View
225
Download
7
Category
Preview:
Citation preview
31104 Qty 4
32100 Qty 233117
Qty 1
36105 Qty 1
31100 Qty 4 31120
Qty 5
32103 Qty 9
31106 Qty 2
33108 Qty 1
33109 Qty 1
12152 Qty 2
12148 Qty 2
44249
13
16
17
31
24
28
23
2526
9
11
12
38
39
1. Remove and identify all loose parts from carton.
(Qty 4) #31104#14 X 1-1/2”
Flat Head Screw
2. Position hopper on side. Install frame using (4) #14 x 1½” Flat Head Phillips screws. TIGHTEN THESE NOW
8-2014 Pt# 52157 PAGE 1
2150 CommerCialBroadCast spreaderASSEMBLY and OPERATING INSTRUCTIONS
PLEASE CALL IF YOU ARE MISSING ANY PARTS, HAVE ANY DIFFICULTY IN ASSEMBLY, OR HAVE ANY QUESTIONS REGARDING THE SAFE OPERATION OF THIS SPREADER. THIS MODEL INCLUDES LIFETIME TECHNICAL SUPPORT SUPPORT HOT LINE: 574-848-7491 or 800-294-0671, email: teChsupport@earthway.Com
HELPFUL HINTS: READ THE DIRECTIONS BEFORE ASSEMBLY ; If your spreader does not spread evenly, be sure the FRONT on the gear box points to the front of the spreader. The impeller must turn clockwise. Reversing the gearbox will cause the impeller to turn counter clockwise. Clean the impeller plate after each use. Fertilizer stuck on the impeller blades will cause uneven spreading.
; Your spreader is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster speeds will change the spread patterns. Wet fertilizer will also change the spread pattern and flow rate. Clean and dry your spreader thoroughly after each use. Regular coating of light spray oil on all metal parts inside & out will help prevent corrosion. Wash between the shut off plate and bottom of the hopper. Do not use powdered materials as it will damage the gearbox.
; Gears are permanently lubricated at the factory. Do not open the gearbox or dirt may enter.
ROCK SALT and POWDERED MATERIALS should not be used in this
spreader as it will damage the gearbox and can void the warranty.
Use only granular materials.
IF YOUR SPREADER COMES SEMI ASSEMBLED, SKIP TO STEP #7
Gearbox AssemblyDrive wheel
Coast wheel
Frame brace
Impeller
Cross Brace
Frame
Lower Handle
Bushing
Shut-Off1/4-20 x 1-1/2”Hex Head Bolt
Step 6BStep 6C
1/4-20 x 2-1/4”Hex Head Bolt
Step 6A
Axle
Foot
Bushing
3. Install impeller onto pinion shaft. Insert 1/8”x 1¼” cotter pin through impeller then through pinion shaft. Use hole closest to the gear box. Spread cotter pin to prevent from falling out.
Next insert Cross Brace thru the Gearbox Brace as shown above.Finish by sliding the Axle into the Gearbox as shown above. NOTE: Ensure that the Axle is exactly as shown above.
FRONT
PinionShaft
1/8 x 1-1/4”Cotter Pin (#36105)
DRIVE WHEELHOLE
COAST WHEELHOLE
Impeller
Cross Brace
GEARBOX & AXLE ASSEMBLY
Gearbox Brace
SLIDE INTO GEARBOX
GearboxFRONT
FRONT
FRONT
4. Install gear box by inserting the pinion shaft into hole in center of hoppers bottom. The word “FRONT” on the gearbox must point to Front of the hopper. Follow label instructions on hopper.
Axle Bearing
FlatSide
Notch
5. Install axle bearings to both lower handles. NOTE: Notch on bearings and lower handles. Bearings must go through flat side of lower handle.
6. A - Install lower handles onto axle to both sides as shown. Insert 2¼” bolt through second hole in lower handle and through first hole in frame install locknut. DO NOT TIGHTEN. B - Now insert 1½” bolt through first hole in lower handle. Then through frame brace. NOTE: Numbers on frame brace must be facing toward gear box as shown. Next into threaded connector in cross brace. DO NOT TIGHTEN.Install the Foot into the Frame and align the bolt holes in the Foot and the Frame(a Phillips screwdriver is helpful)C - Next insert 1½” bolt through other end of frame brace and through second hole in frame through the foot and install locknut.
NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP. DO NOT OVER TIGHTEN.
PAGE 2
PAGE 3
SLIDE
GearboxAxle Assembly
Lower Handle
Frame Brace
Cross Brace
Axle Bushing
4223
7
7. Slide axle bushing over axle and into axle bearing to both sides as shown.
8. Install drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2” cotter pin through wheel and through axle. Bend with pliers to prevent pin from falling out.
9. Install coast wheel to axle using outside pin hole. As shown, insert 1” cotter pin through axle (not thru the wheel). Bend with pliers to prevent pin from falling out.
Coast wheel side1” Cotter Pin
Drive wheel side2” Cotter Pin
10. NOTE: BEFORE INSTALLING GAUGE AND UPPER HANDLES TO HANDLE SHAFT, UPPER HANDLES FEATURE THREE POSITIONS FOR OPERATOR’S COMFORT. If operator chooses middle or upper positions, use handle spacer in hole nearest to handle grips.
Insert 2” bolt through upper handle, then through handle spacer through other upper handle and secure with locknut..DO NOT TIGHTEN LOCKNUT YET. TIGHTEN THIS NUT LAST.
Now slide the upper handle assembly over the handle shaft (on the end with the bolt holes closer to the end). Install gauge & lever using (2) 2” bolts. Be sure gauge is on left hand side. Tighten locknuts to gauge first. TIGHTEN ALL HARDWARE NOW.
11. Insert pivot rod into shut-off plate as shown. Turn to lock in place.
12. Insert other end of pivot rod into pivot and BraCket assembly as shown. Turn to lock in place.
TURN SPREADER UPRIGHT ON TO WHEELS.
Shut-OffPlate
Pivot Rodwith extra bend
RotatePivot
Angle
Attaching Arm
PivotRod
Insert Pivot Rodinto Shut-Off
and rotate to secure
1/4-20 x 2” Hex Head
Bolt
Gauge &Lever Assembly
HandleSpacer
Upper Handles
1/4-20Locknuts
POSITIONSLOWER
UPPER
Handle Shaft
Long end
Control RodTabbed Hole
Control Rod
Lever Tension Nut
Gauge & Lever
30
1/4 - 20 Lock-nut
1/4 - 20 x 2” Bolt
Pivot Bracket
Long EndHoles are farther
from one end
Handle Shaft
14. Install (1) 1/4-20 regular nut (not a locknut) on to control rod as shown.
15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock in place. Next push lever forward to setting “0”. Align control rod with hole in pivot bracket, pull lever backward to insert control rod through hole in pivot bracket. Now install 1/4-20 regular nut on to control rod.
16. Pull lever back to setting “30” as shown. Next push pivot & bracket forward so that the shut off plate in the hopper is in the full open position. REMEMBER SETTING “30” ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in calibration.
17. Tension on the flow control lever may be adjusted by tightening or loosening the tension nut as shown.
¼-20Hex Nuts
Pivot Bracket Control
Rod
PivotRod
18. Insert agitator to pinion shaft on inside of hopper. NOTE: the position of flat side of the agitator in the drawing. The agitator should be installed as shown.
PAGE 4
13. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using 2” bolts and locknuts. TIGHTEN BOLTS AND NUTS NOW.
PAGE 5
The settings furnished on the Rate Setting Matrix are intended as a guide only. Variations in physical characteristics of material applied, walking speed, and roughness of ground surface may require slightly different spreader settings. Due to the above conditions, the manufacturer makes no warranty as to the uniformity of coverage actually obtained from the settings listed.
HOW TO ORDER SPARE PARTSAll spare parts listed herein may be ordered direct from the manufacturer. Be sure to give the following information when ordering.
