2006-07 Annual Habitat Management Plan
Sacramento National Wildlife Refuge
Prepared By: Date: _________________
Refuge Biologist Reviewed By: Date: _________________
Supervisory Wildlife Biologist Reviewed By: Date: _________________
Assistant Refuge Manager
Reviewed By: Date: _________________
Deputy Refuge Manager Approved By: Date: _________________
Project Leader
Sacramento National Wildlife RefugeT1:1
T1:2 T1:3 T1:4
T1:6T2:11
T2:2T2:1
T2:3
T2:4
T2:5T2:6
T2:8
T2:10
T3:1 T3:2 T3:3
TAB:1
TAB:2
TC:1
TC:2
TAB:3TD:1
TD:2
TD:3
TD:4
TD:5
TE:1
TE:2
TE:3
TE:4
TE:6
T4:1 T4:2
T4:3T6/7
T13:1T11:1
T11:2T13:2
T11:4
T13:3T11:5
T12:1
T8:1
T9:1
T9:2
T10:1
T10:3T10:4
T10:2
T8:3T8:2 T14:1 T14:2 T14:3
P1A:1
P1A:3
P1
P1A:4
P1B
T15:1
T12:2T16:1
T16:2
T15:2
T19:1T19:2 T20:1
T17
T18
P4
P2
P5
P6:1
P6:2
P3
TF:3TF:2
TF:1
T21:1 T21:2T21:3
T21:4T22
T23:8
T23:1T23:2 T23:3
T23:4
T23:7
T23:5
P7
T23:6
TGT24:1T24:2 T24:3 T25
T27:1
T27:2 T28:2
T28:1
T31:1
T31:3
T31:2T30
T26:1
T26:2
T29:1T29:2
P7A:1
P7A:4
P7A:2
P7A:3
T34:1T34:2
T37
T40:1T40:2
T40:3 T40:4
T35:1
T35:3 T35:2
T38:1
T38:2
T41:1
T33 P8:1 P8:2
P10:2
T32T36:1
T36:2
T36:3
T36:4P9:1
T39:1 T39:2P9:2
P10:1 TH
T41:2
T42 P11:1 P11:2 P11:3 P11:4
T43P12
T44
TE:5
T5:1T5:2
T5:3
T11:3
T20:2
T45
577
363
296
271
242
232
215
206
187
183
177
176
159
154 150
149
149
98
142
92
92
91
88
87
130
127
127
125
123
82
123
122
81
80
119
79
79
118
78
117
117
116
115
77
76
72
71
68
68101
63
60
60
60
60
57
57
56
0
54
54
53
51
51
50
49
49
0
47
47
46
44
44
43
42
42
42
42
41
39
39
38
38
38
38
38
37
37
36
35
34
34
3434
0
34
33
33
33
33
32
32
32
31
31
31
30
30
30
29
29
29
29
29
28
26
26
26
25
24
25
24
24
23
23
23
23
22
22
20
20
20
20
9
19
9
17
17
17
16
8
16
16
15
8
7
14
0
7
14
13
11
6
6
10
7
10
11
2
Cal ifornia
°
0 6 12 18 243Miles
Sacramento NWR
Delevan NWR
Colusa NWR
Sutter NWR
Butte S ink NWR
Sacramento River NWR
Sacramento NWR Complex
0 0.5 1 1.5 20.25Miles
Refuge BoundaryRoads
Paved
All Weather
Standard Dirt
Non-Drivable
Railroad
Cell Boundaries (no roads)
Habitat Management 2006-07Seasonal Flooded Marsh
Unmanaged Freshwater Wetland
Watergrass
Summer Water
Permanent Pond
Vernal Pool
Alkali Meadow
Vernal Pool/Alkali Meadow Complex
Riparian Willow Scrub
Cottonwood Willow
Mixed Riparian Forest
Annual Grassland
Perennial Grassland
Facilities
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 1
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: CANALS CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE: S
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Giant garter snakes (GGS) hibernate from Oct. - March. With any dirt moving activity it's best to wait until the GGS are active (usually late March). If you have to clean a ditch before the GGS are active work from one side and only take from the center. Place spoil on side of road as the snakes hibernate on the high ground, which is usually the road. If cleaning takes place after the snakes are active you can work up one side and place the spoil on top of the road. The biggest problem with cleaning ditches while the GGS are hibernating is the danger of burying them alive.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install larger pipe on 35-1C on Poleline Rd. @ T272. Do patch work @ lift pump @ 35-1C3. Clean 3-way ditch south to P3 inlet4. Spray ditch to P1A and P2 from dam 15.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 0
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo Reduce primrose 2ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 2
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: 26.2 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:26.2 was cleaned by Fisher on 3/13/03 from N.end down to the T6/7 structure. Giant garter snakes (GGS) hibernate from Oct. - March. With any dirt moving activity it's best to wait until the GGS are active (usually late March). If you have to clean a ditch before the GGS are active work from one side and only take from the center. Place spoil on side of road as the snakes hibernate on the high ground, which is usually the road. If cleaning takes place after the snakes are active you can work up one side and place the spoil on top of the road.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add 30" outlet to relieve pressure during a blowout (T21/T24)2. Mow/disk west bank (snake issues)3. Add 3 SG to delivery turnouts to replace board structures4. Control parrots feather, primrose and trim trees5. Spot repair west road of T11.5, T12, T19 and T246. Gravel east levee7. Clean up dirt from ditch cleaning (disk or remove)8. Evaluate relief valve @ T279. Fix beaver huts by T24.1 and T19.1
10.Evaluate erosion problem @ 35-1C
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 0
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray RodeoSpray Rodeo
Control parrots featherControl primrose
22
ACRES:TREATMENT: OBJECTIVE:Spray RodeoSpray Rodeo
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 3
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T1 CELL: 1-4
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Dirt work completed in 8/02 resulted in reducing the number of cells from 5 to 4.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
96
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklbur prior to seed-set2. Clean ditch of primrose and maintain with Rodeo3. Channel from inlet to SFM4. Repair SE corner of Cell 45. Repair fencing on the north end6. Mow slopes of X-dikes for loafing habitat7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 96
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Rodeo
Reduce cockleburReduce primrose
152
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Rodeo
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 4
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T1 CELL: 6
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE SPECIES - Heckard's dwarf pepper-grass present. LAST burned in July of 99. GAMBUSIA discovered in one of the pools during a survey in 2000. Monitor for possible leak during high water. PG&E maintenance in late summer when the ground is dry (not fall/winter). Large powerline kill of Ross' geese >26 on Feb. 12 or 13 of 2006.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
5.2
VP Alkali Meadow Complex
43
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Fix leak from pump2. Burn uplands3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 49
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 48ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 5
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T2 CELL: 1-8
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Funded by NAWCA in 2004.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
185
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
1
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Continue channel in cell 4 and keep water in channel of cell 22. Mow cocklebur prior to seedset3. Replace WCS from cell 2 to cell 44. Replace inlet to cell 65. Add one island each on the north ends of cells 3, 5, and 86. Mow slopes for loafing and disk levee in cell 6 for loafing7. Clean N. lateral8. Spray star thistle on S. end of cell 89. Spot repair top and slope of cell 8 on south end
10.Rock outlet WCS in cell 8
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 186
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Round-up
Reduce cockleburReduce starthistle
200.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 6
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T2 CELL: 10
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Last prescribed burn completed 8/25/04. Rehab work including addition of a X-dike and channels/potholes completed July 2004. Watch the amount of water released. If too much water is released it spreads out into the vernal pool/al. meadow complex.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
44
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel outlet to the ditch2. Replace outlet and rip-rap3. Install straight pipe in NW corner (water needs to drain off the upland)4. Repair ruts on north end5. Mow slopes for loafing habitat6. Build boat ramp and channel from ramp to channel on west side7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 44
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 7
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T2 CELL: 11
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Fairy shrimp in old "bone yard" vernal pool (1993). Fairy shrimp discovered in 5 vernal pools adj. to c8 and c9 (1998). Monitor cell 8 outlet flow to not flood vernal pools.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
119
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove bamboo by cutting and spraying re-sprouts with roundup2. Remove palm trees by cutting and digging out stumps or painting with garlon3. Remove pile of posts on the north end4. Channel outlet flow from cell 8 into ditch5. Replace the flume6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 119
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Garlon-cut stumpCut to groundSpray Roundup resprout
Eliminate palm treeEliminate arundoEliminate arundo
0.10.10.1
ACRES:TREATMENT: OBJECTIVE:Spray Garlon-cut stumpCut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 8
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T3 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Watch flow from T3.3 outlet to avoid flooding of vernal pools and rare plants.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
68
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
1.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel outlet flow to Logan Cr.2. Spot repair ruts on north end of X-dike between cell 1 and 23. Make bridge ATV accessible4. Plant tules & willows along N. boundary5. Construct boat ramp in cell 36. Remove palm trees/bamboo7. Scald cocklebur (also consider mowing) in cell 1 and punch hole into T2.10 to release water8. Repair erosion at siphon at Logan creek in NE corner of T39. Remove wire structure in south end of cell 3
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 69
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Mow prior to seed-setSpray Roundup resproutCut to groundSpray Garlon-cut stump
Reduce cockleburReduce cockleburEliminate arundoEliminate arundoReduce palm trees
22100.10.10.1
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Mow prior to seed-setSpray Roundup resproutsCut to groundSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 9
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T4 CELL: 1
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:VERNAL POOL IN NW CORNER. No need to disk around the upland portion of the unit.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
20
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
10
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from inlet2. Construct boat ramp in NE corner3. Remove pampas grass4. Spot repair X-dike between cells 1 & 25.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 30
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resprout
Reduce pampassgrassReduce pampassgrass
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 10
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T4 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/7/2006
UNITS REQ. DOWN 1st: T4.3
UNITS REQ. FLOOD 1st: T4.1
SPECIAL MANAGEMENT CONSIDERATIONS:Cocklebur coming under control after 3 seasons of mowing. Need to continue mowing at the correct time. Raised banks from channel work were just under water at operational level and provided excellent loafing habitat for shorebirds and waterfowl.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
51
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Scald cocklebur2. Mow cocklebur prior to seed-set3. Disk south levee and west side of east levee4. Evaluate channel work5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 51
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setScald (by irrigate)
Reduce cockleburReduce cocklebur
3051
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setScald (by irrigate)
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 11
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T4 CELL: 3
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T4.2
SPECIAL MANAGEMENT CONSIDERATIONS:Built park/stretch in the summer of 2000.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
15
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
12
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Tule transplants around islands and fence2. Bring unit down on 4/1. After cocklebur is germinated and tules are planted put water back on to
scald cocklebur3. Disk E. perimeter and N. levee4. Move "Area closed" sign toward fence (7' north of fence) and add sign at equal distance to the
other side of road5. Rehab. south dike6. Mow cocklebur prior to seed-set7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 26
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Mow prior to seed-set
Reduce cockleburReduce cocklebur
1515
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Mow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 12
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T5 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Vernally wet alkali meadows and pools on west side (two thirds of total unit). Avoid flooding the uplands by pushing too much water. Last burned summer of 1998.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
35
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
142
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove bamboo/palm trees along north end2. Rehab islands and add additional island on east portion3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 177
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
BurnCut to groundSpray StalkerSpray Garlon-cut stump
Enhance native plantsEliminate arundoEliminate arundoEliminate palm trees
1420.10.10.1
ACRES:TREATMENT: OBJECTIVE:BurnCut to groundSpray StalkerSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 13
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T5 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T5.1 or T5.3
SPECIAL MANAGEMENT CONSIDERATIONS: Water needs to be backed up at Dam 1 to get water to unit if flooded before T5.1.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
41
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot repair east and north levee2. Maintain viewing lanes3. Add two islands (one on south end for viewing and one on north end middle)4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 41
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 14
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T5 CELL: 3
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Floods when water backed up at Dam 1. Pepperweed located in the SW corner.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
6
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed on south end of T5.32.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 6
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 15
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T6/7 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Submit for future NAWCA or other project funding.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
91
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow X-dikes2. Keep disking in cell 13. Keep rocket net pad clear4. Willow transplants in NE corner5. Remove bamboo and spray re-sprouts with roundup6. Trim trees along N. dike7. Remove old red risers8. Lower island in NE corner and make island south of tule clump (see Denise for location)9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 91
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Roundup resproutCut to groundDisc ASAP aft. drawdown
Reduce cockleburEliminate arundoEliminate arundoReduce Bermuda/jointgrass
50.20.22
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Roundup resproutsCut to groundDisc ASAP aft. drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 16
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T8 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: T8.2
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Huge cocklebur problem. BOR funding approved in 2005. Work need to be done in 2006 including rehabing x-dikes and channel work.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
115
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab x-dikes2. Mow cocklebur prior to seed-set3. Channel from inlet through the high ground to SFM4. Scald cocklebur5. Add outlet in cell 3 or punch hole in road to release water from scalding6. Keep rocket net pad clear of vegetation7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 115
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Mow prior to seed-set
Reduce cockleburReduce cocklebur
1515
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Mow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 17
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T8 CELL: 2
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: None
SPECIAL MANAGEMENT CONSIDERATIONS:Over the water burn completed on 2/25/05. Release any drainwater slowly to avoid flooding uplands and vernal pools in T18. Drain ditch along pole line road dumps into unit. Funded by CA duck stamp for 2006.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
11
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab existing islands and add 2 more2. Build up north perimeter road3. channel and pothole4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 11
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 18
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T8 CELL: 3
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:ENDANGERED SPECIES - Cordylanthus palmatus transplant SE and W of alkali vernal pool in W end of unit. Monitor well casing water source from T13 - make sure it does not run after 3/1 nor before 11/1. Jack/Chris sprayed tall wheat with Roundup in late March of 2002 and April 2003 with good success. Combine T13 with T8.3 when spraying. Need to continue spraying (not sprayed in 2004).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
3.2
VP Alkali Meadow Complex
20
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with Telar on the north end (500+ plants)2. Continue spraying the remaining tall wheat clumps with roundup3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 23
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarSpray Round-up
Reduce pepperweedEliminate tall wheat grass
0.10.1
ACRES:TREATMENT: OBJECTIVE:Spray TelarSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 19
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T9 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: T10.1
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Completed DU/BOR project in 9/01 (islands, rehab X-dikes). Leave north end road unmowed for auto tour disturbance buffer. Mow NE corner for viewing.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
37
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set especially in SE corner2. Replace inlet and inline WCS's3. Tule transplants around islands4. Leave N. end road unmowed for auto tour disturbance buffer. Mow NE corner for viewing5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 37
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 20
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T9 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
76
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set in south end2. Rehab X-dikes3. Channel from inlet to SFM4. Disk X-dikes for loafing habitat5. Replace inline at the T9/T10 inlet6. Repair inlet (pipe separated)7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 76
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 8ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 21
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T10 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:LAST BURNED SUMMER 1997 (WILDFIRE). Pepperweed located on south end on levee north of road.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
60
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar on south end2. Keep viewing lanes open by disking or mowing3. Continue disking the jointgrass in the south end4. Rehab islands5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 60
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarDisc 3 or more times
Reduce pepperweedReduce Bermuda/jointgrass
0.115
ACRES:TREATMENT: OBJECTIVE:Spray TelarDisc 3 or more times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 22
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T10 CELL: 2
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE SPECIES - vernal pool saltbush present in alkali vernal pool. Last burned in August 1998. Board outlet to eliminate water backing in and remove boards early to drain.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
7
Vernal Pool
0.0
VP Alkali Meadow Complex
38
Alkalli Meadow
1
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Primrose control on east side in ditch by spraying2. Burn unit to enhance native vegetation3. Evaluate adding lower portion of unit to cell 44.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 47
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
BurnSpray Rodeo
Enhance native plantsReduce primrose
462
ACRES:TREATMENT: OBJECTIVE:BurnSpray Rodeo
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 23
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T10 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Last prescribed burn in July 2000. Jointgrass becoming a problem on the north end as of 2002. Need to disk at least two times after a burn.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
56
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray jointgrass in north end and follow up with disking2. Construct two islands3. Mow center X-dike for loafing4. Install outlet5. Rehab islands6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 56
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upIrrigateDisc ASAP after drawdow
Reduce jointgrassEnhance moist soil plantsReduce jointgrass
35620
ACRES:TREATMENT: OBJECTIVE:Spray Round-upIrrigateDisc ASAP after drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 24
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T10 CELL: 4
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Jointgrass a big problem on the westside
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
71
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. West side needs heavy disking on cattails/jointgrass2. Gravel and compact boat ramp in SE corner3. Rehab islands4. Mow X-dike for loafing5. Repair low areas in south east corner levees6. Remove old pipe on eastside7. Repair low area on east side @ old outlet site8. Evaluate ditching from inlet (from T10.1) to outlet, giving us SW capability for T10.19.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 71
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 3 or more timesIrrigate
Reduce Bermuda/jointgrassEnhance moist soil plants
2071
ACRES:TREATMENT: OBJECTIVE:Disc 3 or more timesIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 25
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T11 CELL: 1-2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Primary walking trail unit. Eucalyptus Removal Plan approved in 2004. A good source of fill dirt is in cell 1 (several large islands).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
41
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Plant Willows at entrance road2. Rehab islands3. Cut bamboo and spray re-sprouts with round-up4. Remove blackberries and spray re-sprouts in delivery ditch5. Cut down and garlon the eucalyptus on the S. end near office6. Spray riparian loop with Roundup7. Garlon eucalyptus resprouts after cutting along creek (Euc. Removal plan)8. Monitor wood duck boxes along riparian zone in N. end9. Remove palm tree by digging out
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 41
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 2 timesSpray GarlonSpray Round-upCut to groundSpray Rodeo resproutsSpray Garlon-cut stumpSelective tree removal
Reduce cattails/tulesEliminate blackberriesWalking trail accessEliminate arundoEliminate arundoEliminate euc'sRemove palm tree
20.50.50.50.51
0.1
ACRES:TREATMENT: OBJECTIVE:Disc 2 timesSpray GarlonSpray Round-upCut to groundSpray Rodeo resproutsSpray Garlon-cut stumpSelective tree removal
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 26
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T11 CELL: 3
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Primary walking trail unit plus entrance fee kiosk.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
9
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab islands2. Cut bamboo and spray re-sprouts with round-up along the 26.2 and west side of cell 33. Remove blackberries and spray with round-up (kiosk,middle of second pond W. of office and the
west side of cell 3)4. Bury eucalyptus stumps in level slope5. Put logs in for loafing birds (use logs from eucalyptus removal project)6. Maintain viewing lanes7. Remove outlet from cell 3 to cell 48.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 9
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray GarlonCut to groundSpray Roundup resproutSpray Garlon-cut stump
BlackberriesBlackberriesArundoArundoEliminate euc's
0.10.10.50.50.5
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray GarlonCut to groundSpray Roundup resproutsSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 27
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T11 CELL: 4
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
26
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
2.7
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove blackberries and spray re-sprouts2. Channel and pothole work3. Open up ponds around office4. Replace pipe and riser in drain (Logan creek)5. Maintain viewing lanes6. Rehab islands7. Cut bamboo and spray resprouts8. Bury eucalyptus stumps in level slope9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 29
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray stalker
Reduce arundoReduce arundo
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray stalker
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 28
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T11 CELL: 5
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE AND ENDANGERED SPECIES PRESENT. Type-locality for vernal pool smallscale (Atriplex persistens). Tadpole and fairy shrimp in W end. Tule and al. bulrush has been increasing the last couple of years. Is water subbing from T11. 3-4?
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: VERNAL POOL
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.5
VP Alkali Meadow Complex
16
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate for a potential subbing problem coming from T11.4. Unit is junking up with tules and al.
