development Implementation Strategy: to facilitate an effective transition
between project stages and project packages to ensure that the initial vision, objectives and
targets are carried through to completion. Identify Vision, set objectives, targets and KPIs,
Team Chart and Roles etc.)
GF Industry Requirement Report provided by GF
IDP-R2 Tenant Fit-Out Design & Construction Guide Required X X Tenant Fit-Out Design & Construction Guide in order to formally communicate to future
tenants and their design requirements
Not applicable for GF. Requires Clarification
with Estidama
IDP-R3 Basic Commissioning Required X X
Demonstrate that: An independent commissioning agent, reporting to the project owner, is
engaged as part of the project design team throughout the design stages; Commissioning Plan
and Comprehensive commissioning requirements in project specifications and, At the building
completion stage the building has been commissioned by independent commissioning
engineers; The commissioning report has been reviewed and verified prior to building
completion.
Appoint a Commissioning Agent reporting to GF
(Design Stage) / Incorporate commissioning
requirements at building completion stage.
IDP-1 Life Cycle Costing 4 4 X X Use Life Cycle Cost analysis during design
GF to consider appointing a qualified
professional to conduct LCC analysis and update
it through future project stages. CH2M HILL to
include this requirements in RFP
documentation. The LCC proffessional can still
be independent of CH2M and report directly to
GF.
IDP-2 Guest Worker Accommodation 2 2 X X Develop a Guest Worker Accommodation Plan. To be inlcluded in Design Documents
Description Remarks
Integrated Development Process
Yes
Yes
Yes
Project Details
Credit Reference Credit TitleCredit Points
Available
Attainable Design Project Phase
IDP-2 Guest Worker Accommodation 2 2 X X Develop a Guest Worker Accommodation Plan. To be inlcluded in Design Documents
IDP-3 Construction Environmental Management 2 1 1 X X( 1 ) - Develop the CEMP in accordance with Abu Dhabi Environment Agency’s regulations. ( 1
) - Project Lead Contractor is ISO 14001 or EHSMS Certified.Input from Environmental Consultant
IDP-4 Building Envelope Verification 1 1 XDemonstrate that the building envelope meets the design intent and minimizes building
impacts from condensation, water ingress, air infiltration and improper drainage.
Difficult to verify on site (ASHRAE
Guidelines2005, NIBS GL3, BSRIA)
IDP-5 Re-Commissioning 2 2 XDemonstrate that the building performs as designed to protect occupant health and comfort,
as well as providing for ongoing building efficiency.To be determined
IDP-6 Sustainability Awareness 2 2 X( 1 ) - Develop an Occupant Handbook. ( 1 ) - Design an occupant feedback mechanism to give
information on how they impact building performance.To be included in Design requirement
TOTAL 13 10 3 0
NS
NS-R1 Natural Systems Assessment Required XEstablish environmental baseline conditions on site and surroundings to be considered and
assessed at the design stage
Input from ERM / Phase I Assessment and
detailed field surveys to be conducted by
environmental consultantNS-R2 Natural Systems Protection Required X
To protect significant and valuable Natural Systems assets identified in NS-R1 Natural Systems
Assessment.As above
NS-R3Natural Systems Design and Management
StrategyRequired X
To minimize demand for resources, promote soil protection and enhancement and ensure the
long term survival and management of landscaped/habitat areas.Incorporate in Landscape Design
NS-1 Reuse of Land 2 2 X ( 2 ) Demonstrate that at least 75% of the site area has been previously developed.
NS-2 Remediation of Contaminated Land 2 2 X( 2 ) Demonstrate the site is contaminated and an assessment report and remediation strategy
has been prepared.
NS-3 Ecological Enhancement 2 2 X
( 1 ) - 50% of plants to comprise of native and adaptive drought and / or saline tolerant
species including a minimum of 5 different types of species. ( 2 ) - 70% of plants to comprise
native and adaptive drought and / or saline tolerant species including a minimum of 10
different types of species.
Incorporate in Landscape Design
NS-4 Habitat Creation and Restoration 6 6 X
( 4 ) - Prepare a Habitat Creation or Restoration Strategy; and Allocate an on-site or off-site
habitat creation or restoration site of minimum areas as defined above. ( 2 ) - Demonstrate
that through collaboration, off-site ecological corridors have been designed to link similar
habitat types.
TOTAL 12 2 0 10
LBo
LBo-R1 Plan 2030 Required X
Demonstrate that the proposed development is located within an Urban Growth Boundary as
identified by UPC’s adopted Framework Plans. Demonstrate that the proposed development’s
Floor Area Ratio (FAR), dwelling units per hectare (du/ha), building height, building mass,
transportation and open space networks are consistent with the applicable Plan 2030 and/or
Development Code and/or Area Plan.
Obtain Letter from UPC
Required
Demonstrate that, before the start of the design process and site clearance, an urban systems
assessment has been carried out for the project site and at the following scales: Local, Sub-Yes
Natural Systems
Yes
Yes
Yes
Livable Building : Outdoors
Yes
LBo-R2 Urban Systems Assessment Required Xassessment has been carried out for the project site and at the following scales: Local, Sub-
regional, and Regional scale. Identify opportunities and constraints associated with the
development and compile an Urban Systems Assessment Report.
LBo-R3 Outdoor Thermal Comfort Strategy Required X
Shade measures (cover or shade) must be provided in all applicable spaces and achieve a
minimum percent shading. Shade measures include: Exterior Surface Parking with more than
10 spaces (including parking on roof surfaces) 40%, Public Open Spaces (including privately
owned) 60%, Primary Pedestrian Walkways (based on 1.8m width within the through zone)
75%, Secondary Pedestrian Walkways (based on 1.8m width within the through zone) 75%,
Cycle Tracks 50%, Playgrounds 90%
Follow up with Planning Team
LBo-1 Improved Outdoor Thermal Comfort 2 2 x X
Demonstrate that the outdoor thermal comfort strategy has been improved beyond the
minimum established under credit LBo-R3 Outdoor Thermal Comfort Strategy by increasing
the shade measures. (1)50 % (2)55 % - Surface car parking, including parking on roof surfaces
(1)65 % (2)70 % - Public Open Space, including privately owned (1)80 % (2)85 % - Primary
Pedestrian Walkway, based on 1.8m width within the through zone (1)80 % (2)85 % - Secondary
Pedestrian Walkway, based on 1.8m width within the through zone (1)55 % (2)65 % - Cycle
tracks
Follow up with Planning Team
LBo-2 Pearl Rated Communities 1 1 X Demonstrate that the building is located within a Pearl Rated community.
LBo-3 Accessible Community Facilities 1 1 XDemonstrate that the building is located within 350m safe walking distance of any of the five
listed amenities.
LBo-4 Active Urban Environments 1 1 X
Demonstrate that outdoor spaces have been provided and programmed to encourage activity,
including sport and recreation. Develop and implement an Active Urban Environment
Program.
LBo-5 Private Outdoor Space 1 XResidential Only: Provide 90% of units with outdoor amenity space as per the Credit
RequirementsNot Applicable
LBo-6 Public Transport 3 2 1 X
( 2 ) - Demonstrate that the building is within 350m of a tram and/or bus stop with a 15
minute frequency. ( 3 ) - Demonstrate that the building is also within 350m of a metro or
regional rail station.
Confirm with UPC on plans for tram line (North
to GF site)
LBo-7 Bicycle Facilities 2 2 X( 1 ) Meet the Credit Requirements for bicycle parking facilities. ( 1 ) Meet the Additional
Credit Requirements for shower, locker and changing facilities and/or cycle lanes.Confirm with GF on bicycle paths on site
LBo-8 Preferred Car Parking Spaces 1 1 X
6% of parking spaces provided must be identified for the sole use of priority vehicles. The
spaces must be optimally located for building access and half of the spaces must be supplied
with vehicle charging points.