; Model Number ; Part Number ; Part Description
You can contact us by calling (574) 848-7491 or 800-294-0671 to place an order with a credit card. Or online at www.earthway.com/parts Questions? Parts@earthway.com
FULL Rate (one pass) HALF Rate (two passes)
SPREAD PATH
© 2013 Earthway Products, Inc. All rights reserved
5-YEAR LIMITED WARRANTYEarthway Products, Inc. warrants this product free of defects in original workmanship and materials for a period of 5-years to the end user with the original purchase receipt. If a manufacturing non-conformance is found, Earthway Products, Inc. at its discretion will repair or replace the part(s) or product at no charge provided the failure is not the result of incorrect installation, mishandling, misuse, tampering, or normal wear and tear as determined by Earthway. Earthway at its discretion may require that the part(s) or product be returned along with the original purchase receipt at owners’ expense for examination and compliance with the terms of this warranty. Do not return any product without first receiving authorization from Earthway Products, Inc. To seek remedy under this warranty, contact Earthway Products, Inc. at 574-848-7491, techsupport@earthway.com or write to Earthway Products, Inc. P.O. Box 547 Bristol, Indiana 46507 and describe the nature of the manufacturing defect. SPECIFIC LIMITATIONS: This warranty covers only the part(s) or product; any labor charges associated with repair or replacement of non-conformances are specifically excluded. Due to the corrosive nature of most fertilizers and ice melt products, Earthway Products, Inc. makes no warranty against and specifically excludes part(s) or product degradation or failure due to corrosion or its effects, or the use of powdered materials. Clean and dry your spreader thoroughly after each use, as a preventative measure, coat all metal parts with a light oil or silicon spray.
OPERATING INSTRUCTIONSBefore filling hopper, become familiar with the operation of this spreader.
5 Obtain proper setting for material to be used from the enclosed SETTING MATRIX included with this spreader, or from our web site under the MANUALS SECTION.
5 Move stop bolt on rate gauge assembly to the proper setting. 5 While pushing spreader forward, pull control lever back to stop bolt. 5 To stop, push lever forward to close flow holes before you stop moving. 5 When finished, empty any remaining material from hopper. 5 Thoroughly wash spreader and allow to dry before storing. A coating of light oil will help prevent corrosion. 5 If you use Rock Salt, remove agitator when in use to prevent damage to the gearbox.
2150 PARTS LISTkey # part # desCription key # part # desCription
1 40002 ROUND SCREEN 21 36208 #6 X 3/8" TYPE 25 PHPS S.S.
2 60332 HOPPER ASSEMBLY (2150/2150T) 22 12317 SHUT OFF PLATE (2600B) BLACK
3 33117 AGITATOR 23 25222 LOWER HANDLE SQ (2150's/2170's)
4 12220 GEAR BOX BUSHING (2050) 24 25108 FRAME (2150,2170,C22,C24,C25,F-Series)
5 31104 #14 X 1 1/2 TYPE 25 FHPS ZINC 25 44249 FRAME BRACE (2150/2170)
6 32103 1/4-20 NYLON INS LOCKNUT ZINC 26 25228 CROSS BRACE (2150/2170/S25) 11.25 REV908
7 11927 SHUTOFF SUPPORT- LARGE 27 31106 1/4-20 X 2 1/4" HHCS ZINC
8 31120 1/4-20 X 2" HHCS ZINC 28 12109 IMPELLER (9" DIA)
9 60300 PIVOT & BRACKET ASSEMBLY (2150/2170) 29 36105 1/8" X 1 1/4" COTTER PIN S.S.