bulrush2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 17
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 29
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T12 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:None
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
21
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
1
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Eliminate 4 clumps of blackberries located on east side just west of tour route2. Repair flood damage on creek X-ing3. Add rip-rap to SE corner X-ing4. Rehab islands and add one island5. Disk and shape south dike6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 22
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Garlon
Eliminate Him. BlackberryEliminate Him. Blackberry
0.20.2
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Garlon
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 30
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T12 CELL: 2
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 7/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Good early shorebird unit during a slow floodup.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
19
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace SG inlet2. Constuct islands (South end)3. Evaluate habitat improvement potential south of outlet (between managed wetland and creek)4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 19
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 31
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T13 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Watch out for the rare "Brittlescale". Consult before borrowing dirt. Last burned on 6/29/01. Ross' used for grazing during Feb. of 2002. Also had horned lark use after the burn. Jack/Chris sprayed the "tall wheat" in late March of 2002 and April of 2003 along pole line. Combine T8.3 with T13 when spraying. Need to continue spraying (not sprayed in 2004). Sewer pond construction project completed Oct. 5, 2005.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
1.1
VP Alkali Meadow Complex
0
Alkalli Meadow
67
Annual Grasslnd
9
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
24
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clean out pipe underneath poleline (T8.3/T13)2. Cap the well at SE corner3. Remove salt cedar, palm trees and eucalyptus4. Spray remaining tall wheat and perla grass along east side and around carpenter shop5. Plant willows on west side along creek for screen for walking trail6. Spray Arundo7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 101
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upSpray Garlon-cut stumpSpray Garlon-cut stumpSpray Garlon-cut stumpCut to groundSpray Garlon
Eliminate tall wheat and Perla grassEliminate euc'sEliminate palm treesEliminate salt cedarRemove ArundoRemove Arundo
0.50.10.10.10.10.1
ACRES:TREATMENT: OBJECTIVE:Spray Round-upSpray Garlon-cut stumpSpray Garlon-cut stumpSpray Garlon-cut stumpCut to groundSpray Garlon
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 32
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T14 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: T14.2
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Staged DD good for increased smartweed production in c1 vs. watergrass in c2. Need to keep the inlet sealed off after drawdown to keep NW corner from being choked in with tules and jointgrass.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
33
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray remaining isolated jointgrass clumps with roundup2. Disk jointgrass and open up cattails in the NE corner3. Remove island in front of inlet4. Add 2 islands5. Install boat ramp in SE corner6. Remove red risers7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 33
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowDiscSpray Round-upIrrigate
Reduce jointgrassEnhance moist soil plantsReduce jointgrassEnhance moist soil plants
15150.133
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownDiscSpray Round-upIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 33
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T14 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: none
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Unit burned on 7/26/00 with follow-up double disking. There were isolated jointgrass clumps that didn't burn and couldn't be disked. They continue to spread and cause problems.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
38
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk jointgrass on westside and eastside after drawdown and then again after irrigation2. Spray isolated jointgrass clumps prior to disking.3. Add gravel to south side turnout4. Add one island in NW corner5. Mow east levee for loafing habitat6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 38
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowDiscSpray Round-upIrrigate
Reduce jointgrassEnhance moist soil plantsReduce jointgrassEnhance moist soil plants
15150.538
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownDiscSpray Round-upIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 34
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T14 CELL: 3
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Maintain maxium water level without covering islands from June 1 - Nov. 1. Run shallower the rest of the season. Kept in PP 2003 - 2005. Significant waterfowl molting area. Consistently productive pre-season banding site.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
43
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot repair and riprap N end levee2. Pack boat ramp in SE corner3. Replace and rip-rap inline in drain between T10/T14.34. Rehab islands and channels5. Remove tule clump N. of pull out6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 43
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 35
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T15 CELL: 1
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:New cell created with NAWCA project in July 2002 in NW corner of T15. The new cell is now called T15.1 with the rest of the unit called T15.2.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
37
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove 4 clumps of blackberries in NW corner and spray resprouts2. Remove concrete in the NW corner. Snake issues (see MC prior to work)3. Evaluate for native grass restoration4. Spot repair road in SW corner5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 38
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscCut to groundSpray Garlon
Reduce cattails/tulesEliminate blackberriesEliminate blackberries
10.10.1
ACRES:TREATMENT: OBJECTIVE:DiscCut to groundSpray Garlon
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 36
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T15 CELL: 2
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Potential 10/1 floodup to free-up water for S 1/2 of refuge. NAWCA project completed on 7/29/02 resulting in a new cell in NW corner called T15.1 and the rest of the unit is called T15.2. Far west cell provided important roosting habitat for WFIB. Keep cell shallow.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
125
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace CMP under Poleline2. Spot repair X-dikes3. Spot repair south road east of pole line road4. Mow X-dike tops and eastside only5. Gravel and compact boatramp6. Mow cocklebur prior to seed set7. Mow cocklebur around trees8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 126
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 5ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 37
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T16 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: none
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Habitat Objective: PP/SW rotation. Hold water lower in winter. Last in PP in 2005.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
24
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair hole in delivery ditch2. Channel viewing lanes3. Mow cattails on edge to maintain viewing lanes if necessary4. Remove nest boxes and steel posts5. Mow around Pole line Rd./auto tour intersection for traffic visibility6. Maintain 2 turnouts7. Spray and clean primrose in delivery ditch8. Slope X-dike using dirt by structure9. Replace the flume
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 24
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo Reduce primrose 0.1ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 38
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T16 CELL: 2
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Habitat Objective: PP/SW rotation and future SFM. Great-tailed grackle nested in center of unit in 2000 and 2001 and hasn't been back. Last in PP in 2005.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
24
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. SE corner needs lanes disked for airboat/boat ramp access2. Pack gravel at boat ramp in SE corner3. Spray tall wheat on levees4. Replace CMP outlet w/18" CWS5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 24
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscSpray Round-up
Reduce cattailsReduce tall wheat
0.50.1
ACRES:TREATMENT: OBJECTIVE:DiscSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 39
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T17 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE SPECIES - brittlescale and vernal pool saltbush present. Alkali flats & pools and other vernally wet areas predominate on E and central portions. Burn rotation unit. Last burned in 1997.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
242
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Burn in 2005/062.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 242
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 240ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 40
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T18 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Many RARE AND ENDANGERED SPECIES - hairy Orcutt grass, Hoover's spurge, Heckard's dwarf pepper-grass, and several rare saltbushes present in VRN and UPL Habitats. Fairy shrimp present in NE end. Burned the perimeter ditch on 2/25/05 in preparation for a planned larger burn. Watch water discharge from T8 into the T18 ditch. Problems with water leaving the ditch and impacting vernal pools/Al. meadow complex. Bulrush encroachment a big problem in the vernal pools. Unit burned 9/8 and 9/9/05. Excellent response from pheasants and grazing geese.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
95
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
9.8
VP Alkali Meadow Complex
127
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Move spoil back on road and disk2. Replace outlet (T18/P4) with concrete WCS 30" w/ 20' poly pipe3. Install boat ramp SE corner during dike project4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 232
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 41
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T19 CELL: 1
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NAWCA project was completed on 7/29/02.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
28
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with Telar located on the south end2. Rehab north levee3. Construct boatramp and pack gravel in SE corner4. Disk cattail and tule to open up unit5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 29
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarDisc 3 or more times
Reduce pepperweedReduce cattails/tules
0.13
ACRES:TREATMENT: OBJECTIVE:Spray TelarDisc 3 or more times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 42
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T19 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T19.1
SPECIAL MANAGEMENT CONSIDERATIONS: Mow new dikes instead of disking if possible.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
44
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow new X-dikes2. Replace CMP outlet with 18" CWS with 40' of pipe3. Rebuild east levee4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 44
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 43
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T20 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Avoid flooding upland c1 and avoid flooding high ground (alkali meadow HAB) north end c2.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
35
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
1
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace the outlet into drain2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 35
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 44
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T21 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:RARE SPECIES - heartscale present in c4 UPL. Part of mosquito study in 2005.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
39
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.9
VP Alkali Meadow Complex
0
Alkalli Meadow
23
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from inlet to SFM2. Maintain hunting locations (mowing, disking)3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 63
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 45
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T22 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T21
SPECIAL MANAGEMENT CONSIDERATIONS:'Cackler flats' - alkali plant community present. RARE SPECIES - heartscale present in UPL. "Potential UXO site" identified in 2004 avoid all types of heavy equipment work. The site is located along pole line road on the westside of the unit and is currently fenced and posted.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
27
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
33
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair blow out2. Maintain footbridge3. Maintain hunting locations (mowing, disking)4. Riprap outlet5. Repair flume across drain at NE corner6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 60
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 46
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T23 CELL: 1-7
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:A single iodine bush (Allenrolfia occidentalis) plant present in NW of c2. Cells 4,5 & 6 burned on 7/20/99 followed up by disking twice. Pepper weed around blind 5.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
234
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair riser in cell 4 into cell 72. Spray pepperweed around blind 5 with telar3. Replace inline in N Lateral at entrance to Check Station Road w/40" x 30" CWS4. Disc cells 4-6 leave a buffer strip of cattails/tules along the north end5. Cut channel for boat ramp in SW corner of c76. Spray access road (to blind 5D); Rehab blinds-1,2,4,5D,6,7,8,14,15;7. Cut and spray bamboo (blind 1) with round-up8. Spray isolated tall wheat grass going to blind 5D9. Evaluate removing X-dike between cells 5 & 6
10.Spot repair south road and disk and shape north road
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 234
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarCut to groundSpray Roundup resproutDiscSpray Round-up
Eliminate pepperweedEliminate arundoEliminate arundoReduce cattails/tulesReduce non-native grass
0.10.10.10.50.1
ACRES:TREATMENT: OBJECTIVE:Spray TelarCut to groundSpray Roundup resproutsDiscSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 47
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T23 CELL: 8
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:AVOID FLOODING THE UPLANDS.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
45
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
19
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
4
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Place beaver screen on inlet2. Remove the 2 euc's @ check station3. Clean downed trees out of south drain4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 68
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Garlon-cut stump Remove euc's 0.1ACRES:TREATMENT: OBJECTIVE:
Spray Garlon-cut stumpACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 48
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T24 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:LAST BURNED IN AUG 1996.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
34
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair north road2. Disk openings in cattails and disk/mow the 2 islands for loafing habitat3. Maintain hunting locations (mowing, disking)4. Spot repair X-dike between cell 1 & 25.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc Reduce cattails/tules 1ACRES:TREATMENT: OBJECTIVE:
DiscACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 49
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T24 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Last burned in 1996. Hold bottom 1/3 for evap.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
46
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow or disk 4 of the 6 islands. Think about hunter spacing2. Maintain hunting locations (mowing/disking)3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 46
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 50
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T24 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/5/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
25
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
3
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove sled in SW corner2. Rebuild islands and add 1 in NE corner3. Add fill and riprap around outlet4. Rehab south island and add east island5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 28
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 51
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T25 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:GOOD WATERFOWL NESTING UNIT (1986-1988 nest dragging by CWA).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
36
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove old rice boxes2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 36
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 36.25ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 52
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T26 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 10/5/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Prescribed burn completed on 10/99. Terrible cocklebur problem. Keep a section mowed on north slope near bend in road for TWF rocket net site (see MC for location).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
34
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Rebuild loafing islands in cell 13. Add gravel to the north end road4. Scald cocklebur5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc ASAP after drawdowIrrigateScald (by irrigate)
Reduce cockleburEnhance moist soil plantsEnhance moist soil plantsReduce cocklebur
20343434
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc ASAP after drawdownIrrigateScald (by irrigate)
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 53
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T26 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
42
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Spray puncture vine at disabled pullout3. Rehab blind 23D4. Reduce island to the north of 23D blind (take down below the water level)5. Add 2 islands on westside6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 42
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc 2 timesSpray Roundup
Reduce cockleburReduce Bermuda/jointgrassEliminate puncture vine
15150.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc 2 timesSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 54
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T27 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Major rehab in 1997 ; Swainson's Hawks Nesting in riparian habitat along S end; native grass planting on S levee; Unit split in 1998 with c1 the wetland and c2 the riparian strip. Historic cocklebur problem. Hold water level 4-6 inches lower than we have in the past.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
77
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Keep rocket net pad clear of vegetation3. Mow X-dikes for loafing habitat4. Maintain hunting locations (mowing/disking)5. Keep islands mowed or disked for loafing habitat6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 77
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 5ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 55
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T27 CELL: 2
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:THIS CELL WAS SPLIT OUT IN 1998. Vulture nest in 1999 (unknown if successful), 2001(2 fledged!), 2002(1fledged). Ditch to the south was dug out in 2003.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
10
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove pampassgrass in SE corner2. Remove inlet3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 10
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resprout
Eliminate pampassgrassEliminate pampassgrass
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 56
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T28 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T28.2
SPECIAL MANAGEMENT CONSIDERATIONS:Blue herons/great egrets attempted to nest in "Sherwood Forest" in 2001, 2002 and were successful in 2003, 2004 and 2005. Minimize disturbance around Sherwood forest during nesting season (Mar. - July). Leave roads unmowed.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
57
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow/disk remaining jointgrass2. Rehab east dike3. Replace CMP inlet with concrete WCS4. Maintain 3 hunting locations (mowing/disking)5. Spot repair N. road6. Mow or disk the 2 islands for loafing habitat7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 57
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 3 or more times Reduce jointgrass 10ACRES:TREATMENT: OBJECTIVE:
Disc 3 or more timesACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 57
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T28 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Blue herons/great egrets attempted to nest in "Sherwood Forest" in 2001, 2002 and were eventually successful in 2003, 2004 and 2005. Minimize disturbance around Sherwood forest during nesting season (Mar. - July). Leave roads unmowed. Watch water level as the unit has no bottom.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
38
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from inlet2. Disk westside for jointgrass control3. Trim trees along S. end for road access (after rookery finishes)4. Remove steel posts in unit on east side5. Maintain 3 hunting locations (mowing/disking)6. Remove 4 clumps of blackberries located in the SW corner7. Spot repair where the old CMP was removed8. Mow/disk 2 islands for loafing habitat9. Remove outlet and replace with an 18" WCS on eastside
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 38
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 3 or more timesCut to groundSpray GarlonIrrigate
Reduce jointgrassEliminate blackberriesEliminate blackberriesEnhance moist soil plants
100.10.138
ACRES:TREATMENT: OBJECTIVE:Disc 3 or more timesCut to groundSpray GarlonIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 58
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T29 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/1/2006
UNITS REQ. DOWN 1st: None
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Disabled access blind (27D) with boardwalk and platform in unit. Smartweed has come in thick for the last 2 years after the disking. 80% of the unit was disked with the heavy disk on 6/6 - 6/10 of 2003 with good jointgrass control. Continue disking the jointgrass for the best control. Keep the inlet from leaking! Wait for UXO testing before irrigation.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
60
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Follow up disking on areas disked last year2. Disk disease lanes3. Rehab blind 27D (disk lanes north and south for flight pattern and open up around blind)4. Plant additional willows around disabled parking lot for disturbance screen5. Evaluate moving blind 27D for north -south orientation6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 60
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 3 or more timesIrrigate/scald
Reduce jointgrassEnhance moist soil plants
1560
ACRES:TREATMENT: OBJECTIVE:Disc 3 or more timesIrrigate/scald
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 59
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T29 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T29.1
SPECIAL MANAGEMENT CONSIDERATIONS:SW corner was disked to open up cattails in 2003 and had a good kill.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
57
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk cattails/jointgrass on westside in the SW corner2. Spray SW corner for jointgrass3. Mow cocklebur prior to seed-set4. Make 2 islands north of blind 26 half way between the blind and the north end5. Rehab blind 266. Replace outlet in SE corner7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 57
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 3 or more timesMow prior to seed-setSpray Roundup
Reduce jointgrassReduce cockleburReduce jointgrass
532
ACRES:TREATMENT: OBJECTIVE:Disc 3 or more timesMow prior to seed-setSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 60
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T30 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Great Daphnia unit - good shorebird/shoveler use. Hold water level to have some land showing in the SE corner. About 40 acres were burned on the westside in the uplands on 6/10/02. Keep last board in for shorebird use. Swainson's hawks nesting in trees along west side. Draw down was 6/1 in 20045 with poor waterfowl use all year, drawdown adjusted earlier this year. Great late season use by geese, but still poor with ducks.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
84
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
76
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
16
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install staff guage2. Replace CMP outlet under Poleline Rd3. Maintain hunting locations (mowing/disking)4. Remove 3 clumps of blackberries located on the north end5. Spray tall wheat throughout6. Fix ruts in south end road7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 176
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upCut to groundSpray Garlon
Control tall wheatEliminate blackberriesEliminate blackberries
10.10.1
ACRES:TREATMENT: OBJECTIVE:Spray Round-upCut to groundSpray Garlon
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 61
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T31 CELL: 1
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Blue herons/great egrets attempted to nest in "Sherwood forest" in 2001, 2002 and were successful in 2003/2004. Minimize disturbance around Sherwood forest during nesting season (Mar. - July).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
34
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove pampass grass (4 bunches) on the east side in "Sherwood forest"2. Remove salt cedar3. Control tall wheat (target the outer edges first)4. Remove red riser east of cell 35.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resproutSpray Garlon-cut stumpSpray Round-up
Remove pampass grassRemove pampass grassRemove salt cedarControl tall wheat grass
0.10.10.50.5
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resproutsSpray Garlon-cut stumpSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 62
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T31 CELL: 2
DRAWDOWN DATE: 3/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:RARE AND ENDANGERED SPECIES - vernal pool tadpole shrimp and Conservancy fairy shrimp present in vernal pools in SW corner; vernal pool saltbush present. Vehicular and tractor ACCESS PROHIBITED WITHOUT PRIOR CONSULTATION. Vernal pool areas in the SW corner should only be flooded with rainwater - protect from accidental flood-up by monitoring X-dike between SFM & VRN habitats) - flood 4"-6" lower then X-dike to protect vernal pool from delivered water supply and mosquitofish predation.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: VERNAL POOL
CELL PARAMETERS:
Seasonal Flooded
Marsh
89
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
4.0
VP Alkali Meadow Complex
50
Alkalli Meadow
0
Annual Grasslnd
3
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
2
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install staff guage2. Gravel pole line road3. Need to patch holes in delivery ditch (see JS or MC) for locations. Get dirt from T38.14. Replace CMP outlet with concrete WCS5. Switch out deep ditch signs with metal ones6. Repair south levee along drain, need to protect vernal pools (consult MC or JS); access unit only
after unit is baked7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 149
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 63
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T31 CELL: 3
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: evap
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:This was formerly "the tree cell" of c1 ("The Sherwood Forest"); DRAW DOWN BY EVAP. ONLY- DO NOT DUMP INTO C2.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
9
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 9
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 64
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T32 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Vernal pools and other vernally wet habitats present. Golden eagle nest used in 1998 (2 fledged), 1999 (2 fledged), 2000 (2 fledged), 2001 (2 fledged), 2002 (1 fledged), 2003 (2 fledged), 2004 (1 fledged) and 2005 (1 fledged). Two euc's were girdled near the nest tree in 2003 for future snags. Avoid disturbance in NW corner of unit from Feb. - May because of Golden Eagle nest.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
1.0
VP Alkali Meadow Complex
77
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
2
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab S. dike in SE corner2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 81
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 65
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T33 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 8/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:MAINTAIN SW HABITAT IN SOUTH CORNER (7/1 EVAP.). Added a perimeter levee separating the west side uplands on 7/27/03.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
84
Water-grass
0
Summer Water
2
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk checks and open up lanes prior to floodup2. Install boat ramp in SE corner3. Rehab blind 37. Open up to west and north by mowing or disking4. Mow or disk island to the NW for loafing habitat5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 87
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 66
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T34 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Historic heron/egret rookery in south end, but have been absent since they were blown out of the trees in 1999 following two days of intense north wind. Less than an acre was burned in the north end of cell 1 on 6/10/02 during a wildfire. Try holding water 4 inches lower this year, especially in cell 1 (see MC for details). Bird #'s went down in 2003 and 2004. Cell 1 was part of the mosquito study in 2005.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
105
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Trim trees along 26.23. Spot repair eastside levee4. Maintain hunting locations (mowing/disking)5. Disk loafing levees in each cell6. Channel inlet to SFM in cell 17. Spot repair south road8. Spot clean ditch north of cell 19.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 105
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 20ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 67
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T35 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Entire unit disked 3 times on 6/15 - 6/17/05 with the stubble and finish disk.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
42
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install outlet in NE corner2. Disk unit for jointgrass control3. Maintain 3 hunting locations (mowing/disking); Mow/disk the 2 west islands and leave the east
island4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 42
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowIrrigate
Reduce jointgrassEnhance moist soil plants
1042
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 68
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T35 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Unit was broken into 2 cells in 2002 allowing better water level management capability; c2 is cell to east and c3 is cell to west:.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
17
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Maintain one hunt area on east side2. Replace outlet3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 17
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 69
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T35 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 12/5/2006
UNITS REQ. DOWN 1st: T35.2
UNITS REQ. FLOOD 1st: T35.1
SPECIAL MANAGEMENT CONSIDERATIONS:New cell created in July 2002 split from T35.2.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
6
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk if needed to keep the channels open2. Disk and shape spoil from ditch cleaning3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 6
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 2 times Reduce cattails 1ACRES:TREATMENT: OBJECTIVE:
Disc 2 timesACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 70
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T36 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: ST
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:IRRIGATION DRAINAGE HAS NO PLACE TO GO. Burned cells 1,2 & 4 in 1998. Watch water level in cell 3 and don't let it get too deep. . Completely disked cell 1 in May of 2003 and disked 90% of cell 2 in June of 2003. Continue disking for jointgrass control.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
75
Water-grass
73
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add outlet in SW corner in cell 22. Remove CMP in X-dike between cells 2 and 33. Cut a channel from inlet in cell 4 to outlet to aide in drainage (jointgrass problem)4. Rehab blinds - 38,39 & 425. Spray jointgrass along the hunter access to blind 386. Continue disking in cell 2 and disk the NW corner of cell 3 for jointgrass control7. Cut a channel from inlet in cell 3 to outlet to aide in drainage (jointgrass problem)8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 148
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowIrrigateSpray Roundup
Reduce jointgrassEnhance moist soil plantsReduce jointgrass
10732
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownIrrigateSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 71
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T37 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Historic heron/egret rookery site until they were blown out in 1999 following two days of intense north winds. Keep 4-6 inches of water flowing in the ditch during the summer for wildlife use.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
63
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
8
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
1
Cotton-wood Willow
4
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Keep water flowing in ditch during summer for wildlife2. Cut and paint salt cedar with garlon3. Trim trees along 26.24. Evaluate burning and/or spraying to control tall wheat grass5. Evaluate cleaning delivery ditch to T416.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 77
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Garlon-cut stumpSpray Roundup
Eliminate salt cedarEliminate tall wheat grass
0.160
ACRES:TREATMENT: OBJECTIVE:Spray Garlon-cut stumpSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 72
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T38 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/20/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Maintain water level low enough to keep out of upland areas on west side.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
78
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor bamboo/eucalyptus removal and spray any re-sprouts2. Mow cocklebur prior to seed-set3. Clean channel from inlet through uplands to marsh4. Evaluate excavating around tule clumps on westside to maintain openings5. Spot repair north levee6. Maintain 3 openings for hunters7. Keep loafing islands/levees mowed or disked8. Remove red riser9. Maintain disabled boat ramp
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 79
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setCut to groundSpray Roundup resprout
Reduce cockleburEliminate arundoEliminate arundo
50.10.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setCut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 73
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T38 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Good response from waterfowl to disking checks. Leave spaced cover along checks for 2 hunt parties. Maintain water level low enough to keep out of upland areas on west side.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
31
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clean ditch on north end2. Trim trees3. Channel from the inlet to marsh4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 31
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 74
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T39 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Maintain water level within channel/pothole at all times to avoid flooding uplands and N and W end of c2 (vernal pool and alkali meadow HAB).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
12
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
3.4
VP Alkali Meadow Complex
0
Alkalli Meadow
37
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray tall wheat throughout (mostly on the west side)2. Develop burn plan3. Fix riser and pipe on X-dike4. Install flap gate on outlet5. Trim trees on east side6. Disk and shape spoil from ditch cleaning7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 52
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray RodeoBurn
Control tall wheatEnhance native plants
0.537
ACRES:TREATMENT: OBJECTIVE:Spray RodeoBurn
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 75
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T40 CELL: 1,3
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Heavy disking completed on westside with 40 acres disked in cells 1 and 3 with great results May 2004. Spray the remaining isolated jointgrass clumps with roundup. No independent drain option - irrigation drainwater typically drained into cell 4. Jointgrass patches were sprayed in the NE corner of cell 1 on 4/26/05 along with perla grass on X-dike.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
68
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk jointgrass on west side of cell 1 and cell 32. Maintain hunting locations (mowing/disking). There is one island in the middle of each cell
surrounded by tules3. Build loafing islands (one more in each cell) on the west side4. Plant trees in old delivery ditch along W. side5. Spray isolated clumps of jointgrass in cell 1 with Roundup6. Remove all old CMP in delivery ditch7. Evaluate results from spraying jointgrass with roundup8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 68
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowIrrigateSpray Roundup
Reduce Bermuda/jointgrassEnhance moist soil plantsReduce jointgrass
20682
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownIrrigateSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 76
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T40 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Cocklebur and bermuda grass problem.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
29
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray bermuda/jointgrass2. Evaluate for a burn (bermuda problems)3. Mow cocklebur prior to seed-set4. Maintain hunting location by mowing/disking around island in center5. Spot repair X-dike between cells 2 and 46.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 29
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Roundup
Reduce cockleburReduce bermuda/jointgrass
82
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 77
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T40 CELL: 4
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T40.1,3
SPECIAL MANAGEMENT CONSIDERATIONS:Irrigated by default when cells 1,3 are irrigated and drain into it. Major overhaul completed (extra NAWCA from T41) on July 2002.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
34
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Disk lanes in cattails3. Maintain hunting location (mowing/disking)4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate Enhance moist soil plants 34ACRES:TREATMENT: OBJECTIVE:
IrrigateACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 78
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T41 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:FLOOD UNIT INDEPENDENTLY from T37 ditch using T38 & T40 as supplemental. Major overhaul completed in July 2002 with NAWCA. A channel was dug inlet to outlet, channel/potholes, new islands and levee work. Leave water in the south end channel for duck broods.
# OF WCS's TO REPLACE: 3
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
141
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
36
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
1
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install inline and inlet into T41.22. Replace pipe 30" west of parking lot C3. Spot repair south dike4. Replace Free roam sign in south end and repair corner boundary sign in SE corner5. Gravel N. dike and between cells 1 and 26. Clean ditch on westside7. Control tall wheat by spraying with Roundup8. Kill eucalyptus by cutting and painting with Garlon9. Maintain hunting locations (mowing/disking). Mow or disk 5 islands
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 179
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upSpray Garlon-cut stump
Control tall wheatEliminate eucalyptus
10.1
ACRES:TREATMENT: OBJECTIVE:Spray Round-upSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 79
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T42 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Watch water level in the west cells. Need to keep water around blind 52, but not too deep.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
128
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace outlet in N levee2. Excavate around blind 52 and remove sections of levee to the east3. Install new outlet in east levee4. Over water burn to reduce cattail and tule. Follow up with disking5. Disk/mow levees to open up unit; leave 1st 100 yards on N. end to discourage hunters from
shortcutting (disrupt blind 52)6. Rehab blinds 46 & 527.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 128
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn/disc Reduce cattail and tule 60ACRES:TREATMENT: OBJECTIVE:
Burn/discACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 80
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T43 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:None
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
1.0
VP Alkali Meadow Complex
0
Alkalli Meadow
26
Annual Grasslnd
0
Perennial Grasslnd
97
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
3
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray tall wheat (target the outliers first)2. Rehab delivery ditch to P123. Replace CMP riser in SW corner with a 18"4. Remove blackberries on south end5. Remove pile of wire and posts in SW corner6. Burn unit for tall wheat control (need to burn off veg. to be able to get a spray rig in)7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 127
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upBurn
Control tall wheatControl tall wheat
5050
ACRES:TREATMENT: OBJECTIVE:Spray Round-upBurn
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 81
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T44 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Check on access to south side near pump. 30 acres burned in the 10/00 wildfire. Wildfire on south end (1.4 acres) from adjacent rice farmer on 4/20/05. Continued problems with people trespassing.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
102
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
14
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Make foot/quad bridge to access unit using 30" WCS2. Install gate @ GCID lift pumps3. Remove wire4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 117
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 82
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: T45 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Acquired the "Goldoworthy" property in 2004. Currently, best use by mig. Birds (duck pairs, WFIB, shorebirds) in winter/spring after depressions on south end fill with rain water.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
39
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Post boundary signs2. Conduct initial biological inventory3. Clear drains from I5 underpasses4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 39
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 83
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TAB CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE AND ENDANGERED SPECIES PRESENT IN ALKALI MEADOWS, VERNAL POOLS, AND ALKALI PLAYA (i.e.., Game Warden Lake in SE corner). ACCESS ONLY VIA PRIOR CONSULTATION. Burned on 7/8/02 during a wildfire. Project planning funded with DU/BOR and completed in 2005 (Plan in place). Partial funding through BOR/CVPIA/DU in place for habitat/construction work (2006). Remainder planned to be submitted for NAWCA funding.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
63
Vernal Pool
21.8
VP Alkali Meadow Complex
524
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Eliminate arundo in SW corner by cutting and spraying2. Restore natural hydrology to Game Warden Lake and other affected areas (See Plan)3. Clean south ditch, rebuild west levee along Logan creek and rebuild east levee along drain (See
Plan)4. Remove fire boxes5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 609
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resprout
Eliminate arundoEliminate arundo
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 84
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TC CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE AND ENDANGERED SPECIES PRESENT IN VERNAL POOLS, ALKALI MEADOWS, AND ALKALI PLAYA (i.e.., pond in N end of the unit). ACCESS ONLY VIA PRIOR CONSULTATION. Monitor old check around "hour-glass" vernal pool. SOUTH END BURNED ON 4/01 during a prescribed fire. Evaluated in 2004 with TAB as part of DU/BOR engineering study. Submitted for partial funding through BOR/CVPIA/DU for habitat construction work (2005). Balance planned to be submitted for NAWCA funding.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
23
Vernal Pool
9.9
VP Alkali Meadow Complex
84
Alkalli Meadow
32
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Fix leak on N end of unit2. Restore natural hydrology to unit (See Plan)3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 149
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 115ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 85
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TD CELL: 1-4
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flexible Floodup Unit - may flood early if water is available (refer to Tracts 3, D, E, F). Flood date may be delayed if water is short because of need to flood higher priority marsh units. The timing of drawdowns and floodups needs to be considered to minimize conflicts with neighboring rice field operations (i.e. subbing issues).