Follow up with Planning Team
LBo-9 Travel Plan 1 1 X
Demonstrate the development of a Travel Plan. The Travel Plan must include: details of the
type of measures proposed to manage the demand for travel by car; targets for reducing car
travel; means of monitoring the effectiveness of the Plan; and remedial measures that will be
implemented in the event that the stated targets are not delivered.
Confirm with GF
LBo-10 Light Pollution Reduction 1 1 X Demonstrate light pollution reduction in compliance with the Credit Requirements Confirm with Technology Lead
14 5 5 3
Yes
Yes
TOTAL
LBi
LBi-R1 Healthy Ventilation Delivery Required X XProtect the quality of air drawn into buildings for ventilation and to ensure minimum delivery
of outdoor fresh air; Develop an Observational Survey of Local Air Quality
Input from Environmental Consultant (Baseline
Air Quality Assessment)
LBi-R2 Smoking Control Required X XDemonstrate appropriate measures are incorporated into the building design to reduce
exposure to tobacco smokeIncorporate in design requirements
LBi-R3 Legionella Prevention Required X X Manage the risk of Legionella in water based building systems. Incorporate in design requirements
LBi-1 Ventilation Quality 3 2 1 X
( 1 ) - CO2 sensors at all return points. ( 1 ) - Demonstrate an increase in
outdoor air ventilation of 15% above the outdoor air ventilation rates. ( 1 ) - Mixed Mode
Operation (not available to retail use type)
Confirm with Technology Lead
LBi-2.1 Material Emissions : Adhesives & Sealants 1 1 X 95% of all adhesives & sealants meet criteria. Confirm with GF on material selection
LBi-2.2 Material Emissions : Paints & Coatings 1 1 X 95% of all surface areas meet criteria Confirm with GF on material selection
LBi-2.3 Material Emissions : Carpet & Hard Flooring 1 1 X 100% of all carpets, carpet cushion, hard flooring and associated finishes comply Confirm with GF on material selection
LBi-2.4 Material Emissions : Ceiling Systems 1 1 X All ceiling systems meet credit criteria Confirm with GF on material selection
LBi-2.5 Material Emissions : Formaldehyde Reduction 2 2 X( 1 ) - All internal construction materials meet formaldehyde class E1 levels. ( 1 ) All internal
construction and furniture meets formaldehyde class E1 levels.Confirm with GF on material selection
LBi-3 Construction Indoor Air Quality Management 2 2 X Develop a construction IAQ plan Include in the specifications
LBi-4 Car Park Air Quality Management 1 1 X
For enclosed cark park. Ensure car parking ventilation design meets the credit requirements.
Where project does not contain any enclosed car parks (75% enclosed) the credit is
automatically awarded
Confirm with Planning Team
LBi-5.1 Thermal Comfort & Controls : Thermal Zoning 1 1 X Compliant thermal zoning strategy and controlsIncorporate in design requirements / Model to
determine cooling demand
LBi-5.2Thermal Comfort & Controls : Occupant
Control2 2 X
( 1 ) - General: 1 control per 2 occupants, General (Mixed Mode) : 50% occupied area, Multi-
Occupant Spaces (Office, Residential, Schools): 1 control per space (more if movable
partitions present). ( 1 ) - General: 1 control per 2 occupants & modulating HVAC systems in
multi-occupant spaces, General (Mixed Mode): 75% of occupied area, Multi-Occupant Spaces
(Office, Residential, Schools): 1 control per space (more if movable partitions present)
Confirm with Technology Lead
LBi-5.3Thermal Comfort & Controls : Thermal
Comfort Modeling2 2 X
( 1 ) - Category C Performance: PMV levels between -0.7 and +0.7 (15% PPD) & 90%
acceptability limits for Mixed Mode (if applicable). ( 1 ) - Category B Performance: PMV levels
between -0.5 and +0.5 (10% PPD) & 90% acceptability limits for Mixed Mode (if applicable).
PMV - Predicted Mean Vote, PDD - Predicted Percentage Dissatisfied
Confirm with Technology Lead
LBi-6 High Frequency Lighting 1 1 XGeneral: All high frequency fluorescent ballasts and occupancy sensors meeting credit
requirements.Incorporate in design requirements
Yes
Livable Building : Indoors
Yes
Yes
Pearl Building Rating System
Project Name GF
Project ID Administration Building
Pearl Rating Stage
Date 1/10/2010
Credit Points Summary
Yes Maybe NoMaster
Plan
Building
DesignConstr. Phase
Description Remarks
Project Details
Credit Reference Credit TitleCredit Points
Available
Attainable Design Project Phase
LBi-7 Daylight & Glare 2 2 X
( 1 ) - General : min 250 Lux for 50% of occupied area. Meet requirements for occupancy
sensors relevant to space type. Meet requirements for glare control relevant to space type. (
1 ) - General : min 250 Lux for 75% of occupied area. Meet requirements for occupancy
sensors relevant to space type. Meet requirements for glare control relevant to space type.
Allow Occupancy Sensor. Daylight Design
Software - Include in the design
LBi-8 Views 1 1 X General: 75% of occupied areas have views through vision glazing. Confirm with Architect
LBi-9 Indoor Noise Pollution 1 1 X Demonstrate that internal ambient noise levels do not exceed 50 dB(A) Leq in the area to be
occupied.Confirm with Architect
LBi-10 Safe & Secure Environment 1 1 X Develop & Implement Safety & Security Plan
Incorporate Estidama Requirements to Overall
Security Plan (In line with UPC Security
requirements where applicable)
23 16 6 1
PW
PW-R1 Minimum Interior Water Use Reduction Required x XDemonstrate that the project’s predicted interior potable water consumption will be no
greater than the baseline building water consumption using efficiency measures only.
Use UPC Water Calculator / Input from
Technology Lead
PW-R2 Exterior Water Monitoring Required x X
Demonstrate that easily accessible and clearly labelled water meters are provided and
capable of monitoring the water consumption of, at a minimum, the following exterior water
uses (where present): Heat rejection; External hose bibs; Irrigation systems; Swimming pools;
and Water features.
Incorporate at the design stage
TOTAL
Precious Water
Yes
Yes
and Water features.
PW-1 Improved Interior Water Use Reduction 15 5 5 5 X
Demonstrate using the Building Water Calculator that the proposed building has achieved the
following reduction in potable water consumption compared to the baseline building: ( 1 ) 4%
( 2 ) 8% ( 3 ) 12% ( 4 ) 16% ( 5 ) 20% ( 6 ) 24% ( 7 ) 28% ( 8 ) 32% ( 9 ) 36% ( 10 ) 40% ( 11 )
44% ( 12 ) 48% ( 13 ) 52% ( 14 ) 56% ( 15 ) 60%
Confirm with Technology Lead
PW-2.1 Exterior Water Use Reduction: Landscaping 8 2 4 2 X
( 2-4 ) Demonstrate that the average irrigation requirement for all landscaped areas has been
minimized. ( 1 ) Demonstrate that a water efficient irrigation system has been incorporated
into the landscape design. ( 1 ) Demonstrate that best practices for ongoing system
management and operation have been established. ( 2 ) Demonstrate that 100% of the
exterior irrigation demand can be served using the Exterior Water Allowance, and that a
recycled water mainline loop has been installed where Pearl Building Rating System: Design &
Construction, Version 1.0, April 2010 124 of 223 recycled water is not immediately available.
Confirm with Technology Lead
PW-2.2 Exterior Water Use Reduction: Heat Rejection 8 6 2 X
( 2-5 ) Demonstrate that a percentage of the projects cooling tower/district cooling water
make-up requirements can be served using the Exterior Water Allowance. ( 8 ) Demonstrate
that no water is required for heat rejection.
