Detailed Procurement PlanMekong Integrated Water Resource Management Project
As of 02 March 2016
I. General 1. Project information:
Country: Lao PDR Project Implementing Agency:
1. Department of Water Resource Management, Ministry of Natural Resources and Environment (MoNRE)2. Provincial Natural Resource and Environment Department (KHM. and SVK.)3. Department of Irrigation-DIMU/PAFO in KHM. and SVK.4. Department of Livestock and Fisheries-FCMU (CPS. ATP. and SEK.)
2. Bank’s approval Date of the procurement Plan Original Plan : January 31, 2012 1st Revision : November 05, 2012 2nd Revision : February 25, 2013 3rd Revision : August 14, 2014 4th Revision : April 22, 2015 5th Revision : November 11, 2015 6th Revision : March 02, 2016
3. Date of General Procurement Notice: To be advertised by March 15, 2012 (UNDB online)
4. Period covered by this procurement plan: Until the year 2015 implementation of the project.
II. Goods and Works and non-consulting services.
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:
ExpenditureCategory
Contract Value Threshold
(US$’000)
Procurement Method
Contracts Subject to Prior Review (US$’000)
Goods
>= 600 ICB All ICB contracts
100 - < 600 NCB The 1st NCB contract
< 100 Shopping The 1st shopping contract
Works
>= 2,000 ICB All ICB contracts
200 - < 2,000 NCB The 1st NCB contract
< 200 Shopping The 1st shopping contract
2. Prequalification. Not expected for the works/goods packages.
3. Reference to Project Operational Manual: Operation Manual dated January 31, 2012.
4. Any Other Special Procurement Arrangements: Advance contracting may be applied for some items as specified in the Procurement Plan.
5. Procurement Packages for Works & Goods (prior & post reviews) with Methods and Time Schedule
1 2 3 4 5 6 7 8 9
No. Contract (Description) Estimated Cost USD
Procurement Method
PQ (yes/no)
Domestic Preference
(yes/no)
Review by Bank
(Prior / Post)
Expected Bid/Quotation Opening Date
Comment
Component 2 : National Water Resource Management (NMPU)
C2.0.0-W-01 NPMU Office Renovation* 28,000 Shopping No No Prior Oct 2013
1st shopping of works, completed
Pomrungros Aluminium Company
C2.0.0-G-02 Vehicles: 3 units (NPMU and Water Law) 85,000 NCB No Yes Prior
1st NCB of goods Completed
TNK Trading Company Ltd.-Mitsu
Lao
C2.0.0-G-03 NPMU Office Equipment: Lot 1 15,000 Shopping No No Post May 2013 completed Best Computer
107164
C2.0.0-G-04 NPMU Office Equipment Lot 2: 9,000 Shopping No No Post Sept 2014 Completed Best Computer
C2.0.0-G-05 Finance Management Software for NPMU 10,000 Shopping No No Post Mar 2014
C2.0.0-G-06 Motorcycles 4 units for NPMU 6,000 Shopping No No Post Oct 2013Completed
NCX. Co.LTD
Component 2.1 : Water Law
C2.1.0-G-01 Water Law Office Equipment 12,000 Shopping No No Post Feb 2014 Completed Best Computer
Component 2.2 : Water Quality
C2.2.0-W-01
Construction Works for laboratory building including Interior Works for Laboratory Support systems (Vientiane Capital)
1,068,840 NCB No No Prior Dec 2014
Completed Rattanaphonexay Construction Sole
Company, Ltd
C2.2.0-G-02 One 4WD Pick-Up 35,000 Shopping No No Post Mar 2014Completed
Keo Auto Group Co.Ltd
C2.2.0-G-03 Office Equipment for Water Quality Component 18,000 Shopping No No Post Mar 2014 Completed
Best Computer
C2.2.0-G-04 Water Quality Ecosystem Monitoring Field Equipment 30,500 Shopping No No Post Apr 2014 Cancelled
C2.2.0-G-05 Office Equipment @ computer, Desktop for data base and office use 10,000 Shopping No No Post Mar 2016
C2.2.0-G-06 Laboratory Equipment chemical, GPS 10,000 Shopping No No Post Feb 2016
C2.2.0-G-07 Motorcycles 6,000 Shopping No No Post July 2015
Completed New Chip Xeng
(NCX) Company, Ltd-
Component 2.3 : Water Modeling
C2.3.0-G-01 Modelling Office Equipment: Lot 1 25,000 Shopping No No Post July 2013
completed 1st shopping of
goods, PS IT Shop-
C2.3.0-G-02 Modelling Office Equipment: Lot 2 12,000 Shopping No No Post Apr 2015 Completed BEST Computer-
C2.3.0-G-03 Modelling Software 5,000 Shopping No No Post Mar 2016
C2.3.0-G-04 Geography data for modeling work 10,000 SS* No No Prior Nov 2014
Completed The National Geographic Department-
C2.3.0-G-05 Modelling Office Equipment: Lot 3 25,000 Shopping No No Post Mar 2016
Component 2.4 : Hydro meteorological
C2.4.0-W-01 New Building Construction in DMH-VTE 650,000 NCB No No Prior Mar 2015
1st NCB of work-On going Bidding
Process
C2.4.0-W-02 Office Renovation in DMH-VTE 50,000 Shopping No No Prior Aug 2014
completed 1st shopping of work, Building Concepts
Sole Co., Ltd
C2.4.0-G-03
Hydro-meteorological Equipment and Data Management Software with Technical Support: Lot 1 75,000 Shopping No No Post Dec 2014
Canadian Environmental
Assistance (CEA) Combined with other Weather
Station Equipment
C2.4.0-G-04Hydro-meteorological Equipment and Data Management Software with Technical Support: Lot 2
42,500 Shopping No Yes Post June 2015Combined with other Weather
Station Equipment
C2.4.0-W-05 Hydromet: Civil Works for Power Conditioner* 21,200 Shopping No No Post Jun 2014
Combined with other Weather
Station Equipment
C2.4.0-W-06 Hydromet office Construction (SVK.) 100,000 Shopping No No Post Mar 2015Sansasavanh
Construction Co., LTD - Completed
C2.4.0-G-07 Hydromet Office Supplies 4,100 Shopping No No Post Cancelled
C2.4.0-G-08Hydromet and Metreology Field Instrument Equipment : Lot 1 for SEK. Basin
121,000 Shopping No No Post
Canadian Environmental
Assistance (CEA) Combined with other Weather
Station Equipment
C2.4.0-G-09Hydromet and Metreology Field Instrument Equipment: Lot 2 for SEK. Basin
121,000 Shopping No No PostCombined with other Weather
Station Equipment
2
C2.4.0-G-10 Field Equipment (meters and tools): Lot 1 for 1st year 25,000 Shopping No No Post Feb 2015
Completed SKN Trading
Import-Export Sole Co.-
C2.4.0-G-11 Acquisition Servers, Decoded Software, database software 85,000 Shopping No No Post Feb 2016
C2.4.0-G-12 Telemetry Reception System 60,000 Shopping No No Post
C2.4.0-G-13 License Software 25,000 Shopping No No Post
C2.4.0-G-14 Hydrological and hydraulic models software 31,000 Shopping No No Post Feb 2016
C2.4.0-G-15 Communication and Warning System 50,000 Shopping No Yes Post Feb 2016
C2.4.0-G-16 Field office & Office Computers 19,800 Shopping No No Post Aug 2014Completed
Best Computer
C2.4.0-G-17 Vehicles 3 units DMH 94,000 NCB No Yes Post Apr 2013
completed Vientiane Motors Market Co. Ltd-
Mazda
C2.4.0-G-18 Motorcycles 12 units (10 Units) 16,000 Shopping No No Prior Oct 2013
Completed NCX.