# OF WCS's TO REPLACE: 3
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
142
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Open up thick areas with a disk2. Replace 3 WCS in X-dikes3. Spray primrose in N. delivery ditch4. Build up road in SW corner of cell 45. Evaluate veg. comp after drawdown for possible watergrass management6. Rip-rap 25-1C7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 142
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray RodeoDisc ASAP after drawdowDisc ASAP after drawdow
Reduce primroseEnhance moist soil plantsReduce cattails/tules
0.5158
ACRES:TREATMENT: OBJECTIVE:Spray RodeoDisc ASAP after drawdownDisc ASAP after drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 86
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TD CELL: 5
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flexible Floodup Unit - may flood early if water is available (refer to Tracts 3, D, E, F). Channel/pothole project completed in 7/01. Unit a SW/PP option and was last in summer water in 2004.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
23
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install boat ramp and pack gravel in SW corner2. Re-rock 3-way WCS3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 23
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 87
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TE CELL: 1-3
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flexible Floodup Unit - may flood early if water is available (refer to Tracts 3, D, E, F). Fill channels and flood cell 3 and then back water in.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
91
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove bamboo and spray re-sprouts with roundup2. Mow and scald cocklebur prior to flower stage. Cover cells 1-2 and hold then release into the east
ditch3. Channel from inlet to SFM in cell 14. Rehab islands5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 91
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resproutScald (by irrigate)Mow prior to seed-set
Reduce arundoReduce arundoReduce cockleburReduce cocklebur
0.50.55858
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resproutsScald (by irrigate)Mow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 88
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TE CELL: 4
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/20/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flexible Floodup Unit - may flood early if water is available (refer to Tracts 3, D, E, F).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
29
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Rehab islands3. Open up island of trees for a mower4. Cut and spray arundo along eastside5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 29
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setCut to groundSpray Roundup resproutSelective tree removal
Reduce cockleburEliminate ArundoEliminate ArundoOpen up to get equip. in
50.50.50.5
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setCut to groundSpray Roundup resproutsSelective tree removal
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 89
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TE CELL: 5
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Cell 5 burned in wildfire from Willow Creek duck club burn (Lucky 7, Tract 25)in summer of 1993. Overwater burn completed on 3/5/03. NAWCA funded project completed 8/4/04. Channels and potholes were put in this formerly flat unit. A dike protecting uplands was also put in on the west side. This will be the first draw down for this new unit.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
22
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
5
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
3
Cotton-wood Willow
0
Flooded Willow
2
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add flapgate to outlet2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 32
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 90
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TE CELL: 6
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Planned new delivery canal for Willow Creek area (small NAWCA through private lands); will try to mesh this work with TF project (submitted to BOR), specifically for potential borrow sites.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
16
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add outlet with flapgate in south east corner2. Make 4 islands3. Evaluate how water is getting into the unit (water subbing or the ditch got too high)4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 16
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 91
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TF CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flexible Floodup Unit - may flood early if water is available (refer to Tracts 3, D, E, F). Submitted to BOR for habitat project (TF.1-2/P1B/P3) in spring 2005. BOR funding approved and project needs to be done in 2006.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
37
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from inlet to marsh2. Disk openings in cattails3. Trim trees along W. perimeter for road access4. Cut bamboo and spray re-sprouts with round-up5. Evaluate putting in a X-dike on N. end for better water management6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 37
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 2 timesCut to groundSpray Roundup resprout
Reduce cattails/tulesEliminate arundoEliminate arundo
30.10.1
ACRES:TREATMENT: OBJECTIVE:Disc 2 timesCut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 92
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TF CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flexible Floodup Unit - may flood early if water is available (refer to Tracts 3, D, E, F). Future PP. Submitted to BOR for habitat project (TF.1-2/P1B/P3) in spring 2005. BOR funding approved and project needs to be done in 2006.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
36
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
2
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab south dike2. Replace outlet3. Make sure ditch drains to Logan creek and then plug pipe from TF to TG4. Mow cocklebur prior to seed-set5. Cut and paint figtree in NW corner6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 38
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Garlon-cut stump
Reduce cockleburEliminate figtree
50.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 93
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TF CELL: 3
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Need to come up with a plan for firebreaks.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
13
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 13
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 13ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 94
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TG CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:RARE AND ENDANGERED SPECIES present in vernal pools and alkali meadows. Parts of this unit flood with P10 flood-up when Dam 2 is in use. Protect natural hydrology. Watch water level in pools. Look for source of water (possibly from neighbor). Walked east boundary (12/18/02) & found a WCS(outlet) on adjacent private land going on to TG. Submitted for BOR funding in 2005 to have DU engineering evaluate with TH.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
15.2
VP Alkali Meadow Complex
172
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Work with land owners to east to remove/repair WCS that is draining water into east side & causing
veg. problems2. Evaluate levee spot repair/reinforcement to prevent floodup along Logan creek3. Evaluate hydrology4. Restore large vernal pool at W. boundary - restore hydrology & burn out alkali bulrush5. Planned burn - 216ac upland to enhance grassland/native plants6. Replace fence along Norman Rd.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 187
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 187ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 95
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: TH CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Parts of this unit floods with P10 flood-up based on Dam 2 operation. Good shallow "vernal-style" wetlands in SW corner. Evaluate hydrology and tule response. Need to keep outlet open after Logan goes down and then board before Logan comes back up. Put in boards prior to Logan coming up. Submitted for BOR funding in 2005 to have DU engineering evaluate with TG.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
2.2
VP Alkali Meadow Complex
185
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
28
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Come up with a plan to fix the unmanaged flooding problems2. Evaluate re-working the east bank of Logan creek3. Remove palm trees4. Replace flap gate on outlet pipe going into Logan Cr. With an improved version5. Clean out outlet6. Burn7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 215
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
BurnSpray Garlon-cut stump
Enhance native plantsEliminate palm trees
2140.1
ACRES:TREATMENT: OBJECTIVE:BurnSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 96
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P1 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:RARE AND ENDANGERED SPECIES present in vernal pool and alkali meadow (old c1) - Hoover's spurge, Hairy Orcutt grass, Green's tuctoria, vernal pool saltscale, brittlescale, vernal pool tadpole shrimp, a rare (endemic) population of Colorado fairy shrimp! Maintain low enough water level to avoid flooding west side vernal pools and surrounding uplands. Wildfire burned about the entire west side of unit on 7/8/02. Restrict equipment operation to managed wetland pond bottoms only.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
232
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
7
Vernal Pool
1.0
VP Alkali Meadow Complex
0
Alkalli Meadow
56
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Continue channel work to outlet2. Install staff gauge in SE corner3. Rehab island in SW corner and remove veg. that blocks viewing from auto tour4. Install inlet from 25.1C5. Remove isolated clumps of tall wheat/perlagrass by spraying with Roundup6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 296
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-up Eliminate tall wheat/perla grass
0.1ACRES:TREATMENT: OBJECTIVE:
Spray Round-upACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 97
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P1A CELL: 1,3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Order water in advance so cell 3 floodup is not delayed. Cell 2 became part of cell 1 due to levee taken out in 1998. Parts of cell 1 are excellent shorebird habitat. AVOID SOIL DISTURBANCE TO N END OF C3. About 5 acres were burned in the NE corner of cell 3 during a wildfire on 7/8/02.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
217
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
17
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove CMP in cell 1 that dumps into creek2. Remove and replace CMP in cell 3 that dumps into creek3. Gravel walkway to photoblind4. Clean/spray W. ditch of c1 and disk N. end of C1 near inlet5. Install boat ramp in SE corner of c16. Service radial arm gates on Dam 17. Rehab X-dike between cell 1 and cell 38. Tule transplants @ photo blind9. Mow viewing lanes and turnouts
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 234
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo Control primrose 1ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 98
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P1A CELL: 4
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:1 acre burned during the wildfire on 7/8/02.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
79
Water-grass
0
Summer Water
5
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Trim trees blocking viewing into P3 and P1B2. Maintain islands and viewing lanes3. Mow turnouts4. Install boat ramp NE corner5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 84
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 99
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P1B CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:40 acres burned on the northend during the wildfire on 7/8/02. Submitted to BOR for habitat project (TF.1-2/P1B/P3) in spring 2005. Kept PP in 20056 with great results from breeding and molting birds. Bird use started to decline in the fall until we pulled down the unit 8" in mid-Nov and the birds responded big time, especially the geese on the mudflats.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
149
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab. islands and add 3 islands (across the n. end)2. Replace east outlet in south levee3. Replace west outlet in south levee w/24"x40' CWS4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 149
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 100
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P2 CELL: 99
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE: R
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: P5
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Unit was burned on 9/15/00 and disked. WESTERN GREBES nesting (watch out when airboating). Huge fish and submergent vegetation die-off on 7/7/03, apparently due to stagnation from lack of water coming in. As a result, the wildlife use declined significantly. All the grebes abandoned their nests and the molting ducks left for better places. THIS UNIT REQUIRES A SUBSTANTIAL FLOW THROUGH DURING SUMMER MONTHS. Great-tailed grackles nesting in unit during the 20056 season. Started using outlet to P5 for additional summer flow-through. Prescibed burn completed on 2 of the 3 islands on 3/9/06.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
162
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
19
Alkalli Meadow
22
Annual Grasslnd
4
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Lower west outlet into T182. Remove blackberries on westside3. Rip-rap outlet to T184. Burn 2 of the 3 islands5. Remove outlet in middle of south levee6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 206
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
BurnCut to groundSpray Garlon
Improve loafing habitateliminate blackberrieseliminate blackberries
20.10.1
ACRES:TREATMENT: OBJECTIVE:BurnCut to groundSpray Garlon
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 101
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P3 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:The north end was burned on 2/28/03 in preparation for NAWCA channel/pothole project. NAWCA funded project completed 8/5/04. Channels and islands were added in the NE corner. South end island work part of TF project submitted in spring 2005 (BOR).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
159
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Burn lower half for jointgrass/bermuda control2. Fix low spot @ outlet on south end3. Mow cocklebur prior to seed-set4. Remove palm tree in NE corner5. Cut channels NE from SE outlet from P1B6. Construct islands on south end7. Disk tules in NW corner for viewing8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 159
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Garlon-cut stumpBurn/discDisc 3 or more times
Reduce cockleburEliminate palm treeReduce Bermuda/jointgrassReduce tules
50.1701.5
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Garlon-cut stumpBurn/discDisc 3 or more times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 102
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P4 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T18 or P2
SPECIAL MANAGEMENT CONSIDERATIONS:Last burned in 1997.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
81
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
41
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove old pipe in SE corner2. Schedule replacement of siphon to T233. Install a boatramp in SE corner4. Raise south perimeter dike5. Add islands towards the middle and east side (stay away from the feather edges on west side)6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 122
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 103
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P5 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Drawdown with P6.2 to avoid need for separate outlet.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
105
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
37
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace south east CMP into P6.22. Gravel and pack boat ramp3. Raise south perimeter dike4. Spot repair west levee5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 142
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 104
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P6 CELL: 1
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: P2 or P1A
SPECIAL MANAGEMENT CONSIDERATIONS:Keep water level shallow on the East side - great loafing and feeding site for waterfowl and shorebirds. Borrow any dirt from the S end.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
130
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install staff gauge2. Mow cocklebur prior to seed-set3. Replace outlet in SE corner to Logan Cr4. Rehab X-dike between cells 1 and 25. Remove palm trees6. Add gravel for access to photo blind7. Riprap outlet between cell1 and cell 28.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 130
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Garlon-cut stump
Reduce cockleburRemove palm tree
150.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 105
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P6 CELL: 2
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: P6.1
SPECIAL MANAGEMENT CONSIDERATIONS:MAINTAIN SW HABITAT IN SE CORNER (7/1 EVAP.). Over water burn completed in the SW corner of unit March 2004. Photoblind #2 in NE part of unit.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
174
Water-grass
0
Summer Water
9
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install staff gauge in SW corner2. Disk channels/potholes in SW corner (prescribed burn last year)3. Build islands in bottom end4. Water tules at photoblind5. Tule transplants at photoblind6. Gravel and pack boat ramp in SW corner7. Fix the approach to gate off Norman Rd. @ SE corner (flood damage)8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 183
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 106
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P7 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:MAINTAIN SW HABITAT IN SE CORNER (7/1 evap). Great habitat diversity: alkali meadow - shallow SFM - deep water.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
180
Water-grass
0
Summer Water
46
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
1.0
VP Alkali Meadow Complex
0
Alkalli Meadow
44
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with Telar in NE corner2. Spot repair east and south levee3. Remove old footbridge by blind 114. Install boat ramp at SE corner5. Mow loafing islands around blind 14A6. Rehab. Gate @ parking lot D7. Rehab Blinds 9,11,12,13,14A,168.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 272
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 107
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P7A CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:RARE SPECIES - brittlescale present in alklai meadows (UPL Habitat). Other plants uncommon on Refuge found in UPL. Fairy shrimp in vernal pools. C1 & C4 LAST BURNED SUMMER 1997 (WILDFIRE).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
63
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
1
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
29
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from inlet to SFM following old channel to inlet of cell 22. Rehab blinds 20,293.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 93
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 108
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P7A CELL: 2
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
65
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
7
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install outlet in NE corner for SW capability2. Tule transplants prior to floodup3. Rehab blinds 21,34,354.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 72
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 109
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P7A CELL: 3
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Prescribed burn completed on 3/11/05. Submitted for DU/BOR funding to evaluate potential options for better water management capabilities (2006).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
53
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
1.1
VP Alkali Meadow Complex
0
Alkalli Meadow
44
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab Dam 22. Come up with plan to restore (channel/pothole?)3. Burn tules for surveying work and place for dirt4. Evaluate for potential blind site5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 98
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 110
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P7A CELL: 4
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Held in summer water in 2004 with good results.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
32
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.7
VP Alkali Meadow Complex
0
Alkalli Meadow
21
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove blackberry in SW corner2. Rehab. Blind 303.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 53
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup Eliminate blackberry 0.1ACRES:TREATMENT: OBJECTIVE:
Spray RoundupACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 111
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P8 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Maintain cell 2 water level lower from Nov. - Jan. About 5 acres burned in P8.2 during a wildfire on 7/10/01.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
109
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor/spray pepperweed on the north end of P8.12. Replace inlet with a CWS3. Rehab blinds 31,32,36,44,454. Spot repair X-dike between T33/P8.15.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 109
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 112
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P9 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T36
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
30
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Construct channels to distribute more water to south end of unit (potential NAWCA project)2. Rehab blind 40A3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 30
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 113
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P9 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
116
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clean ditch on south end and put spoil on north bank2. Construct boat ramp in SE corner3. Lower loafing island in south end to just underneath the water line4. Rehab blinds 40,41,43,495.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 116
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 114
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P10 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: P8.2
SPECIAL MANAGEMENT CONSIDERATIONS:RARE SPECIES - San Joaquin spearscale present on west levee on the middle and top of slope.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
86
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
1
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed located on X-dike between cells 1 and 22.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 88
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.2ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 115
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P10 CELL: 2
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS: Burned (approx. 140 acres) in a wildfire on 7/10/01. Last in SW in 2002 with excellent wildlife use, including nesting black terns in NW corner.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
352
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
11
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace CMP in east road with a 36" WCS with flapgate2. Replace outlet with a 36" in the SE corner with a flap gate and rip-rap3. Rehab east road4. Clean ditch on south end and use spoil to form levee on the N. side of the ditch5. Rebuild islands and add 26. Spot repair north end levee7. Remove palm trees by cutting or digging out with the backhoe8. Channel from inlet through the thick tules/silt to open marsh9. Mow slopes of X-dike for waterfowl loafing habitat
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 363
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Garlon-cut stump Eliminate palm trees 0.1ACRES:TREATMENT: OBJECTIVE:
Spray Garlon-cut stumpACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 116
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P11 CELL: 1-2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: P9.2
SPECIAL MANAGEMENT CONSIDERATIONS:FLOODS SIMULTANEOUSLY W/ P9.2; SALICORNIA PLANTS IN NW CORNER OF C2. Maintain shallow water depth - expose NW corner of cell 2.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
141
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
20
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab Blinds 47,48,50, 54 & 562. Install boat ramp in SE corner3. Install outlet in SE corner of cell 24.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 161
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 117
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P11 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Develop SW rotation with P10. Drain in spring prior to GCID activation of weir in SFM years. Prescribed burn on 7/10/01 followed by a heavy disking.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
149
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Put in outlet in SE corner to bypass cell 4 (check elevation drop)2. Replace boundary signs south end3. Trim trees along the south end4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 150
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Selective tree removal Keeping the roads clear 0.5ACRES:TREATMENT: OBJECTIVE:
Selective tree removalACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 118
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P11 CELL: 4
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Drain in spring prior to GCID activation of weir. Need to make sure that we use both outlets to drain.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
119
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
3
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace concrete outlet with 6' 30" WCS with 30' pipe2. Remove bamboo in north west corner3. Rehab east road4. Trim trees on south and east levees5. Remove palm trees6. Replace boundary signs south end7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 123
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resproutSpray Garlon-cut stump
Eliminate arundoEliminate arundoEliminate palm trees
0.10.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resproutsSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX SAC YEAR 20067 printed: 119
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SAC UNIT: P12 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Floodup follows T41 (8/15). Burned in a wildfire in 10/00. Unit was drawndown on 4/1/04 and flooded back up after the cocklebur germination to achieve scald. Adjacent rice farming concern with beavers plugging the drain. If the drain gets plugged water backs up and floods the private property.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
55
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
27
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate and rehab inlet ditch system2. Disk cattails and make some openings3. Spray the "outlaying" tall wheat with roundup4. Add logs to unit for turtle basking areas - consider location in relation to expected future equipment
operation5. Rehab Blind 556. Evaluate for an irrigation7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 82
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upDisc ASAP after drawdow
Reduce tall wheatReduce cattails/tules
0.52
ACRES:TREATMENT: OBJECTIVE:Spray Round-upDisc ASAP after drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
Sum
mar
y of
Pla
nned
Hab
itat A
cres
*12
-Jul
-06
Sacr
amen
to N
WR
Com
plex
2006
7Ye
ar:
REF
UG
E
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lity
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
610
035
00
BTS
10
029
00
00
40
110
00
645
646
2915
691
0
2730
135
255
227
40C
LS11
918
239
739
741
00
01
014
00
633
4734
6610
5715
4555
50
3480
226
435
459
7D
EL13
9036
437
292
00
424
00
00
545
9946
1292
646
5582
0
667
930
06
LS2
00
314
217
184
8037
150
064
03
760
762
800
116
1674
0
5735
162
619
570
87SA
C16
320
0185
334
105
00
511
02
00
031
7086
7249
3079
117
1038
90
1059
416
964
90
SUT
450
010
112
50
00
011
328
70
35
1880
1925
226
403
2559
0
1428
161
915
1219
0414
0TO
TALS
2272
1247
580
184
8084
134
313
114
343
1614
643
5018
317
1866
061
1625
450
713
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
ads,
can
als,
and
othe
r unm
anag
ed a
reas
.
51
Sum
mar
y of
Pla
nned
Hab
itat A
cres
by
Uni
t*
Sacr
amen
to N
WR
Com
plex
YEA
R:
2006
7R
EFU
GE:
SAC
23-M
ay-0
6
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
CAN
A99:
00
00
00
00
00
00
00
00
00
00
00
00
026
.299:
00
00
00
00
00
00
00
00
00
00
00
00
0T1
1-4
:96
00
096
096
00
00
00
00
00
00
00
00
960
T16:
00
00
00
05
430
00
00
490
00
00
00
049
0T2
1-8
:18
50
00
185
018
50
01
00
00
10
00
00
00
018
60
T210:
00
440
440
440
00
00
00
00
00
00
00
044
0T2
11:0
00
00
00
011
90
00
00
119
00
00
00
00
119
0T3
99:68
00
068
068
10
00
00
01
00
00
00
00
690
T41:
200
00
200
200
010
00
00
100
00
00
00
030
0T4
2:51
00
051
051
00
00
00
00
00
00
00
00
510
T43:
00
150
150
150
012
00
00
120
00
00
00
026
0T5
1:35
00
035
035
014
20
00
00
142
00
00
00
00
177
0T5
2:41
00
041
041
00
00
00
00
00
00
00
00
410
T53:
60
00
60
60
00
00
00
00
00
00
00
06
0T6
/799:
910
00
910
910
00
00
00
00
00
00
00
091
0T8
1:11
50
00
115
011
50
00
00
00
00
00
00
00
011
50
T82:
110
00
110
110
00
00
00
00
00
00
00
011
0T8
3:0
00
00
00
320
00
00
023
00
00
00
00
230
T91:
370
00
370
370
00
00
00
00
00
00
00
037
0T9
2:76
00
076
076
00
00
00
00
00
00
00
00
760
T10
1:60
00
060
060
00
00
00
00
00
00
00
00
600
T10
2:0
00
00
77
038
10
00
040
00
00
00
00
470
T10
3:0
560
056
056
00
00
00
00
00
00
00
00
560
T10
4:0
710
071
071
00
00
00
00
00
00
00
00
710
T11
1-2
:41
00
041
041
00
00
00
00
00
00
00
00
410
T11
3:0
09
09
09
00
00
00
00
00
00
00
00
90
T11
4:26
00
026
026
30
00
00
03
00
00
00
01
290
T11
5:0
00
00
00
116
00
00
017
00
00
00
00
170
T12
1:21
00
021
021
00
10
00
01
00
00
00
00
220
T12
2:19
00
019
019
00
00
00
00
00
00
00
00
190
T13
99:0
00
00
00
10
679
00
077
00
00
00
024
101
0T1
41:
033
00
330
330
00
00
00
00
00
00
00
033
0T1
42:
038
00
380
380
00
00
00
00
00
00
00
038
0
Pag
e 1
of 4
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
T14
3:0
043
043
043
00
00
00
00
00
00
00
00
430
T15
1:37
00
037
037
00
00
00
00
00
00
00
00
380
T15
2:12
50
00
125
012
50
00
00
00
00
00
00
00
012
60
T16
1:24
00
024
024
00
00
00
00
00
00
00
00
240
T16
2:24
00
024
024
00
00
00
00
00
00
00
00
240
T17
99:0
00
00
00
024
20
00
00
242
00
00
00
00
242
0T1
899:
950
00
950
9510
127
00
00
013
70
00
00
00
023
20
T19
1:0
028
028
028
00
00
00
00
00
00
00
01
290
T19
2:44
00
044
044
00
00
00
00
00
00
00
00
440
T20
99:35
00
035
035
00
10
00
01
00
00
00
00
350
T21
99:39
00
039
039
10
230
00
024
00
00
00
00
630
T22
99:27
00
027
027
00
330
00
033
00
00
00
00
600
T23
1-7
:23
40
00
234
023
40
00
00
00
00
00
00
00
023
40
T23
8:0
00
00
4545
00
019
00
019
00
00
00
04
680
T24
1:34
00
034
034
00
00
00
00
00
00
00
00
340
T24
2:46
00
046
046
00
00
00
00
00
00
00
00
460
T24
3:25
00
025
025
00
30
00
03
00
00
00
00
280
T25
99:0
00
00
00
00
360
00
036
00
00
00
00
360
T26
1:34
00
034
034
00
00
00
00
00
00
00
00
340
T26
2:42
00
042
042
00
00
00
00
00
00
00
00
420
T27
1:77
00
077
077
00
00
00
00
00
00
00
00
770
T27
2:10
00
010
010
00
00
00
00
00
00
00
00
100
T28
1:0
570
057
057
00
00
00
00
00
00
00
00
570
T28
2:0
380
038
038
00
00
00
00
00
00
00
00
380
T29
1:0
600
060
060
00
00
00
00
00
00
00
00
600
T29
2:57
00
057
057
00
00
00
00
00
00
00
00
570
T30
99:84
00
084
084
00
760
00
076
016
00
00
160
176
0T3
11:
00
00
00
00
00
00
00
00
340
00
034
034
0T3
12:
890
00
890
894
500
30
00
570
20
00
02
014
90
T31
3:9
00
09
09
00
00
00
00
00
00
00
00
90
T32
99:0
00
00
00
177
00
00
078
02
00
00
20
810
T33
99:84
02
087
087
00
00
00
00
00
00
00
00
870
T34
99:10
50
00
105
010
50
00
00
00
00
00
00
00
010
50
T35
1:0
420
042
042
00
00
00
00
00
00
00
00
420
T35
2:17
00
017
017
00
00
00
00
00
00
00
00
170
T35
3:6
00
06
06
00
00
00
00
00
00
00
00
60
T36
99:75
730
014
80
148
00
00
00
00
00
00
00
00
148
0T3
799:
00
00
00
00
630
08
00
711
40
00
05
077
0T3
81:
780
00
780
780
00
00
00
00
00
00
00
079
0
Pag
e 2
of 4
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
T38
2:31
00
031
031
00
00
00
00
00
00
00
00
310
T39
99:12
00
012
012
30
370
00
041
00
00
00
00
520
T40
1,3
:0
680
068
068
00
00
00
00
00
00
00
00
680
T40
2:29
00
029
029
00
00
00
00
00
00
00
00
290
T40
4:0
340
034
034
00
00
00
00
00
00
00
00
340
T41
99:14
10
00
141
014
10
036
00
00
360
10
00
01
117
90
T42
99:12
80
00
128
012
80
00
00
00
00
00
00
00
012
80
T43
99:0
00
00
00
10
260
970
012
40
30
00
03
012
70
T44
99:0
00
00
00
00
102
00
00
102
014
00
00
140
117
0T4
599:
00
00
00
00
390
00
00
390
00
00
00
039
0TA
B99:
00
00
063
6322
524
00
00
054
50
00
00
00
060
90
TC99:
00
00
023
2310
8432
00
00
125
00
00
00
00
149
0TD
1-4
:14
20
00
142
014
20
00
00
00
00
00
00
00
014
20
TD5:
230
00
230
230
00
00
00
00
00
00
00
023
0TE
1-3
:91
00
091
091
00
00
00
00
00
00
00
00
910
TE4:
290
00
290
290
00
00
00
00
00
00
00
029
0TE
5:22
00
022
022
00
50
00
05
30
20
00
40
320
TE6:
00
00
016
160
00
00
00
00
00
00
00
016
0TF
1:37
00
037
037
00
00
00
00
00
00
00
00
370
TF2:
360
00
360
360
02
00
00
20
00
00
00
038
0TF
3:0
00
00
00
00
130
00
013
00
00
00
00
130
TG99:
00
00
00
015
172
00
00
018
70
00
00
00
018
70
TH99:
00
00
00
02
185
00
00
018
70
280
00
028
021
50
P1
99:23
20
00
232
723
91
056
00
00
570
00
00
00
029
60
P1A
1,3
:21
70
00
217
021
70
017
00
00
170
00
00
00
023
40
P1A
4:79
05
084
084
00
00
00
00
00
00
00
00
840
P1B
99:14
90
00
149
014
90
00
00
00
00
00
00
00
014
90
P2
99:0
00
162
162
016
20
1922
40
00
440
00
00
00
020
60
P3
99:15
90
00
159
015
90
00
00
00
00
00
00
00
015
90
P4
99:81
00
081
081
041
00
00
041
00
00
00
00
122
0P
599:
105
00
010
50
105
00
370
00
037
00
00
00
00
142
0P
61:
130
00
013
00
130
00
00
00
00
00
00
00
00
130
0P
62:
174
09
018
30
183
00
00
00
00
00
00
00
00
183
0P
799:
180
046
022
70
227
10
440
00
045
00
00
00
00
272
0P
7A1:
630
00
631
650
029
00
00
290
00
00
00
093
0P
7A2:
00
650
650
650
07
00
00
70
00
00
00
072
0P
7A3:
530
00
530
531
044
00
00
450
00
00
00
098
0P
7A4:
320
00
320
321
021
00
00
210
00
00
00
053
0P
899:
109
00
010
90
109
00
00
00
00
00
00
00
00
109
0
Pag
e 3
of 4
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
P9
1:30
00
030
030
00
00
00
00
00
00
00
00
300
P9
2:11
60
00
116
011
60
00
00
00
00
00
00
00
011
60
P10
1:86
00
086
086
00
10
00
01
00
00
00
00
880
P10
2:0
035
20
352
035
20
011
00
00
110
00
00
00
036
30
P11
1-2
:14
10
00
141
014
10
020
00
00
200
00
00
00
016
10
P11
3:14
90
00
149
014
90
00
00
00
00
00
00
00
015
00
P11
4:11
90
00
119
011
90
00
00
00
00
30
00
03
012
30
P12
99:55
00
055
055
00
270
00
027
00
00
00
00
820
5735
162
619
570
87TO
TALS
2001
3410
50
05
110
02
163
853
00
3170
8672
4930
7910
476
117
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
othe
r unm
anag
ed a
reas
.
0
Pag
e 4
of 4
UN
IT W
OR
K P
LAN
2006
7SA
CR
efug
eYe
ar:
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
CAN
ALS9
91
1:
Inst
all l
arge
r pip
e on
35-
1C o
n P
olel
ine
Rd.