10 12274 GRIP (2150/2170) 7.5" LONG 30 70138 PNEUMATIC DRIVE WHEEL STUD (2150/S25)
11 44251 PIVOT ROD (2150/2170/C22/C24) 31 60333 New Floating GEAR BOX (2150/C22)
12 60298 GAUGE & LEVER ASSEMBLY (2150/C22) 32 12148 AXLE BEARING (2130/2150/2170/S25)
13 60175 UPPER HANDLE SQUARE W/GRIP 33 12152 AXLE BUSHING (2130/2150/2170/S25)
14 12344 HANDLE SPACER (2150/2170) SQ. 34 33109 3/16" X 2" COTTER PIN ZINC
15 31100 1/4-20 X 1 1/2 HHMS ZINC 35 60027 WING NUT ASSEMBLY BLACK16 25223 HANDLE SHAFT SQ (2150) 36 37100 1/4-20 X 1" CARRIAGE BOLT ZINC
17 42256 CONTROL ROD (2150/C24SS) 37 12147 SPACER (PIVOT LINK)
18 31138 #8 X 3/8" PMT #8 HD COARSE BLACK 38 24500 AXLE, COINED (2150, 2170, C, PUSH/TOW)
19 33108 3/16" X 1" COTTER PIN ZINC 39 25723 FRAME Foot (Flex-Select Painted)
20 32100 1/4-20 HEX NUT ZINC
44249
23
10
24
7
22
28
39
21
9
11
20
6
2
3
1
19
30
3132
33
34
29
23
2526
8
5
8
6
6
17
20
27
15 25
15
13 353637
14
16
15
27
12
4
1815
38
60043ROPTIONALHeavy-Duty Rain Cover
& Side Deflector Kit
77001OPTIONALHeavy-DutyRain Cover
60166ROPTIONAL3-Side Salt Deflector Kit
Earthway Products, Inc.P.O. Box 547
Bristol, IN 46507Phone:1-800-294-0671
www.earthway.com
30 20 10 0
Lesco Settings
Standard Settings Gauge Overlay #12196 andOPTIONAL Lesco Settings Gauge Overlay #12195
30 20 10 0
EarthWay Settings
Bol
t Id
enti
fier
1-1/2”
1”
2”
2-1/4”
2-3/4”
Pt.
#53
192
5 10 15
30
Inse
rt C
ontr
ol R
od
into
the
Piv
ot B
rack
et
Att
ach
1/4-
20 R
egul
arH
ex N
uts
at t
hese
poi
nts.
Not
ice
the
posi
tion
of t
he d
oubl
e be
nd p
oint
.It
mus
t be
at
this
loca
tion
30
Bro
adca
st S
etti
ng M
atri
x C
alib
ratio
n Te
chni
que
s
Shu
t-O
ffFu
lly O
pen
Tig
hten
Scr
ew
Slid
e O
uter
Con
trol
Wir
e to
Cal
ibra
te
Cab
le T
ype
Ad
just
men
tLo
osen
/tig
hten
scr
ew o
n ca
ble
clam
p th
en
slid
e ou
ter c
able
in/o
ut fo
r cal
ibra
tion
Fig
2D
rop
ho
les
sho
wn
fully
op
en.
Ho
w t
o e
nsur
e yo
ur s
pre
ader
is p
rop
erly
cal
ibra
ted
Mak
e su
re th
e dr
op h
oles
in th
e bo
ttom
of t
he h
oppe
r are
fully
ope
n w
hen
the
Rat
e C
ontro
l han
dle
is o
n #3
0. I
f not
, ple
ase
adju
st c
ontro
l cab
le o
r con
trol r
od to
allo
w fo
r a fu
ll op
en h
oppe
r pos
ition
at #
30.
Ro
d T
ype
Ad
just
men
t1.
Ope
n th
e sh
ut-o
ff so
that
the
drop
hol
es a
re c
ompl
etel
y op
en a
s illu
stra
ted
to th
e rig
ht.
2. R
evie
w th
e C
ontro
l Lev
er p
ositi
on -
if it
is s
et s
o th
at th
e fo
rwar
d ed
ge is
at #
30, y
ou a
re c
alib
rate
d. I
f not
,
yo
u
need
to a
djus
t the
con
trol r
od a
t the
piv
ot b
rack
et s
how
n in
Fig
1.
A
. If
your
shu
t-of
f is
not a
ble
to o
pen
fully
as
in s
tep
#1. L
oose
n th
e to
p nu
t a fe
w tu
rns,
then
loos
en th
e lo
wer
nut
so
that
it a
llow
s yo
u to
pus
h th
e sh
ut-o
ff op
en fu
lly.