Co.LTD(Honda)1st shopping of
goods,
C2.4.0-G-19 Civil Works for Hydro-met Stations 190,000 Shopping No No Post Mar 2015
CompletedLao Creation Sole
Company, Ltd
C2.4.0-NCS-20
Service Installation Support of Hydromet Equipment 70,000 Shopping No No Post Sept. 2015
CompletedLao Creation Sole
Company, Ltd-
C2.4-ICB-21
Supply and Installation of Hydrometeorological Equipment and Data Management Software with Technical Support
$384,767.00 ICB No No Prior July 2015
CompletedCanadian
Environmental Assistance (CEA)
C2.4.0-G-22 Field Equipment and Logistics: Lot 2 25,000 Shopping No No Post Feb 2016
Component 3.1.1 : Provincial-Natural Resources and Environment Department (P-NRED) of KHM. & SVK.
C3.1.1-W-01 New Construction of Office Building for PoNRE KHM.
200,000 Shopping No No Prior March2015
Completed Lao Urban
Development Sole Co. -
C3.1.1-W-02 Office Renovation for PoNRE - SVK. 20,000 Shopping No No Post Dec 2013Completed
Sengvixay Group Construction
C3.1.1-W-03Office Renovation for 4 Districts Office of Nongbok, Xebangfai; Boulapha and Gnomalath, KHM.
20,000 Shopping No No Prior Mar 2-013
Completed Viengthong
Construction Co.,LTD
C3.1.1-W-04 Office Renovation for 1 Districts Office of Mahaxay, KHM. 5,000 Shopping No No Prior March 2015
Completed Sengvixay Group
Construction
C3.1.1-W-05Office Renovation for PONRE SVK. four 3) Districts Offices ( Phinh, Champhone, Songkhone)
15,000 Shopping No No Post Mar 2013
Completed Mouknapha Construction
Co.,LTD
C3.1.1-W-06Office Renovation for PONRE SVK. four (1) Districts Offices (Xaibouly,SVK
5,000 Shopping No No Post March 2015Completed
Sengvixay Group Construction Co.,
Ltd. –
C3.1.1-G-07 Pick-Up 4WD for DWR, KHM, SVK 112,500 NCB No No Prior Apr 2013
completed Vientiane Motor Motor Market
Co.,LTD
C3.1.1-G-08 Motorcycles for SVK. and KHM. 20,000 Shopping No No Post Feb 2014 Completed NC Co.,LTD
C3.1.1-G-09 Office Equipment for DWR, PoNRE-KHM and SVK 20,000 Shopping No No Post July 2013 Completed
Best Computer
C3.1.1-G-10Office Furniture(Chair- desks, Filing cabinet, Safe, Meeting table, Whiteboard, etc. ;)
10,000 Shopping No No Post May 2014 Completed Best Computer
C3.1.1-G-11 Office Equipment for DWR, PoNRE-KHM and SVK. 10,000 Shopping No No Post 12 Jul 2013 Completed
Best Computer
C3.1.1-G-12Office Furniture (Chair- Desks, Filing cabinet, Safe, Meeting table, Whiteboard, etc. ;)
5,000 Shopping No No Post 09 My2014 Completed Best Computer
C3.1.1-G-13 Office equipment for (5) Districts of KHM.: Nongbok, Xebangfai; Mahaxay; Boulapha and Gnomalath; and (4) districts of Savanakhet: Xaibouly, Phinh, Champhone,
10,000 Shopping No No Post Feb2014 Completed Best Computer
3
Songkhone.C3.1.1-G-14 Pick-Up 4WD for Component 3.1.1 45,000 Shopping No No Post Mar 2016 C3.1.1-G-15 Field Equipment (GPS, Note book
computers, other as needed,) 15,000 Shopping No No Post Mar 2016
C3.1.1-G-16 Satellites Images, data set (cooperation MRC support, Dept geography, and etc.;)
3,000 Shopping No No Post Mar 2016
C3.1.1-G-17 Community Investments in XBF 50,000 Shopping (Community Involvement)
No No Post Oct 2015 Completed in multiple packages
C3.1.1-G-18 Community Investments in XCP 50,000 Shopping (Community Involvement)
No No Post Oct 2016 Completed in multiple packages
C3.1.1-W-19 Water Drilling and Sample Testing 25,000 Shopping No No Post Mar 2016
C3.1.1-G-20 Office Furniture and Equipment 6,000 Shopping No No Post Apr 2016
Component 3.1.2: Xebangfai & Xebanghieng Floodplain Management
A XBF First Year Civil Works for Floodgates and Irrigation
C3.1.2-W-01 Floodgates, Lot 1 100,000 Shopping No No Post Dec. 2014
Completed CompletedPhouvieng Building and Irrigation
Construction
C3.1.2-W-01-A Floodgates, Lot 2 100,000 Shopping
No
No Post Dec. 2014
Completed Phouvieng Building and Irrigation
Construction on January 2015
C3.1.2-W-01-B Floodgates, Lot 3 100,000 Shopping
No
No Post Dec. 2014
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on
January 2015
C3.1.2-W-01-C Floodgates, Lot 4 100,000 Shopping
No
No Post Dec. 2014
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on
January 2015
C3.1.2-W-01-D Floodgates, Lot 5 100,000 Shopping
No
No Post Dec. 2014
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on
January 2015
C3.1.2-W-01-E Floodgates, Lot 6 100,000 Shopping No No Post Dec 2015
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 28
Dec 2015.
C3.1.2-W-01-F Floodgates, Lot 7 100,000 Shopping
No
No Post
Dec 2015 Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 28
Dec 2015.
C3.1.2-W-01-G Floodgates, Lot 8 100,000 Shopping
No
No Post
Dec 2015 Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 28
Dec 2015.
C3.1.2-W-01-H Floodgates, Lot 9 100,000 Shopping
No
No Post
Dec 2015 Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 28
Dec 2015.
C3.1.2-W-01-I Floodgates, Lot 10 100,000 Shopping
No
No Post
Dec 2015 Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 28
Dec 2015.C3.1.2-W-02 Major Repair Pontoon (6schemes)* 50,000 Shopping No No Prior Sep 2013 Cancelled
B XBF First Year Program Spare Parts: Lot 1
C3.1.2-G-03 New Pontoon (6 schemes): Lot 1 89,520 NCB No Yes Prior Aug. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 08
October 2013.
C3.1.2-G-04 New Pumps & Motors (75KW) 49,620 NCB No Yes Post Aug. 2013
Completed PP Electric Sole
Company, Ltd on 21 October 2013.