@ T
27
Do
patc
h w
ork
@ li
ft pu
mp
@ 3
5-1C
Cle
an 3
-way
ditc
h so
uth
to P
3 in
let
Spr
ay d
itch
to P
1A a
nd P
2 fro
m d
am 1
Y Y* * * *
Spra
y R
odeo
2R
educ
e pr
imro
se
26.2
991
1:
Add
30"
out
let t
o re
lieve
pre
ssur
e du
ring
a bl
owou
t (T2
1/T2
4)
Mow
/dis
k w
est b
ank
(sna
ke is
sues
)
Add
3 S
G to
del
iver
y tu
rnou
ts to
repl
ace
boar
d st
ruct
ures
Con
trol p
arro
ts fe
athe
r, pr
imro
se a
nd tr
im tr
ees
Spo
t rep
air w
est r
oad
of T
11.5
, T12
, T19
and
T24
Gra
vel e
ast l
evee
Cle
an u
p di
rt fro
m d
itch
clea
ning
(dis
k or
rem
ove)
Eva
luat
e re
lief v
alve
@ T
27
Fix
beav
er h
uts
by T
24.1
and
T19
.1
Eva
luat
e er
osio
n pr
oble
m @
35-
1C
Y* * * * * * * * * *
Spra
y R
odeo
Spr
ay R
odeo
2 2
Con
trol p
arro
ts
feat
her
Con
trol p
rimro
se
T11-
40
10/1
/200
61
:M
ow c
ockl
bur p
rior t
o se
ed-s
et
Cle
an d
itch
of p
rimro
se a
nd m
aint
ain
with
Rod
eo
Cha
nnel
from
inle
t to
SFM
Rep
air S
E c
orne
r of C
ell 4
Rep
air f
enci
ng o
n th
e no
rth e
nd
Mow
slo
pes
of X
-dik
es fo
r loa
fing
habi
tat
Y
Y
Y
Y Y Y Y
* * * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay R
odeo
15 2R
educ
e co
ckle
bur
Red
uce
prim
rose
T81
18/
15/2
006
1:
Reh
ab x
-dik
es
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Cha
nnel
from
inle
t thr
ough
the
high
gro
und
to S
FM
Sca
ld c
ockl
ebur
Add
out
let i
n ce
ll 3
or p
unch
hol
e in
road
to re
leas
e w
ater
from
sc
aldi
ngK
eep
rock
et n
et p
ad c
lear
of v
eget
atio
n
Y
Y
Y
Y Y Y Y
* * * * * *
04/1
5/20
06Sc
ald
(by
irrig
ate)
Mow
prio
r to
seed
-set
15 15
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
T83
01
:S
pray
pep
perw
eed
with
Tel
ar o
n th
e no
rth e
nd (5
00+
plan
ts)
Con
tinue
spr
ayin
g th
e re
mai
ning
tall
whe
at c
lum
ps w
ith ro
undu
p
Y Y
* *
Spra
y Te
lar
Spr
ay R
ound
-up
0.1
0.1
Red
uce
pepp
erw
eed
Elim
inat
e ta
ll w
heat
gra
ss
Page
1 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T14
31
10/1
/200
61
:S
pot r
epai
r and
ripr
ap N
end
leve
e
Pac
k bo
at ra
mp
in S
E c
orne
r
Rep
lace
and
rip-
rap
inlin
e in
dra
in b
etw
een
T10/
T14.
3
Reh
ab is
land
s an
d ch
anne
ls
Rem
ove
tule
clu
mp
N. o
f pul
l out
Y
Y
Y
Y Y Y Y Y
* * * * *
07/1
5/20
06
T16
11
9/1/
2006
1:
Rep
air h
ole
in d
eliv
ery
ditc
h
Cha
nnel
vie
win
g la
nes
Mow
cat
tails
on
edge
to m
aint
ain
view
ing
lane
s if
nece
ssar
y
Rem
ove
nest
box
es a
nd s
teel
pos
ts
Mow
aro
und
Pol
e lin
e R
d./a
uto
tour
inte
rsec
tion
for t
raffi
c vi
sibi
lity
Mai
ntai
n 2
turn
outs
Spr
ay a
nd c
lean
prim
rose
in d
eliv
ery
ditc
h
Slo
pe X
-dik
e us
ing
dirt
by s
truct
ure
Rep
lace
the
flum
e
Y
YY
Y Y Y Y
* * * * * * * * *
04/1
5/20
06Sp
ray
Rod
eo0.
1R
educ
e pr
imro
se
T16
21
9/15
/200
61
:S
E c
orne
r nee
ds la
nes
disk
ed fo
r airb
oat/b
oat r
amp
acce
ss
Pac
k gr
avel
at b
oat r
amp
in S
E c
orne
r
Spr
ay ta
ll w
heat
on
leve
es
Rep
lace
CM
P o
utle
t w/1
8" C
WS
Y Y* * * *
05/0
1/20
06D
isc
Spr
ay R
ound
-up
0.5
0.1
Red
uce
catta
ils
Red
uce
tall
whe
at
T22
990
10/1
/200
61
:R
epai
r blo
w o
ut
Mai
ntai
n fo
otbr
idge
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g, d
iski
ng)
Rip
rap
outle
t
Rep
air f
lum
e ac
ross
dra
in a
t NE
cor
ner
Y Y* * * * *
04/0
1/20
06
T28
21
9/10
/200
61
:C
hann
el fr
om in
let
Dis
k w
ests
ide
for j
oint
gras
s co
ntro
l
Trim
tree
s al
ong
S. e
nd fo
r roa
d ac
cess
(afte
r roo
kery
fini
shes
)
Rem
ove
stee
l pos
ts in
uni
t on
east
sid
e
Mai
ntai
n 3
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Rem
ove
4 cl
umps
of b
lack
berri
es lo
cate
d in
the
SW
cor
ner
Spo
t rep
air w
here
the
old
CM
P w
as re
mov
ed
Mow
/dis
k 2
isla
nds
for l
oafin
g ha
bita
t
Rem
ove
outle
t and
repl
ace
with
an
18" W
CS
on
east
side
Y
Y
Y Y* * * * * * * * *
04/0
1/20
06D
isc
3 or
mor
e tim
es
Cut
to g
roun
d
Spr
ay G
arlo
n
Irrig
ate
10 0.1
0.1
38
Red
uce
join
tgra
ss
Elim
inat
e bl
ackb
errie
sE
limin
ate
blac
kber
ries
Enh
ance
moi
st
soil
plan
ts
Page
2 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T35
11
9/1/
2006
1:
Inst
all o
utle
t in
NE
cor
ner
Dis
k un
it fo
r joi
ntgr
ass
cont
rol
Mai
ntai
n 3
hunt
ing
loca
tions
(mow
ing/
disk
ing)
; Mow
/dis
k th
e 2
wes
t isl
ands
and
leav
e th
e ea
st is
land
Y
Y
Y
Y Y
* * *
04/1
5/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Irrig
ate
10 42
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
ts
T36
991
9/1/
2006
1:
Add
out
let i
n S
W c
orne
r in
cell
2
Rem
ove
CM
P in
X-d
ike
betw
een
cells
2 a
nd 3
Cut
a c
hann
el fr
om in
let i
n ce
ll 4
to o
utle
t to
aide
in d
rain
age
(join
tgra
ss p
robl
em)
Reh
ab b
linds
- 38
,39
& 4
2
Spr
ay jo
intg
rass
alo
ng th
e hu
nter
acc
ess
to b
lind
38
Con
tinue
dis
king
in c
ell 2
and
dis
k th
e N
W c
orne
r of c
ell 3
for
join
tgra
ss c
ontro
lC
ut a
cha
nnel
from
inle
t in
cell
3 to
out
let t
o ai
de in
dra
inag
e (jo
intg
rass
pro
blem
)
Y
Y
Y Y
* * * * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Irrig
ate
Spr
ay R
ound
up
10 73 2
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
tsR
educ
e jo
intg
rass
T42
992
8/15
/200
61
:R
epla
ce o
utle
t in
N le
vee
Exc
avat
e ar
ound
blin
d 52
and
rem
ove
sect
ions
of l
evee
to th
e ea
st
Inst
all n
ew o
utle
t in
east
leve
e
Ove
r wat
er b
urn
to re
duce
cat
tail
and
tule
. Fol
low
up
with
dis
king
Dis
k/m
ow le
vees
to o
pen
up u
nit;
leav
e 1s
t 100
yar
ds o
n N
. end
to
dis
cour
age
hunt
ers
from
sho
rtcut
ting
(dis
rupt
blin
d 52
)R
ehab
blin
ds 4
6 &
52
Y
Y
Y
Y Y Y
* * * * * *
04/1
5/20
06Bu
rn/d
isc
60R
educ
e ca
ttail
and
tule
P1A
1,3
18/
15/2
006
1:
Rem
ove
CM
P in
cel
l 1 th
at d
umps
into
cre
ek
Rem
ove
and
repl
ace
CM
P in
cel
l 3 th
at d
umps
into
cre
ek
Gra
vel w
alkw
ay to
pho
tobl
ind
Cle
an/s
pray
W. d
itch
of c
1 an
d di
sk N
. end
of C
1 ne
ar in
let
Inst
all b
oat r
amp
in S
E c
orne
r of c
1
Ser
vice
radi
al a
rm g
ates
on
Dam
1
Reh
ab X
-dik
e be
twee
n ce
ll 1
and
cell
3
Tule
tran
spla
nts
@ p
hoto
blin
d
Mow
vie
win
g la
nes
and
turn
outs
Y
Y
Y Y Y
* * * * * * * * *
04/1
5/20
06Sp
ray
Rod
eo1
Con
trol p
rimro
se
Page
3 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P62
010
/1/2
006
1:
Inst
all s
taff
gaug
e in
SW
cor
ner
Dis
k ch
anne
ls/p
otho
les
in S
W c
orne
r (pr
escr
ibed
bur
n la
st y
ear)
Bui
ld is
land
s in
bot
tom
end
Wat
er tu
les
at p
hoto
blin
d
Tule
tran
spla
nts
at p
hoto
blin
d
Gra
vel a
nd p
ack
boat
ram
p in
SW
cor
ner
Fix
the
appr
oach
to g
ate
off N
orm
an R
d. @
SE
cor
ner (
flood
da
mag
e)
Y Y* * * * * * *
05/0
1/20
06
P7A
10
9/15
/200
61
:C
hann
el fr
om in
let t
o S
FM fo
llow
ing
old
chan
nel t
o in
let o
f cel
l 2
Reh
ab b
linds
20,
29
Y
Y* *
04/0
1/20
06
P11
41
10/1
0/20
061
:R
epla
ce c
oncr
ete
outle
t with
6' 3
0" W
CS
with
30'
pip
e
Rem
ove
bam
boo
in n
orth
wes
t cor
ner
Reh
ab e
ast r
oad
Trim
tree
s on
sou
th a
nd e
ast l
evee
s
Rem
ove
palm
tree
s
Rep
lace
bou
ndar
y si
gns
sout
h en
d
Y
Y
Y* * * * * *
04/1
5/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
sS
pray
Gar
lon-
cut s
tum
p
0.1
0.1
0.1
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Elim
inat
e pa
lm
trees
T41
09/
1/20
062
:C
hann
el fr
om in
let
Con
stru
ct b
oat r
amp
in N
E c
orne
r
Rem
ove
pam
pas
gras
s
Spo
t rep
air X
-dik
e be
twee
n ce
lls 1
& 2
Y
Y
Y* * * *
05/0
1/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
Red
uce
pam
pass
gras
sR
educ
e pa
mpa
ssgr
ass
T11
1-2
09/
25/2
006
2:
Pla
nt W
illow
s at
ent
ranc
e ro
ad
Reh
ab is
land
s
Cut
bam
boo
and
spra
y re
-spr
outs
with
roun
d-up
Rem
ove
blac
kber
ries
and
spra
y re
-spr
outs
in d
eliv
ery
ditc
h
Cut
dow
n an
d ga
rlon
the
euca
lypt
us o
n th
e S.
end
nea
r offi
ce
Spr
ay ri
paria
n lo
op w
ith R
ound
up
Gar
lon
euca
lypt
us re
spro
uts
afte
r cut
ting
alon
g cr
eek
(Euc
. R
emov
al p
lan)
Mon
itor w
ood
duck
box
es a
long
ripa
rian
zone
in N
. end
Rem
ove
palm
tree
by
digg
ing
out
Y
Y
Y Y Y Y Y
* * * * * * * * *
04/1
5/20
06D
isc
2 tim
es
Spr
ay G
arlo
n
Spr
ay R
ound
-up
Cut
to g
roun
d
Spr
ay R
odeo
resp
rout
s
Spr
ay G
arlo
n-cu
t stu
mp
Sel
ectiv
e tre
e re
mov
al
2 0.5
0.5
0.5
0.5 1 0.1
Red
uce
catta
ils/tu
les
Elim
inat
e bl
ackb
errie
sW
alki
ng tr
ail
acce
ssE
limin
ate
arun
do
Elim
inat
e ar
undo
Elim
inat
e eu
c's
Rem
ove
palm
tree
Page
4 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T14
10
8/15
/200
62
:S
pray
rem
aini
ng is
olat
ed jo
intg
rass
clu
mps
with
roun
dup
Dis
k jo
intg
rass
and
ope
n up
cat
tails
in th
e N
E c
orne
r
Rem
ove
isla
nd in
fron
t of i
nlet
Add
2 is
land
s
Inst
all b
oat r
amp
in S
E c
orne
r
Rem
ove
red
riser
s
Y
Y
Y Y Y
* * * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Dis
c
Spr
ay R
ound
-up
Irrig
ate
15 15 0.1
33
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
tsR
educ
e jo
intg
rass
Enh
ance
moi
st
soil
plan
ts
T14
20
9/1/
2006
2:
Dis
k jo
intg
rass
on
wes
tsid
e an
d ea
stsi
de a
fter d
raw
dow
n an
d th
en
agai
n af
ter i
rriga
tion
Spr
ay is
olat
ed jo
intg
rass
clu
mps
prio
r to
disk
ing.
Add
gra
vel t
o so
uth
side
turn
out
Add
one
isla
nd in
NW
cor
ner
Mow
eas
t lev
ee fo
r loa
fing
habi
tat
Y
Y
Y Y
* * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Dis
c
Spr
ay R
ound
-up
Irrig
ate
15 15 0.5
38
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
tsR
educ
e jo
intg
rass
Enh
ance
moi
st
soil
plan
ts
T20
991
11/1
/200
62
:R
epla
ce th
e ou
tlet i
nto
drai
n
YY
*04
/15/
2006
T26
10
10/5
/200
62
:M
ow c
ockl
ebur
prio
r to
seed
-set
Reb
uild
loaf
ing
isla
nds
in c
ell 1
Add
gra
vel t
o th
e no
rth e
nd ro
ad
Sca
ld c
ockl
ebur
Y
Y
Y* * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Dis
c A
SA
P a
fter
draw
dow
nIrr
igat
e
Sca
ld (b
y irr
igat
e)
20 34 34 34
Red
uce
cock
lebu
r
Enh
ance
moi
st
soil
plan
tsE
nhan
ce m
oist
so
il pl
ants
Red
uce
cock
lebu
r
T29
21
8/15
/200
62
:D
isk
catta
ils/jo
intg
rass
on
wes
tsid
e in
the
SW
cor
ner
Spr
ay S
W c
orne
r for
join
tgra
ss
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Mak
e 2
isla
nds
north
of b
lind
26 h
alf w
ay b
etw
een
the
blin
d an
d th
e no
rth e
ndR
ehab
blin
d 26
Rep
lace
out
let i
n S
E c
orne
r
Y
Y Y* * * * * *
04/0
1/20
06D
isc
3 or
mor
e tim
es
Mow
prio
r to
seed
-set
Spr
ay R
ound
up
5 3 2
Red
uce
join
tgra
ss
Red
uce
cock
lebu
r
Red
uce
join
tgra
ss
Page
5 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T38
10
9/20
/200
62
:M
onito
r bam
boo/
euca
lypt
us re
mov
al a
nd s
pray
any
re-s
prou
ts
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Cle
an c
hann
el fr
om in
let t
hrou
gh u
plan
ds to
mar
sh
Eva
luat
e ex
cava
ting
arou
nd tu
le c
lum
ps o
n w
ests
ide
to m
aint
ain
open
ings
Spo
t rep
air n
orth
leve
e
Mai
ntai
n 3
open
ings
for h
unte
rs
Kee
p lo
afin
g is
land
s/le
vees
mow
ed o
r dis
ked
Rem
ove
red
riser
Mai
ntai
n di
sabl
ed b
oat r
amp
Y
Y
Y
Y Y Y
* * * * * * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
5 0.1
0.1
Red
uce
cock
lebu
r
Elim
inat
e ar
undo
Elim
inat
e ar
undo
T39
990
10/1
/200
62
:S
pray
tall
whe
at th
roug
hout
(mos
tly o
n th
e w
est s
ide)
Dev
elop
bur
n pl
an
Fix
riser
and
pip
e on
X-d
ike
Inst
all f
lap
gate
on
outle
t
Trim
tree
s on
eas
t sid
e
Dis
k an
d sh
ape
spoi
l fro
m d
itch
clea
ning
Y
Y Y Y
* * * * * *
04/1
5/20
06Sp
ray
Rod
eo
Bur
n
0.5
37C
ontro
l tal
l whe
at
Enh
ance
nat
ive
plan
ts
TD5
010
/1/2
006
2:
Inst
all b
oat r
amp
and
pack
gra
vel i
n S
W c
orne
r
Re-
rock
3-w
ay W
CS
Y
Y* *
04/1
5/20
06
P199
18/
15/2
006
2:
Con
tinue
cha
nnel
wor
k to
out
let
Inst
all s
taff
gaug
e in
SE
corn
er
Reh
ab is
land
in S
W c
orne
r and
rem
ove
veg.
that
blo
cks
view
ing
from
aut
o to
urIn
stal
l inl
et fr
om 2
5.1C
Rem
ove
isol
ated
clu
mps
of t
all w
heat
/per
lagr
ass
by s
pray
ing
with
R
ound
up
Y Y Y
* * * * *
04/1
5/20
06Sp
ray
Rou
nd-u
p0.
1E
limin
ate
tall
whe
at/p
erla
gra
ss
P799
09/
15/2
006
2:
Spr
ay p
eppe
rwee
d w
ith T
elar
in N
E c
orne
r
Spo
t rep
air e
ast a
nd s
outh
leve
e
Rem
ove
old
foot
brid
ge b
y bl
ind
11
Inst
all b
oat r
amp
at S
E c
orne
r
Mow
loaf
ing
isla
nds
arou
nd b
lind
14A
Reh
ab. G
ate
@ p
arki
ng lo
t D
Reh
ab B
linds
9,1
1,12
,13,
14A
,16
Y
Y Y
* * * * * * *
04/0
1/20
06Sp
ray
Tela
r0.
1R
educ
e pe
pper
wee
d
Page
6 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P7A
21
10/1
/200
62
:In
stal
l out
let i
n N
E c
orne
r for
SW
cap
abilit
y
Tule
tran
spla
nts
prio
r to
flood
up
Reh
ab b
linds
21,
34,3
5
Y Y* * *
07/1
5/20
06
P10
10
9/15
/200
62
:S
pray
pep
perw
eed
loca
ted
on X
-dik
e be
twee
n ce
lls 1
and
2
Y
Y
*04
/15/
2006
Spra
y Te
lar
0.2
Red
uce
pepp
erw
eed
P10
22
9/15
/200
62
:R
epla
ce C
MP
in e
ast r
oad
with
a 3
6" W
CS
with
flap
gate
Rep
lace
out
let w
ith a
36"
in th
e S
E c
orne
r with
a fl
ap g
ate
and
rip-
rap
Reh
ab e
ast r
oad
Cle
an d
itch
on s
outh
end
and
use
spo
il to
form
leve
e on
the
N.
side
of t
he d
itch
Reb
uild
isla
nds
and
add
2
Spo
t rep
air n
orth
end
leve
e
Rem
ove
palm
tree
s by
cut
ting
or d
iggi
ng o
ut w
ith th
e ba
ckho
e
Cha
nnel
from
inle
t thr
ough
the
thic
k tu
les/
silt
to o
pen
mar
sh
Mow
slo
pes
of X
-dik
e fo
r wat
erfo
wl l
oafin
g ha
bita
t
Y
Y
Y Y
* * * * * * * * *
07/1
5/20
06Sp
ray
Gar
lon-
cut s
tum
p0.