Confirm with Technology Lead
PW-2.3 Exterior Water Use Reduction: Water Features 4 2 2 X
( 2 ) Demonstrate that the water make-up requirements for all exterior water features can be
served using the Exterior Water Allowance. ( 1 ) Demonstrate that all external swimming
pools are provided with adequate pool blankets. ( 4 ) Demonstrate that there are no exterior
water features or swimming pools.
Confirm with Technology Lead
PW-3 Water Monitoring & Leak Detection 4 4 X
( 2 ) Demonstrate that metering facilities that monitor the water consumption of major
individual interior uses are installed. ( 2 ) Demonstrate that a leak detection system has been
installed.
Include requirements for Leak Detection into
Design requirements
PW-4 Stormwater Management 4 2 2 X
( 1-2 ) Stormwater management system is designed to meet Quantity Control criteria as per
Credit Requirements. ( 1 ) Stormwater management system is designed to meet Quality
Control criteria as per Credit Requirements. ( 1 ) An Operation & Maintenance Plan has been
developed.
Confirm with Technology Lead
TOTAL 43 15 19 9
RE
RE-R1 Minimum Energy Performance Required x X
Develop an energy model for the proposed building(s) using appropriate dynamic simulation
modeling software and calculate the baseline building energy consumption according to the
building performance rating method outlined in Appendix G of ANSI/ASHRAE/IESNA Standard
90.1-2007, using the minimum acceptable standards for building fabric, HVAC, service water
heating, power, lighting and other equipment. Demonstrate a minimum 12% performance
improvement compared to the baseline building performance demonstrated by the energy
simulation model as per the methodology outlined within Appendix G of Standard 90.1-2007.
Include Energy Model in design requirements
RE-R2 Energy Monitoring and Reporting Required x X
Demonstrate that easily accessible and clearly labelled energy sub-meters are provided which
enable a minimum of 90% of the estimated annual energy consumption of each fuel type
(electricity, gas etc) to be monitored as outlined within the Calculations and Methodologies Include in specifications
Yes
Yes
Resourceful Energy
RE-R2 Energy Monitoring and Reporting Required x X(electricity, gas etc) to be monitored as outlined within the Calculations and Methodologies
section.
Include in specifications
RE-R3Ozone Impacts of Refrigerants & Fire
Suppression SystemsRequired x X
Refrigerants - Demonstrate that all refrigerants to be installed within the project site
boundary have an ozone depletion potential (ODP) of zero. Fire Suppression Systems -
Demonstrate that all gaseous fire suppression systems to be installed within the project site
boundary have an ozone depletion potential (ODP) of zero
Include in specifications
RE-1 Improved Energy Performance 15 5 5 5 X
Demonstrate further percentage reductions in the proposed building energy consumption
beyond the baseline building consumption determined in RE-R1. Points are awarded as
follows: ( 1 ) 14% ( 2 ) 16% ( 3 ) 18% ( 4 ) 20% ( 5 ) 22.5% ( 6 ) 25% ( 7 ) 27.5% ( 8 ) 30% ( 9 )
32.5% ( 10 ) 35% ( 11 ) 40% ( 12 ) 45% ( 13 ) 50% ( 14 ) 55% ( 15 ) 60%
The points indicated are based on assumptions
and excpected to be revised once Energy
Simulaition baseline and options are developed
RE-2 Cool Building Strategies 6 3 1 1 X
( 1-5 ) Demonstrate percentage reductions in annual external heat gain attributed to passive
design measures. ( 1 ) 10% ( 2 ) 20% ( 3 ) 30% ( 4 ) 40% ( 5 ) 50% ( 1 ) Demonstrate that
roofing materials with a high Solar Reflectance Index will be used.
Confirm with Technology Lead
RE-3 Energy Efficient Appliances 3 3 X
Demonstrate that all developer purchased and/or leased installed appliances shall be energy
efficient, and that tenant guidelines outlining the benefits of energy efficient appliances will
be produced.
RE-4 Vertical Transportation 3 2 1 X
( 1 ) Demonstrate that easily accessible stairs shall be provided to at least the first three
floors of the building. ( 1 ) Demonstrate that all lifts within the building shall be energy
efficient. ( 1 ) Demonstrate that all escalators within the building shall be energy efficient.
RE-5 Peak Load Reduction 4 4 X
( 2 ) Demonstrate peak electrical load shall be less than 80% above annual average electrical
load. ( 4 ) Demonstrate peak electrical load shall be less than 60% above annual average
electrical load.
Confirm with Technology Lead
RE-6 Renewable Energy 9 3 6 X
Demonstrate that a percentage of the total energy consumption will be supplied by onsite
renewable energy. ( 1 ) 1% ( 2 ) 3% ( 3 ) 5% ( 4 ) 7% ( 5 ) 10% ( 6 ) 13% ( 7 ) 16% ( 8 ) 20% -
( 1 ) Demonstrate that 20% of the project’s non-renewable energy use will be supplied by
offsite renewable energy.
1% Cost of PV to be determined
RE-7Global Warming Impacts of Refrigerants & Fire
Suppression Systems4 2 2 X
( 1 ) Demonstrate that the weighted average of all refrigerants shall have a GWP of 10 or less.
( 1 ) Demonstrate that a permanent refrigerant leak detection system shall be installed. ( 1 )
Demonstrate that an automatic refrigerant pump down system shall be installed. ( 1 )
Demonstrate that 100% of gaseous fire systems shall have a GWP of 1 or less.
Confirm with Technology Lead
TOTAL 44 13 15 15
SM
SM-R1 Hazardous Waste EliminationRequired X X
To eliminate exposure of building occupants to asbestos and minimize toxic effects of
chromated copper arsenate (CCA) treated timber on people and the environment.Include in materials specifications
SM-R2 Basic Construction Waste Management
Required X X
Reduce the long-term environmental impacts associated with construction waste collection,
transport and disposal; Minimum final recycling/salvage rate of 30% of construction and
demolition waste (weight/volume) - excluding hazardous
Incorporate Requirements into Construction
Waste Management Plan prepared by
Environmental Consultant
Yes
Yes
Stewarding Materials
Yes
Yes
SM-R2 Basic Construction Waste Management demolition waste (weight/volume) - excluding hazardous Environmental Consultant
SM-R3 Basic Operational Waste Management
Required X X
Reduce the long-term environmental impacts associated with operational waste collection,
transport and disposal; Proposed option: 40% minimum target of diversion rate
(weight/volume) & Waste segregation in 4 types and waste containers location requirements
Incorporate Requirements into Operational
Waste Management Plan prepared by
Environmental Consultant
SM-1 Non-Polluting Materials
3 2 1 X
( 1 ) Building meets the ‘Zero Ozone Depleting Potential, Low Global Warming Potential
Insulation’ Credit Requirements through design. ( 1 ) Building meets the ‘Chlorine Free
Materials’ Credit Requirements through design. ( 1 ) Building meets the ‘Low Toxicity
Materials’ Credit Requirements through design.
Confirm with Technology Lead
SM-2 Design for Material Reduction1 1 X
General: Building is designed with at least one material reduction initiative. Offices only: At
least two initiatives are required.Confirm with Technology Lead
SM-3 Design for Flexibility & Adaptability
1 1 X
Demonstrate the following: 90% of the building has regular rhythm to exposed facades (by
area); Floor-to-floor heights of at least 3.6 meters; 90% of the windows are evenly distributed
around exposed elevations (by area); 90% of interior, non-structural walls are demountable or
movable (by area); and 90% of pipes, wiring and conduits are not permanently embedded in
building materials (in length).
SM-4 Design for Disassembly
1 1 X
Develop a Building Disassembly Plan highlighting the following: materials intended for
recovery; materials connection requirements; system for marking and identifying recoverable
elements prior to installation; best management practices for disassembly; and the
disassembly sequence. Demonstrate that 50% of the building structural skeleton, 75% of
façade, or 90% of the roof is designed for disassembly (by surface area).
SM-5 Modular Flooring Systems 1 1 X At least 95% (by surface area) of finished floor areas are specified with modular flooring
products.SM-6 Design for Durability 1 1 X Develop a Building Durability Plan.
