NOE – The Formwork

Assembly and Operating ManualDated 03.2010

2  Dated 03.2010  AuV NOElight Subject to technical modifications.

Subject to technical modifications.  AuV NOElight  Dated 03.2010  3

Contents

1. Safesettingdownofwallformworkelements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   5

2. OverviewoftheNOEIightpanelformworksystem  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   6

3. Assemblyinstructions . . . . . . . . . . . . . . . . . . . . . . . .   83.1  Uploading formwork elements . . . . . . . . . . . . . . . . . . .   83.2  Stripping formwork  . . . . . . . . . . . . . . . . . . . . . . . . . . . .   83.2.1  Preassembling the first face formwork . . . . . . . . . . . . .   83.2.2  Erecting the first face formwork . . . . . . . . . . . . . . . . . .   113.2.3  Installing the (opposing) second face formwork . . . . .   143.3  Concreting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   153.4  Stripping formwork  . . . . . . . . . . . . . . . . . . . . . . . . . . . .   153.4.1  Stripping the second face formwork – formwork  

without scaffolding  . . . . . . . . . . . . . . . . . . . . . . . . . . . .   153.4.2  Stripping the first face formwork – formwork with 

scaffolding  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   173.5  Preparation for transport  . . . . . . . . . . . . . . . . . . . . . . .   17

4. StandardconstructionNOEIightformwork . . . . .   18

5. Elementconnections  . . . . . . . . . . . . . . . . . . . . . . . . .   195.1  Element connection with NOE AluLock –  

with 100 mm compensation piece  . . . . . . . . . . . . . . . .   195.2  Connection using a compensation panel –  

50–250 mm compensation piece . . . . . . . . . . . . . . . . . .   19

6. Tierods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   206.1  No longitudinal compensation piece . . . . . . . . . . . . . .   206.2  With longitudinal compensation piece up to 50 mm .   206.3  With longitudinal compensation piece up to 100 mm   206.4  Tie rods over the top of the panel  . . . . . . . . . . . . . . . .   216.5  Ties with a compensation panel . . . . . . . . . . . . . . . . . .   21

7 Cornersolutions  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   227.1  Corner 90° . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   227.1.1  Corner 90° – with EC panel ECP . . . . . . . . . . . . . . . . . . . 227.1.2  Corner 90° – with external corner angle ECA  . . . . . . .   237.2  Corners 60°–150° . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   247.3  Connections in corner area to transfer  

tension forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   25

8. Extendingpanels . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   26

9. Formworkconnectionsolutions . . . . . . . . . . . . . . .   279.1  Connecting longitudinally to an existing wall . . . . . . .   279.2  Connecting transversely to an existing wall or  

floor slab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   279.3  Connections forming T-walls . . . . . . . . . . . . . . . . . . . . .   28

10. Stop-endformwork  . . . . . . . . . . . . . . . . . . . . . . . . . .   28

11. SpecialapplicationsofNOEIight . . . . . . . . . . . . . . .   2911.1  Forming rectangular columns with external corner 

panels ECP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   2911.2  Use as foundation formwork . . . . . . . . . . . . . . . . . . . . .   3011.3  Use as circular formwork . . . . . . . . . . . . . . . . . . . . . . . .   31

12. Cranetransport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3212.1  Crane transport general advice . . . . . . . . . . . . . . . . . . .   3212.2  Transporting panels horizontally by crane using  

stacking corners  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3212.3  Transporting panels vertically by crane using  

crane bow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3312.4  Transporting small items by crane using a  

NOE box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3412.5  Transporting stabilizers and other items using  

NOE pallets  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   34

13. Scaffoldsandstabilizers . . . . . . . . . . . . . . . . . . . . . .   3513.1  Walkway brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3513.2  Concreting platform with hatch . . . . . . . . . . . . . . . . . .   3613.3  Attachment of ladder and ladder support . . . . . . . . . .   3713.4  Fall protection measures for formwork  

height > 3,00 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3713.5  Stabilizers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   38

14. Individualparts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3914.1  NOEIight standard panels  . . . . . . . . . . . . . . . . . . . . . . .   3914.1.1  Overview fo formwork elements  . . . . . . . . . . . . . . . . .   3914.1.2  Elevations and sections  . . . . . . . . . . . . . . . . . . . . . . . . .   4014.2  NOEIight external corner angel ECA . . . . . . . . . . . . . . .   4114.3  NOEIight external corner angel ECP . . . . . . . . . . . . . . .   4214.4  NOEIight internal corners IC  . . . . . . . . . . . . . . . . . . . . .   4314.5  NOEIight internal corner hinge . . . . . . . . . . . . . . . . . . .   4414.6  NOEIight external corner hinge  . . . . . . . . . . . . . . . . . .   4514.7  NOEIight external filler  . . . . . . . . . . . . . . . . . . . . . . . . .   4614.8  NOEIight internal filler . . . . . . . . . . . . . . . . . . . . . . . . . .   4614.9  Filler tying channel . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   4614.10  Compensation panel  . . . . . . . . . . . . . . . . . . . . . . . . . . .   4714.11  Filler piece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   4814.12  Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   4914.13  Ties and fastenings . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   4914.14  Scaffolds and accessories . . . . . . . . . . . . . . . . . . . . . . . .   5014.15  Transport equipment . . . . . . . . . . . . . . . . . . . . . . . . . . .   5114.16  Plastic plugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   51

4  Dated 03.2010  AuV NOElight Subject to technical modifications.

GSV Guidelines Important information regarding the intended useand safe application of formwork and falsework

The contractor is responsible for drawing up a comprehensive risk assessment and a set of installation instructions. The latter is not usually identical to the assembly instructions.