1E
limin
ate
palm
tre
es
P12
990
10/1
/200
62
:E
valu
ate
and
reha
b in
let d
itch
syst
em
Dis
k ca
ttails
and
mak
e so
me
open
ings
Spr
ay th
e "o
utla
ying
" tal
l whe
at w
ith ro
undu
p
Add
logs
to u
nit f
or tu
rtle
bask
ing
area
s - c
onsi
der l
ocat
ion
in
rela
tion
to e
xpec
ted
futu
re e
quip
men
t ope
ratio
nR
ehab
Blin
d 55
Eva
luat
e fo
r an
irrig
atio
n
YY
Y
Y* * * * * *
04/0
1/20
06Sp
ray
Rou
nd-u
p
Dis
c A
SA
P a
fter
draw
dow
n
0.5 2
Red
uce
tall
whe
at
Red
uce
catta
ils/tu
les
T21-
82
8/15
/200
63
:C
ontin
ue c
hann
el in
cel
l 4 a
nd k
eep
wat
er in
cha
nnel
of c
ell 2
Mow
coc
kleb
ur p
rior t
o se
edse
t
Rep
lace
WC
S fr
om c
ell 2
to c
ell 4
Rep
lace
inle
t to
cell
6
Add
one
isla
nd e
ach
on th
e no
rth e
nds
of c
ells
3, 5
, and
8
Mow
slo
pes
for l
oafin
g an
d di
sk le
vee
in c
ell 6
for l
oafin
g
Cle
an N
. lat
eral
Spr
ay s
tar t
hist
le o
n S
. end
of c
ell 8
Spo
t rep
air t
op a
nd s
lope
of c
ell 8
on
sout
h en
d
Roc
k ou
tlet W
CS
in c
ell 8
YY
YY
Y Y Y Y
* * * * * * * * * *
05/0
1/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay R
ound
-up
20 0.1
Red
uce
cock
lebu
r
Red
uce
star
this
tle
Page
7 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T210
210
/1/2
006
3:
Cha
nnel
out
let t
o th
e di
tch
Rep
lace
out
let a
nd ri
p-ra
p
Inst
all s
traig
ht p
ipe
in N
W c
orne
r (w
ater
nee
ds to
dra
in o
ff th
e up
land
)R
epai
r rut
s on
nor
th e
nd
Mow
slo
pes
for l
oafin
g ha
bita
t
Bui
ld b
oat r
amp
and
chan
nel f
rom
ram
p to
cha
nnel
on
wes
t sid
e
Y
Y
Y Y Y
* * * * * *
07/1
5/20
06
T10
31
8/15
/200
63
:S
pray
join
tgra
ss in
nor
th e
nd a
nd fo
llow
up
with
dis
king
Con
stru
ct t
wo
isla
nds
Mow
cen
ter X
-dik
e fo
r loa
fing
Inst
all o
utle
t
Reh
ab is
land
s
Y
Y
Y
Y* * * * *
04/1
5/20
06Sp
ray
Rou
nd-u
p
Irrig
ate
Dis
c A
SA
P a
fter
draw
dow
n
3 56 20
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
tsR
educ
e jo
intg
rass
T10
40
8/15
/200
63
:W
est s
ide
need
s he
avy
disk
ing
on c
atta
ils/jo
intg
rass
Gra
vel a
nd c
ompa
ct b
oat r
amp
in S
E c
orne
r
Reh
ab is
land
s
Mow
X-d
ike
for l
oafin
g
Rep
air l
ow a
reas
in s
outh
eas
t cor
ner l
evee
s
Rem
ove
old
pipe
on
east
side
Rep
air l
ow a
rea
on e
ast s
ide
@ o
ld o
utle
t site
Eva
luat
e di
tchi
ng fr
om in
let (
from
T10
.1) t
o ou
tlet,
givi
ng u
s SW
ca
pabi
lity
for T
10.1
Y
Y
Y
Y Y Y
* * * * * * * *
04/1
5/20
06D
isc
3 or
mor
e tim
es
Irrig
ate
20 71
Red
uce
Ber
mud
a/jo
intg
ras
s Enh
ance
moi
st
soil
plan
ts
T11
40
10/1
/200
63
:R
emov
e bl
ackb
errie
s an
d sp
ray
re-s
prou
ts
Cha
nnel
and
pot
hole
wor
k
Ope
n up
pon
ds a
roun
d of
fice
Rep
lace
pip
e an
d ris
er in
dra
in (L
ogan
cre
ek)
Mai
ntai
n vi
ewin
g la
nes
Reh
ab is
land
s
Cut
bam
boo
and
spra
y re
spro
uts
Bur
y eu
caly
ptus
stu
mps
in le
vel s
lope
Y Y Y Y Y Y
* * * * * * * *
05/0
1/20
06C
ut to
gro
und
Spr
ay s
talk
er
0.1
0.1
Red
uce
arun
do
Red
uce
arun
do
T18
991
10/1
/200
63
:M
ove
spoi
l bac
k on
road
and
dis
k
Rep
lace
out
let (
T18/
P4)
with
con
cret
e W
CS
30" w
/ 20'
pol
y pi
pe
Inst
all b
oat r
amp
SE c
orne
r dur
ing
dike
pro
ject
Y Y* * *
04/1
5/20
06
Page
8 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T19
21
10/1
5/20
063
:M
ow n
ew X
-dik
es
Rep
lace
CM
P o
utle
t with
18"
CW
S w
ith 4
0' o
f pip
e
Reb
uild
eas
t lev
ee
YY
Y Y* * *
04/1
5/20
06
T24
10
9/15
/200
63
:R
epai
r nor
th ro
ad
Dis
k op
enin
gs in
cat
tails
and
dis
k/m
ow th
e 2
isla
nds
for l
oafin
g ha
bita
tM
aint
ain
hunt
ing
loca
tions
(mow
ing,
dis
king
)
Spo
t rep
air X
-dik
e be
twee
n ce
ll 1
& 2
Y
YY
Y* * * *
04/0
1/20
06D
isc
1R
educ
e ca
ttails
/tule
s
T28
11
9/15
/200
63
:M
ow/d
isk
rem
aini
ng jo
intg
rass
Reh
ab e
ast d
ike
Rep
lace
CM
P in
let w
ith c
oncr
ete
WC
S
Mai
ntai
n 3
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Spo
t rep
air N
. roa
d
Mow
or d
isk
the
2 is
land
s fo
r loa
fing
habi
tat
Y
Y
Y Y* * * * * *
04/1
5/20
06D
isc
3 or
mor
e tim
es10
Red
uce
join
tgra
ss
T40
1,3
08/
15/2
006
3:
Dis
k jo
intg
rass
on
wes
t sid
e of
cel
l 1 a
nd c
ell 3
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g). T
here
is o
ne is
land
in
the
mid
dle
of e
ach
cell
surro
unde
d by
tule
sB
uild
loaf
ing
isla
nds
(one
mor
e in
eac
h ce
ll) o
n th
e w
est s
ide
Pla
nt tr
ees
in o
ld d
eliv
ery
ditc
h al
ong
W. s
ide
Spr
ay is
olat
ed c
lum
ps o
f joi
ntgr
ass
in c
ell 1
with
Rou
ndup
Rem
ove
all o
ld C
MP
in d
eliv
ery
ditc
h
Eva
luat
e re
sults
from
spr
ayin
g jo
intg
rass
with
roun
dup
Y
Y
Y Y
* * * * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Irrig
ate
Spr
ay R
ound
up
20 68 2
Red
uce
Ber
mud
a/jo
intg
ras
s Enh
ance
moi
st
soil
plan
tsR
educ
e jo
intg
rass
TC99
03
:Fi
x le
ak o
n N
end
of u
nit
Res
tore
nat
ural
hyd
rolo
gy to
uni
t (S
ee P
lan)
Y* *
Burn
115
Enh
ance
nat
ive
plan
ts
TE5
010
/1/2
006
3:
Add
flap
gate
to o
utle
t
YY
*05
/15/
2006
TE6
13
:A
dd o
utle
t with
flap
gate
in s
outh
eas
t cor
ner
Mak
e 4
isla
nds
Eva
luat
e ho
w w
ater
is g
ettin
g in
to th
e un
it (w
ater
sub
bing
or t
he
ditc
h go
t too
hig
h)
Y Y Y
* * *
Page
9 o
f 21
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P61
19/
15/2
006
3:
Inst
all s
taff
gaug
e
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Rep
lace
out
let i
n S
E co
rner
to L
ogan
Cr
Reh
ab X
-dik
e be
twee
n ce
lls 1
and
2
Rem
ove
palm
tree
s
Add
gra
vel f
or a
cces
s to
pho
to b
lind
Rip
rap
outle
t bet
wee
n ce
ll1 a
nd c
ell 2
Y
Y
Y Y* * * * * * *
05/0
1/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay G
arlo
n-cu
t stu
mp
15 0.1
Red
uce
cock
lebu
r
Rem
ove
palm
tree
T43
09/
15/2
006
4:
Tule
tran
spla
nts
arou
nd is
land
s an
d fe
nce
Brin
g un
it do
wn
on 4
/1. A
fter c
ockl
ebur
is g
erm
inat
ed a
nd tu
les
are
plan
ted
put w
ater
bac
k on
to s
cald
coc
kleb
urD
isk
E. p
erim
eter
and
N. l
evee
Mov
e "A
rea
clos
ed" s
ign
tow
ard
fenc
e (7
' nor
th o
f fen
ce) a
nd a
dd
sign
at e
qual
dis
tanc
e to
the
othe
r sid
e of
road
Reh
ab. s
outh
dik
e
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Y
Y
Y Y* * * * * *
07/1
5/20
06Sc
ald
(by
irrig
ate)
Mow
prio
r to
seed
-set
15 15
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
T92
18/
15/2
006
4:
Mow
coc
kleb
ur p
rior t
o se
ed-s
et in
sou
th e
nd
Reh
ab X
-dik
es
Cha
nnel
from
inle
t to
SFM
Dis
k X-
dike
s fo
r loa
fing
habi
tat
Rep
lace
inlin
e at
the
T9/T
10 in
let
Rep
air i
nlet
(pip
e se
para
ted)
Y
Y
Y Y Y
* * * * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et8
Red
uce
cock
lebu
r
T15
21
9/1/
2006
4:
Rep
lace
CM
P u
nder
Pol
elin
e
Spo
t rep
air X
-dik
es
Spo
t rep
air s
outh
road
eas
t of p
ole
line
road
Mow
X-d
ike
tops
and
eas
tsid
e on
ly
Gra
vel a
nd c
ompa
ct b
oatra
mp
Mow
coc
kleb
ur p
rior t
o se
ed s
et
Mow
coc
kleb
ur a
roun
d tre
es
Y
Y
Y* * * * * * *
05/0
1/20
06M
ow p
rior t
o se
ed-s
et5
Red
uce
cock
lebu
r
T21
990
9/1/
2006
4:
Cha
nnel
from
inle
t to
SFM
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g, d
iski
ng)
Y* *
04/0
1/20
06
Page
10
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T23
1-7
18/
15/2
006
4:
Rep
air r
iser
in c
ell 4
into
cel
l 7
Spr
ay p
eppe
rwee
d ar
ound
blin
d 5
with
tela
r
Rep
lace
inlin
e in
N L
ater
al a
t ent
ranc
e to
Che
ck S
tatio
n R
oad
w/4
0" x
30"
CW
SD
isc
cells
4-6
leav
e a
buffe
r stri
p of
cat
tails
/tule
s al
ong
the
north
en
dC
ut c
hann
el fo
r boa
t ram
p in
SW
cor
ner o
f c7
Spr
ay a
cces
s ro
ad (t
o bl
ind
5D);
Reh
ab b
linds
-1,
2,4,
5D,6
,7,8
,14,
15;
Cut
and
spr
ay b
ambo
o (b
lind
1) w
ith ro
und-
up
Spr
ay is
olat
ed ta
ll w
heat
gra
ss g
oing
to b
lind
5D
Eva
luat
e re
mov
ing
X-di
ke b
etw
een
cells
5 &
6
Spo
t rep
air s
outh
road
and
dis
k an
d sh
ape
north
road
YY
Y
Y Y
* * * * * * * * * *
04/1
5/20
06Sp
ray
Tela
r
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sD
isc
Spr
ay R
ound
-up
0.1
0.1
0.1
0.5
0.1
Elim
inat
e pe
pper
wee
dE
limin
ate
arun
do
Elim
inat
e ar
undo
Red
uce
catta
ils/tu
les
Red
uce
non-
nativ
e gr
ass
T24
30
10/5
/200
64
:R
emov
e sl
ed in
SW
cor
ner
Reb
uild
isla
nds
and
add
1 in
NE
cor
ner
Add
fill
and
ripra
p ar
ound
out
let
Reh
ab s
outh
isla
nd a
nd a
dd e
ast i
slan
d
* * * *
04/1
5/20
06
T30
991
8/15
/200
64
:In
stal
l sta
ff gu
age
Rep
lace
CM
P o
utle
t und
er P
olel
ine
Rd
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
Rem
ove
3 cl
umps
of b
lack
berri
es lo
cate
d on
the
north
end
Spr
ay ta
ll w
heat
thro
ugho
ut
Fix
ruts
in s
outh
end
road
Y
Y
Y Y* * * * * *
04/1
5/20
06Sp
ray
Rou
nd-u
p
Cut
to g
roun
d
Spr
ay G
arlo
n
1 0.1
0.1
Con
trol t
all w
heat
Elim
inat
e bl
ackb
errie
sE
limin
ate
blac
kber
ries
T43
991
4:
Spr
ay ta
ll w
heat
(tar
get t
he o
utlie
rs fi
rst)
Reh
ab d
eliv
ery
ditc
h to
P12
Rep
lace
CM
P ri
ser i
n S
W c
orne
r with
a 1
8"
Rem
ove
blac
kber
ries
on s
outh
end
Rem
ove
pile
of w
ire a
nd p
osts
in S
W c
orne
r
Bur
n un
it fo
r tal
l whe
at c
ontro
l (ne
ed to
bur
n of
f veg
. to
be a
ble
to
get a
spr
ay ri
g in
)
Y Y Y
* * * * * *
Spra
y R
ound
-up
Bur
n
50 50
Con
trol t
all w
heat
Con
trol t
all w
heat
Page
11
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
TAB
990
4:
Elim
inat
e ar
undo
in S
W c
orne
r by
cutti
ng a
nd s
pray
ing
Res
tore
nat
ural
hyd
rolo
gy to
Gam
e W
arde
n La
ke a
nd o
ther
af
fect
ed a
reas
(See
Pla
n)C
lean
sou
th d
itch,
rebu
ild w
est l
evee
alo
ng L
ogan
cre
ek a
nd
rebu
ild e
ast l
evee
alo
ng d
rain
(See
Pla
n)R
emov
e fir
e bo
xes
Y* * * *
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
Elim
inat
e ar
undo
Elim
inat
e ar
undo
P1B
992
9/10
/200
64
:R
ehab
. isl
ands
and
add
3 is
land
s (a
cros
s th
e n.
end
)
Rep
lace
eas
t out
let i
n so
uth
leve
e
Rep
lace
wes
t out
let i
n so
uth
leve
e w
/24"
x40'
CW
S
Y
Y
Y
* * *
04/0
1/20
06
P399
09/
1/20
064
:B
urn
low
er h
alf f
or jo
intg
rass
/ber
mud
a co
ntro
l
Fix
low
spo
t @ o
utle
t on
sout
h en
d
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Rem
ove
palm
tree
in N
E c
orne
r
Cut
cha
nnel
s N
E fr
om S
E o
utle
t fro
m P
1B
Con
stru
ct is
land
s on
sou
th e
nd
Dis
k tu
les
in N
W c
orne
r for
vie
win
g
Y
Y
Y Y* * * * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay G
arlo
n-cu
t stu
mp
Bur
n/di
sc
Dis
c 3
or m
ore
times
5 0.1
70 1.5
Red
uce
cock
lebu
r
Elim
inat
e pa
lm
tree
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
tule
s
P92
09/
1/20
064
:C
lean
ditc
h on
sou
th e
nd a
nd p
ut s
poil
on n
orth
ban
k
Con
stru
ct b
oat r
amp
in S
E c
orne
r
Low
er lo
afin
g is
land
in s
outh
end
to ju
st u
nder
neat
h th
e w
ater
line
Reh
ab b
linds
40,
41,4
3,49
Y
Y* * * *
04/1
5/20
06
T211
15
:R
emov
e ba
mbo
o by
cut
ting
and
spra
ying
re-s
prou
ts w
ith ro
undu
p
Rem
ove
palm
tree
s by
cut
ting
and
digg
ing
out s
tum
ps o
r pai
ntin
g w
ith g
arlo
nR
emov
e pi
le o
f pos
ts o
n th
e no
rth e
nd
Cha
nnel
out
let f
low
from
cel
l 8 in
to d
itch
Rep
lace
the
flum
e
Y Y Y
* * * * *
Spra
y G
arlo
n-cu
t stu
mp
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
0.1
Elim
inat
e pa
lm
tree
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Page
12
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T6/7
990
8/1/
2006
5:
Mow
X-d
ikes
Kee
p di
skin
g in
cel
l 1
Kee
p ro
cket
net
pad
cle
ar
Will
ow tr
ansp
lant
s in
NE
cor
ner
Rem
ove
bam
boo
and
spra
y re
-spr
outs
with
roun
dup
Trim
tree
s al
ong
N. d
ike
Rem
ove
old
red
riser
s
Low
er is
land
in N
E co
rner
and
mak
e is
land
sou
th o
f tul
e cl
ump
(see
Den
ise
for l
ocat
ion)
YY
Y
Y
* * * * * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay R
ound
up
resp
rout
sC
ut to
gro
und
Dis
c A
SA
P a
ft.
draw
dow
n
5 0.2
0.2 2
Red
uce
cock
lebu
r
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Red
uce
Ber
mud
a/jo
intg
ras
s
T13
990
5:
Cle
an o
ut p
ipe
unde
rnea
th p
olel
ine
(T8.
3/T1
3)
Cap
the
wel
l at S
E co
rner
Rem
ove
salt
ceda
r, pa
lm tr
ees
and
euca
lypt
us
Spr
ay re
mai
ning
tall
whe
at a
nd p
erla
gra
ss a
long
eas
t sid
e an
d ar
ound
car
pent
er s
hop
Pla
nt w
illow
s on
wes
t sid
e al
ong
cree
k fo
r scr
een
for w
alki
ng tr
ail
Spr
ay A
rund
o
Y Y Y Y
* * * * * *
Spra
y R
ound
-up
Spr
ay G
arlo
n-cu
t stu
mp
Spr
ay G
arlo
n-cu
t stu
mp
Spr
ay G
arlo
n-cu
t stu
mp
Cut
to g
roun
d
Spr
ay G
arlo
n
0.5
0.1
0.1
0.1
0.1
0.1
Elim
inat
e ta
ll w
heat
and
Per
la
gras
sE
limin
ate
euc'
s
Elim
inat
e pa
lm
trees
Elim
inat
e sa
lt ce
dar
Rem
ove
Aru
ndo
Rem
ove
Aru
ndo
T26
20
10/1
/200
65
:M
ow c
ockl
ebur
prio
r to
seed
-set
Spr
ay p
unct
ure
vine
at d
isab
led
pullo
ut
Reh
ab b
lind
23D
Red
uce
isla
nd to
the
north
of 2
3D b
lind
(take
dow
n be
low
the
wat
er le
vel)
Add
2 is
land
s on
wes
tsid
e
Y
Y Y* * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Dis
c 2
times
Spr
ay R
ound
up
15 15 0.1
Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s Elim
inat
e pu
nctu
re v
ine
TE4
09/
20/2
006
5:
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Reh
ab is
land
s
Ope
n up
isla
nd o
f tre
es fo
r a m
ower
Cut
and
spr
ay a
rund
o al
ong
east
side
Y
YY
* * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sS
elec
tive
tree
rem
oval
5 0.5
0.5
0.5
Red
uce
cock
lebu
r
Elim
inat
e A
rund
o
Elim
inat
e A
rund
o
Ope
n up
to g
et
equi
p. in
Page
13
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
TF1
09/
15/2
006
5:
Cha
nnel
from
inle
t to
mar
sh
Dis
k op
enin
gs in
cat
tails
Trim
tree
s al
ong
W. p
erim
eter
for r
oad
acce
ss
Cut
bam
boo
and
spra
y re
-spr
outs
with
roun
d-up
Eva
luat
e pu
tting
in a
X-d
ike
on N
. end
for b
ette
r wat
er
man
agem
ent
Y
Y
Y* * * * *
04/0
1/20
06D
isc
2 tim
es
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
3 0.1
0.1
Red
uce
catta
ils/tu
les
Elim
inat
e ar
undo
Elim
inat
e ar
undo
TH99
05
:C
ome
up w
ith a
pla
n to
fix
the
unm
anag
ed fl
oodi
ng p
robl
ems
Eva
luat
e re
-wor
king
the
east
ban
k of
Log
an c
reek
Rem
ove
palm
tree
s
Rep
lace
flap
gat
e on
out
let p
ipe
goin
g in
to L
ogan
Cr.
With
an
impr
oved
ver
sion
Cle
an o
ut o
utle
t
Bur
n
* * * * * *
Burn
Spr
ay G
arlo
n-cu
t stu
mp
214
0.1
Enh
ance
nat
ive
plan
tsE
limin
ate
palm
tre
es
P599
19/
15/2
006
5:
Rep
lace
sou
th e
ast C
MP
into
P6.
2
Gra
vel a
nd p
ack
boat
ram
p
Rai
se s
outh
per
imet
er d
ike
Spo
t rep
air w
est l
evee
Y Y* * * *
05/0
1/20
06
P11
31
9/15
/200
65
:P
ut in
out
let i
n S
E c
orne
r to
bypa
ss c
ell 4
(che
ck e
leva
tion
drop
)
Rep
lace
bou
ndar
y si
gns
sout
h en
d
Trim
tree
s al
ong
the
sout
h en
d
Y
Y
* * *
04/1
5/20
06Se
lect
ive
tree
rem
oval
0.5
Kee
ping
the
road
s cl
ear
T399
010
/1/2
006
6:
Cha
nnel
out
let f
low
to L
ogan
Cr.
Spo
t rep
air r
uts
on n
orth
end
of X
-dik
e be
twee
n ce
ll 1
and
2
Mak
e br
idge
ATV
acc
essi
ble
Pla
nt tu
les
& w
illow
s al
ong
N. b
ound
ary
Con
stru
ct b
oat r
amp
in c
ell 3
Rem
ove
palm
tree
s/ba
mbo
o
Sca
ld c
ockl
ebur
(als
o co
nsid
er m
owin
g) in
cel
l 1 a
nd p
unch
hol
e in
to T
2.10
to re
leas
e w
ater
Rep
air e
rosi
on a
t sip
hon
at L
ogan
cre
ek in
NE
cor
ner o
f T3
Rem
ove
wire
stru
ctur
e in
sou
th e
nd o
f cel
l 3
Y
Y
Y Y* * * * * * * * *
05/0
1/20
06Sc
ald
(by
irrig
ate)
Mow
prio
r to
seed
-set
Spr
ay R
ound
up
resp
rout
sC
ut to
gro
und
Spr
ay G
arlo
n-cu
t stu
mp
22 10 0.1
0.1
0.1
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Red
uce
palm
tre
es
Page
14
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T42
09/
7/20
066
:S
cald
coc
kleb
ur
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Dis
k so
uth
leve
e an
d w
est s
ide
of e
ast l
evee
Eva
luat
e ch
anne
l wor
k
Y
YY
Y Y* * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Sca
ld (b
y irr
igat
e)
30 51R
educ
e co
ckle
bur
Red
uce
cock
lebu
r
T52
08/
25/2
006
6:
Spo
t rep
air e
ast a
nd n
orth
leve
e
Mai
ntai
n vi
ewin
g la
nes
Add
two
isla
nds
(one
on
sout
h en
d fo
r vie
win
g an
d on
e on
nor
th
end
mid
dle)
Y
Y* * *
04/1
5/20
06
T33
990
8/1/
2006
6:
Dis
k ch
ecks
and
ope
n up
lane
s pr
ior t
o flo
odup
Inst
all b
oat r
amp
in S
E c
orne
r
Reh
ab b
lind
37. O
pen
up to
wes
t and
nor
th b
y m
owin
g or
dis
king
Mow
or d
isk
isla
nd to
the
NW
for l
oafin
g ha
bita
t
Y
Y
Y
* * * *
04/1
5/20
06
T34
990
9/1/
2006
6:
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Trim
tree
s al
ong
26.2
Spo
t rep
air e
asts
ide
leve
e
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
Dis
k lo
afin
g le
vees
in e
ach
cell
Cha
nnel
inle
t to
SFM
in c
ell 1
Spo
t rep
air s
outh
road
Spo
t cle
an d
itch
north
of c
ell 1
Y
Y
Y
Y* * * * * * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et20
Red
uce
cock
lebu
r
T38
20
8/15
/200
66
:C
lean
ditc
h on
nor
th e
nd
Trim
tree
s
Cha
nnel
from
the
inle
t to
mar
sh
Y
Y
Y* * *
04/0
1/20
06
T40
20
9/1/
2006
6:
Spr
ay b
erm
uda/
join
tgra
ss
Eva
luat
e fo
r a b
urn
(ber
mud
a pr
oble
ms)
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Mai
ntai
n hu
ntin
g lo
catio
n by
mow
ing/
disk
ing
arou
nd is
land
in
cent
erS
pot r
epai
r X-d
ike
betw
een
cells
2 a
nd 4
Y
Y
* * * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay R
ound
up
8 2
Red
uce
cock
lebu
r
Red
uce
berm
uda/
join
tgra
ss
Page
15
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
TD1-
43
8/15
/200
66
:O
pen
up th
ick
area
s w
ith a
dis
k
Rep
lace
3 W
CS
in X
-dik
es
Spr
ay p
rimro
se in
N. d
eliv
ery
ditc
h
Bui
ld u
p ro
ad in
SW
cor
ner o
f cel
l 4
Eva
luat
e ve
g. c
omp
afte
r dra
wdo
wn
for p
ossi
ble
wat
ergr
ass
man
agem
ent
Rip
-rap
25-1
C
Y
Y* * * * * *
04/0
1/20
06Sp
ray
Rod
eo
Dis
c A
SA
P a
fter
draw
dow
nD
isc
AS
AP
afte
r dr
awdo
wn
0.5
15 8
Red
uce
prim
rose
Enh
ance
moi
st
soil
plan
tsR
educ
e ca
ttails
/tule
s
TG99
06
:W
ork
with
land
ow
ners
to e
ast t
o re
mov
e/re
pair
WC
S th
at is
dr
aini
ng w
ater
into
eas
t sid
e &
cau
sing
veg
. pro
blem
sE
valu
ate
leve
e sp
ot re
pair/
rein
forc
emen
t to
prev
ent f
lood
up a
long
Lo
gan
cree
kE
valu
ate
hydr
olog
y
Res
tore
larg
e ve
rnal
poo
l at W
. bou
ndar
y - r
esto
re h
ydro
logy
&
burn
out
alk
ali b
ulru
shP
lann
ed b
urn
- 216
ac u
plan
d to
enh
ance
gra
ssla
nd/n
ativ
e pl
ants
Rep
lace
fenc
e al
ong
Nor
man
Rd.
Y* * * * * *
Burn
187
Enh
ance
nat
ive
plan
ts
P1A
40
9/15
/200
66
:Tr
im tr
ees
bloc
king
vie
win
g in
to P
3 an
d P
1B
Mai
ntai
n is
land
s an
d vi
ewin
g la
nes
Mow
turn
outs
Inst
all b
oat r
amp
NE
cor
ner
YY
Y
Y* * * *
05/0
1/20
06
P499
010
/1/2
006
6:
Rem
ove
old
pipe
in S
E c
orne
r
Sch
edul
e re
plac
emen
t of s
ipho
n to
T23
Inst
all a
boa
tram
p in
SE
cor
ner
Rai
se s
outh
per
imet
er d
ike
Add
isla
nds
tow
ards
the
mid
dle
and
east
sid
e (s
tay
away
from
the
feat
her e
dges
on
wes
t sid
e)
* * * * *
04/1
5/20
06
P91
09/
1/20
066
:C
onst
ruct
cha
nnel
s to
dis
tribu
te m
ore
wat
er to
sou
th e
nd o
f uni
t (p
oten
tial N
AW
CA
proj
ect)
Reh
ab b
lind
40A
Y
Y
* *
04/1
5/20
06
T51
010
/15/
2006
7:
Rem
ove
bam
boo/
palm
tree
s al
ong
north
end
Reh
ab is
land
s an
d ad
d ad
ditio
nal i
slan
d on
eas
t por
tion
Y* *
04/1
5/20
06Bu
rn
Cut
to g
roun
d
Spr
ay S
talk
erS
pray
Gar
lon-
cut s
tum
p
142
0.1
0.1
0.1
Enh
ance
nat
ive
plan
tsE
limin
ate
arun
do
Elim
inat
e ar
undo
Elim
inat
e pa
lm
trees
Page
16
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T10
10
8/15
/200
67
:S
pray
pep
perw
eed
with
tela
r on
sout
h en
d
Kee
p vi
ewin
g la
nes
open
by
disk
ing
or m
owin
g
Con
tinue
dis
king
the
join
tgra
ss in
the
sout
h en
d
Reh
ab is
land
s
YY
YY
Y Y
* * * *
04/1
5/20
06Sp
ray
Tela
r
Dis
c 3
or m
ore
times
0.1
15
Red
uce
pepp
erw
eed
Red
uce
Ber
mud
a/jo
intg
ras
s
T11
30
10/1
/200
67
:R
ehab
isla
nds
Cut
bam
boo
and
spra
y re
-spr
outs
with
roun
d-up
alo
ng th
e 26
.2
and
wes
t sid
e of
cel
l 3R
emov
e bl
ackb
errie
s an
d sp
ray
with
roun
d-up
(kio
sk,m
iddl
e of
se
cond
pon
d W
. of o
ffice
and
the
wes
t sid
e of
cel
l 3)
Bur
y eu
caly
ptus
stu
mps
in le
vel s
lope
Put
logs
in fo
r loa
fing
bird
s (u
se lo
gs fr
om e
ucal
yptu
s re
mov
al
proj
ect)
Mai
ntai
n vi
ewin
g la
nes
Rem
ove
outle
t fro
m c
ell 3
to c
ell 4
Y
Y
Y
Y Y Y
* * * * * * *
07/1
5/20
06C
ut to
gro
und
Spr
ay G
arlo
n
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sS
pray
Gar
lon-
cut s
tum
p
0.1
0.1
0.5
0.5
0.5
Bla
ckbe
rries
Bla
ckbe
rries
Aru
ndo
Aru
ndo
Elim
inat
e eu
c's
T12
21
7/15
/200
67
:R
epla
ce S
G in
let
Con
stuc
t isl
ands
(Sou
th e
nd)
Eva
luat
e ha
bita
t im
prov
emen
t pot
entia
l sou
th o
f out
let (
betw
een
man
aged
wet
land
and
cre
ek)
* * *
05/0
1/20
06
T31
10
7:
Rem
ove
pam
pass
gra
ss (4
bun
ches
) on
the
east
sid
e in
"S
herw
ood
fore
st"
Rem
ove
salt
ceda
r
Con
trol t
all w
heat
(tar
get t
he o
uter
edg
es fi
rst)
Rem
ove
red
riser
eas
t of c
ell 3
Y Y
* * * *
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sS
pray
Gar
lon-
cut s
tum
p
Spr
ay R
ound
-up
0.1
0.1
0.5
0.5
Rem
ove
pam
pass
gra
ssR
emov
e pa
mpa
ss g
rass
Rem
ove
salt
ceda
rC
ontro
l tal
l whe
at
gras
sT4
199
39/
1/20
067
:In
stal
l inl
ine
and
inle
t int
o T4
1.2
Rep
lace
pip
e 30
" wes
t of p
arki
ng lo
t C
Spo
t rep
air s
outh
dik
e
Rep
lace
Fre
e ro
am s
ign
in s
outh
end
and
repa
ir co
rner
bou
ndar
y si
gn in
SE
cor
ner
Gra
vel N
. dik
e an
d be
twee
n ce
lls 1
and
2
Cle
an d
itch
on w
ests
ide
Con
trol t
all w
heat
by
spra
ying
with
Rou
ndup
Kill
euca
lypt
us b
y cu
tting
and
pai
ntin
g w
ith G
arlo
n
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g). M
ow o
r dis
k 5
isla
nds
Y
Y
Y Y Y
* * * * * * * * *
04/1
5/20
06Sp
ray
Rou
nd-u
p
Spr
ay G
arlo
n-cu
t stu
mp
1 0.1
Con
trol t
all w
heat
Elim
inat
e eu
caly
ptus
Page
17
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P899
19/
1/20
067
:M
onito
r/spr
ay p
eppe
rwee
d on
the
north
end
of P
8.1
Rep
lace
inle
t with
a C
WS
Reh
ab b
linds
31,
32,3
6,44
,45
Spo
t rep
air X
-dik
e be
twee
n T3
3/P
8.1
Y
Y
Y Y
* * * *
04/1
5/20
06Sp
ray
Tela
r0.