SM-7 Building Reuse2 2 X
( 1 ) At least 25% of the building structural system, by surface area, will be reused. ( 2 ) At
least 50% of the building structural system, by surface area, will be reused.
SM-8 Material Reuse 1 1 X The cost of specified reused materials equal to at least 3% of the Total Material Cost.
SM-9 Regional Materials2 1 1 X
( 1 ) Cost of regional materials specified equal to 10% of Total Material Cost. ( 2 ) Cost of
regional materials specified equal to 20% of Total Material Cost.Further Research on materials availability
SM-10 Recycled Materials
6 1 5 X
( 1 ) Steel-framed: at least 50% of specified structural steel (by weight) has 25% post-
consumer recycled content or is reused Concrete-framed: at least 80% of specified rebar or
stressing steel has 90% post-consumer recycled content. ( 1 ) Specified concrete mix and
reduction in cement use will achieve an embodied GHG of concrete as per table SM10.1, rows
B1, C1 and D1. ( 2 ) Specified concrete mix and reduction in cement use will achieve an
embodied GHG of concrete as per table SM10.1, rows B2, C2 and D2. ( 1 ) At least 15% of all
specified aggregates to be used for structural or non-structural applications are recycled. ( 2 )
Only recycled aggregate is specified for use as base, sub-base or backfill. ( 1 ) Cost of
specified recycled materials equal to at least 10% of Total Material Costs.
Further Research on materials availability
Yes
Pearl Building Rating System
Project Name GF
Project ID Administration Building
Pearl Rating Stage
Date 1/10/2010
Credit Points Summary
Yes Maybe NoMaster
Plan
Building
DesignConstr. Phase
Description Remarks
Project Details
Credit Reference Credit TitleCredit Points
Available
Attainable Design Project Phase
SM-11 Rapidly Renewable Materials
1 1 X
at least 75% (by area) of one or more specified building components are rapidly renewable; at
least 35% (by area) of two or more specified building components are rapidly renewable; or at
least 15% (by area) of four or more specified building components are rapidly renewable.
SM-12 Reused or Certified Timber2 1 1 X
( 1 ) At least 50% (by cost) of the specified timber comply with the Credit Requirements. ( 2 )
At least 70% (by cost) of the specified timber comply with the Credit Requirements.
SM-13 Improved Construction Waste Management
2 1 1 X
( 1 ) Demonstrate CDWMP aims for a minimum of 50% demolition and construction waste (by
weight or volume) to be recycled / salvaged. ( 2 ) Demonstrate CDWMP aims for a minimum of
70% demolition and construction waste (by weight or volume) to be recycled / salvaged.
SM-14 Improved Operational Waste Management
2 1 1 X
( 1 ) General: An Operational Waste Management Plan (OWMP) is developed for a minimum
targeted diversion rate of 60% (by weight or volume. ( 2 ) General: An OWMP is developed for
a minimum targeted diversion rate of 80% (by weight or volume.
SM-15 Organic Waste Management2 2 X
( 1 ) Landscaping waste or food waste collection and/or treatment is proposed onsite. ( 2 )
Food and landscaping waste collection and/or treatment are proposed onsite.
TOTAL 28 6 17 5 0 0 0
IP
IP-1 Innovating Cultural & Regional Practices 1 1Develop a design strategy for incorporating solutions that showcase cultural and regional
practicesMix of Arabic and Islamic features
Develop, document and implement an innovative design and/or construction solution that Occupant Education: Display of Energy
Innovating Practice
IP-2 Innovating Practice 2 1 1
Develop, document and implement an innovative design and/or construction solution that
addresses one or more of the four pillars of Estidama. AND Develop a guideline document that
enables the innovative solution to be repeated.
Occupant Education: Display of Energy
consumption (each floor, kiosk)
TOTAL 3 2 1 0 0 0 0
TOTAL POINTS 180 69 66 43
1 PEARL ALL REQUIRED
2 PEARL 60-84 POINTS
3 PEARL 85 - 114 POINTS
4 PEARL 115 - 139 POINTS
5 PEARL 140 + POINTS
Pearl Building Rating System
Credit Section Credit Points AvailableYes
Credit Points
Maybe
Credit Points
Project Name GF IDP - Integrated Development Process 10 3
Project ID FAB NS - Natural Systems 2 0
Pearl Rating Stage LB - Livable Buildings 19 6
Date Oct-10 PW - Precious Water 19 10
RE - Resourceful Energy 10 10
SM - Stewarding Materials 6 15
IP - Innovating Practice 2 1
Total 68 45
Project Details
Pearl Rating Levels Total 68 45
Total Credit Points Pearl Rating
Required credits only 1
60 2
85 3
115 4
140 5
Pearl Rating Levels
Design Pearl Rating 2
Pearl Building Rating System
Project Name GF
Project ID FAB
Pearl Rating Stage
Date Oct-10
Credit Points Summary
Yes Maybe NoMaster
Plan
Building
Design
Constr.
Phase
IDP
IDP-R1 Integrated Development Strategy Required X
Integrated Development Implementation Strategy: to facilitate an effective transition
between project stages and project packages to ensure that the initial vision, objectives and
targets are carried through to completion. Identify Vision, set objectives, targets and KPIs,
Team Chart and Roles etc.)
Requires input from GF on Estidama vision,
targets and relative issues. Confirm Project
Boundaries
IDP-R2 Tenant Fit-Out Design & Construction Guide Required X X Tenant Fit-Out Design & Construction Guide in order to formally communicate to future
tenants and their design requirements
Not applicable for GF. Requires Clarification
with Estidama
IDP-R3 Basic Commissioning Required X X
Demonstrate that: An independent commissioning agent, reporting to the project owner, is
engaged as part of the project design team throughout the design stages; Commissioning Plan
and Comprehensive commissioning requirements in project specifications and, At the building
completion stage the building has been commissioned by independent commissioning
engineers; The commissioning report has been reviewed and verified prior to building
completion.
Appoint a Commissioning Agent reporting to GF
(Design Stage) / Incorporate commissioning
requirements at building completion stage.
IDP-1 Life Cycle Costing 4 4 X X Use Life Cycle Cost analysis during design
GF to consider appointing a qualified
professional to conduct LCC analysis and update
it through future project stages. CH2M HILL to
include this requirements in RFP
documentation.
IDP-2 Guest Worker Accommodation 2 2 X X Develop a Guest Worker Accommodation Plan. To be inlcluded in Design Documents
IDP-3 Construction Environmental Management 2 1 1 X X( 1 ) - Develop the CEMP in accordance with Abu Dhabi Environment Agency’s regulations. ( 1
) - Project Lead Contractor is ISO 14001 or EHSMS Certified.Input from Environmental Consultant
Project Details
Credit Reference Credit TitleCredit Points
Available
Attainable Design Project Phase
Description Remarks
Integrated Development Process
Yes
Yes
Yes
) - Project Lead Contractor is ISO 14001 or EHSMS Certified.
IDP-4 Building Envelope Verification 1 1 XDemonstrate that the building envelope meets the design intent and minimizes building
impacts from condensation, water ingress, air infiltration and improper drainage.Difficult to verify on site.
IDP-5 Re-Commissioning 2 2 XDemonstrate that the building performs as designed to protect occupant health and comfort,
as well as providing for ongoing building efficiency.To be determined
IDP-6 Sustainability Awareness 2 2 X( 1 ) - Develop an Occupant Handbook. ( 1 ) - Design an occupant feedback mechanism to give
information on how they impact building performance.To be included in Design requirement
TOTAL 13 10 3 0
NS
NS-R1 Natural Systems Assessment Required XEstablish environmental baseline conditions on site and surroundings to be considered and
assessed at the design stage
Input from ERM / Phase I Assessment and
detailed field surveys to be conducted by
environmental consultantNS-R2 Natural Systems Protection Required X
To protect significant and valuable Natural Systems assets identified in NS-R1 Natural Systems
Assessment.As above
NS-R3Natural Systems Design and Management
StrategyRequired X
To minimize demand for resources, promote soil protection and enhancement and ensure the
long term survival and management of landscaped/habitat areas.Incorporate in Landscape Design
NS-1 Reuse of Land 2 2 X ( 2 ) Demonstrate that at least 75% of the site area has been previously developed.