Nex
t tig
hten
eac
h nu
t so
that
they
con
tact
the
pivo
t bra
cket
with
out m
ovin
g it,
and
then
car
eful
ly ti
ghte
n ea
ch n
ut fu
lly s
o th
ey d
o no
t loo
sen
durin
g us
e. R
eche
ck a
djus
tmen
t
as
out
lined
in #
1 ab
ove.
B
. If
your
shu
t-of
f is
able
to o
pen
fully
as
in s
tep
#1, b
ut th
e C
ontro
l Lev
er is
not
at #
30.
Loos
en th
e to
p nu
t a fe
w
tu
rns,
then
loos
en th
e lo
wer
nut
so
that
it a
llow
s yo
u to
pus
h th
e C
ontro
l Lev
er to
#30
. N
ext t
ight
en e
ach
nut s
o
that
they
con
tact
the
pivo
t bra
cket
with
out m
ovin
g it.
Car
eful
ly ti
ghte
n ea
ch n
ut fu
lly s
o th
ey d
o no
t loo
sen
durin
g
use.
Rec
heck
adj
ust a
s ou
tline
d in
#1
abov
e.C
able
Typ
e A
dju
stm
ent
1. O
pen
the
Con
trol L
ever
so
that
the
shut
-off
and
drop
hol
es a
re c
ompl
etel
y op
en a
s illu
stra
ted
abov
e rig
ht.
2. R
evie
w th
e C
ontro
l Lev
er p
ositi
on s
o th
at th
e in
dica
tor i
s po
inte
d to
#30
, if i
t is
your
cal
ibra
tion
is c
orre
ct.
If no
t you
ne
ed to
adj
ust t
he c
ontro
l cab
le a
t the
cab
le c
lam
p on
the
unde
rsid
e of
the
hopp
er a
s sh
own
in F
ig 2
.
A.
If yo
ur s
hut-
off i
s no
t abl
e to
ope
n fu
lly a
s in
ste
p #1
. Loo
sen
the
cabl
e cl
amp
scre
w s
light
ly s
o th
at y
ou c
an s
lide
th
e ou
ter c
able
out
so
that
the
shut
-off
is fu
lly o
pen.
Nex
t tig
hten
the
cabl
e cl
amp
scre
w s
ecur
ely.
Rec
heck
adju
stm
ent a
s ou
tline
d in
#1
abov
e.
B. I
f you
r shu
t-of
f is
able
to o
pen
fully
as
in s
tep
#1, b
ut th
e C
ontro
l Lev
er is
not
at #
30.
Loos
en th
e ca
ble
clam
p sc
rew
sl
ight
ly s
o th
at y
ou c
an s
lide
the
oute
r cab
le in
so
that
the
Con
trol L
ever
ope
ns to
#30
. Nex
t tig
hten
the
cabl
e cl
amp
sc
rew
sec
urel
y. R
eche
ck a
djus
tmen
t as
outli
ned
in #
1 ab
ove.
If yo
u ha
ve a
ny q
uest
ions
rega
rdin
g th
e op
erat
ion
or a
ssem
bly
of y
our s
prea
der p
leas
e ca
ll us
at 8
00-2
94-0
671
or
57
4-84
8-74
91 M
onda
y -
Frid
ay 9
:00a
m -
4:0
0pm
Eas
tern
. A
cces
sorie
s an
d R
epai
r P
arts
are
als
o av
aila
ble
at th
ese
num
bers
.
Fig
1
CH
AR
T 1
BA
G C
OV
ER
AG
E IN
S
QU
AR
E F
EE
T5,
000
10,0
0015
,000
LBS
/1,0
00 S
Q F
T
B A G W E I G H T
5 LB
S.
1.0
0.5
0.3
10 L
BS
.2.
01.
00.
715
LB
S.
3.0
1.5
1.0
18 L
BS
.3.
61.
81.
220
LB
S.
4.0
2.0
1.3
25 L
BS
.5.
02.
51.
730
LB
S.
6.0
3.0
2.0
35 L
BS
.7.
03.
52.
340
LB
S.
8.0
4.0
2.7
45 L
BS
.9.
04.
53.
050
LB
S.