1R
educ
e pe
pper
wee
d
P11
1-2
19/
1/20
067
:R
ehab
Blin
ds 4
7,48
,50,
54
& 5
6
Inst
all b
oat r
amp
in S
E c
orne
r
Inst
all o
utle
t in
SE
cor
ner o
f cel
l 2
Y
Y
* * *
04/0
1/20
06
T16
08
:Fi
x le
ak fr
om p
ump
Bur
n up
land
s
Y* *
Burn
48E
nhan
ce n
ativ
e pl
ants
T82
010
/1/2
006
8:
Reh
ab e
xist
ing
isla
nds
and
add
2 m
ore
Bui
ld u
p no
rth p
erim
eter
road
chan
nel a
nd p
otho
le
Y
Y
Y* * *
05/0
1/20
06
T91
28/
15/2
006
8:
Mow
coc
kleb
ur p
rior t
o se
ed-s
et e
spec
ially
in S
E c
orne
r
Rep
lace
inle
t and
inlin
e W
CS
's
Tule
tran
spla
nts
arou
nd is
land
s
Leav
e N
. end
road
unm
owed
for a
uto
tour
dis
turb
ance
buf
fer.
Mow
NE
cor
ner f
or v
iew
ing
Y
Y
Y Y* * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T10
20
8:
Prim
rose
con
trol o
n ea
st s
ide
in d
itch
by s
pray
ing
Bur
n un
it to
enh
ance
nat
ive
vege
tatio
n
Eva
luat
e ad
ding
low
er p
ortio
n of
uni
t to
cell
4
* * *
Burn
Spr
ay R
odeo
46 2
Enh
ance
nat
ive
plan
tsR
educ
e pr
imro
se
T12
10
10/1
/200
68
:E
limin
ate
4 cl
umps
of b
lack
berri
es lo
cate
d on
eas
t sid
e ju
st w
est
of to
ur ro
ute
Rep
air f
lood
dam
age
on c
reek
X-in
g
Add
rip-
rap
to S
E c
orne
r X-in
g
Reh
ab is
land
s an
d ad
d on
e is
land
Dis
k an
d sh
ape
sout
h di
ke
Y* * * * *
04/1
5/20
06C
ut to
gro
und
Spr
ay G
arlo
n
0.2
0.2
Elim
inat
e H
im.
Bla
ckbe
rryE
limin
ate
Him
. B
lack
berry
T19
10
10/1
/200
68
:S
pray
pep
perw
eed
with
Tel
ar lo
cate
d on
the
sout
h en
d
Reh
ab n
orth
leve
e
Con
stru
ct b
oatra
mp
and
pack
gra
vel i
n S
E c
orne
r
Dis
k ca
ttail
and
tule
to o
pen
up u
nit
Y
Y
Y
Y* * * *
07/1
5/20
06Sp
ray
Tela
r
Dis
c 3
or m
ore
times
0.1 3
Red
uce
pepp
erw
eed
Red
uce
catta
ils/tu
les
Page
18
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T27
20
8:
Rem
ove
pam
pass
gras
s in
SE
cor
ner
Rem
ove
inle
t
Y Y
* *
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
Elim
inat
e pa
mpa
ssgr
ass
Elim
inat
e pa
mpa
ssgr
ass
T29
10
8/1/
2006
8:
Follo
w u
p di
skin
g on
are
as d
iske
d la
st y
ear
Dis
k di
seas
e la
nes
Reh
ab b
lind
27D
(dis
k la
nes
north
and
sou
th fo
r flig
ht p
atte
rn a
nd
open
up
arou
nd b
lind)
Pla
nt a
dditi
onal
willo
ws
arou
nd d
isab
led
park
ing
lot f
or
dist
urba
nce
scre
enE
valu
ate
mov
ing
blin
d 27
D fo
r nor
th -s
outh
orie
ntat
ion
Y
Y
Y* * * * *
04/0
1/20
06D
isc
3 or
mor
e tim
es
Irrig
ate/
scal
d
15 60
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
ts
T31
21
11/1
0/20
068
:In
stal
l sta
ff gu
age
Gra
vel p
ole
line
road
Nee
d to
pat
ch h
oles
in d
eliv
ery
ditc
h (s
ee J
S o
r MC
) for
loca
tions
. G
et d
irt fr
om T
38.1
Rep
lace
CM
P o
utle
t with
con
cret
e W
CS
Sw
itch
out d
eep
ditc
h si
gns
with
met
al o
nes
Rep
air s
outh
leve
e al
ong
drai
n, n
eed
to p
rote
ct v
erna
l poo
ls
(con
sult
MC
or J
S);
acce
ss u
nit o
nly
afte
r uni
t is
bake
d
* * * * * *
03/0
1/20
06
TE1-
30
9/1/
2006
8:
Rem
ove
bam
boo
and
spra
y re
-spr
outs
with
roun
dup
Mow
and
sca
ld c
ockl
ebur
prio
r to
flow
er s
tage
. Cov
er c
ells
1-2
an
d ho
ld th
en re
leas
e in
to th
e ea
st d
itch
Cha
nnel
from
inle
t to
SFM
in c
ell 1
Reh
ab is
land
s
Y
Y Y Y
* * * *
04/0
1/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
sS
cald
(by
irrig
ate)
Mow
prio
r to
seed
-set
0.5
0.5
58 58
Red
uce
arun
do
Red
uce
arun
do
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
TF2
110
/1/2
006
8:
Reh
ab s
outh
dik
e
Rep
lace
out
let
Mak
e su
re d
itch
drai
ns to
Log
an c
reek
and
then
plu
g pi
pe fr
om T
F to
TG
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Cut
and
pai
nt fi
gtre
e in
NW
cor
ner
* * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay G
arlo
n-cu
t stu
mp
5 0.1
Red
uce
cock
lebu
r
Elim
inat
e fig
tree
T15
10
9/1/
2006
9:
Rem
ove
4 cl
umps
of b
lack
berri
es in
NW
cor
ner a
nd s
pray
re
spro
uts
Rem
ove
conc
rete
in th
e N
W c
orne
r. S
nake
issu
es (s
ee M
C p
rior
to w
ork)
Eva
luat
e fo
r nat
ive
gras
s re
stor
atio
n
Spo
t rep
air r
oad
in S
W c
orne
r
Y
Y
Y* * * *
05/1
5/20
06D
isc
Cut
to g
roun
d
Spr
ay G
arlo
n
1 0.1
0.1
Red
uce
catta
ils/tu
les
Elim
inat
e bl
ackb
errie
sE
limin
ate
blac
kber
ries
T17
990
9:
Bur
n in
200
5/06
*Bu
rn24
0E
nhan
ce n
ativ
e pl
ants
Page
19
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T23
80
8/15
/200
69
:P
lace
bea
ver s
cree
n on
inle
t
Rem
ove
the
2 eu
c's
@ c
heck
sta
tion
Cle
an d
owne
d tre
es o
ut o
f sou
th d
rain
Y* * *
04/1
5/20
06Sp
ray
Gar
lon-
cut s
tum
p0.
1R
emov
e eu
c's
T24
20
9/25
/200
69
:M
ow o
r dis
k 4
of th
e 6
isla
nds.
Thi
nk a
bout
hun
ter s
paci
ng
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
Y
YY
* *04
/15/
2006
T27
10
9/1/
2006
9:
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Kee
p ro
cket
net
pad
cle
ar o
f veg
etat
ion
Mow
X-d
ikes
for l
oafin
g ha
bita
t
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
Kee
p is
land
s m
owed
or d
iske
d fo
r loa
fing
habi
tat
Y
Y
Y* * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et5
Red
uce
cock
lebu
r
T32
990
9:
Reh
ab S
. dik
e in
SE
cor
ner
*
T35
21
9/10
/200
69
:M
aint
ain
one
hunt
are
a on
eas
t sid
e
Rep
lace
out
let
Y
Y
Y
* *04
/15/
2006
T35
30
12/5
/200
69
:D
isk
if ne
eded
to k
eep
the
chan
nels
ope
n
Dis
k an
d sh
ape
spoi
l fro
m d
itch
clea
ning
Y
Y* *
04/1
5/20
06D
isc
2 tim
es1
Red
uce
catta
ils
T37
990
9:
Kee
p w
ater
flow
ing
in d
itch
durin
g su
mm
er fo
r wild
life
Cut
and
pai
nt s
alt c
edar
with
gar
lon
Trim
tree
s al
ong
26.2
Eva
luat
e bu
rnin
g an
d/or
spr
ayin
g to
con
trol t
all w
heat
gra
ss
Eva
luat
e cl
eani
ng d
eliv
ery
ditc
h to
T41
Y Y
* * * * *
Spra
y G
arlo
n-cu
t stu
mp
Spr
ay R
ound
up
0.1
60
Elim
inat
e sa
lt ce
dar
Elim
inat
e ta
ll w
heat
gra
ss
T40
40
9/1/
2006
9:
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Dis
k la
nes
in c
atta
ils
Mai
ntai
n hu
ntin
g lo
catio
n (m
owin
g/di
skin
g)
Y
Y
* * *
04/1
5/20
06Irr
igat
e34
Enh
ance
moi
st
soil
plan
ts
T44
991
9:
Mak
e fo
ot/q
uad
brid
ge to
acc
ess
unit
usin
g 30
" WC
S
Inst
all g
ate
@ G
CID
lift
pum
ps
Rem
ove
wire
Y* * *
T45
990
9:
Pos
t bou
ndar
y si
gns
Con
duct
initi
al b
iolo
gica
l inv
ento
ry
Cle
ar d
rain
s fro
m I5
und
erpa
sses
Y Y* * *
Page
20
of 2
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P299
01/
1/20
079
:Lo
wer
wes
t out
let i
nto
T18
Rem
ove
blac
kber
ries
on w
ests
ide
Rip
-rap
outle
t to
T18
Bur
n 2
of th
e 3
isla
nds
Rem
ove
outle
t in
mid
dle
of s
outh
leve
e
Y Y
* * * * *
12/3
1/20
06Bu
rn
Cut
to g
roun
d
Spr
ay G
arlo
n
2 0.1
0.1
Impr
ove
loaf
ing
habi
tat
elim
inat
e bl
ackb
errie
sel
imin
ate
blac
kber
ries
P7A
30
9:
Reh
ab D
am 2
Com
e up
with
pla
n to
rest
ore
(cha
nnel
/pot
hole
?)
Bur
n tu
les
for s
urve
ying
wor
k an
d pl
ace
for d
irt
Eva
luat
e fo
r pot
entia
l blin
d si
te
Y* * * *
P7A
40
10/1
/200
69
:R
emov
e bl
ackb
erry
in S
W c
orne
r
Reh
ab. B
lind
30
Y
Y* *
04/0
1/20
06Sp
ray
Rou
ndup
0.1
Elim
inat
e bl
ackb
erry
T53
010
:S
pray
pep
perw
eed
on s
outh
end
of T
5.3
Y*
Spra
y Te
lar
0.1
Red
uce
pepp
erw
eed
T11
50
10:
Eva
luat
e fo
r a p
oten
tial s
ubbi
ng p
robl
em c
omin
g fro
m T
11.4
. Uni
t is
junk
ing
up w
ith tu
les
and
al. b
ulru
sh
Y
*
T25
990
10:
Rem
ove
old
rice
boxe
s
*
Burn
36E
nhan
ce n
ativ
e pl
ants
T31
30
11/1
/200
610
:
05
/01/
2006
TF3
010
:
Bu
rn13
Enh
ance
nat
ive
plan
ts
541=
unit
not f
unct
iona
l due
to m
ultip
le p
robl
ems
5-6=
unit
will
like
l y m
ake
it th
roug
h up
com
ing
seas
on O
NLY
9=un
it fu
nctio
nal,
but r
e qui
res
enha
ncem
ent t
o im
prov
e qu
ality
2=un
it no
t fun
ctio
nal d
ue to
a s
ingl
e pr
oble
m
3-4=
will
like
l y fa
il du
ring
upco
min
g flo
od c
ycle
7-8=
rout
ine
mai
nten
ance
onl
y (i.
e. d
isci
ng la
nes
or c
heck
s, g
rave
l, et
c.)
10=n
o m
aint
enan
ce n
eces
sar y
oth
er th
an s
ite v
isit.
Prio
rity
Num
bers
:
Page
21
of 2
1
PLANNED DRAWDOWN SCHEDULE23-May-06 SAC 20067Year:
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
26.2 99 0 0%:
CANALS 99 S 0 0%:
P7A 3 53 1%:
T1 6 0 1%:
T10 2 0 1%:
T11 5 0 1%:
T13 99 0 1%:
T17 99 0 1%:
T2 11 0 1%:
T25 99 0 1%:T27 2 10 1%:
T31 1 0 1%:
T32 99 0 1%:
T37 99 0 1%:
T43 99 0 1%:
T44 99 0 1%:
T45 99 0 1%:
T5 3 6 1%:
T8 3 0 1%:
TAB 99 0 1%:TC 99 0 1%:
TE 6 0 1%:
TF 3 0 1%:
TG 99 0 1%:
TH 99 0 1%:
69 69
T31 2 S 89 2%3/1/2006 :
89 158
P11 1-2 S 141 4%4/1/2006 :
P12 99 S 55 5%4/1/2006 :P1B 99 S 149 7%4/1/2006 :
P7 99 ST 227 10%4/1/2006 :
P7A 1 S 63 11%4/1/2006 :
P7A 4 S 32 12%4/1/2006 :
Page 1 of 4
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
T14 1 S 33 12%4/1/2006 :
T14 2 S 38 13%4/1/2006 :
T21 99 S 39 13%4/1/2006 :
T22 99 S 27 14%4/1/2006 :
T24 1 S 34 14%4/1/2006 :
T26 1 S 34 15%4/1/2006 :
T28 2 S 38 15%4/1/2006 :
T29 1 S 60 16%4/1/2006 :
T29 2 S 57 17%4/1/2006 :
T34 99 S 105 18%4/1/2006 :
T36 99 ST 148 20%4/1/2006 :
T38 2 S 31 21%4/1/2006 :
T4 2 S 51 21%4/1/2006 :T40 1,3 S 68 22%4/1/2006 :
T40 2 S 29 23%4/1/2006 :
T9 2 S 76 24%4/1/2006 :
TD 1-4 S 142 26%4/1/2006 :
TE 1-3 S 91 27%4/1/2006 :
TF 1 S 37 28%4/1/2006 :
1802 1960
P1 99 S 232 31%4/15/2006 :
P10 1 S 86 32%4/15/2006 :
P11 4 S 119 34%4/15/2006 :P11 3 S 149 36%4/15/2006 :
P1A 1,3 S 217 39%4/15/2006 :
P3 99 S 159 41%4/15/2006 :
P4 99 S 81 42%4/15/2006 :
P8 99 S 109 44%4/15/2006 :
P9 1 S 30 44%4/15/2006 :
P9 2 S 116 46%4/15/2006 :
T1 1-4 S 96 47%4/15/2006 :
T10 3 S 56 48%4/15/2006 :
T10 4 S 71 49%4/15/2006 :T10 1 S 60 50%4/15/2006 :
T11 1-2 S 41 51%4/15/2006 :
T12 1 S 21 51%4/15/2006 :
T16 1 S 24 51%4/15/2006 :
Page 2 of 4
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
T18 99 S 95 53%4/15/2006 :
T19 2 S 44 53%4/15/2006 :
T20 99 S 35 54%4/15/2006 :
T23 1-7 S 234 57%4/15/2006 :
T23 8 S 0 57%4/15/2006 :
T24 2 ST 46 58%4/15/2006 :
T24 3 S 25 58%4/15/2006 :
T26 2 S 42 59%4/15/2006 :
T27 1 S 77 60%4/15/2006 :
T28 1 S 57 60%4/15/2006 :
T30 99 S 84 62%4/15/2006 :
T33 99 ST 87 63%4/15/2006 :
T35 3 S 6 63%4/15/2006 :T35 2 ST 17 63%4/15/2006 :
T35 1 S 42 64%4/15/2006 :
T38 1 S 78 65%4/15/2006 :
T39 99 S 12 65%4/15/2006 :
T40 4 S 34 66%4/15/2006 :
T41 99 S 141 68%4/15/2006 :
T42 99 S 128 69%4/15/2006 :
T5 1 S 35 70%4/15/2006 :
T5 2 S 41 70%4/15/2006 :
T6/7 99 S 91 72%4/15/2006 :T8 1 S 115 73%4/15/2006 :
T9 1 S 37 74%4/15/2006 :
TD 5 S 23 74%4/15/2006 :
TE 4 S 29 75%4/15/2006 :
TF 2 S 36 75%4/15/2006 :
3358 5319
P1A 4 ST 84 76%5/1/2006 :
P5 99 S 105 78%5/1/2006 :
P6 2 ST 183 80%5/1/2006 :
P6 1 S 130 82%5/1/2006 :T11 4 S 26 83%5/1/2006 :
T12 2 S 19 83%5/1/2006 :
T15 2 S 125 85%5/1/2006 :
T16 2 S 24 85%5/1/2006 :
Page 3 of 4
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
T2 1-8 S 185 87%5/1/2006 :
T3 99 S 68 88%5/1/2006 :
T31 3 evap 9 89%5/1/2006 :
T4 1 S 20 89%5/1/2006 :
T8 2 S 11 89%5/1/2006 :
990 6308
T15 1 S 37 90%5/15/2006 :
TE 5 S 22 90%5/15/2006 :
60 6368
P10 2 ST 352 95%7/15/2006 :
P7A 2 S 65 96%7/15/2006 :
T11 3 S 9 96%7/15/2006 :
T14 3 S 43 96%7/15/2006 :T19 1 S 28 97%7/15/2006 :
T2 10 S 44 98%7/15/2006 :
T4 3 S 15 98%7/15/2006 :
556 6924
P2 99 R 162 100%12/31/2006 :
162 7086
7086Grand Total :
Page 4 of 4
Irrigation SummaryRefuge: SAC Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T3 99 5/1/2006 Yes 10/1/2006 Scald (by irrigate) Reduce cocklebur 22:
T4 2 4/1/2006 Yes 9/7/2006 Scald (by irrigate) Reduce cocklebur 51:
T4 3 7/15/2006 Yes 9/15/2006 Scald (by irrigate) Reduce cocklebur 15:
T8 1 4/15/2006 Yes 8/15/2006 Scald (by irrigate) Reduce cocklebur 15:
T10 3 4/15/2006 Yes 8/15/2006 Irrigate Enhance moist soil plants 56:
T10 4 4/15/2006 Yes 8/15/2006 Irrigate Enhance moist soil plants 71:
T14 1 4/1/2006 Yes 8/15/2006Irrigate Enhance moist soil plants 33
:
T14 2 4/1/2006 Yes 9/1/2006Irrigate Enhance moist soil plants 38
:
T26 1 4/1/2006 Yes 10/5/2006 IrrigateScald (by irrigate)
Enhance moist soil plantsReduce cocklebur
3434
:
T28 2 4/1/2006 Yes 9/10/2006Irrigate Enhance moist soil plants 38
:
T29 1 4/1/2006 Yes 8/1/2006 Irrigate/scald Enhance moist soil plants 60:
T35 1 4/15/2006 Yes 9/1/2006 Irrigate Enhance moist soil plants 42:
T36 99 4/1/2006 Yes 9/1/2006 Irrigate Enhance moist soil plants 73:
T40 1,3 4/1/2006 Yes 8/15/2006 Irrigate Enhance moist soil plants 68:
T40 4 4/15/2006 Yes 9/1/2006 Irrigate Enhance moist soil plants 34:
TE 1-3 4/1/2006 Yes 9/1/2006 Scald (by irrigate) Reduce cocklebur 58:
Page 1 of 1
PLANNED FLOODUP SCHEDULE23-May-06 SAC 20067Year:Refuge:
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED
T2 11 0 0%:T31 1 0 0%:T43 99 0 0%:T44 99 0 0%:T45 99 0 0%:T27 2 10 0%:T5 3 6 0%:T25 99 0 0%:TH 99 0 0%:26.2 99 0 0%:T37 99 0 0%:P7A 3 53 1%:T32 99 0 1%:TAB 99 0 1%:TC 99 0 1%:T1 6 0 1%:T17 99 0 1%:T13 99 0 1%:T10 2 0 1%:TE 6 0 1%:T11 5 0 1%:CANAL 99 0 1%:TF 3 0 1%:TG 99 0 1%:T8 3 0 1%:
69Subtotal: 697/15/2006
T12 2 19 1%:88Subtotal: 19
8/1/2006T29 1 60 2%:T33 99 87 3%:T6/7 99 91 5%:
325Subtotal: 2388/15/2006
T2 1-8 185 7%:T42 99 128 9%:
Page 1 of 4
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODEDT30 99 84 10%:T29 2 57 11%:T8 1 115 13%:T23 8 0 13%:T10 4 71 14%:T9 1 37 14%:T9 2 76 15%:TD 1-4 142 17%:T10 1 60 18%:T14 1 33 19%:P1 99 232 22%:T10 3 56 23%:T23 1-7 234 26%:T40 1,3 68 27%:T38 2 31 27%:P1A 1,3 217 30%:
2150Subtotal: 18258/25/2006
T5 2 41 31%:2190Subtotal: 41
9/1/2006T36 99 148 33%:T41 99 141 35%:T40 4 34 35%:P8 99 109 37%:P9 1 30 37%:T16 1 24 38%:T21 99 39 38%:T15 2 125 40%:T15 1 37 41%:T4 1 20 41%:T14 2 38 41%:TE 1-3 91 43%:P9 2 116 44%:T40 2 29 45%:T27 1 77 46%:T34 99 105 47%:P3 99 159 50%:T35 1 42 50%:P11 1-2 141 52%:
3695Subtotal: 15059/7/2006
Page 2 of 4
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODEDT4 2 51 53%:
3746Subtotal: 51
9/10/2006T28 2 38 53%:P1B 99 149 56%:T35 2 17 56%:
3950Subtotal: 2049/15/2006
TF 1 37 56%:T4 3 15 56%:T24 1 34 57%:P10 1 86 58%:P10 2 352 63%:P11 3 149 65%:T28 1 57 66%:P5 99 105 68%:P6 1 130 69%:P1A 4 84 71%:P7A 1 63 71%:P7 99 227 75%:T16 2 24 75%:
5314Subtotal: 1363
9/20/2006T38 1 78 76%:TE 4 29 76%:
5420Subtotal: 1079/25/2006
T11 1-2 41 77%:T24 2 46 78%:
5508Subtotal: 8710/1/2006
P6 2 183 80%:TF 2 36 81%:TE 5 22 81%:TD 5 23 81%:T8 2 11 82%:T39 99 12 82%:P12 99 55 83%:T3 99 68 84%:P4 99 81 85%:T26 2 42 85%:
Page 3 of 4
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODEDT22 99 27 86%:T1 1-4 96 87%:T11 3 9 87%:P7A 4 32 88%:T2 10 44 88%:T19 1 28 89%:T11 4 26 89%:T12 1 21 89%:P7A 2 65 90%:T14 3 43 91%:T18 99 95 92%:
6527Subtotal: 1019
10/5/2006T24 3 25 92%:T26 1 34 93%:
6586Subtotal: 5910/10/2006
P11 4 119 95%:6705Subtotal: 119
10/15/2006T19 2 44 95%:T5 1 35 96%:
6784Subtotal: 79
11/1/2006T31 3 9 96%:T20 99 35 96%:
6829Subtotal: 4411/10/2006
T31 2 89 98%:6918Subtotal: 89
12/5/2006T35 3 6 98%:
6924Subtotal: 6
1/1/2007P2 99 162 100%:
7086Subtotal: 162
Page 4 of 4
PLANNED FLOODUP RATE BY MANAGED WETLAND HABITAT TYPE23-May-06 SAC 20067Refuge: Year:
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total7/15/2006 19 0 0 00% 0% 0%0%
19 0 0 07/15/2006
8/1/2006 110 0 0 00% 0% 0%2%8/1/2006 110 60 0 010% 0% 0%2%8/1/2006 194 60 2 010% 0% 0%3%
176 60 2 08/1/2006
8/15/2006 231 60 2 010% 0% 0%4%8/15/2006 315 60 2 010% 0% 0%6%8/15/2006 431 60 2 010% 0% 0%8%8/15/2006 431 128 2 022% 0% 0%8%8/15/2006 558 128 2 022% 0% 0%10%8/15/2006 558 161 2 028% 0% 0%10%8/15/2006 618 161 2 028% 0% 0%11%8/15/2006 850 161 2 028% 0% 0%15%8/15/2006 1035 161 2 028% 0% 0%18%8/15/2006 1066 161 2 028% 0% 0%19%8/15/2006 1066 232 2 041% 0% 0%19%8/15/2006 1142 232 2 041% 0% 0%20%8/15/2006 1375 232 2 041% 0% 0%24%8/15/2006 1432 232 2 041% 0% 0%25%8/15/2006 1432 232 2 041% 0% 0%25%8/15/2006 1574 232 2 041% 0% 0%28%8/15/2006 1791 232 2 041% 0% 0%32%8/15/2006 1791 288 2 051% 0% 0%32%
1596 228 0 08/15/2006
8/25/2006 1831 288 2 051% 0% 0%32%41 0 0 08/25/2006
9/1/2006 1831 322 2 057% 0% 0%32%9/1/2006 1831 360 2 063% 0% 0%32%9/1/2006 1957 360 2 063% 0% 0%35%9/1/2006 2098 360 2 063% 0% 0%37%9/1/2006 2135 360 2 063% 0% 0%38%9/1/2006 2159 360 2 063% 0% 0%38%9/1/2006 2275 360 2 063% 0% 0%40%9/1/2006 2416 360 2 063% 0% 0%43%9/1/2006 2455 360 2 063% 0% 0%43%9/1/2006 2546 360 2 063% 0% 0%45%9/1/2006 2575 360 2 063% 0% 0%45%9/1/2006 2575 402 2 071% 0% 0%45%9/1/2006 2684 402 2 071% 0% 0%47%9/1/2006 2788 402 2 071% 0% 0%49%9/1/2006 2818 402 2 071% 0% 0%50%9/1/2006 2893 475 2 083% 0% 0%51%9/1/2006 2913 475 2 083% 0% 0%51%
Page 1 of 3
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total9/1/2006 2990 475 2 083% 0% 0%53%9/1/2006 3149 475 2 083% 0% 0%56%
1318 187 0 09/1/2006
9/7/2006 3200 475 2 083% 0% 0%56%51 0 0 09/7/2006
9/10/2006 3200 514 2 090% 0% 0%56%9/10/2006 3348 514 2 090% 0% 0%59%9/10/2006 3366 514 2 090% 0% 0%59%
166 38 0 09/10/2006
9/15/2006 3366 514 17 090% 3% 0%59%9/15/2006 3515 514 17 090% 3% 0%62%9/15/2006 3515 514 369 090% 60% 0%62%9/15/2006 3552 514 369 090% 60% 0%63%9/15/2006 3732 514 415 090% 67% 0%66%9/15/2006 3732 570 415 0100% 67% 0%66%9/15/2006 3818 570 415 0100% 67% 0%67%9/15/2006 3897 570 420 0100% 68% 0%69%9/15/2006 3932 570 420 0100% 68% 0%69%9/15/2006 3995 570 420 0100% 68% 0%71%9/15/2006 4125 570 420 0100% 68% 0%73%9/15/2006 4230 570 420 0100% 68% 0%75%9/15/2006 4254 570 420 0100% 68% 0%75%