• Risk Assessment The contractor is responsible for the compilation, documentation, implementation and revision of a risk assessment for each construction site. His employees are obliged to implement the measures resulting from this in accordance with all legal requirements.• Installation Instructions The contractor is responsible for compiling a written set of installation instructions. The assembly instructions forms part of the basis for the compila-tion of a set of installation instructions. • Assembly Instructions Formwork is technical work equipment which is in-tended for commercial use only. The intended use must take place exclusively through properly trained personnel and appropriately qualified supervising personnel. The assembly instructions are an integral component of the formwork construction. They com-prise at least safety guidelines, details on the stan-dard configuration and intended use, as well as the system description. The functional instructions (standard configuration) contained in the assembly instructions are to be complied with as stated. Enhancements, deviations or changes represent a potential risk and therefore require separate verification (with the help of a risk assessment) or a set of installation instructions which comply with the relevant laws, standards and safety regulations. The same applies in those cases where formwork and/or falsework components are provided by the contractor. • Availability of the Assembly Instructions The contractor has to ensure that the assembly in-structions provided by the manufacturer or formwork supplier are available at the place of use. Site per-sonnel are to be informed of this before assembly and use takes place, and that they are available at all times. • Representations The representations shown in the assembly instruc-tions are, in part, situations of assembly and not always complete in terms of safety considerations. The safety installations which have possibly not been shown in these representations must nevertheless be available.

• Storage and TransportationThe special requirements of the respective formwork con-structions regarding transportation procedures as well as storage must be complied with. By way of example, name the appropriate lifting gear to be used. • Material Check Formwork and falsework material deliveries are to be checked on arrival at the construction site/place of destina-tion as well as before each use to ensure that they are in perfect condition and function correctly. Changes to the formwork materials are not permitted. • Spare Parts and Repairs Only original components may be used as spare parts. Re-pairs are to be carried out by the manufacturer or authorized repair facilities only. • Use of Other Products Combining formwork components from different manufac-turers carries certain risks. They are to be individually veri-fied and can result in the compilation of a separate set of assembly instructions required for the installation of the equipment. • Safety Symbols Individual safety symbols are to be complied with. Examples:

• Miscellaneous Technical improvements and modifications are subject to change without notice. For the safety-related application and use of the products, all current country-specific laws, standards as well as other safety regulations are to be complied with without excep-tion. They form a part of the obligations of employers and employees regarding industrial safety. This results in, among other things, the responsibility of the contractor to ensure the stability of the formwork and falsework construc-tions as well as the structure during all stages of construc-tion. This also includes the basic assembly, dismantling and the transport of the formwork and falsework constructions or their components. The complete construction is to be checked during and after assembly.

Version: 28.08.2009 Copyright: Güteschutzverband Betonschalungen e.V. PO BOX 10 41 60 40852 Ratingen Germany

Visual check: the intended operation is to be carried out through a visual check. Note: supplementary information for safe, correct and professional execution of work activities.

Safety information: non-compliance can lead to damage to materials or risk to the health of site personnel (also life)