10.0
5.0
3.3
SP
RE
AD
WID
TH
S F
OR
DIF
FER
EN
T
PA
RT
ICLE
SIZ
ES
Par
ticle
Siz
eE
nglis
hM
etric
Sm
all/
Fine
(S
and
)5-
7ft.
1.5-
2.1m
Med
ium
(H
alf B
B)
7-9f
t.2.
1-2.
7m
Larg
e(F
ull B
B)
9-12
ft.
2.7-
3.7m
SP
RE
AD
WID
TH
FO
R D
IFFE
RE
NT
S
IZE
GR
AS
S S
EE
DS
eed
Siz
eE
nglis
hM
etric
Fine
5-7f
t.1.
5-2.
1m
Coa
rse
7-10
ft.
2.1-
3.1m
ES
TAB
LIS
HIN
G A
SE
TT
ING
RA
TE
Ste
p 1
: Use
Cha
rt 1
to e
stim
ate
the
num
ber o
f LB
S/1
,000
squ
are
feet
of c
over
age
(Exa
mpl
e: 2
0 LB
. bag
with
10,
000
squa
re fo
ot c
over
age
= 2
.0 L
BS
/1,0
00
squa
re fe
et)
Ste
p 2
: Fi
nd th
e cl
oses
t LB
S/1
,000
squ
are
feet
in C
hart
2 th
at y
ou e
stim
ated
usi
ng
Cha
rt 1
(Exa
mpl
e: 2
.0 L
BS
/1,0
00 s
quar
e fe
et =
Spr
eade
r Set
ting
of 1
3)S
tep
3:
Det
erm
ine
the
Spr
ead
Wid
th b
y ev
alua
ting
the
parti
cle
or s
eed
size
in
Cha
rt 3
to d
eter
min
e th
e S
prea
d W
idth
bet
wee
n S
prea
d P
aths
ME
TR
IC R
AT
E S
ET
TIN
GD
eter
min
ing
a S
etti
ng R
ate
Use
cha
rt be
low
to d
eter
min
e th
e S
etti
ng R
ate
base
d on
Gra
ms/
Sq
uare
M
eter
of c
over
age
as d
irect
ed o
n th
e ba
g.
GR
AM
S/S
Q
ME
TER
LBS
./1,
000
SQ
FT
SP
RE
AD
ER
S
ETT
ING
5 G
ram
s1.
0 LB
S.
1110
Gra
ms
2.0
LBS
.13
15 G
ram
s3.
0 LB
S.
1420
Gra
ms
4.0
LBS
.16
25 G
ram
s5.
0 LB
S.
1730
Gra
ms
6.0
LBS
.18
35 G
ram
s7.
0 LB
S.
1940
Gra
ms
8.0
LBS
.20
45 G
ram
s9.
0 LB
S.
2250
Gra
ms
10.0
LB
S.
23
The
sett
ings
furn
ishe
d o
n th
e R
ate
Set
ting
Mat
rix a
re in
tend
ed a
s a
guid
e on
ly.
Varia
tions
in p
hysi
cal c
hara
cter
istic
s of
mat
eria
l ap
plie
d, w
alki
ng s
pee
d, a
nd r
ough
ness
of
gro
und
sur
face
may
req
uire
slig
htly
diff
eren
t sp
read
er s
ettin
gs. D
ue t
o th
e ab
ove
cond
ition
s, E
PI m
akes
no
war
rant
y as
to
the
unifo
rmity
of c
over
age
actu
ally
ob
tain
ed fr
om t
he s
ettin
gs li
sted
.
FULL
Rat
e (o
ne p
ass)
HA
LF R
ate
(tw
o p
asse
s)
SP
RE
AD
PA
TH
S
© 2
013
Ear
thw
ay P
rodu
cts,
Inc.
All
right
s re
serv
ed
Mai
ntai
n a
cons
iste
nt w
alki
ng
spee
d of
2-3
mph
or
the
appl
icat
ion
rate
will
cha
nge.
All
spre
ad w
idth
s ar
e de
term
ined
by
part
icle
si
ze a
nd w
eigh
t.
Recommended