889 57 418 09/15/2006
9/20/2006 4283 570 420 0100% 68% 0%76%9/20/2006 4361 570 420 0100% 68% 0%77%
107 0 0 09/20/2006
9/25/2006 4402 570 420 0100% 68% 0%78%9/25/2006 4448 570 420 0100% 68% 0%78%
87 0 0 09/25/2006
10/1/2006 4475 570 420 0100% 68% 0%79%10/1/2006 4531 570 420 0100% 68% 0%80%10/1/2006 4554 570 420 0100% 68% 0%80%10/1/2006 4554 570 465 0100% 75% 0%80%10/1/2006 4576 570 465 0100% 75% 0%81%10/1/2006 4607 570 465 0100% 75% 0%81%10/1/2006 4628 570 465 0100% 75% 0%82%10/1/2006 4628 570 474 0100% 77% 0%82%10/1/2006 4640 570 474 0100% 77% 0%82%10/1/2006 4735 570 474 0100% 77% 0%84%10/1/2006 4735 570 502 0100% 81% 0%84%10/1/2006 4772 570 502 0100% 81% 0%84%10/1/2006 4853 570 502 0100% 81% 0%86%10/1/2006 4865 570 502 0100% 81% 0%86%10/1/2006 4932 570 502 0100% 81% 0%87%10/1/2006 5028 570 502 0100% 81% 0%89%10/1/2006 5053 570 502 0100% 81% 0%89%
Page 2 of 3
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total10/1/2006 5053 570 545 0100% 88% 0%89%10/1/2006 5095 570 545 0100% 88% 0%90%10/1/2006 5269 570 554 0100% 90% 0%93%10/1/2006 5269 570 619 0100% 100% 0%93%
821 0 198 010/1/2006
10/5/2006 5294 570 619 0100% 100% 0%93%10/5/2006 5329 570 619 0100% 100% 0%94%
59 0 0 010/5/2006
10/10/2006 5448 570 619 0100% 100% 0%96%119 0 0 010/10/2006
10/15/2006 5483 570 619 0100% 100% 0%97%10/15/2006 5527 570 619 0100% 100% 0%98%
79 0 0 010/15/2006
11/1/2006 5537 570 619 0100% 100% 0%98%11/1/2006 5571 570 619 0100% 100% 0%98%
44 0 0 011/1/2006
11/10/2006 5661 570 619 0100% 100% 0%100%89 0 0 011/10/2006
12/5/2006 5667 570 619 0100% 100% 0%100%6 0 0 012/5/2006
1/1/2007 5667 570 619 162100% 100% 100%100%0 0 0 1621/1/2007
Page 3 of 3
Planned Mowing SummaryRefuge: SAC Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T1 1-4: 4/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 15Y YY
T2 1-8: 5/1/2006 No 8/15/2006 Mow prior to seed-set Reduce cocklebur 20YY
T2 10: 7/15/2006 No 10/1/2006 Y
T3 99: 5/1/2006 Yes 10/1/2006 Mow prior to seed-set Reduce cocklebur 10YY
T4 1: 5/1/2006 No 9/1/2006 Y
T4 2: 4/1/2006 Yes 9/7/2006 Mow prior to seed-set Reduce cocklebur 30Y
T4 3: 7/15/2006 Yes 9/15/2006 Mow prior to seed-set Reduce cocklebur 15Y
T5 2: 4/15/2006 No 8/25/2006 Y
T6/7 99: 4/15/2006 No 8/1/2006 Mow prior to seed-set Reduce cocklebur 5Y YY
T8 1: 4/15/2006 Yes 8/15/2006 Mow prior to seed-set Reduce cocklebur 15Y
T9 1: 4/15/2006 No 8/15/2006 Mow prior to seed-set Reduce cocklebur 10Y
T9 2: 4/1/2006 No 8/15/2006 Mow prior to seed-set Reduce cocklebur 8Y
T10 1: 4/15/2006 No 8/15/2006 YY
T10 3: 4/15/2006 Yes 8/15/2006 Y
T10 4: 4/15/2006 Yes 8/15/2006 Y
T11 3: 7/15/2006 No 10/1/2006 Y
T15 2: 5/1/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 5Y Y
T16 1: 4/15/2006 No 9/1/2006 Y
Page 1 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T19 1: 7/15/2006 No 10/1/2006 Y
T19 2: 4/15/2006 No 10/15/2006 Y
T20 99: 4/15/2006 No 11/1/2006 Y
T23 1-7: 4/15/2006 No 8/15/2006 YY
T24 1: 4/1/2006 No 9/15/2006 Y
T24 2: 4/15/2006 No 9/25/2006 YY
T26 1: 4/1/2006 Yes 10/5/2006 Mow prior to seed-set Reduce cocklebur 20Y
T26 2: 4/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 15
T27 1: 4/15/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 5Y
T28 2: 4/1/2006 Yes 9/10/2006 Y
T29 2: 4/1/2006 No 8/15/2006 Mow prior to seed-set Reduce cocklebur 3
T30 99: 4/15/2006 No 8/15/2006 YY
T34 99: 4/1/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 20Y
T35 1: 4/15/2006 Yes 9/1/2006 Y
T35 2: 4/15/2006 No 9/10/2006 Y
T38 1: 4/15/2006 No 9/20/2006 Mow prior to seed-set Reduce cocklebur 5Y
T40 2: 4/1/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 8YY
T41 99: 4/15/2006 No 9/1/2006 YY
TE 1-3: 4/1/2006 Yes 9/1/2006Mow prior to seed-set Reduce cocklebur 58
Y
TE 4: 4/15/2006 No 9/20/2006 Mow prior to seed-set Reduce cocklebur 5YY
Page 2 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
TE 5: 5/15/2006 No 10/1/2006 Y
TF 1: 4/1/2006 No 9/15/2006 Y
TF 2: 4/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 5
P1A 1,3: 4/15/2006 No 8/15/2006 YY
P1A 4: 5/1/2006 No 9/15/2006 YY
P1B 99: 4/1/2006 No 9/10/2006 Y
P3 99: 4/15/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 5YY
P6 1: 5/1/2006 No 9/15/2006 Mow prior to seed-set Reduce cocklebur 15YY
P7 99: 4/1/2006 No 9/15/2006 Y
P7A 4: 4/1/2006 No 10/1/2006 Y
P9 1: 4/15/2006 No 9/1/2006 YY
P9 2: 4/15/2006 No 9/1/2006 Y
P11 1-2: 4/1/2006 No 9/1/2006 Y
P11 3: 4/15/2006 No 9/15/2006 Y
P11 4: 4/15/2006 No 10/10/2006 Y
P12 99: 4/1/2006 No 10/1/2006 YY
Page 3 of 3
Planned Discing SummaryRefuge: SAC Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T2 1-8: 05/01/2006 No 08/15/2006 YY
T2 10: 07/15/2006 No 10/01/2006 Y
T4 1: 05/01/2006 No 09/01/2006 Y
T4 2: 04/01/2006 Yes 09/07/2006 YY
T4 3: 07/15/2006 Yes 09/15/2006 Y
T6/7 99: 04/15/2006 No 08/01/2006Disc ASAP aft. drawdown Reduce Bermuda/jointgrass 2
Y
T8 1: 04/15/2006 Yes 08/15/2006 YY
T8 2: 05/01/2006 No 10/01/2006 YY
T9 1: 04/15/2006 No 08/15/2006 Y
T9 2: 04/01/2006 No 08/15/2006 Y
T10 1: 04/15/2006 No 08/15/2006 Disc 3 or more times Reduce Bermuda/jointgrass 15YY
T10 3: 04/15/2006 Yes 08/15/2006 Disc ASAP after drawdown Reduce jointgrass 20YY
T10 4: 04/15/2006 Yes 08/15/2006 Disc 3 or more times Reduce Bermuda/jointgrass 20YY
T11 1-2: 04/15/2006 No 09/25/2006 Disc 2 times Reduce cattails/tules 2YY
T11 3: 07/15/2006 No 10/01/2006 YY
T14 1: 04/01/2006 Yes 08/15/2006 Disc ASAP after drawdownDisc
Reduce jointgrassEnhance moist soil plants
1515
YY
T14 2: 04/01/2006 Yes 09/01/2006 Disc ASAP after drawdownDisc
Reduce jointgrassEnhance moist soil plants
1515
YY
Page 1 of 4
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T14 3: 07/15/2006 No 10/01/2006 YYY
T15 1: 05/15/2006 No 09/01/2006 Disc Reduce cattails/tules 1YY
T16 1: 04/15/2006 No 09/01/2006 YY
T16 2: 05/01/2006 No 09/15/2006 Disc Reduce cattails 0.5
T19 1: 07/15/2006 No 10/01/2006 Disc 3 or more times Reduce cattails/tules 3YY
T19 2: 04/15/2006 No 10/15/2006 Y
T23 1-7: 04/15/2006 No 08/15/2006Disc Reduce cattails/tules 0.5
Y
T24 1: 04/01/2006 No 09/15/2006 Disc Reduce cattails/tules 1YY
T24 2: 04/15/2006 No 09/25/2006 Y
T26 1: 04/01/2006 Yes 10/05/2006 Disc ASAP after drawdown Enhance moist soil plants 34Y
T26 2: 04/15/2006 No 10/01/2006 Disc 2 times Reduce Bermuda/jointgrass 15Y
T27 1: 04/15/2006 No 09/01/2006 Y
T28 1: 04/15/2006 No 09/15/2006 Disc 3 or more times Reduce jointgrass 10YY
T28 2: 04/01/2006 Yes 09/10/2006 Disc 3 or more times Reduce jointgrass 10Y
T29 1: 04/01/2006 Yes 08/01/2006 Disc 3 or more times Reduce jointgrass 15YY
T29 2: 04/01/2006 No 08/15/2006 Disc 3 or more times Reduce jointgrass 5Y
T33 99: 04/15/2006 No 08/01/2006 YYY
T34 99: 04/01/2006 No 09/01/2006 YY
T35 1: 04/15/2006 Yes 09/01/2006 Disc ASAP after drawdown Reduce jointgrass 10YY
Page 2 of 4
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T35 2: 04/15/2006 No 09/10/2006 YY
T35 3: 04/15/2006 No 12/05/2006 Disc 2 times Reduce cattails 1Y
T36 99: 04/01/2006 Yes 09/01/2006 Disc ASAP after drawdown Reduce jointgrass 10YY
T38 1: 04/15/2006 No 09/20/2006 YY
T38 2: 04/01/2006 No 08/15/2006 YY
T39 99: 04/15/2006 No 10/01/2006 Y
T40 1,3: 04/01/2006 Yes 08/15/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 20YY
T40 4: 04/15/2006 Yes 09/01/2006 YY
T42 99: 04/15/2006 No 08/15/2006 Burn/disc Reduce cattail and tule 60YYY
TD 1-4: 04/01/2006 No 08/15/2006 Disc ASAP after drawdownDisc ASAP after drawdown
Enhance moist soil plantsReduce cattails/tules
158
Y
TD 5: 04/15/2006 No 10/01/2006 Y
TE 4: 04/15/2006 No 09/20/2006 Y
TF 1: 04/01/2006 No 09/15/2006 Disc 2 times Reduce cattails/tules 3Y
P1A 4: 05/01/2006 No 09/15/2006 Y
P1B 99: 04/01/2006 No 09/10/2006 YY
P3 99: 04/15/2006 No 09/01/2006 Burn/discDisc 3 or more times
Reduce Bermuda/jointgrassReduce tules
701.5
P7A 1: 04/01/2006 No 09/15/2006 Y
P8 99: 04/15/2006 No 09/01/2006 YY
Page 3 of 4
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
P10 1: 04/15/2006 No 09/15/2006 Y
P10 2: 07/15/2006 No 09/15/2006 YY
P11 1-2: 04/01/2006 No 09/01/2006 Y
P11 3: 04/15/2006 No 09/15/2006 Y
P11 4: 04/15/2006 No 10/10/2006 Y
P12 99: 04/01/2006 No 10/01/2006 Disc ASAP after drawdown Reduce cattails/tules 2Y
Page 4 of 4
Planned Spray SummaryRefuge: SAC Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?CANAL 99 No Spray Rodeo Reduce primrose 2:
26.2 99 No Spray RodeoSpray Rodeo
Control parrots featherControl primrose
22
:
T1 1-4 4/15/2006 No 10/1/2006 Spray Rodeo Reduce primrose 2:
T2 1-8 5/1/2006 No 8/15/2006 Spray Round-up Reduce starthistle 0.1:
T2 11 No Spray Garlon-cut stump
Spray Roundup resprouts
Eliminate palm tree
Eliminate arundo
0.1
0.1
:
T3 99 5/1/2006 Yes 10/1/2006 Spray Roundup resprouts
Spray Garlon-cut stump
Eliminate arundo
Reduce palm trees
0.1
0.1
:
T4 1 5/1/2006 No 9/1/2006 Spray Roundup resprouts Reduce pampassgrass 0.1:
T5 1 4/15/2006 No 10/15/2006 Spray StalkerSpray Garlon-cut stump
Eliminate arundoEliminate palm trees
0.10.1
:
T5 3 No Spray Telar Reduce pepperweed 0.1:
T6/7 99 4/15/2006 No 8/1/2006 Spray Roundup resprouts Eliminate arundo 0.2:
T8 3 No Spray TelarSpray Round-up
Reduce pepperweedEliminate tall wheat grass
0.10.1
:
T10 1 4/15/2006 No 8/15/2006 Spray Telar Reduce pepperweed 0.1:
T10 2 No Spray Rodeo Reduce primrose 2:
T10 3 4/15/2006 Yes 8/15/2006 Spray Round-up Reduce jointgrass 3:
T11 1-2 4/15/2006 No 9/25/2006 Spray GarlonSpray Round-up
Spray Rodeo resproutsSpray Garlon-cut stump
Eliminate blackberriesWalking trail access
Eliminate arundoEliminate euc's
0.50.5
0.51
:
T11 3 7/15/2006 No 10/1/2006 Spray Garlon
Spray Roundup resproutsSpray Garlon-cut stump
Blackberries
ArundoEliminate euc's
0.1
0.50.5
:
Page 1 of 4
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T11 4 5/1/2006 No 10/1/2006 Spray stalker Reduce arundo 0.1:
T12 1 4/15/2006 No 10/1/2006 Spray Garlon Eliminate Him. Blackberry 0.2:
T13 99 No Spray Round-up
Spray Garlon-cut stumpSpray Garlon-cut stumpSpray Garlon-cut stumpSpray Garlon
Eliminate tall wheat and Perla grassEliminate euc'sEliminate palm treesEliminate salt cedarRemove Arundo
0.5
0.10.10.10.1
:
T14 1 4/1/2006 Yes 8/15/2006 Spray Round-up Reduce jointgrass 0.1:
T14 2 4/1/2006 Yes 9/1/2006 Spray Round-up Reduce jointgrass 0.5:
T15 1 5/15/2006 No 9/1/2006 Spray Garlon Eliminate blackberries 0.1:
T16 1 4/15/2006 No 9/1/2006 Spray Rodeo Reduce primrose 0.1:
T16 2 5/1/2006 No 9/15/2006 Spray Round-up Reduce tall wheat 0.1:
T19 1 7/15/2006 No 10/1/2006 Spray Telar Reduce pepperweed 0.1:
T23 1-7 4/15/2006 No 8/15/2006 Spray Telar
Spray Roundup resprouts
Spray Round-up
Eliminate pepperweed
Eliminate arundo
Reduce non-native grass
0.1
0.1
0.1
:
T23 8 4/15/2006 No 8/15/2006 Spray Garlon-cut stump Remove euc's 0.1:
T26 2 4/15/2006 No 10/1/2006 Spray Roundup Eliminate puncture vine 0.1:
T27 2 No Spray Roundup resprouts Eliminate pampassgrass 0.1:
T28 2 4/1/2006 Yes 9/10/2006 Spray Garlon Eliminate blackberries 0.1:
T29 2 4/1/2006 No 8/15/2006 Spray Roundup Reduce jointgrass 2:
T30 99 4/15/2006 No 8/15/2006 Spray Round-up
Spray Garlon
Control tall wheat
Eliminate blackberries
1
0.1
:
T31 1 No Spray Roundup resproutsSpray Garlon-cut stumpSpray Round-up
Remove pampass grassRemove salt cedarControl tall wheat grass
0.10.50.5
:
Page 2 of 4
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T36 99 4/1/2006 Yes 9/1/2006 Spray Roundup Reduce jointgrass 2:
T37 99 No Spray Garlon-cut stumpSpray Roundup
Eliminate salt cedarEliminate tall wheat grass
0.160
:
T38 1 4/15/2006 No 9/20/2006 Spray Roundup resprouts Eliminate arundo 0.1:
T39 99 4/15/2006 No 10/1/2006 Spray Rodeo Control tall wheat 0.5:
T40 1,3 4/1/2006 Yes 8/15/2006 Spray Roundup Reduce jointgrass 2:
T40 2 4/1/2006 No 9/1/2006 Spray Roundup Reduce bermuda/jointgrass 2:
T41 99 4/15/2006 No 9/1/2006 Spray Round-upSpray Garlon-cut stump
Control tall wheatEliminate eucalyptus
10.1
:
T43 99 No Spray Round-up Control tall wheat 50:
TAB 99 No Spray Roundup resprouts Eliminate arundo 0.1:
TD 1-4 4/1/2006 No 8/15/2006 Spray Rodeo Reduce primrose 0.5:
TE 1-3 4/1/2006 Yes 9/1/2006 Spray Roundup resprouts Reduce arundo 0.5:
TE 4 4/15/2006 No 9/20/2006 Spray Roundup resprouts Eliminate Arundo 0.5:
TF 1 4/1/2006 No 9/15/2006 Spray Roundup resprouts Eliminate arundo 0.1:
TF 2 4/15/2006 No 10/1/2006 Spray Garlon-cut stump Eliminate figtree 0.1:
TH 99 No Spray Garlon-cut stump Eliminate palm trees 0.1:
P1 99 4/15/2006 No 8/15/2006 Spray Round-up Eliminate tall wheat/perla grass
0.1:
P1A 1,3 4/15/2006 No 8/15/2006 Spray Rodeo Control primrose 1:
P2 99 12/31/2006 No 1/1/2007 Spray Garlon eliminate blackberries 0.1:
P3 99 4/15/2006 No 9/1/2006 Spray Garlon-cut stump Eliminate palm tree 0.1:
P6 1 5/1/2006 No 9/15/2006 Spray Garlon-cut stump Remove palm tree 0.1:
Page 3 of 4
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?P7 99 4/1/2006 No 9/15/2006 Spray Telar Reduce pepperweed 0.1:
P7A 4 4/1/2006 No 10/1/2006 Spray Roundup Eliminate blackberry 0.1:
P8 99 4/15/2006 No 9/1/2006 Spray Telar Reduce pepperweed 0.1:
P10 1 4/15/2006 No 9/15/2006 Spray Telar Reduce pepperweed 0.2:
P10 2 7/15/2006 No 9/15/2006 Spray Garlon-cut stump Eliminate palm trees 0.1:
P11 4 4/15/2006 No 10/10/2006 Spray Roundup resproutsSpray Garlon-cut stump
Eliminate arundoEliminate palm trees
0.10.1
:
P12 99 4/1/2006 No 10/1/2006 Spray Round-up Reduce tall wheat 0.5:
Page 4 of 4
Planned Burn SummaryRefuge: SAC Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T1 6: No Burn Enhance native plants 48
T5 1 4/15/2006: No 0/15/2006 Burn Enhance native plants 142
T10 2: No Burn Enhance native plants 46
T17 99: No Burn Enhance native plants 240
T25 99: No Burn Enhance native plants 36.25
T39 99 4/15/2006: No 10/1/2006 Burn Enhance native plants 37
T42 99 4/15/2006: No 8/15/2006 Burn/disc Reduce cattail and tule 60
T43 99: No Burn Control tall wheat 50
TC 99: No Burn Enhance native plants 115
TF 3: No Burn Enhance native plants 13
TG 99: No Burn Enhance native plants 187
TH 99: No Burn Enhance native plants 214
P2 99 12/31/2006: No 1/1/2007 Burn Improve loafing habitat 2
P3 99 4/15/2006: No 9/1/2006 Burn/disc Reduce Bermuda/jointgrass 70
Page 1 of 1
Plan
ned
Publ
ic U
se P
roje
cts
Ref
uge:
Year
:SA
C20
067
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T43
Tule
tran
spla
nts
arou
nd is
land
s an
d fe
nce
Mov
e "A
rea
clos
ed" s
ign
tow
ard
fenc
e (7
' nor
th o
f fen
ce) a
nd a
dd s
ign
at e
qual
dis
tanc
e to
the
othe
r sid
e of
road
:09
/15/
2006
07/1
5/20
06
T52
Mai
ntai
n vi
ewin
g la
nes
Add
two
isla
nds
(one
on
sout
h en
d fo
r vie
win
g an
d on
e on
nor
th e
nd m
iddl
e):
08/2
5/20
0604
/15/
2006
T6/7
99W
illow
tran
spla
nts
in N
E c
orne
rLo
wer
isla
nd in
NE
cor
ner a
nd m
ake
isla
nd s
outh
of t
ule
clum
p (s
ee D
enis
e fo
r loc
atio
n):
08/0
1/20
0604
/15/
2006
T91
Tule
tran
spla
nts
arou
nd is
land
sLe
ave
N. e
nd ro
ad u
nmow
ed fo
r aut
o to
ur d
istu
rban
ce b
uffe
r. M
ow N
E c
orne
r for
vie
win
g:
08/1
5/20
0604
/15/
2006
T10
1K
eep
view
ing
lane
s op
en b
y di
skin
g or
mow
ing
:08
/15/
2006
04/1
5/20
06
T11
1-2
Pla
nt W
illow
s at
ent
ranc
e ro
adR
emov
e bl
ackb
errie
s an
d sp
ray
re-s
prou
ts in
del
iver
y di
tch
Cut
dow
n an
d ga
rlon
the
euca
lypt
us o
n th
e S
. end
nea
r offi
ceS
pray
ripa
rian
loop
with
Rou
ndup
Gar
lon
euca
lypt
us re
spro
uts
afte
r cut
ting
alon
g cr
eek
(Euc
. Rem
oval
pla
n)M
onito
r woo
d du
ck b
oxes
alo
ng ri
paria
n zo
ne in
N. e
nd
:09
/25/
2006
04/1
5/20
06
T11
3R
emov
e bl
ackb
errie
s an
d sp
ray
with
roun
d-up
(kio
sk,m
iddl
e of
sec
ond
pond
W. o
f offi
ce a
nd th
e w
est s
ide
of c
ell 3
)M
aint
ain
view
ing
lane
s:
10/0
1/20
0607
/15/
2006
T14
2A
dd g
rave
l to
sout
h si
de tu
rnou
t:
09/0
1/20
0604
/01/
2006
T14
3R
emov
e tu
le c
lum
p N
. of p
ull o
ut:
10/0
1/20
0607
/15/
2006
T16
1
Cha
nnel
vie
win
g la
nes
Mow
cat
tails
on
edge
to m
aint
ain
view
ing
lane
s if
nece
ssar
yM
ow a
roun
d P
ole
line
Rd.
/aut
o to
ur in
ters
ectio
n fo
r tra
ffic
visi
bilit
yM
aint
ain
2 tu
rnou
ts
:09
/01/
2006
04/1
5/20
06
T21
99M
aint
ain
hunt
ing
loca
tions
(mow
ing,
dis
king
):
09/0
1/20
0604
/01/
2006
T22
99M
aint
ain
foot
brid
geM
aint
ain
hunt
ing
loca
tions
(mow
ing,
dis
king
):
10/0
1/20
0604
/01/
2006
Page
1 o
f 4
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T23
1-7
Spr
ay a
cces
s ro
ad (t
o bl
ind
5D);
Reh
ab b
linds
-1,2
,4,5
D,6
,7,8
,14,
15;
:08
/15/
2006
04/1
5/20
06
T24
1D
isk
open
ings
in c
atta
ils a
nd d
isk/
mow
the
2 is
land
s fo
r loa
fing
habi
tat
:09
/15/
2006
04/0
1/20
06
T24
2M
ow o
r dis
k 4
of th
e 6
isla
nds.