C3.1.2-G-05 Flexible Pipes 31,400 NCB No Yes Post Aug. 2013 Completed
4
PP Electric Sole Company, Ltd on 27
November 2013
C3.1.2-G-06 Valves, Lot 1-XBF38,700
Shopping No Yes Post May 2014
Completed PP Electric Sole
Company, Ltd on 2 June 2014
C3.1.2-G-07 Control Panel, Lot 1-XBF 26,200 Shopping No Yes Post Apr 2014
Completed PP Electric Sole
Company, Ltd on 2 June 2014
C3.1.2-G-08 Impeller, coupling and other spare parts 50,000 SS* No Yes Prior Apr 2014 Cancelled
C3.1.2-G-09 Mechanical tools87,946,000 K
Shopping No No Post Apr 2014
Completed Kitisack Construction Materials
Supplier on 2 June 2014
C3.1.2-G-10 Construction Materials for Canal Improvement: Lot 1 28,361 Shopping No No Post Oct. 2013
Completed Phouvieng Building and Irrigation
Construction on 04 November 2013
C3.1.2-G-11 Construction Materials for Canal Improvement: Lot 2 28,361 Shopping No No Post Oct. 2013
Completed Phouvieng Building and Irrigation
Construction on 04 November 2013
C3.1.2-G-12 Construction Materials for Canal Improvement: Lot 3 29,204 Shopping No No Post Oct. 2013
Completed Phouvieng Building and Irrigation
Construction on 04 November 2013
C3.1.2-G-13 Construction Materials for Canal Improvement: Lot 4 29,486 Shopping No No Post Oct. 2013
Completed Phouvieng Building and Irrigation
Construction on 04 November 2013
C3.1.2-G-14 Construction Materials for Canal Improvement: Lot 5 29,204 Shopping No No Post Oct. 2013
Completed Phouvieng Building and Irrigation
Construction on 04 November 2013
C3.1.2-G-15 Construction Materials for Canal Improvement: Lot 6 28,736 Shopping No No Post Oct. 2013
Completed Phouvieng Building and Irrigation
Construction on 04 November 2013
C3.1.2-G-16 Construction Materials for Canal Improvement: Lot 7 28,984 Shopping No No Post Oct. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 12
November 2013.
C3.1.2-G-17 XBF First Year Program Spare Parts: Lot 2 88,000 Shopping No Yes Post Dec 2015
Completed Kitisack Construction Materials Supplier on Nov 2015
C3.1.2-G-18 XBH First Year Civil Works for Weirs & Irrigation 150,000 NCB No No Post Cancelled
C XBH First Year Program Spare Parts
C3.1.2-G-19 UPVC Delivery Pipes 26,930 Shopping No Yes Prior Aug. 2013
Completed Kitisack Construction Materials Supplier on 06 August
2013.
C3.1.2-G-20 Steel Delivery Pipes - XBH 39,049 Shopping No Yes Post Apr 2014
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 2
June 2014.
C3.1.2-G-21 New Pontoon (6 schemes): Lot 2 89,010 NCB No Yes Post Aug. 2013
Completed Phouvieng Building and Irrigation
Construction on 31 October 2013
C3.1.2-G-22 New Pumps & motors (75KW) 74,331 NCB No Yes Post Aug. 2013Completed PP Electric Sole Company, Ltd on
27 November 2013
C3.1.2-G-23 New Pumps & Motors (37KW) 49,878 NCB No Yes Post Aug. 2013Completed PP Electric Sole Company, Ltd on
21 October 2013.
C3.1.2-G-24 Flexible Pipes 23,250 NCB No Yes Post Aug. 2013Completed PP Electric Sole Company, Ltd on
27 November 2013
C3.1.2-G-25 Valves, Lot 1-XBH42,900
Shopping No Yes Post May 2014Completed PP Electric Sole Company, Ltd on
2 June 2014
C3.1.2-G-026 Control Panel, Lot 1-XBH35,540
Shopping No Yes Post Apr 2014Completed PP Electric Sole Company, Ltd on
2 June 2014
5
C3.1.2-G-27 Impeller, coupling and other spare parts 50,000 SS* No Yes Post Cancelled
C3.1.2-G-028 Mechanical tools104,394,000 K
Shopping No Yes Post Apr 2014
Completed Kitisack Construction Materials
Supplier on 2 June 2014
C3.1.2-G-29 Construction Materials for Canal Improvement: Lot 1 28,857 Shopping No No Post Oct. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 12
November 2013
C3.1.2-G-30 Construction Materials for Canal Improvement: Lot 2 29,059 Shopping No No Post Oct. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 12
November 2013
C3.1.2-G-31 Construction Materials for Canal Improvement: Lot 3 28,823 Shopping No No Post Oct. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 12
November 2013
C3.1.2-G-32 Construction Materials for Canal Improvement: Lot 4 29,059 Shopping No No Post Oct. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 12
November 2013
C3.1.2-G-33 Construction Materials for Canal Improvement: Lot 5 28,985 Shopping No No Post Oct. 2013
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 12
November 2013
C3.1.2-G-34 XBF, Second Year Civil Works: Flood gate @ $100,000 per gate 200,000 Shopping No Yes Post Cancelled
C3.1.2-G-35XBF, Second Year Spare Parts: Pump Motors 37 and 75Kw and Control Panel ;Lot 2-XBF
98,508 Shopping No Yes Post Jun 2014Completed PP Electric Sole Company, Ltd on
7 July 2014
C3.1.2-G-36XBF, Second Year Spare Parts: Pump Motors 75Kw and Control Panel ;Lot 3-XBF
93,144 Shopping No Yes Post Jun 2014Completed PP Electric Sole Company, Ltd on
7 July 2014
C3.1.2-G-37 XBF, Second Year Spare Parts: Flexible Pipes, Lot 2-XBF 51,600 Shopping No Yes Post Jun 2014
Completed PP Electric Sole Company, Ltd on
7 July 2014
C3.1.2-G-38 New Pontoon (6 schemes), Lot 2-XBF 93,000 Shopping No Yes Post May 2014
Completed Phouvieng Building and Irrigation Construction on 7 July
2014
C3.1.2-G-39 Valves; Bearings and Steel Pipes 80,000 Shopping No Yes Post Oct 2014Completed PP Electric Sole Company, Ltd on
21 November 2014
C3.1.2-G-40 UPVC Delivery Pipes, Lot 1-XBF 238,968,000 K Shopping No Yes Post Aug 2014
Completed Kitisack Construction Materials
Supplier on 23 Sep. 2014
C3.1.2-G-41 Mechanical tools 15,000 Shopping No Yes Post Nov 2014 Cancelled
C3.1.2-G-42 Construction Materials for Canal Improvement: Lot 8 30,000 Shopping No No Post Oct 2014
Completed Phouvieng Building and Irrigation
Construction on 20 November 2014
C3.1.2-G-43 Construction Materials for Canal Improvement: Lot 9 30,000 Shopping No No Post Oct 2014
Completed Phouvieng Building and Irrigation
Construction on 20 November 2014
C3.1.2-G-44 Construction Materials for Canal Improvement: Lot 10 30,000 Shopping No No Post Oct 2014
Completed Phouvieng Building and Irrigation
Construction on 20 November 2014
C3.1.2-G-45 Construction Materials for Canal Improvement: Lot 11 30,000 Shopping No No Post Oct 2014
Completed Phouvieng Building and Irrigation
Construction on 20 November 2014
C3.1.2-G-46 Construction Materials for Canal Improvement: Lot 12 30,000 Shopping No No Post Oct 2014
Completed Phouvieng Building and Irrigation
Construction on 20 November 2014
C3.1.2-G-47 Construction Materials for Canal Improvement: Lot 13 30,000 Shopping No No Post Oct 2014
Completed Phouvieng Building and Irrigation
Construction on 20 November 2014
C3.1.2-G-48 Construction Materials for Canal Improvement: Lot 14-XBF 30,000 Shopping No No Post Nov 2015
Completed Phouvieng Building and Irrigation
Construction on 20
6
November 2015
C3.1.2-G-49 Construction Materials for Canal Improvement: Lot 15-XBF 30,000 Shopping No No Post Nov 2015
Completed Phouvieng Building and Irrigation
Construction on 20 November 2015
C3.1.2-G-50 Construction Materials for Canal Improvement: Lot 16-XBF 30,000 Shopping No No Post Nov 2015
Completed Phouvieng Building and Irrigation
Construction on 20 November 2015
C3.1.2-G-51 XBH, Second Year Civil Works (multiple lots) 200,000 NCB No Yes Post Oct 2015
Cancelled
C3.1.2-G-52XBH, Second Year Spare Parts: Pump Motors 75KW and Control Panel, Lot 4-XBH
93,144 Shopping No Yes Post Jun 2014
Completed PP Electric Sole
Company, Ltd on 7 July 2014
C3.1.2-G-53XBH, Second Year Spare Parts: Pump Motors 37Kw and Control Panel, Lot 3-XBH
99,686 Shopping No Yes Post Jun 2014
Completed PP Electric Sole
Company, Ltd on 7 July 2014
C3.1.2-G-54 New Pontoon (6 schemes), Lot 2-XBH 97,800 Shopping No No Post May 2014
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 7
July 2014
C3.1.2-G-55 Flexible Pipes, Lot 2-XBH 54,800 Shopping No No Post Jun 2014
Completed PP Electric Sole
Company, Ltd on 7 July 2014
C3.1.2-G-56 UPVC Delivery Pipes, Lot 2-XBH 476,660,800 K Shopping No No Post Aug 2014
Completed Kitisack Construction Materials
Supplier on 23 Sep. 2014
C3.1.2-G-57 Valves; Bearings and Suction Pipes 30,000 Shopping No No Post Oct 2014
Completed PP Electric Sole
Company, Ltd on 21 November 2014
C3.1.2-G-58 Control Panel 30,000 Shopping No No Post Aug 2014 Cancelled
C3.1.2-G-59 Mechanical tools 15,000 Shopping No No Post Aug 2014 Cancelled
C3.1.2-G-60 Construction Materials for Canal Improvement: Lot 6 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-61 Construction Materials for Canal Improvement: Lot 7 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-62 Construction Materials for Canal Improvement: Lot 8 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-63 Construction Materials for Canal Improvement: Lot 9 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-64 Construction Materials for Canal Improvement: Lot 10 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-65 Construction Materials for Canal Improvement: Lot 11 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-66 Construction Materials for Canal Improvement: Lot 12 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-67 Construction Materials for Canal Improvement: Lot 13 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014C3.1.2-G-68 Construction Materials for Canal
Improvement: Lot 1430,000 Shopping No No Post Oct 2014 Completed Noukham
Irrigation Road and Building Construction
7
Company, Ltd on 20 November 2014
C3.1.2-G-69 Construction Materials for Canal Improvement: Lot 15 30,000 Shopping No No Post Oct 2014
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2014
C3.1.2-G-70 Pump Spare Parts: Bearings, couplings and valves 60,000 Shopping No No Post Mar 2016
C3.1.2-G-71 Vehicles: 3 Units (4WD Pick-Up) 70,350.00 NCB No No Prior Mar 2013 Completed TNK on 21 May 2013
C3.1.2-G-72 Motorcycles (KM & SVK) 18,539.00 Shopping No No Prior Feb 2013 Completed NCX on 13 May 2013
C3.1.2-G-73 Office Equipment (KM & SVK) 29,387.00 Shopping No No Post Feb 2013Completed PC
Electronic on 03 May 2013
C3.1.2-G-74 Office Furniture (KM & SVK) 14,933.00 Shopping No No Post Feb 2013Completed
Phonesavanh on 10 April 2013
C3.1.2-W-75 Office Renovation in Savannakhet 23,583.65 Shopping No No Prior Dec 2012
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 25
January 2013.
C3.1.2-G-76 Survey Equipment: PAFO-SVK & KM 24,408 Shopping No No Post Oct 2013
Completed Phanthavong
Company, Ltd on 13 Jan 2014
C3.1.2-G-77 Water Efficiency and Monitoring Equipment: PAFO-SVK and KM 30,000 Shopping No No Post Dec.2014 Cancelled
C3.1.2-W-78 Office Construction for C3.1.2 in Khammouane 100,000 NCB No No Post April 2015
Completed Phouvieng Building and Irrigation
Construction on 25 May 2015
Contract Variation Order on October
2015
C3.1.2-W-79Installation of New Pumps + Motors + Control Panel and other related accessories parts
30,000 Shopping No No Post Mar 2016
C3.1.2-G-80 One (1) vehicle 45,000 Shopping No No Post May 2015KLM Import - Export
Sole Co., LTD on June 2015
C3.1.2-G-81Water Monitoring and Weather survey Equipment for Irrigation Management
50,000 Shopping No No Post May 2015 Cancelled
C3.1.2-G-82
New Pontoons: 6 sets, Lot 3-XBH 90,000 Shopping No No Post May 2015
Completed Nounkham Irrigation Road and
Building Construction Company, Ltd on 11
June 2015
C3.1.2-G-83 New Pump Set; Motor and Control Panel (37Kw – 1 sets +75Kw – 5 sets)-Lot 4-XBF
90,000 Shopping No No Post June 2015Completed PP Electric Sole Company, Ltd on
14 September 2015
C3.1.2-G-84New Pump Set, Motor and Control Panel: (37Kw – 3 sets +75Kw – 3 sets)-Lot 5-XBH
90,000 Shopping No No Post June 2015Completed PP Electric Sole Company, Ltd on
14 September 2015
C3.1.2-G-85New Pump Set, Motor and Control Panel: (37Kw – 3 sets +75Kw – 2 sets)-Lot 6-XBH
75,000 Shopping No No Post June 2015Completed PP Electric Sole Company, Ltd on
14 September 2015
C3.1.2-G-86 UPVc Pipes: Lot 2-XBF 40,000 Shopping No No Post Sept 2015
Completed Kitisack Construction Materials
Supplier on 14 September 2015
C3.1.2-G-87 UPVc Pipes: Lot 3-XBH 80,000 Shopping No No Post Sept 2015
Completed Kitisack Construction Materials
Supplier on 14 September 2015
C3.1.2-G-88 Construction Materials for Canal Improvement, Lot 17-XBF 30,000 Shopping No No Post Nov 2015
Completed Phouvieng Building and Irrigation
Construction on 20 November 2015
C3.1.2-G-89 Construction Materials for Canal Improvement, Lot 18-XBF 30,000 Shopping No No Post Nov 2015
Completed Phouvieng Building and Irrigation
Construction on 20 November 2015
C3.1.2-G-90 Construction Materials for Canal Improvement, Lot 16-XBH
30,000 Shopping No No Post Nov 2015
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2015C3.1.2-G-91 Construction Materials for Canal
Improvement, Lot 17-XBH30,000 Shopping No No Post Nov 2015 Completed Noukham
Irrigation Road and
8
Building Construction Company, Ltd on 20
November 2015
C3.1.2-G-92
Construction Materials for Canal Improvement, Lot 18-XBH
30,000 Shopping No No Post Nov 2015
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2015
C3.1.2-G-93
Construction Materials for Canal Improvement, Lot 19-XBH
30,000 Shopping No No Post Nov 2015
Completed Noukham Irrigation Road and
Building Construction Company, Ltd on 20
November 2015
C3.1.2-G-94 Steel Delivery Pipes, Dia. 40 cm and Dia. 50 cm 100,000 NCB No No Post Mar 2016
C3.1.2-G-95Suction and discharge pipes, Dia. 20 cm, 25 cm and 30 cm, 150 cm long
40,000 Shopping No No Post Mar 2016
C3.1.2-G-96 Furniture for New Office in KHM 30,000 Shopping No No Post Nov 2015
Completed Phonesavanh
Furniture on 09 Dec 2015
C3.1.2-G-97 One (1) vehicle 45,000 Shopping No No Post Aug 2016
C3.1.2-G-98 Electrical Transformer for C3.1.2 Office 15,000 Shopping No No Post Feb 2016 Issued NOL
25 Jan 2016
Component 3.2 : Lao Fishery Management
C3.2.0-G-01 Community Support for Demarkation: First 5 Khum Bans) 15,000 Shopping No No Post April 2016 Multiple packages
C3.2.0-G-01-A Community Support for Demarkation: 2nd (5 Khum Bans) 15,000 Shopping No No Post Oct 2016 Multiple packages
C3.2.0-W-02Fishery Management Plan and Investment (goods/works): for 15 Khum Ban
15,000 Shopping No No Post Jan 2016Multiple packages
C3.2.0-G-03Rural Infrastructure Support: Estimate of $40,000 per Khum Ban x 15 Khum Ban
600,000 Shopping No No Post Feb 2016 Multiple packages.
C3.2.0-G-04Livelihood Demonstration: $20,000 per Khum Ban x 5 Khum Ban for Phase 1
325,000 Shopping No No Post Nov 2015 Multiple packages
C3.2.0-G-05 Demarkation of FCZ establishment 12,000 Shopping No No Post Apr 2016
C3.2.0-W-06 Office Renovation CPS. 25,000 Shopping No No Prior Jan 2014Completed.Henphouvan
Construction Co
C3.2.0-W-07 Office Renovation SEK. 9,000 Shopping No No Post Aug 2014Completed.
Bounphiengduen Construction Co
C3.2.0-W-08 Office Renovation ATP. 9,000 Shopping No No Post Aug 2014Completed.
Banchai Construction Co.
C3.2.0-W-09 Office Renovation DLF-Vientiane 10,000 Shopping No No Post Mar 2014Completed.Sonesavanh
Construction Co.
C3.2.0-G-10 Office Equipment For CPS. 28,000 Shopping No No Post Jul 2014Completed.
Mahaxay Computer Center-
C3.2.0-G-11 Office Equipment for SEK. 12,000 Shopping No No Post Jul 2014Completed.
Mahaxay Computer Center-
C3.2.0-G-12 Office Equipment for ATP. 12,000 Shopping No No Post Jul 2014Completed.
Mahaxay Computer Center
C3.2.0-G-13 Office Equipment for Vientiane-DLF 16,000 Shopping No No Post Aug 2015
CompletedMahasok Trading
Sole Company
C3.2.0-G-14 Office furniture for CPS,SK,ATP 15,000 Shopping No No Post Jul 2014 Completed.Bounthung Shop
C3.2.0-G-15-A Vehicles for CPS. and VTE 72,000 Shopping No Yes Post Jul 2013Completed. Isuzu Lao Company
C3.2.0-G-15-B Additional Vehicles for ATP and SEK 72,800 Shopping No Yes Post June 2014 Completed
Lao Ford city
C3.2.0-G-16
Boat for CPS. (4): Khong District (2); Phatumphone (1); and Sanasomboune (1);Boat for ATP.: Sanamsai (2);Boat for SEK.: Lamam (2)
26,000 Shopping No No Post Mar 2016 Multiple packages
C3.2.0-G-17 Motorcycle for CPS. office (6): Khong District (2); Phatumphone
58,000 Shopping No No Post Aug 2014 Completed. Honda Pakse -
9
(2); and Sanasomboune (2) and DLF-VTE (2)&Motorcycle for ATP. office (3): Districts (4); District WREA (1) and SEK. office (3); Districts (4); District WREA (1)
C3.2.0-W-18 Hatchery Renovation KM8 158,000 Shopping No No Post Apr 2016
C3.2.0-W-19 Hatchery renovation, Banna CPS. 82,000 Shopping No No Post Apr 2016
C3.2.0-W-20 Hatchery Renovation SEK. 62,000 Shopping No No Post Apr 2016
C3.2.0-W-21 Hatchery Construction ATP. 221,000 NCB No No Post Apr 2016
C3.2.0-G-22 Communities Fisheries Support under CDD sub-projects 35,000
Community Participation
in Procurement
No No Post Jan 2016 Multiple packages
C3.2.0-G-23 Fish Breeders, Feed, Equipment and others for km8 10,000 Shopping No No Post Feb 2016 Multiple packages
C3.2.0-G-24 Fish Breeders, Feed, Equipment and others for Banna 8,000 Shopping No No Post Feb 2016 Multiple packages
C3.2.0-G-25 Fish Breeders, Feed, Equipment and others for SEK. 7,000 Shopping No No Post Feb 2016 Multiple packages
C3.2.0-G-26 Mapping for FMC Registration for 5 Khum Bans; Phase 1 16,000 Shopping No No Post Mar 2016 Multiple packages
C3.2.0-G-27 Additional One (1) vehicle for Pakse C3.2 40,000 Shopping No No Post Aug 2014 Completed.
Por-mortor Shop -
C3.2.0-G-28 Four (4) Truck for Hatchery Support 110,000 NCB No No Post Mar 2016
C3.2.0-G-29 Additional Office Equipment and Furniture For CPS. 10,000 Shopping No No Post Mar 2016
C3.2.0-G-30 Additional Office Equipment and Furniture for SEK. 2,000 Shopping No No Post Jan 2017
C3.2.0-G-31 Additional Office Equipment ad Furniture for ATP. 2,000 Shopping No No Post Jan 2017
C3.2.0-G-32 Rice Seed for Livelihood Support
5,000 SS No No Prior
June 2015 CompletedPhongnam Rice Research and
Produce StationC3.2.0-G-33 Supply Medical Equipment for
Vaccination and Livestock Materials
25,000 Shopping No No Post
June 2015 CompletedLaoyongcharoen Trading Import-
Export Company
III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and
Employment of Consultants:
ExpenditureCategory
Contract Value Threshold (US$’000)
Procurement Method
Contracts Subject to Prior Review (US$’000)
Consultant services
>= 300 QCBS, QBS, All
<= 300 LCS, CQS >=100, the 1st contract for hiring firm for each selection method & all SSS
NA IC >10 for SSS and fiduciary and legal staff
2. Short list comprising entirely of national consultants: No short lists of consultants for services are expected to comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if a need arises during the project implementation and if it is warranted, short lists of consultants for services estimated to cost less than $200,000 equivalent per contract may be composed entirely of national consultants.
3. Any Other Special Selection Arrangements: Advance Contracting Advance contracting may be applied for some items as specified in the Procurement Plan.
4. Consultancy Assignments with Selection Methods (prior & post reviews) and Time Schedule.
5. For all contract amendments/extensions/ follow-on contracts, etc. after November 1, 2015 the following guidelines shall apply: i) gross salary increases shall be limited to CPI plus a performance-based increase not to exceed 2%; ii) there shall be no increase in living allowances or similar expenses unless explicitly authorized by MOF Decree.
1 2 3 4 5 6 7 8
Ref. No. Description of AssignmentEstimated
Cost for First Contract US$
SelectionMethod for
First Contract
Department responsible for procurement
Reviewby Bank for
First Contract
(Prior / Post)
ExpectedProposals
SubmissionDate for First
Contract
NameDate of Contract SigningReview Method(Contract Sequence)
Component 2 : National Water Resource Management
10
C2.0.0-ICS-01 Communication Specialist 20,000 IC NPMU Post May 2015 Cancelled
C2.0.0-ICS-02 and
C2.0.0-ICS-12Implementation Support Consultant: 38,000 per
year IC NPMU Prior Oct. 2012
Vic Macasaquit(a) Oct. 2012-Prior OK
(b) August 2013-Prior OK(c) Jan. 2014-Prior OK
(June 2014: Bank Provides Retro for
Extension)July 2014-Prior OKJuly 2015-Prior OK
July 2016-PostJuly 2017-Post
C2.0.0-ICS-03 NPMU Project Secretary 4,800 IC NPMU Post Mar 2016
C2.0.0-ICS-04 NPMU International Technical Coordinator 24,000 IC NPMU Post Jun 2015 Cancelled
C2.0.0-ICS-05 National Procurement Specialist 24,000 IC NPMU Prior Mar 2015
Seng ThanongsackJan. 2014-Prior OK
C2.0.0-ICS-06 Senior Finance Management Officer 138,000 IC NPMU Prior Mar 2015
Noel RochMay 2013-Prior OK
November 2013-Prior OKMay 2014-Prior OKMay 2015-Prior OK
May 2016-PostMay 2017-Post
C2.0.0-ICS-07 National Finance Consultant 24,000 IC NPMU Prior Feb 2015
Chantasack SouvannasyJan. 2013 Prior OKJan. 2014-Prior OKJan. 2015-Prior OK
Jan. 2016-PostJan.2017 Post
C2.0.0-ICS-08 Accountant Assistant 9,600 IC NPMU Prior Feb 2015
Phoukham Channakhone March 2013-Prior OKMarch 2014-Prior OKMarch 2015-Prior OK
March 2016-PostMarch 2017-Post
C2.0.0-ICS-09 M&E Specialist 12,000 IC NPMU Post March 2016 Pending
C2.0.0-ICS-10 National Accounting Software Specialist 20,000 IC NPMU Prior Mar 2014 Bounmy KhounlathApril 2014-Prior OK
C2.0.0-ICS-11 Project Audit for 2012-2013 25,300 LCS NPMU Prior Dec 2014 Pricewaterhouse Cooper Nov. 2014-Prior OK
C2.0.0-LCS-12 International implementation support consultant 24,000 IC/SS* NPMU Prior Jun 2014 Vic Macasaquit-Contract Extension for 2014
C2.0.0-ICS-13 Technical WRM advisor (part time) 24,000 IC/SS* NPMU Prior Jun 2014 Manida Unkulvasapaul - Completed
C2.0.0-ICS-14 Project Audit for 2014 20,000 LCS NPMU Prior Apr 2015 Ernest and YoungJuly 2015-Prior OK
C2.0.0-ICS-15 National Procurement Specialist 2 12,000 IC NPMU Prior Feb 2016 Re-advertise
C2.0.0-ICS-16 Project Administrative and Logistics Specialist 10,000 IC NPMU Post Feb 2016 Alis Kounsombath
C2.0.0-ICS-17 Project Audit for 2015-2018 80,000 CQS NPMU Prior Dec 2015 On-going for RFP with KPMG Audit Company
Component 2.1 : Water Law
C2.1.0-LCS-01 National Water Resource Consultant: 12 months (intermittent) 24,000 IC NPMU Post Apr 2015
Sinxay Vongphachanh
April 2013Renewed 2014 –Post ReviewRenewed 2015-Post ReviewRenewed 2016- Post ReviewRenewed 2017-Post Review
C2.1.0-LCS-02 National Legal Consultant: 12 months (full-time) 36,000 IC NPMU Original
Prior Apr 2015
Sypha Chanthavong
April 2013-Prior Review OKApril 2014 –Prior Review OK
April 2015-Prior Not OKRenewed 2016- Post ReviewRenewed 2017-Post Review
C2.1.0-LCS-03 Project Secretary for Water Law: 8,000 IC NPMU Post Mar 2015 Cancelled
C2.1-IC-04 International IWRMP Consultant 15,000 IC NPMU Post Mar 2016C2.1-IC-05 Data and Information Management Consultant 3,000 IC NPMU Post Mar 2016C2.1-IC-06 Water Resource Fees Specialist 3,000 IC NPMU Post Mar 2016
C2.1-IC-07 Protected Areas and Wetland Management Specialist 3,000 IC NPMU Post Mar 2016
C2.1-IC-08 Water Quality Standards Specialist 3,000 IC NPMU Post Mar 2016
11
C2.1-IC-09 Groundwater Management Specialist 3,000 IC NPMU Post Mar 2016
C2.1-IC-10 Flood and Drought Management Specialist 3,000 IC NPMU Post Mar 2016
Component 2.2 : Water Quality
C2.2.0-ICS-01 Consultant Engineer for Inspecting architecture Work for Lab Construction and Design 84,980 CQS DWR/NREI Post Feb 2014
INAXES
Contracted As Design Firm: March 2014 $84,900 (CQS)
C2.2.0-ICS-02 Consultant to train Lab staff for Fixing and Maintenance laboratory equipment 10,000 IC DWR/NREI Post Jan 2016 On Going Evaluation
C2.2.0-ICS-03 Regional Water Quality and Ecosystem Specialist IC NPMU/ NREI Post Cancelled
C2.2.0-ICS-04 National Supervision for Construction 10,000 IC NPMU/ NREI Post Sept 2015Completed
Mr. Phatthana Simmalavong
C2.2.0-ICS-05 Regional Lab Advisor-Laboratory Management 10,500 IC/SSS NPMU/ NREI Prior Mar 2015 On Going NegotiationC2.2.0-ICS-06 Regional Quality Advisor for Laboratory 10,500 IC/SSS NPMU/ NREI Prior Mar 2015 On Going Negotiation
C2.2.0-ICS-07 Regional Technical Advisor for Laboratory 10,500 IC/SSS NPMU/ NREI Prior Mar 2015 On Going Negotiation
Component 2.3 : Water Modeling
C2.3.0-ICS-01 InternationalModelling Advisor 1 32,240 SS NPMU/ NREI Prior
Juha Sarkkula Under Component 2.2
July 2014-Prior ReviewMarch 2015-No Cost
Extension
C2.3.0-ICS-02 International Modelling Expert 1 32,250 SS NPMU/ NREI PriorJorma Ensio KoponenJuly 2014-Prior Review
Dec 2014 – Post Review
C2.3.0-ICS-03 National Modelling Consultant 9,000 IC NPMU/ NREI Post Dec 2015 Mr. Somzay Champathangkham
C2.3.0-ICS-04 Hydrological Modelling Consultant 2 50,000 IC NPMU/ NREI Post Dec 2015 On Going Negotiation
Component 2.4 : Hydro meteorological
C2.4.0-ICS-01 International Hydromet/ Early Warning CTA 139,668 IC NPMU/ DMH Prior June 2014
Russel BoalsMay 2013- IC Prior
Review OKJan 2015-SS-Prior
Review OkJan 2016 - Post
C2.4.0-ICS-02 National Hydromet/ Early Warning Specialist: 40,074.30 IC NPMU/ DMH Prior Sep 2014
Somphanh VithayaJuly 2014-Prior Review
Ok(1st Contract of 2.4)
March 2015-Prior Not OKMarch 2016-PostMarch 2017-Post
C2.4.0-ICS-03Detailed Design and Construction Supervision Engineer for DMH Building in Head Office 25,000 CQS NPMU/ DMH Prior May
2014
SK Consult-CompletedJuly 2014; Prior Review
Ok(First CQS Contract)
C2.4.0-ICS-04 Head Quarter new building detailed design and construction 2,500 IC NPMU/ DMH Post Sep 2014 Cancelled
C2.4.0-ICS-05PIU’s Office renovation detailed design and renovation SVK.’s Hydromet Office detailed design and construction
5,000 CQS NPMU/ DMH Post Aug2014
Building Concept-CompletedSept 2015
Component 3.1.1 : Strengthening Management in Priority River Basins and Floodplains
C3.1.1-ICS-01 National Coordinator: Contract Extension 38,400 IC DWR Prior May 2015
Mr. Bounhueng PhanthasithNovember 2014-Prior Review
Ok (1st Contract of Subcomponent)
November 2015-Post ReviewNovember 2016-Post Review
C3.1.1-ICS-02 International Consultant for Project Implementation Support 15,000 IC DWR Prior May 2015
Contract Extension of Mr. Macasaquit for 2015
C3.1.1-ICS-03 International/regional IWRM Advisor to guide the planning
34,500 IC/SSS DWR Prior Apr 2015 Dr. ManidaAugust 2014-Prior Review Ok
12
August 2015-Prior Review OkAugust 2016-Post
C3.1.1-ICS-04 National Hydrology Specialist - Short term 24,000 IC DWR Post Mar 2016 Procurement On-Going
C3.1.1-ICS-05 National Community engagement Specialist-Short term 24,000 IC DWR Post Dec 2015 Mr. Vipaka Halsacda
C3.1.1-ICS-06 Design & Supervision for new building PoNRE KHM. 12,900 IC DWR Prior 15 Aug
2014
Mr Ekvinay Sayaraj Completed
August 2014 Contract Awarded
1st Contract Required Prior Review But Bank Did Not Give NO. Bank provided “Retroactive NO-Oct 2015”Extension and Amendement to August 2016
C3.1.1-ICS-07 Project Accountant: 1st year 12,000 IC DWR-PoNRE KHM& SVK Prior Nov 2014
Ms Anoulack SinouvongDecember 2014-Prior Review
Okay(Fiduciary Staff)
December 2015-Post ReviewDecember 2016-Post ReviewDecember 2017-Post Review
C3.1.1-ICS-08 Cashier for KHM 7,500 IC DWR-PoNRE KHM Prior Feb 2015
Ms Pingpong BoualaphaMarch 2015-Prior Review
Okay(Fiduciary Staff)March 2016-PostMarch 2017-Post
C3.1.1-ICS-09 Cashier for SVK 7,500 IC DWR-PoNRESVK. Prior Sept 2015 Cancelled
C3.1.1-ICS-10 Local Technical Coordinator for Khammouane 16,000 IC DWR-PoNRE KHM Post Mar 2016
C3.1.1-ICS-11 Local Technical Coordinator for Savanaketh 16,000 IC DWR-PoNRESVK. Post Apr 2015 Cancelled
C3.1.1-ICS-12 Project Administrative Support 10,000 IC DWR-PoNRESVK. Post Mar 2016
C3.1.1-ICS-13 National Ground Water Consultant 16,000 IC DWR-PoNRESVK. Post Mar 2016
C3.1.1-ICS-14 National Coordinator 2 30,000 IC DWR-PoNREKHM Post Mar 2016
C3.1.1-ICS-15 International Flood plain/Wetland planning & Management Specialist 70,000 IC DWR-PoNRE
KHM Post Mar 2016
Component 3.1.2 : Upgrading of existing infrastructure for agricultural development and enhanced environmental benefits in XBF and XBH
C3.1.2-CQS-01 Consulting Firm for Survey & Design of Flood Gates along XBF 50,000 CQS DIMU/ PAFO
(KM & SVK) Prior Mar 2014 Lao-Asie Consultant GroupCompleted
C3.1.2-SSS-02 International Consultant for Survey Design of Civil Work for XBF & XBH 50,000 SS* DIMU/ PAFO