Subject to technical modifications.  AuV NOElight  Dated 03.2010  5

1. Safesettingdownofwallformworkelements

6  Dated 03.2010  AuV NOElight Subject to technical modifications.

2.OverviewoftheNOEIightpanelformworksystem

Subject to technical modifications.  AuV NOElight  Dated 03.2010  7

2.OverviewoftheNOEIightpanelformworksystem

8  Dated 03.2010  AuV NOElight Subject to technical modifications.

3.Assemblyinstructions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  9

3.Assemblyinstructions

10  Dated 03.2010  AuV NOElight Subject to technical modifications.

3.Assemblyinstructions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  11

3.Assemblyinstructions

12  Dated 03.2010  AuV NOElight Subject to technical modifications.

3.Assemblyinstructions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  13

3.Assemblyinstructions

14  Dated 03.2010  AuV NOElight Subject to technical modifications.

3.Assemblyinstructions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  15

3.Assemblyinstructions

16  Dated 03.2010  AuV NOElight Subject to technical modifications.

3.Assemblyinstructions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  17

3.Assemblyinstructions

18  Dated 03.2010  AuV NOElight Subject to technical modifications.

4.StandardconstructionNOEIightformwork

Subject to technical modifications.  AuV NOElight  Dated 03.2010  19

5.Elementconnections

20  Dated 03.2010  AuV NOElight Subject to technical modifications.

6.Tierods

Subject to technical modifications.  AuV NOElight  Dated 03.2010  21

6.Tierods

22  Dated 03.2010  AuV NOElight Subject to technical modifications.

7. Cornersolutions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  23

7. Cornersolutions

24  Dated 03.2010  AuV NOElight Subject to technical modifications.

7. Cornersolutions

Subject to technical modifications.  AuV NOElight  Dated 03.2010  25

7. Cornersolutions

26  Dated 03.2010  AuV NOElight Subject to technical modifications.

8.Extendingpanels

Subject to technical modifications.  AuV NOElight  Dated 03.2010  27

9.Formworkconnectionsolutions

28  Dated 03.2010  AuV NOElight Subject to technical modifications.

9.Formworkconnectionsolutions

10.Stop-endformwork

Subject to technical modifications.  AuV NOElight  Dated 03.2010  29

11. SpecialapplicationsofNOElight

30  Dated 03.2010  AuV NOElight Subject to technical modifications.

11. SpecialapplicationsofNOElight

Subject to technical modifications.  AuV NOElight  Dated 03.2010  31

11. SpecialapplicationsofNOElight

32  Dated 03.2010  AuV NOElight Subject to technical modifications.

12.Cranetransport

Subject to technical modifications.  AuV NOElight  Dated 03.2010  33

12.Cranetransport

34  Dated 03.2010  AuV NOElight Subject to technical modifications.

12.Cranetransport

Subject to technical modifications.  AuV NOElight  Dated 03.2010  35

13.Scaffoldsandstabilizers

36  Dated 03.2010  AuV NOElight Subject to technical modifications.

13.Scaffoldsandstabilizers

Subject to technical modifications.  AuV NOElight  Dated 03.2010  37

13.Scaffoldsandstabilizers

38  Dated 03.2010  AuV NOElight Subject to technical modifications.

13.Scaffoldsandstabilizers

Subject to technical modifications.  AuV NOElight  Dated 03.2010  39

14.Individualparts

40  Dated 03.2010  AuV NOElight Subject to technical modifications.

14.Individualparts

Subject to technical modifications.  AuV NOElight  Dated 03.2010  41

14.Individualparts

42  Dated 03.2010  AuV NOElight Subject to technical modifications.

14.Individualparts

Subject to technical modifications.  AuV NOElight  Dated 03.2010  43

14.Individualparts

44  Dated 03.2010  AuV NOElight Subject to technical modifications.

14.Individualparts

Subject to technical modifications.  AuV NOElight  Dated 03.2010  45

14.Individualparts

46  Dated 03.2010  AuV NOElight Subject to technical modifications.

14.Individualparts

Subject to technical modifications.  AuV NOElight  Dated 03.2010  47

14.Individualparts

48  Dated 03.2010  AuV NOElight Subject to technical modifications.

14.Individualparts

Subject to technical modifications.  AuV NOElight  Dated 03.2010  49

14.Individualparts

50  Dated 03.2010  AuV NOElight Subject to technical modifications.

14.Individualparts

Subject to technical modifications.  AuV NOElight  Dated 03.2010  51

14.Individualparts

NOE Alutop

NOElight NOE Lalu

NOEtop

NOE-SchaltechnikGeorg Meyer-KellerGmbH + Co. KGKuntzestrasse 7273079 SuessenGermany

Telefon +49 7162 13-1Telefax +49 7162 13-288info@noe.dewww.noe.dewww.noe .com

Belgium

Brazil

Bulgaria

France

Malaysia

Netherlands

Poland

Russia

Serbia

Slovakia

USA

plast

Austria Croatia

Czech Republic Switzerland

NOE-Schaltechnikwww.noe-schaltechnik.atnoe@noe-schaltechnik.at

NOE oplatna tehnika d.o.o.www.noe.hrnoe@noe.hr

ISD-NOEwww.isd-noe.czzdaril@isd-noe.cz

NOE-Schaltechnikwww.noe.chinfo@noe.ch

NOE-Bekistingtechniek n.v.www.noe.beinfo@noe.be

Mills do BrasilEstruturas e Serviços Ltdawww.mills.com.brmillsbr@cepa.com.br

NOE-Schaltechnikwww.noebg.comnoe-bg@netbg.com

NOE-Francewww.noefrance.frinfo@noefrance.fr

ICS-NOE ASIA SDN-BHDwww.noeasia.cominfo@noeasia.com

NOE-Bekistingtechniek b.v.www.noe.nlinfo@noe.nl

NOE-PL Sp. Zo.o.www.noe.com.plnoe@noe.com.pl

NOE St. Petersburgnoe@sovintel.ru

NOE Sistemske Oplate d.o.o.www.noe-scg.comnoe-scg@eunet.yu

ISD-NOEwww.isd-noe.skinfo@isd-noe.sk

NOE USAwww.noeusa.comt.phifer@noeusa.com

NOE – The Formwork

NS/

e 0

8.10

 Su

bje

ct t

o t

ech

nic

al m

od

ific

atio

ns.

Recommended