NS-2 Remediation of Contaminated Land 2 2 X( 2 ) Demonstrate the site is contaminated and an assessment report and remediation strategy
has been prepared.
NS-3 Ecological Enhancement 2 2 X
( 1 ) - 50% of plants to comprise of native and adaptive drought and / or saline tolerant
species including a minimum of 5 different types of species. ( 2 ) - 70% of plants to comprise
native and adaptive drought and / or saline tolerant species including a minimum of 10
different types of species.
Incorporate in Landscape Design
NS-4 Habitat Creation and Restoration 6 6 X
( 4 ) - Prepare a Habitat Creation or Restoration Strategy; and Allocate an on-site or off-site
habitat creation or restoration site of minimum areas as defined above. ( 2 ) - Demonstrate
that through collaboration, off-site ecological corridors have been designed to link similar
habitat types.
TOTAL 12 2 0 10
LBo
LBo-R1 Plan 2030 Required X
Demonstrate that the proposed development is located within an Urban Growth Boundary as
identified by UPC’s adopted Framework Plans. Demonstrate that the proposed development’s
Floor Area Ratio (FAR), dwelling units per hectare (du/ha), building height, building mass,
transportation and open space networks are consistent with the applicable Plan 2030 and/or
Development Code and/or Area Plan.
Obtain Letter from UPC
LBo-R2 Urban Systems Assessment Required X
Demonstrate that, before the start of the design process and site clearance, an urban systems
assessment has been carried out for the project site and at the following scales: Local, Sub-
regional, and Regional scale. Identify opportunities and constraints associated with the
development and compile an Urban Systems Assessment Report.
Natural Systems
Yes
Yes
Yes
Livable Building : Outdoors
Yes
Yes
development and compile an Urban Systems Assessment Report.
LBo-R3 Outdoor Thermal Comfort Strategy Required X
Shade measures (cover or shade) must be provided in all applicable spaces and achieve a
minimum percent shading. Shade measures include: Exterior Surface Parking with more than
10 spaces (including parking on roof surfaces) 40%, Public Open Spaces (including privately
owned) 60%, Primary Pedestrian Walkways (based on 1.8m width within the through zone)
75%, Secondary Pedestrian Walkways (based on 1.8m width within the through zone) 75%,
Cycle Tracks 50%, Playgrounds 90%
Follow up with Planning Team
LBo-1 Improved Outdoor Thermal Comfort 2 2 x X
Demonstrate that the outdoor thermal comfort strategy has been improved beyond the
minimum established under credit LBo-R3 Outdoor Thermal Comfort Strategy by increasing
the shade measures. (1)50 % (2)55 % - Surface car parking, including parking on roof surfaces
(1)65 % (2)70 % - Public Open Space, including privately owned (1)80 % (2)85 % - Primary
Pedestrian Walkway, based on 1.8m width within the through zone (1)80 % (2)85 % - Secondary
Pedestrian Walkway, based on 1.8m width within the through zone (1)55 % (2)65 % - Cycle
tracks
Follow up with Planning Team
LBo-2 Pearl Rated Communities 1 1 X Demonstrate that the building is located within a Pearl Rated community.
LBo-3 Accessible Community Facilities 1 1 XDemonstrate that the building is located within 350m safe walking distance of any of the five
listed amenities.
LBo-4 Active Urban Environments 1 1 X
Demonstrate that outdoor spaces have been provided and programmed to encourage activity,
including sport and recreation. Develop and implement an Active Urban Environment
Program.
LBo-5 Private Outdoor Space 1 XResidential Only: Provide 90% of units with outdoor amenity space as per the Credit
RequirementsNot Applicable
LBo-6 Public Transport 3 2 1 X
( 2 ) - Demonstrate that the building is within 350m of a tram and/or bus stop with a 15
minute frequency. ( 3 ) - Demonstrate that the building is also within 350m of a metro or
regional rail station.
Confirm with UPC on plans for tram line (North
to GF site)
LBo-7 Bicycle Facilities 2 2 X( 1 ) Meet the Credit Requirements for bicycle parking facilities. ( 1 ) Meet the Additional
Credit Requirements for shower, locker and changing facilities and/or cycle lanes.Confirm with GF on bicycle paths on site
LBo-8 Preferred Car Parking Spaces 1 1 X
6% of parking spaces provided must be identified for the sole use of priority vehicles. The
spaces must be optimally located for building access and half of the spaces must be supplied
with vehicle charging points.
Follow up with Planning Team
LBo-9 Travel Plan 1 1 X
Demonstrate the development of a Travel Plan. The Travel Plan must include: details of the
type of measures proposed to manage the demand for travel by car; targets for reducing car
travel; means of monitoring the effectiveness of the Plan; and remedial measures that will be
implemented in the event that the stated targets are not delivered.
Confirm with GF
LBo-10 Light Pollution Reduction 1 1 X Demonstrate light pollution reduction in compliance with the Credit Requirements Confirm with Technology Lead
14 5 5 3
LBi
Yes
TOTAL
Livable Building : IndoorsLBi
LBi-R1 Healthy Ventilation Delivery Required X XProtect the quality of air drawn into buildings for ventilation and to ensure minimum delivery
of outdoor fresh air; Develop an Observational Survey of Local Air Quality
Input from Environmental Consultant (Baseline
Air Quality Assessment)
LBi-R2 Smoking Control Required X XDemonstrate appropriate measures are incorporated into the building design to reduce
exposure to tobacco smokeIncorporate in design requirements
LBi-R3 Legionella Prevention Required X X Manage the risk of Legionella in water based building systems. Incorporate in design requirements
LBi-1 Ventilation Quality 3 2 1 X
( 1 ) - CO2 sensors at all return points. ( 1 ) - Demonstrate an increase in
outdoor air ventilation of 15% above the outdoor air ventilation rates. ( 1 ) - Mixed Mode
Operation (not available to retail use type)
Achieve 15% above outdoor ventilation rates for
the Clean Room
LBi-2.1 Material Emissions : Adhesives & Sealants 1 1 X 95% of all adhesives & sealants meet criteria. Confirm with GF on material selection
LBi-2.2 Material Emissions : Paints & Coatings 1 1 X 95% of all surface areas meet criteria Confirm with GF on material selection
LBi-2.3 Material Emissions : Carpet & Hard Flooring 1 1 X 100% of all carpets, carpet cushion, hard flooring and associated finishes comply Confirm with GF on material selection
LBi-2.4 Material Emissions : Ceiling Systems 1 1 X All ceiling systems meet credit criteria Confirm with GF on material selection
LBi-2.5 Material Emissions : Formaldehyde Reduction 2 2 X( 1 ) - All internal construction materials meet formaldehyde class E1 levels. ( 1 ) All internal
construction and furniture meets formaldehyde class E1 levels.Confirm with GF on material selection
LBi-3 Construction Indoor Air Quality Management 2 2 X Develop a construction IAQ plan Include in the specifications
LBi-4 Car Park Air Quality Management 1 1 X
For enclosed cark park. Ensure car parking ventilation design meets the credit requirements.