Thi
nk a
bout
hun
ter s
paci
ngM
aint
ain
hunt
ing
loca
tions
(mow
ing/
disk
ing)
:09
/25/
2006
04/1
5/20
06
T24
3R
ebui
ld is
land
s an
d ad
d 1
in N
E c
orne
rR
ehab
sou
th is
land
and
add
eas
t isl
and
:10
/05/
2006
04/1
5/20
06
T26
2R
ehab
blin
d 23
DR
educ
e is
land
to th
e no
rth o
f 23D
blin
d (ta
ke d
own
belo
w th
e w
ater
leve
l):
10/0
1/20
0604
/15/
2006
T27
1M
aint
ain
hunt
ing
loca
tions
(mow
ing/
disk
ing)
:09
/01/
2006
04/1
5/20
06
T28
1M
aint
ain
3 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g):
09/1
5/20
0604
/15/
2006
T28
2M
aint
ain
3 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g):
09/1
0/20
0604
/01/
2006
T29
1R
ehab
blin
d 27
D (d
isk
lane
s no
rth a
nd s
outh
for f
light
pat
tern
and
ope
n up
aro
und
blin
d)P
lant
add
ition
al w
illow
s ar
ound
dis
able
d pa
rkin
g lo
t for
dis
turb
ance
scr
een
Eva
luat
e m
ovin
g bl
ind
27D
for n
orth
-sou
th o
rient
atio
n
:08
/01/
2006
04/0
1/20
06
T29
2R
ehab
blin
d 26
:08
/15/
2006
04/0
1/20
06
T30
99M
aint
ain
hunt
ing
loca
tions
(mow
ing/
disk
ing)
:08
/15/
2006
04/1
5/20
06
T31
2S
witc
h ou
t dee
p di
tch
sign
s w
ith m
etal
one
s:
11/1
0/20
0603
/01/
2006
T33
99R
ehab
blin
d 37
. Ope
n up
to w
est a
nd n
orth
by
mow
ing
or d
iski
ng:
08/0
1/20
0604
/15/
2006
T34
99M
aint
ain
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Dis
k lo
afin
g le
vees
in e
ach
cell
:09
/01/
2006
04/0
1/20
06
T35
1M
aint
ain
3 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g); M
ow/d
isk
the
2 w
est i
slan
ds a
nd le
ave
the
east
isla
nd:
09/0
1/20
0604
/15/
2006
T35
2M
aint
ain
one
hunt
are
a on
eas
t sid
e:
09/1
0/20
0604
/15/
2006
T36
99R
ehab
blin
ds -
38,3
9 &
42
Spr
ay jo
intg
rass
alo
ng th
e hu
nter
acc
ess
to b
lind
38:
09/0
1/20
0604
/01/
2006
Page
2 o
f 4
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T38
1E
valu
ate
exca
vatin
g ar
ound
tule
clu
mps
on
wes
tsid
e to
mai
ntai
n op
enin
gsM
aint
ain
3 op
enin
gs fo
r hun
ters
Mai
ntai
n di
sabl
ed b
oat r
amp
:09
/20/
2006
04/1
5/20
06
T40
1,3
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g). T
here
is o
ne is
land
in th
e m
iddl
e of
eac
h ce
ll su
rroun
ded
by tu
les
:08
/15/
2006
04/0
1/20
06
T40
2M
aint
ain
hunt
ing
loca
tion
by m
owin
g/di
skin
g ar
ound
isla
nd in
cen
ter
:09
/01/
2006
04/0
1/20
06
T40
4M
aint
ain
hunt
ing
loca
tion
(mow
ing/
disk
ing)
:09
/01/
2006
04/1
5/20
06
T41
99R
epla
ce F
ree
roam
sig
n in
sou
th e
nd a
nd re
pair
corn
er b
ound
ary
sign
in S
E c
orne
rM
aint
ain
hunt
ing
loca
tions
(mow
ing/
disk
ing)
. Mow
or d
isk
5 is
land
s:
09/0
1/20
0604
/15/
2006
T42
99
Exc
avat
e ar
ound
blin
d 52
and
rem
ove
sect
ions
of l
evee
to th
e ea
st
Dis
k/m
ow le
vees
to o
pen
up u
nit;
leav
e 1s
t 100
yar
ds o
n N
. end
to d
isco
urag
e hu
nter
s fro
m s
hortc
uttin
g (d
isru
pt b
lind
52)
Reh
ab b
linds
46
& 5
2:
08/1
5/20
0604
/15/
2006
T45
99P
ost b
ound
ary
sign
s:
P199
Reh
ab is
land
in S
W c
orne
r and
rem
ove
veg.
that
blo
cks
view
ing
from
aut
o to
ur:
08/1
5/20
0604
/15/
2006
P1A
1,3
Gra
vel w
alkw
ay to
pho
tobl
ind
Tule
tran
spla
nts
@ p
hoto
blin
dM
ow v
iew
ing
lane
s an
d tu
rnou
ts
:08
/15/
2006
04/1
5/20
06
P1A
4Tr
im tr
ees
bloc
king
vie
win
g in
to P
3 an
d P
1B
Mai
ntai
n is
land
s an
d vi
ewin
g la
nes
Mow
turn
outs
:09
/15/
2006
05/0
1/20
06
P399
Dis
k tu
les
in N
W c
orne
r for
vie
win
g:
09/0
1/20
0604
/15/
2006
P61
Add
gra
vel f
or a
cces
s to
pho
to b
lind
:09
/15/
2006
05/0
1/20
06
P62
Wat
er tu
les
at p
hoto
blin
dTu
le tr
ansp
lant
s at
pho
tobl
ind
:10
/01/
2006
05/0
1/20
06
P799
Rem
ove
old
foot
brid
ge b
y bl
ind
11M
ow lo
afin
g is
land
s ar
ound
blin
d 14
AR
ehab
. Gat
e @
par
king
lot D
Reh
ab B
linds
9,1
1,12
,13,
14A
,16
:09
/15/
2006
04/0
1/20
06
P7A
1R
ehab
blin
ds 2
0,29
:09
/15/
2006
04/0
1/20
06
Page
3 o
f 4
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
P7A
2Tu
le tr
ansp
lant
s pr
ior t
o flo
odup
Reh
ab b
linds
21,
34,3
5:
10/0
1/20
0607
/15/
2006
P7A
3E
valu
ate
for p
oten
tial b
lind
site
:
P7A
4R
ehab
. Blin
d 30
:10
/01/
2006
04/0
1/20
06
P899
Reh
ab b
linds
31,
32,3
6,44
,45
:09
/01/
2006
04/1
5/20
06
P91
Reh
ab b
lind
40A
:09
/01/
2006
04/1
5/20
06
P92
Reh
ab b
linds
40,
41,4
3,49
:09
/01/
2006
04/1
5/20
06
P11
1-2
Reh
ab B
linds
47,
48,5
0, 5
4 &
56
:09
/01/
2006
04/0
1/20
06
P12
99R
ehab
Blin
d 55
:10
/01/
2006
04/0
1/20
06
Page
4 o
f 4
2006-07 Annual Habitat Management Plan
Delevan National Wildlife Refuge
Prepared By: Date: _________________
Refuge Biologist Reviewed By: Date: _________________
Supervisory Wildlife Biologist Reviewed By: Date: _________________
Assistant Refuge Manager
Reviewed By: Date: _________________
Deputy Refuge Manager Approved By: Date: _________________
Project Leader
Delevan NWR
T26:1
TA
T1:1 T1:2 T2:1 T2:2 T3:1
T5:1
T5:2
T5:3
T5:4
T5:5
T10
T9:1
T8T7:1
T6
T11
T16
T17:1
T17:2
T12
T9:2
T14
T15
T18 T19
T20:1 T20:2
T24:2T24:1T23
T22
T21:1 T21:2 T21:3T21:4
T27:1
T27:2 T27:3
T28
T33
T29 T30:1
T34:1
T30:2
T34:2
T34:3
T35:1
T31:2
T31:1
T25
T32
T26:2
T27:4
T27:5
T36
T37:1
T37:2
T42:2
T42:1
T38
T39:1
T39:2
T40T41:2
T43:1
T44:2
T43:2
T44:1
T44:3
T4T3:2
T7:2
T41:1
T35:2
256
253
231
149
148
147
147
95
142
141
141
91
136
90
90
134
88
87
86
125
124
80
80
78
75
75
75
112
73
72
106
70
68
66
65
64
64
64
64
63
60
60
54 53 52
5151
51
46
44
42
42
41
40
39
35 35
35
35
34
32
32
28
28
26
25
24
24
23
8
11
10
3
16
4
3
°
T45:1
T45:2T45:3
Rennick Property
41
1816
0 0.5 1 1.5 20.25Miles
RoadsPaved
All Weather
Standard Dirt
Non-Drivable
Railroad
Cell Boundaries (no roads)
Habitat Management 2006-07Seasonal Flooded Marsh
Unmanaged Freshwater Wetland
Watergrass
Summer Water
Permanent Pond
Vernal Pool
Alkali Meadow
Vernal Pool/Alkali Meadow Complex
Riparian Willow Scrub
Cottonwood Willow
Mixed Riparian Forest
Annual Grassland
Perennial Grassland
Facilities
Cal ifornia
0 5 10 15 202.5Miles
Sacramento NWR
Delevan NWR
Colusa NWR
Sutter NWR
Butte S ink NWR
Sacramento River NWR
Sacramento NWR Complex
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 1
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: CANALS CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE: S
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clean center lateral (1.5 miles)2. Spray primrose in ditches (3.5 miles were treated last year)3. Replace riser in center lateral with a 30" (T27.5)4. Clean east drain (between T38/T39) of silt and primrose buildup5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 0
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo Reduce primrose 4ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 2
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T1 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE:
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: None
UNITS REQ. FLOOD 1st: None
SPECIAL MANAGEMENT CONSIDERATIONS:FORMER GRAZING ALLOTMENT (1984). Manage drawdown with T1.2. Drawdown and floodup new for 2001. Develop burn rotation for uplands.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
14
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
73
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Burn uplands (combine with T1.2). Spray firebreak with Roundup and burn firebreak prior to the
burn2. Develop a plan to control starthistle. Data indicates unless we can burn 3 years in a row, burning is
not effective3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 88
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
BurnSpray RoundupSpray Roundup
Enhance native plantsReduce starthistleFirebreaks
8715
ACRES:TREATMENT: OBJECTIVE:BurnSpray RoundupSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 3
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T1 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: none
SPECIAL MANAGEMENT CONSIDERATIONS:FORMER GRAZING ALLOTMENT (1984). Manage drawdown with T1.1. Develop burn rotation for uplands.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
60
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
26
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Burn uplands (combine with T1.1)2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 86
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Enhance native plants 26ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 4
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T2 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Old ditch was cleaned out in 2002 to help with drainage problem. Prescribed burn completed 9/16/04 and disked twice. Awesome response from mowing the X-dike from loafing waterfowl. Fire monitoring results show big decreases for jointgrass/bermuda and increases for watergrass and sprangletop. Continue postburn monitoring.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
95
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab islands2. Disk remaining jointgrass3. Mow X-dike for loafing habitat4. Spray primrose in N. delivery ditch5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 95
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray RodeoIrrigateDisc
Reduce primroseEnhance moist soil plantsSpot disk for jointgrass
2955
ACRES:TREATMENT: OBJECTIVE:Spray RodeoIrrigateDisc
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 5
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T2 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
80
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Scald or mow cocklebur2. Spray pepperweed with telar in NE corner3. Rehab X-dike (east side only)4. Disk for jointgrass control5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 80
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarDisc ASAP after drawdowIrrigate/scaldMow prior to seed-set
Reduce pepperweedReduce Bermuda/jointgrassReduce cockleburReduce cocklebur
0.1208020
ACRES:TREATMENT: OBJECTIVE:Spray TelarDisc ASAP after drawdownIrrigate/scaldMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 6
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T3 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Colusa Mosquito Abatement light trap installed at pump house, north of shop in April 2005.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
3
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
47
Annual Grasslnd
0
Perennial Grasslnd
27
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab north dike of north lateral2. Monitor wood duck boxes3. Repair loading dock4. Spray shop area with Roundup5. Maintain shop area6. Clean west side behind shop7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 78
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup Weed maintenance 0.5ACRES:TREATMENT: OBJECTIVE:
Spray RoundupACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 7
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T4 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:POTENTIAL CORDYLANTHUS SITE. NO DISTURBANCE OF THIS AREA WITHOUT PRIOR CONSULTATION.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
45
Annual Grasslnd
0
Perennial Grasslnd
27
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 72
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 8
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T5 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: R
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Drains into the channel in T5.2. Last in SW in 2004. Getting a handle on primrose with disking and no SW.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
24
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab islands2. Disk primrose and open up cattail in NW corner3. Gravel boatramp in SW corner4. Channel/pothole north corner5. Add outlet in NE corner6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 24
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowDisc ASAP after drawdow
Reduce primroseReduce cattails/tules
32
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownDisc ASAP after drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 9
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T5 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T5.1
SPECIAL MANAGEMENT CONSIDERATIONS:BURNED ON 9/19/04 AND 10/2/04 (unit was subdivided and had to be burned over 2 days because of air quality issues). Burn was followed by disking 2X prior to flood-up. Excellent response with partial irrigation. Funded for 20067 NAWCA habitat project.
# OF WCS's TO REPLACE: 5
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
141
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk unit for jointgrass control2. Install a 36" inline in the lateral in NW corner3. Replace 2 outlets and add 1 outlet4. Install a 24" inlet in NW corner5. Add 2 islands6. Evaluate putting in a levee to separate the upland on the N. end7. Mow slopes for loafing habitat8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 141
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowMow prior to seed-setIrrigate/scaldSpray Roundup resprout
Reduce Bermuda/jointgrassReduce cockleburEnhance moist soil plantsEliminate arundo
5101400.1
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownMow prior to seed-setIrrigate/scaldSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 10
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T5 CELL: 3
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:LAST BURNED ON 9/20/01. Unit has no independent drainage capability and jointgrass is becoming a problem. Consider no irrigation until outlet is put in. Botulism outbreak in 2004. Funded for 20067 NAWCA habitat project.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
80
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Put siphon outlet in SE corner in early March (start permit process in Nov/Dec. 2005)2. Disk jointgrass3. Spray jointgrass in SW corner (3 acres)4. Install boatramp and pack gravel in SW corner5. Replace riser in X-dike (cell3/4)6. Rehab X-dike (cell3/4) flood damage and rat damage7. Mow perimeter levee tops/slopes for loafing areas on south and north end8. Remove old duck blinds9. Remove old inlet
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 80
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowSpray Round-up
Reduce Berm./jointgrassReduce jointgrass
153
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 11
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T5 CELL: 4
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/1/2006
UNITS REQ. DOWN 1st: T5.5
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:BOTULISM OUTBREAK IN 2004. Funded for 20067 NAWCA habitat project.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
106
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk firebreaks2. Burn jointgrass. Consider spraying with Roundup first3. Spot repair X-dike between cell 4 & 54. Mow slopes for loafing5. Remove old duckblind in south center6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 106
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowBurn
Make firebreaksReduce jointgrass
5106
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownBurn
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 12
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T5 CELL: 5
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T5.4
SPECIAL MANAGEMENT CONSIDERATIONS:Summer/Fall BOTULISM OUTBREAK IN 2004
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
64
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair east perimeter levee2. Replace pipe and riser into T15 with 24"3. Burn for jointgrass control4. Mow X-dike for loafing habitat5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 64
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn/disc Reduce jointgrass 64ACRES:TREATMENT: OBJECTIVE:
Burn/discACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 13
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T6 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HELD IN SW IN 2003 WITH EXCELLENT RESPONSE from broods and then later from shorebirds during drawdown in late July/early August. Mosquito study "Control" site in 2004. Potential photo blind site created in 2005 on the south end. Site will be monitored for disturbance issues.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
90
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Gravel boatramp2. Construct island and rehab current ones3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 90
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 14
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T7 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: ST
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HABITAT ENHANCEMENT PROJECT (DUCK STAMP) completed in 2005. Project involved channel work and the re-working of the levees.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
3
Water-grass
65
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace CMP in inline2. Disk jointgrass3. Pick two cells and disk for better watergrass germination4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 68
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowMow prior to seed-set
Reduce jointgrassReduce cocklebur
2020
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 15
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T8 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS PRESENT IN SE CORNER.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
32
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove wire and wood debris from SW corner2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 32
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 16
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T9 CELL: 1
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
10
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
61
Annual Grasslnd
0
Perennial Grasslnd
4
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor "vernal pools" created during 1992 drought relief work2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 75
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 17
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T9 CELL: 2
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE: S
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:None
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
2
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
2
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace inlet with 18" WCS2. Vegetation control along road for traffic visibility3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 4
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 18
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T10 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS present in the southeast corner, continue monitoring. NO DISTURBANCE OF THIS AREA WITHOUT PRIOR CONSULTATION. Evaluate and fix leak from east lateral in the SE corner. The leak is becoming worse every year. Pepperweed located in the north end. Possible spot for "overflow hours"?
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.1
VP Alkali Meadow Complex
0
Alkalli Meadow
81
Annual Grasslnd
0
Perennial Grasslnd
9
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Fix leak in the SE corner2. Spray pepperweed with telar. Most of it's located within the cordylanthus towards the north end3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 90
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 19
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T11 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Cordylanthus located in NE corner between T11 and T7 north of access road.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
149
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot repair south x-dike use dirt from T16 project2. Install boatramp and pack gravel in SE corner3. Mow cocklebur prior to seed-set4. Replace CMP inlet5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 149
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 20
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T12 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS present throughout the unit, especially around the vernal pools, continue to monitor. NO DISTURBANCE OF THIS AREA WITHOUT PRIOR CONSULTATION.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
6.2
VP Alkali Meadow Complex
56
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
4
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray tall wheat grass on south end2. Clean up pipe pile in SW corner3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 66
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup Eliminate tall wheat grass 0.1ACRES:TREATMENT: OBJECTIVE:
Spray RoundupACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 21
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T14 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DU PROJECT IN 1993. Last in PP in 2002. Completed CA duck stamp project (delivery ditch to T15) on 7/20/04. Need to monitor for botulism as unit has a botulism history.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
28
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rock inlet2. Rebuild islands3. Mow X-dike for loafing habitat4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 28
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 22
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T15 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T14 OR T5.2-.5
SPECIAL MANAGEMENT CONSIDERATIONS:Channel, pothole work and summer water capability completed Sept 2004 (CA Duck Stamp Project). Last in SW in 2005.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
148
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray jointgrass2. Spot repair north levee3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 148
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup Control jointgrass 5ACRES:TREATMENT: OBJECTIVE:
Spray RoundupACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 23
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T16 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/7/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:BOTULISM OUTBREAK IN 2005. Funded for 2006 CA duck stamp habitat enhancement project.
# OF WCS's TO REPLACE: 3
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
231
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace inlet with a 24"2. Add inlet in NW corner and channel out to SFM3. Replace outlet w/24" concrete WCS4. Rehab islands and add two more5. Mow cocklebur prior to seed-set, especially in the SE corner6. Install boat ramp and pack gravel in SE corner7. Mow lanes on westside in al. bulrush for disease monitoring8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 231
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 3ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 24
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T17 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:INLET IS UNDERGROUND PIPED ALONG THE NORTH END OF CELL 2. Unit last burned on 2/22/02 (over the water). Major overhaul in 7/02 with channels/potholes and islands. MAJOR TCBB SITE IN 2004! Most of the worlds population was there with a 120,000 + bird estimation done by Bill Hamiliton. TCBB'S first moved in on 5/21/04. Avoid disturbance from May - July. Delay drawdown as necessary to accommodate TCBB fledging. Last in SW in 20056.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
32
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab channels and potholes2. Install rock/gravel for boat ramp in NE corner3. Remove palm tree on island in south end4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 32
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Garlon-cut stump
Remove palm treeRemove palm tree
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 25
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T17 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED ALONG THE EAST SIDE
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
39
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed on east side in middle along road with telar2. Raise south permiter levee3. Replace inlet and outlet4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 39
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 26
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T18 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS located immediately north in T12 and also on the north end of T18 and the eastside of T18. BOR/DU funded project was completed in July of 2002 (perimeter levee rehab.).
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
33
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.9
VP Alkali Meadow Complex
17
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace outlet2. Mow east side levee for loafing3. Spray tall wheat grass on south end4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 51
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup Eliminate tall wheat grass 0.1ACRES:TREATMENT: OBJECTIVE:
Spray RoundupACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 27
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T19 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T18
SPECIAL MANAGEMENT CONSIDERATIONS:TULE GOOSE USE AREA. If dirt is needed take from the islands. Pepperweed along west side and south end. New cordylanthus population discovered on the north end in 2005.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
34
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
17
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar - mostly located along west side2. Fix rathole on east side coming from the east lateral3. Spray tall wheat grass on north end4. Spray primrose in ditch on east side5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 51
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarSpray RodeoSpray Roundup
Reduce pepperweedReduce primroseEliminate tall wheat grass
0.10.50.1
ACRES:TREATMENT: OBJECTIVE:Spray TelarSpray RodeoSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 28
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T20 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS present along the north side of T20.1 north levee/road.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
166
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel low spots using spoil for X-dike (between cells 1&2) and islands2. Spot repair flood damage on south, north and east dikes3. Construct boatramp and pack gravel in SE corner4. Spray primrose in ditch5. Mow cocklebur prior to seed-set6. Remove old inlet into T20.17.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 166
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Rodeo
Reduce cockleburReduce primrose
100.5
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Rodeo
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 29
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T21 CELL: 1-2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: R
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED present along the south boundary (check station road) and the X-dikes. Maintain 150 ft. of cattail along south boundary as a disturbance screen for check station area. Burned cells 1-2 on 8/2/01. Project work completed in August 2004 (duck stamp) and included channels to inlets, islands and rising the X-dikes. Botulism outbreak in 2004.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
128
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar2. Follow up disking for cells 1-23. Disk jointgrass in NW corner of cell 2. Consider spraying it first with Roundup4. Spray isolated patches of jointgrass5. Mow X-dike slopes for loafing6. Rehab inline at SW corner7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 128
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarIrrigate/scaldDisc ASAP after drawdowSpray Roundup
Reduce pepperweedEnhance moist soil plantsReduce jointgrassEliminate jointgrass
0.1128202
ACRES:TREATMENT: OBJECTIVE:Spray TelarIrrigate/scaldDisc ASAP after drawdownSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 30
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T21 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T21.2
SPECIAL MANAGEMENT CONSIDERATIONS:Huge cocklebur problem. Pepperweed located on X-dikes. Botulism outbreak in 2004.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
54
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar2. Mow cocklebur prior to seed-set3. Mow X-dikes for loafing habitat4. Disk jointgrass on north end5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 54
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray TelarDisc 3 or more times
Reduce cockleburReduce pepperweedReduce Bermuda/jointgrass
100.15
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray TelarDisc 3 or more times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 31
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T21 CELL: 4
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T21.3
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
28
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Scald cocklebur with irrigation water from cells 1-32. Mow X-dikes for loafing habitat3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 28
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate) Reduce cocklebur 28ACRES:TREATMENT: OBJECTIVE:
Scald (by irrigate)ACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 32
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T22 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Old pad with metal sticking up in unit (watch out! - flat tires).
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
47
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
17
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate deep ponds in unit2. Remove metal hazards at cement pad3. Remove old fence and barbwire (YCC project)4. Install outlet to T285. Construct 2 islands in deep part of unit, stay away from feather edges6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 64
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 33
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T23 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T22
SPECIAL MANAGEMENT CONSIDERATIONS:TULE GOOSE AREA
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
27
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
26
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove inlet in NW and put in NE corner with 18" concrete and 40' pipe2. Spray tall wheat/Perla grass on west side3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 52
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup Eliminate tall wheat/Perla grass
0.1ACRES:TREATMENT: OBJECTIVE:
Spray RoundupACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 34
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T24 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS PRESENT. NO DISTURBANCE OF THIS AREA WITHOUT PRIOR CONSULTATION. Jointgrass burn in the fall of 1993. PEPPERWEED in the SW corner.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
74
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
16
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar2. Mow X-dike for loafing habitat3. Disk to control the jointgrass and to prepare a moist-soil plant seedbed4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 91
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarDisc ASAP aft. drawdownScald (by irrigate)
Reduce pepperweedReduce jointgrassReduce cocklebur
0.13074
ACRES:TREATMENT: OBJECTIVE:Spray TelarDisc ASAP aft. drawdownScald (by irrigate)
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 35
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T24 CELL: 2
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.1 or T25
SPECIAL MANAGEMENT CONSIDERATIONS:Submitted as a proposal for CDFG Duck Stamp in 2006.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
134
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
8
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair flood damage to perimeter dikes,especially on east side2. Finish channeling to outlet3. Remove old duck blinds4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 142
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 36
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T25 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:BOR/DU PROJECT COMPLETED IN AUGUST 2001
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
52
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add logs for turtle basking habitat in south west corner2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 52
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate) Reduce cocklebur 52ACRES:TREATMENT: OBJECTIVE:
Scald (by irrigate)ACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 37
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T26 CELL: 1
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED LOCATED ON WEST LEVEE ON TRAP SITE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
141
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar (big population located on west levee on launch pad)2. Remove remaining bamboo and spray resprouts with Roundup3. Keep west and east X-dikes mowed or disked for better waterfowl use4. Install pit blinds (see Rich P. or Mike C. for location)5. Maintain hunting locations (mowing/disking)6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 141
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarCut to groundSpray Roundup resprout
Reduce pepperweedEliminate arundoEliminate arundo
0.10.10.1
ACRES:TREATMENT: OBJECTIVE:Spray TelarCut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 38
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T26 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: R
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:SW/PP ROTATION WITH T27.1 AND 2. Early drawdown required because of MID ditch operation. Inlet is piped in underground from the lateral running west to east to the NW corner. Last in SW in 2001.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
23
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk primrose2. Install boatramp and gravel in SE corner3. Maintain 2 hunting locations (mowing/disking)4. Disk islands and open up unit5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 23
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdow Reduce primrose 4ACRES:TREATMENT: OBJECTIVE:
Disc ASAP after drawdownACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 39
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T27 CELL: 1-2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:MOBILITY IMPAIRED HUNT SITE LOCATION. Replaced siphon under west lateral spring of 2005. Last in SW in 2002.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
34
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Overwater burn2. Replace CMP (inlet of cell 2) with CWS3. Rehab blinds 29D and 30D4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn/disc reduce some cattail and tule 15ACRES:TREATMENT: OBJECTIVE:
Burn/discACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 40
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T27 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
123
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
3
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove blackberries in south west corner and spray resprouts2. Spray pepperweed with telar3. Remove footbridge X-ing4. Remove spoil along east road5. Install boat ramp at inlet6. Gravel checkstation road7. Rehab blinds 1,2,4,&58.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 125
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarCut to groundSpray Roundup resproutCut to groundSpray Garlon-cut stump
Reduce pepperweedEliminate blackberriesEliminate blackberriesEliminate euc'sEliminate euc's
0.10.10.10.10.1
ACRES:TREATMENT: OBJECTIVE:Spray TelarCut to groundSpray Roundup resproutsCut to groundSpray Garlon-cut stump
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 41
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T27 CELL: 4
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Habitat enhancement project funded by CA duck stamp for 20067 (see specific projects 1-3).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
51
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from inlet west2. Disc openings in cattails3. Needs channel and island rehab4. Maintain 3 hunting locations (mowing/disking)5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 51
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 2 times Reduce cattails/tules 5ACRES:TREATMENT: OBJECTIVE:
Disc 2 timesACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 42
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T27 CELL: 5
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: R
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PRESCRIBED BURN ON AUGUST 2001. Consider irrigation if we get a good smartweed crop.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
44
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Continue to disk previously disked channels and pockets2. