2013 ITP20 Potential Needs Maps [Draft] - SPP

Preview:

Citation preview

2013 ITP20 Potential Needs Maps [Draft]

2013 ITP20

October 16, 2012

1

Revision History

2

Date Notes

10-16-2012 Original draft. Posted to SPP.org

2013 ITP20 potential needs maps

• Four futures were evaluated in the 2013 ITP20 for reliability, policy, and economic needs.

• The potential needs highlighted on the following maps were identified in accordance with the 2013 ITP20 scope.

• Maps are draft and will be updated as the assessment progresses

3

BUSINESS AS USUAL FUTURE (F1) Peak hour system flows (230 kV and above)

4

5

Future 1

ADDITIONAL WIND FUTURE (F2) Peak hour system flows (230 kV and above)

6

7

Future 1

ADDITIONAL WIND PLUS EXPORTS FUTURE (F3)

Peak hour system flows (230 kV and above)

8

9

Future 1

COMBINED POLICY FUTURE (F4) Peak hour system flows (230 kV and above)

10

11

Future 1

Recommended