Where project does not contain any enclosed car parks (75% enclosed) the credit is
automatically awarded
Confirm with Planning Team
LBi-5.1 Thermal Comfort & Controls : Thermal Zoning 1 1 X Compliant thermal zoning strategy and controlsIncorporate in design requirements / Model to
determine cooling demand
LBi-5.2Thermal Comfort & Controls : Occupant
Control2 2 X
( 1 ) - General: 1 control per 2 occupants, General (Mixed Mode) : 50% occupied area, Multi-
Occupant Spaces (Office, Residential, Schools): 1 control per space (more if movable
partitions present). ( 1 ) - General: 1 control per 2 occupants & modulating HVAC systems in
multi-occupant spaces, General (Mixed Mode): 75% of occupied area, Multi-Occupant Spaces
(Office, Residential, Schools): 1 control per space (more if movable partitions present)
Confirm with Technology Lead
LBi-5.3Thermal Comfort & Controls : Thermal
Comfort Modeling2 2 X
( 1 ) - Category C Performance: PMV levels between -0.7 and +0.7 (15% PPD) & 90%
acceptability limits for Mixed Mode (if applicable). ( 1 ) - Category B Performance: PMV levels
between -0.5 and +0.5 (10% PPD) & 90% acceptability limits for Mixed Mode (if applicable).
PMV - Predicted Mean Vote, PDD - Predicted Percentage Dissatisfied
Confirm with Technology Lead
LBi-6 High Frequency Lighting 1 1 XGeneral: All high frequency fluorescent ballasts and occupancy sensors meeting credit
requirements.Incorporate in design requirements
LBi-7 Daylight & Glare 2 2 X
( 1 ) - General : min 250 Lux for 50% of occupied area. Meet requirements for occupancy
sensors relevant to space type. Meet requirements for glare control relevant to space type. (
1 ) - General : min 250 Lux for 75% of occupied area. Meet requirements for occupancy
sensors relevant to space type. Meet requirements for glare control relevant to space type.
Allow Occupancy Sensor. Daylight Design
Software - Include in the design
LBi-8 Views 1 1 X General: 75% of occupied areas have views through vision glazing. Confirm with Architect
Livable Building : Indoors
Yes
Yes
Yes
LBi-8 Views 1 1 X General: 75% of occupied areas have views through vision glazing. Confirm with Architect
LBi-9 Indoor Noise Pollution 1 1 X Demonstrate that internal ambient noise levels do not exceed 50 dB(A) Leq in the area to be
occupied.Confirm with Architect
LBi-10 Safe & Secure Environment 1 1 X Develop & Implement Safety & Security PlanIncorporate Estidama Requirements to Overall
Security Plan
23 14 1 8
PW
PW-R1 Minimum Interior Water Use Reduction Required x XDemonstrate that the project’s predicted interior potable water consumption will be no
greater than the baseline building water consumption using efficiency measures only.
Use UPC Water Calculator / Input from
Technology Lead
PW-R2 Exterior Water Monitoring Required x X
Demonstrate that easily accessible and clearly labelled water meters are provided and
capable of monitoring the water consumption of, at a minimum, the following exterior water
uses (where present): Heat rejection; External hose bibs; Irrigation systems; Swimming pools;
and Water features.
Incorporate at the design stage
PW-1 Improved Interior Water Use Reduction 15 5 10 X
Demonstrate using the Building Water Calculator that the proposed building has achieved the
following reduction in potable water consumption compared to the baseline building: ( 1 ) 4%
( 2 ) 8% ( 3 ) 12% ( 4 ) 16% ( 5 ) 20% ( 6 ) 24% ( 7 ) 28% ( 8 ) 32% ( 9 ) 36% ( 10 ) 40% ( 11 )
44% ( 12 ) 48% ( 13 ) 52% ( 14 ) 56% ( 15 ) 60%
Confirm with Technology Lead
PW-2.1 Exterior Water Use Reduction: Landscaping 8 4 2 2 X
( 2-4 ) Demonstrate that the average irrigation requirement for all landscaped areas has been
minimized. ( 1 ) Demonstrate that a water efficient irrigation system has been incorporated
into the landscape design. ( 1 ) Demonstrate that best practices for ongoing system
management and operation have been established. ( 2 ) Demonstrate that 100% of the
exterior irrigation demand can be served using the Exterior Water Allowance, and that a
recycled water mainline loop has been installed where Pearl Building Rating System: Design &
Construction, Version 1.0, April 2010 124 of 223 recycled water is not immediately available.
Confirm with Technology Lead
PW-2.2 Exterior Water Use Reduction: Heat Rejection 8 6 2 X
( 2-5 ) Demonstrate that a percentage of the projects cooling tower/district cooling water
make-up requirements can be served using the Exterior Water Allowance. ( 8 ) Demonstrate
that no water is required for heat rejection.
Confirm with Technology Lead
PW-2.3 Exterior Water Use Reduction: Water Features 4 4 X
( 2 ) Demonstrate that the water make-up requirements for all exterior water features can be
served using the Exterior Water Allowance. ( 1 ) Demonstrate that all external swimming
pools are provided with adequate pool blankets. ( 4 ) Demonstrate that there are no exterior
water features or swimming pools.
Confirm with Technology Lead
PW-3 Water Monitoring & Leak Detection 4 4 X
( 2 ) Demonstrate that metering facilities that monitor the water consumption of major
individual interior uses are installed. ( 2 ) Demonstrate that a leak detection system has been
installed.
Include requirements for Leak Detection into
Design requirements
PW-4 Stormwater Management 4 2 2 X
( 1-2 ) Stormwater management system is designed to meet Quantity Control criteria as per
Credit Requirements. ( 1 ) Stormwater management system is designed to meet Quality
Control criteria as per Credit Requirements. ( 1 ) An Operation & Maintenance Plan has been
developed.
Confirm with Technology Lead
TOTAL
Precious Water
Yes
Yes
TOTAL 43 19 10 14
RE
RE-R1 Minimum Energy Performance Required x X
Develop an energy model for the proposed building(s) using appropriate dynamic simulation
modeling software and calculate the baseline building energy consumption according to the
building performance rating method outlined in Appendix G of ANSI/ASHRAE/IESNA Standard
90.1-2007, using the minimum acceptable standards for building fabric, HVAC, service water
heating, power, lighting and other equipment. Demonstrate a minimum 12% performance
improvement compared to the baseline building performance demonstrated by the energy
simulation model as per the methodology outlined within Appendix G of Standard 90.1-2007.
Include Energy Model in design requirements
RE-R2 Energy Monitoring and Reporting Required x X
Demonstrate that easily accessible and clearly labelled energy sub-meters are provided which
enable a minimum of 90% of the estimated annual energy consumption of each fuel type
(electricity, gas etc) to be monitored as outlined within the Calculations and Methodologies
section.
Include in specifications
RE-R3Ozone Impacts of Refrigerants & Fire
Suppression SystemsRequired x X
Refrigerants - Demonstrate that all refrigerants to be installed within the project site
boundary have an ozone depletion potential (ODP) of zero. Fire Suppression Systems -
Demonstrate that all gaseous fire suppression systems to be installed within the project site
boundary have an ozone depletion potential (ODP) of zero
Include in specifications
RE-1 Improved Energy Performance 15 5 10 X
Demonstrate further percentage reductions in the proposed building energy consumption
beyond the baseline building consumption determined in RE-R1. Points are awarded as
follows: ( 1 ) 14% ( 2 ) 16% ( 3 ) 18% ( 4 ) 20% ( 5 ) 22.5% ( 6 ) 25% ( 7 ) 27.5% ( 8 ) 30% ( 9 )
32.5% ( 10 ) 35% ( 11 ) 40% ( 12 ) 45% ( 13 ) 50% ( 14 ) 55% ( 15 ) 60%
The points indicated are based on assumptions
and excpected to be revised once Energy
Simulaition baseline and options are developed
RE-2 Cool Building Strategies 6 3 1 1 X
( 1-5 ) Demonstrate percentage reductions in annual external heat gain attributed to passive
design measures. ( 1 ) 10% ( 2 ) 20% ( 3 ) 30% ( 4 ) 40% ( 5 ) 50% ( 1 ) Demonstrate that
roofing materials with a high Solar Reflectance Index will be used.