(KM & SVK) Prior Oct 2014 Gary ThorncraftAugust 2014-Prior Review Okay
C3.1.2-SSS-03 National Community Development Specialist (CD) 30,000 IC-SSS*
(KDP) DIMU/ PAFO Prior July 2015
Mr. Manane Vongnalaysane(Transferred from KDP)
July 2014-Prior Review OkayJuly 2015-Post (Khamphet said
Post Was Okay)July 2016-PostJuly 2017-Post
C3.1.2-ICS-04 National Irrigation Engineer 30,000 IC-SSS(KDP) DIMU/ PAFO Prior Jan 2015
Mr. Vivarath SihaboujApril 2015-Prior Review Okay
April 2016-PostApril 2017-Post
C3.1.2-ICS-05 Provincial Technical Coordinator / National M&E Specialist 30,000 IC-SSS
(KDP) DIMU/ PAFO Post July 2015
Mr. Thaly SALICHANH-June 2015-Prior Review Okay
June 2016-PostJune 2017-Post
C3.1.2-ICS-06 National Agriculture Extension Specialist 30,000 IC DIMU/ PAFO Post Mar 2015
Mr. Manivong ThephavanhApril 2014-PostApril 2015-PostApril 2016-Post
April-Post
C3.1.2-ICS-07 Pump Engineer 30,000 IC-SSS(KDP) DIMU/ PAFO Prior Mar 2015
Mr. Somchith PhonephachanhMarch 2015-Prior Review Okay
March 2016-PostMarch 2017-Post
C3.1.2-ICS-08 Electric Engineer 30,000 IC DIMU/ PAFO Post Nov 2016
C3.1.2-ICS-09 Project Finance Officer 24,000 IC DIMU/ PAFO Prior Nov 2016
C3.1.2-ICS-10 Project Assistant Finance Officer 12,000 IC-SSS(KDP) DIMU/ PAFO Prior Nov 2014
Ms. Khouanta LatthachackNov. 2013-Prior Review OkayNov. 2014-Prior Review Okay
Nov. 2015-Prior ReviewNov. 2016-PostNov. 2017-Post
13
C3.1.2-ICS-11 Project Secretary (VTE/ DOI) 4,800 IC DOI/ VTE Post Apr 2016
C3.1.2-ICS-12 Project Secretary/Casier (Khammouane) 3,600 IC-SSS(KDP) DIMU/ PAFO Post Nov 2014
Ms. Lathdaphone AthpanyaJan. 2015-Prior Review Okay
(Fidicary)Jan. 2016-PostJan. 2017-PostJan. 2018-Post
C3.1.2-ICS-13 Project Secretary (Savannakhet) 3,600 IC DIMU/ PAFO Post Nov 2015
Ms. Alounsouk HeuangsavanhNov. 2015-PostNov. 2016-PostNov. 2017-Post
C3.1.2-ICS-14 Senior Irrigation Management Specialist 30,000 IC-SSS(KDP) DIMU/PAFO Prior Feb 2013
Somsanong KeovilayFeb. 2013-Prior Review Okay
Feb. 2014-Jan.2015: Prior Review Okay
Feb. 2015-June 2015- Bank Gave “Retro NO”
July 2015- Bank Gave “Retro NO”
July 2016-PostJuly 2017-Post
C3.1.2-ICS-15 Senior Irrigation Management Consultant 45,000 IC DIMU/PAFO Post Jan 2016 On going negotiation
Component 3.2 Lao Fishery Management
C3.2.0-ICS-01 National Consultant for Registration, CPS.: 12 months input for 1st year 20,000 IC CMU. CPS. Post Jan 2016 Cancelled
C3.2.0-ICS-02National Consultant for preparing the community fisheries plan: 12 months input for 1st year (National Technical Advisor)
26,000 IC CMU. CPS. Post Apr 2015Mr Soulivanthong Kingkeo
July 2014-Post ReviewCompleted
C3.2.0-ICS-03 National Consultant for livelihood activities 26,000 IC CMU. CPS. Post Jul 2014
Mr. Vilath KeovichithAugust 2014-PostAugust 2015-PostAugust 2016-Post
C3.2.0-ICS-04 National Technical Consultant for rural infrastructure 30,000 IC CMU. CPS. Post Jul 2014
Mr. Khaykeo XaymounvongFeb. 2015-PostFeb. 2016-PostFeb. 2017-Post
C3.2.0-ICS-05 National Consultant Baseline Data Collection 20,000 IC CMU. CPS. Post Jan 2016 Cancelled
C3.2.0-ICS-06 National Consultant Fisheries Monitoring and Evaluation 30,000 IC CMU. CPS. Post Feb 2016
C3.2.0-ICS-07 Detailed Design and Supervision Engineer for Hatchery 100,000 CQS CMU. CPS. Post Feb 2015 GECI Consulting-Completed
May 2015
C3.2.0-ICS-08 Regional Consultant for Hatchery operation (part time): 1st year 20,000 IC CMU. CPS. Post Jan 2016 On going negotiation
C3.2.0-ICS-09 National Consultant for Hatchery Construction and Operation in provinces 11,000 IC CMU. CPS. Post June 2016
C3.2.0-ICS-10 International Technical Consultant 51,000 IC CMU. CPS. Post Sept 2014
Simon DiffeyNovember 2014-Prior Okay
Jan. 2016-PostJan. 2017-Post
C3.2.0-ICS-11International/Regional Consultant for Procurement and Admin Support (full time)-For Contract Extension
30,000 IC CMU. CPS. Prior May 2015Completed.
Contract Extension of Mr. Macasaquit for 2015
C3.2.0-ICS-12 Financial Management Consultant/Specialist 18,000 IC CMU. CPS. Prior Dec 2014
Mr. Vilaysack PhonechalernJan. 2015-Prior OkApril 2015-Prior OK
April 2016-PostApril 2017-Post
C3.2.0-ICS-13 Senior Accountant 16,800 IC CMU. CPS. Prior Feb 2014
Ms Vilayphone InthirathFeb. 2014-Prior OKFeb. 2015-Prior OK
Feb. 2016-PostFeb. 2017-Post
C3.2.0-ICS-14 Cashier CPS (1) 14,200 IC CMU. CPS. ATP. & SEK. Prior Feb 2014
Ms. Lamphone OnesengphetMarch 2014-Prior OKMarch 2015-Prior OK
March 2016-PostMarch 2017-Post
C3.2.0-ICS-15 National Procurement Consultant 20,300 IC CMU. CPS. Prior Jan 2014. Mr. Banthalongsack Souvannakhily (Resigned)
C3.2.0-ICS-16 Secretary CPS 12,900 IC CMU. CPS. ATP. & SEK. Post Jan 2014
Ms. Thipdoungchanh Phouthavong
April 2014-PostApril 2015-PostApril 2016-PostApril 2017-Post
C3.2.0-ICS-17 National Technical Advisor 2 53,000 IC-SSS CMU. CPS. ATP. & SEK
Prior Oct 2015Mr Soulivanthong Kingkeo
Jan 2016-OKDec 2016-Post
14
C3.2.0-ICS-18 GIS/Database Specialist 30,000 IC CMU. CPS. ATP. & SEK Post Jan 2016
C3.2.0-ICS-19 National Technical Consultant for Rural Infrastructure - 2 30,000 IC CMU. CPS.
ATP. & SEK Post Jan 2016
C3.2-0-ICS-20 National Fishery Management Specialist -Consultant 62,000 IC CMU. CPS.
ATP. & SEK Post Jan 2016Completed
Dr. Sinthavong Viravong on February 2016
C3.2-0-ICS-21 Chief Technical Advisor 200,000 IC CMU. CPS. ATP. & SEK Post Feb 2016
C3.2-0-ICS-22 Consultant for Technical Review of Hatcheries Designs and Specification 10,000 IC-SSS CMU Post Feb 2016
15