2010 Slide Tour AssessmentHwy 49:04, Ksituan River East Slide
File No: 2008_1002a34c_Photopages_GP 12b_November 19_2010File No: 2008_1002a34c_Photopages_GP 12b_November 19_2010
Note: Photos taken on May 2010Note: Photos taken on May 2010
November 20102008-1002
Photo 1
Photo 1a
Looking west along lower slope of berm? Slumping of berm (2H:1V) lower slope face evident at its eastern half portion? Minor toe roll started to develop towards R/W boundary fence? A buried pipeline run along floodplain just outside toe of embankment and R/W ? A roll of cantilever concrete pile retaining wall was constructed along top of berm
Another view
SISI
Buried PipelineBuried Pipeline
River FlowRiver Flow River FlowRiver Flow
Berm With Pile WallBerm With Pile Wall
Ksituan River FlowKsituan River Flow
Buried Pipeline
Buried Pipeline
GP 12bPage 2 of 2
2010 Slide Tour AssessmentHwy 49:04, Ksituan River East Slide
Note: Photos taken on May 2010Note: Photos taken on May 2010
2008-1002
Photo 2
Photo 2a
Looking east (towards Rycroft) along top of berm? A roll of cantilever concrete pile retaining wall (22 m depths) was constructed along top of berm? Approximately 15m to 20m width of berm? No surface distress along top of berm
Looking east (towards Rycroft) along toe of berm? Slumping of berm slope becoming apparent at its eastern end
Top of Berm with Pile
Retaining Wall beneath SurfaceTop of Berm with Pile
Retaining Wall beneath Surface
Top of Berm with Pile Wall
Top of Berm with Pile Wall