Confirm with Technology Lead
RE-3 Energy Efficient Appliances 3 3 X
Demonstrate that all developer purchased and/or leased installed appliances shall be energy
efficient, and that tenant guidelines outlining the benefits of energy efficient appliances will
be produced.
RE-4 Vertical Transportation 3 2 1 X
( 1 ) Demonstrate that easily accessible stairs shall be provided to at least the first three
floors of the building. ( 1 ) Demonstrate that all lifts within the building shall be energy
efficient. ( 1 ) Demonstrate that all escalators within the building shall be energy efficient.
RE-5 Peak Load Reduction 4 4 X
( 2 ) Demonstrate peak electrical load shall be less than 80% above annual average electrical
load. ( 4 ) Demonstrate peak electrical load shall be less than 60% above annual average
electrical load.
Confirm with Technology Lead
RE-6 Renewable Energy 9 3 6 X
Demonstrate that a percentage of the total energy consumption will be supplied by onsite
renewable energy. ( 1 ) 1% ( 2 ) 3% ( 3 ) 5% ( 4 ) 7% ( 5 ) 10% ( 6 ) 13% ( 7 ) 16% ( 8 ) 20% -
( 1 ) Demonstrate that 20% of the project’s non-renewable energy use will be supplied by
offsite renewable energy.
1% Cost of PV
Resourceful Energy
Yes
Yes
Yes
offsite renewable energy.
RE-7Global Warming Impacts of Refrigerants & Fire
Suppression Systems4 2 2 X
( 1 ) Demonstrate that the weighted average of all refrigerants shall have a GWP of 10 or less.
( 1 ) Demonstrate that a permanent refrigerant leak detection system shall be installed. ( 1 )
Demonstrate that an automatic refrigerant pump down system shall be installed. ( 1 )
Demonstrate that 100% of gaseous fire systems shall have a GWP of 1 or less.
Confirm with Technology Lead
TOTAL 44 10 10 23
SM
SM-R1 Hazardous Waste EliminationRequired X X
To eliminate exposure of building occupants to asbestos and minimize toxic effects of
chromated copper arsenate (CCA) treated timber on people and the environment.Include in materials specifications
SM-R2 Basic Construction Waste Management
Required X X
Reduce the long-term environmental impacts associated with construction waste collection,
transport and disposal; Minimum final recycling/salvage rate of 30% of construction and
demolition waste (weight/volume) - excluding hazardous
Incorporate Requirements into Construction
Waste Management Plan prepared by
Environmental Consultant
SM-R3 Basic Operational Waste Management
Required X X
Reduce the long-term environmental impacts associated with operational waste collection,
transport and disposal; Proposed option: 40% minimum target of diversion rate
(weight/volume) & Waste segregation in 4 types and waste containers location requirements
Incorporate Requirements into Operational
Waste Management Plan prepared by
Environmental Consultant
SM-1 Non-Polluting Materials
3 2 1 X
( 1 ) Building meets the ‘Zero Ozone Depleting Potential, Low Global Warming Potential
Insulation’ Credit Requirements through design. ( 1 ) Building meets the ‘Chlorine Free
Materials’ Credit Requirements through design. ( 1 ) Building meets the ‘Low Toxicity
Materials’ Credit Requirements through design.
Confirm with Technology Lead
SM-2 Design for Material Reduction1 1 X
General: Building is designed with at least one material reduction initiative. Offices only: At
least two initiatives are required.Confirm with Technology Lead
SM-3 Design for Flexibility & Adaptability
1 1 X
Demonstrate the following: 90% of the building has regular rhythm to exposed facades (by
area); Floor-to-floor heights of at least 3.6 meters; 90% of the windows are evenly distributed
around exposed elevations (by area); 90% of interior, non-structural walls are demountable or
movable (by area); and 90% of pipes, wiring and conduits are not permanently embedded in
building materials (in length).
SM-4 Design for Disassembly
1 1 X
Develop a Building Disassembly Plan highlighting the following: materials intended for
recovery; materials connection requirements; system for marking and identifying recoverable
elements prior to installation; best management practices for disassembly; and the
disassembly sequence. Demonstrate that 50% of the building structural skeleton, 75% of
façade, or 90% of the roof is designed for disassembly (by surface area).
SM-5 Modular Flooring Systems 1 1 X At least 95% (by surface area) of finished floor areas are specified with modular flooring
products.SM-6 Design for Durability 1 1 X Develop a Building Durability Plan.
SM-7 Building Reuse2 2 X
( 1 ) At least 25% of the building structural system, by surface area, will be reused. ( 2 ) At
least 50% of the building structural system, by surface area, will be reused.
Yes
Stewarding Materials
Yes
Yes
SM-7 Building Reuse least 50% of the building structural system, by surface area, will be reused.
SM-8 Material Reuse 1 1 X The cost of specified reused materials equal to at least 3% of the Total Material Cost.
SM-9 Regional Materials2 1 1 X
( 1 ) Cost of regional materials specified equal to 10% of Total Material Cost. ( 2 ) Cost of
regional materials specified equal to 20% of Total Material Cost.Further Research on materials availability
SM-10 Recycled Materials
6 1 5 X
( 1 ) Steel-framed: at least 50% of specified structural steel (by weight) has 25% post-
consumer recycled content or is reused Concrete-framed: at least 80% of specified rebar or
stressing steel has 90% post-consumer recycled content. ( 1 ) Specified concrete mix and
reduction in cement use will achieve an embodied GHG of concrete as per table SM10.1, rows
B1, C1 and D1. ( 2 ) Specified concrete mix and reduction in cement use will achieve an
embodied GHG of concrete as per table SM10.1, rows B2, C2 and D2. ( 1 ) At least 15% of all
specified aggregates to be used for structural or non-structural applications are recycled. ( 2 )
Only recycled aggregate is specified for use as base, sub-base or backfill. ( 1 ) Cost of
specified recycled materials equal to at least 10% of Total Material Costs.
Further Research on materials availability
SM-11 Rapidly Renewable Materials
1 1 X
at least 75% (by area) of one or more specified building components are rapidly renewable; at
least 35% (by area) of two or more specified building components are rapidly renewable; or at
least 15% (by area) of four or more specified building components are rapidly renewable.
SM-12 Reused or Certified Timber2 2 X
( 1 ) At least 50% (by cost) of the specified timber comply with the Credit Requirements. ( 2 )
At least 70% (by cost) of the specified timber comply with the Credit Requirements.
SM-13 Improved Construction Waste Management
2 1 1 X
( 1 ) Demonstrate CDWMP aims for a minimum of 50% demolition and construction waste (by
weight or volume) to be recycled / salvaged. ( 2 ) Demonstrate CDWMP aims for a minimum of
70% demolition and construction waste (by weight or volume) to be recycled / salvaged.
SM-14 Improved Operational Waste Management
2 1 1 X
( 1 ) General: An Operational Waste Management Plan (OWMP) is developed for a minimum
targeted diversion rate of 60% (by weight or volume. ( 2 ) General: An OWMP is developed for
a minimum targeted diversion rate of 80% (by weight or volume.
SM-15 Organic Waste Management2 2 X
( 1 ) Landscaping waste or food waste collection and/or treatment is proposed onsite. ( 2 )
Food and landscaping waste collection and/or treatment are proposed onsite.
TOTAL 28 6 15 7 0 0 0
IP
IP-1 Innovating Cultural & Regional Practices 1 1Develop a design strategy for incorporating solutions that showcase cultural and regional
practicesMix of Arabic and Islamic features
IP-2 Innovating Practice 2 1 1
Develop, document and implement an innovative design and/or construction solution that
addresses one or more of the four pillars of Estidama. AND Develop a guideline document that
enables the innovative solution to be repeated.
Occupant Education: Display of Energy
consumption (each floor, kiosk)
TOTAL 3 2 1 0 0 0 0
Innovating Practice
TOTAL POINTS 180 68 45 65
1 PEARL ALL REQUIRED
2 PEARL 60-84 POINTS
3 PEARL 85 - 114 POINTS
4 PEARL 115 - 139 POINTS
5 PEARL 140 + POINTS
PG. 1 Page | 2.3-1
Estidama Registration Form
Pearl Building Rating System Registration Form
Project Name
Project Location (street name, region, emirate)
Current Project Stage
Total Site Area (m2)
Gross Floor Area (m2) - Office
Gross Floor Area (m2) - Multi-Unit Residential
Gross Floor Area (m2) - Retail
Gross Floor Area (m2) - School
Gross Floor Area (m2) - All Other Occupancy Types
Gross Floor Area (m2)
Site Context (Urban,Suburban,Rural)
Current Site Condition
Within Urban Growth Boundary?
Estimated number of permanent residents
Estimated Date of Completion (dd/mm/yyyy)
Is the Project Government Funded?
What Pearl Level is the project targeting?
Is the Project Confidential ?
Emailed affection plan to UPC with this form ?
Project Description (include list of all 'other space types' in the project)
Name (individual / organisation)
Authorized contact name
City
Country
Type of organization
Prefered contact method
Phone number
Fax number
Email address
Office / Unit number
Office building name
Office street name and number
City
Country
P.O. Box
Name
Accreditation
Phone number
Fax number
Email address
Project Information
Owner or Owners Representative Information
PQP / Sustainability Consultant Information
Postal Address :
Email address
Company Address
Emailed proof of sustainability consultant accreditation with this form?
Emailed owners consent for project registration with this form?
For any queries related to project registration mona_alzaabi@upc.gov.ae
Estidama Project ID
(will be issued by UPC upon return of this information)
PG. 1 Page | 2.3-1
Response to GF Comments on Draft Report
GF – Milestone 10 (Design Guidelines): Response to Comments
Section GF Comments CH2M HILL Response
General
There should be a section to describe the purpose of this document.
This document is a section of the overall CH2M HILL submittal (as per CH2M HILL Scope of Work). A small introductory paragraph is added.
Analysis of Building Rating Systems
It should also be noted that LEED is the only system currently at use in the SC industry.
Text added
Perhaps it should be noted here what the frequency is for certifications under each system specific to the SC industry.
LEED is the only building certification systems used for FAB application. GF FAB AD 01 will be the first facility following Estidama Building Rating System.
This comment is not needed Phrase deleted
Please modify - delete However Word deleted Project Boundary for certification
a To clarify, while the CUB building technically wasn't included in certification for Fab8, the systems in the CUB were included. They must be, because these systems are required as part of the energy model.
Text modified as follows: ‘ Separate project boundaries were established for the Administration and FAB Building, with the utility systems (CUB building) included in the energy model calculations for the FAB’
To clarify, we would certainly expect CUB to be covered under Estidama. We don't want UPC to think otherwise.
Noted : Text changed accordingly
ISDM
Is this fair? Is the average building in AD not already above and beyond "business as usual"?
For the purpose of this document, only Estidama will be looked at, hence Abu Dhabi BAU building performance is more applicable.
How is this baseline meant to relate to that required under LEED and/or Estidama?
The Baseline for the FAB application will need to be developed and agreed with UPC when pursuing Estidama certification.
Model is suitable for high level comparison of scenarios
Text amended
Section 7 Technical Design Guidelines
Why was this particular set of indicators chosen?
This was agreed with GF and is part of CH2M HILL – Milestone 10 Deliverables requirements. These specific guidelines cover key sustainability aspects particularly when pursuing LEED certification as initially targeted.
The final version of the document examines applicability with Estidama requirements consistent with client’s direction as of 17th of October 2010. Hence, the ‘Erosion and Sedimentation
GF – Milestone 10 (Design Guidelines): Response to Comments
Control’ section is not considered applicable to Estidama rating system and is only kept in the Appendix section.
This was in ERM Permitting scope, although we have not approved development of that deliverable.
Typically, for EHS permitting purposes waste management focuses on waste handling and disposal, whereas sustainability guidelines would focus in achieving the required percentage of waste diversion from landfill to obtain the relevant Estidama credits.
Text added to reflect permitting/compliance requirements under the sections:
7.1.1
‘Demonstrate Compliance with local regulation with respect to Construction and Demolition Waste Management’ 7.4.1.
‘Ensure full compliance with the Local Regulatory Framework as reflected within GF’s Construction Environmental Management Plan’
Section 7.1 - Construction and Demolition Waste Management
As noted, 30% is minimum required under Estidama so design target should aim higher. At least to the 50% that earns "Improved" level (and LEED credit). 75% should probably be used, it allows all credit points to be earned and recent projects (GF and others) have demonstrated that 90% and greater is feasible.
Text modified to reflect this: A 70% diversion from landfill is targeted as a minimum, in line with Estidama Credit requirements.
Section 7.2 - Construction Indoor Air Quality Management
Need to ensure the project benefits from Fab8 experience with SAIC/NYSERDA energy modeling
Sharing Lessons Learnt with the Abu Dhabi Team would be beneficial.
Section 7.4 - Erosion and Sedimentation
Do we have any indication of comparability of AD construction requirements vs. the EPA regs cited here?
This section was initially prepared in line with LEED credit rating requirements. Following client’s direction as of 17th of October 2010 to include in our deliverable only Estidama
GF – Milestone 10 (Design Guidelines): Response to Comments
Control (ESC) Management Plan
requirements, the Erosion and Sedimentation Control Management section is not considered relevant to the Estidama rating system. Comparing to LEED, under Estidama, there is no individual credit on Erosion and Sedimentation Control Management. Relevant control measures fulfilling Estidama requirements (Credit: IDP – 3) are expected to be addressed under the Construction Environmental Management Plan in line with EAD ‘CEMP - Technical Guidelines Document’ (April 2010). It is understood that the GF CEMP will be prepared by ERM. No further comparison is required at this stage. The ESC section is kept in the Appendix section for reference only.
Section 8.1 - Preliminary Scorecards Purpose
‘Identify potential opportunities that can be refined via ROI analysis in Design phase’
Text added
Figure 7-2
Figure 7.2 and meant to cover the Fab/CUB? Typo corrected
Section 10 – Supply Chain Strategy
Missing
Figure is not shown on pdf format / Figure added
Is this referring to embodied carbon? Yes, text amended.
Appendix 1 How is this being planned relative to concept submittal? It would be advantageous to proactively reach out to the UPC Estidama team to review our approach
During the preparation of Concept Review Submission, CH2M HILL team met with UPC to clarify various issues, including Estidama.
Appendix 3 What is the purpose of this item? The contractor is responsible for ensuring they implement the Air Quality Plan. This applies to the other sections as well. What is the purpose of this comment? Ultimately, the contractor is responsible for ensuring that the
Text amended: The Engineer / Client Representative will be responsible for overseeing Contractor’s compliance.
GF – Milestone 10 (Design Guidelines): Response to Comments
required reporting occurs. This applies to the other sections as well.
Appendix 3 What "lessons learned" can we note from Fab8 experience?
Sharing Lessons Learnt with the Abu Dhabi Team would be beneficial.
Appendix 3 - ESC
Is there a citation available detailing local requirements?
Added: Environment Agency of Abu Dhabi, Technical Guidance Document for Construction Environmental Management Plan (CEMP), April 2010
Appendix 3 - Minimum Energy performance Page: 60
What other references should we be citing, there must be a host of them.
ASHRAE is referenced by Estidama.
change "and/or" to "and" (in next bullet as well) As mentioned earlier, as per client’s request (17/10/10), the final CH2M HILL deliverable will only assess Estidama requirements. Text has been amended accordingly.
Scorecards All GF comments have been incorporated into the scorecards. Total score has been revised accordingly.
Recommended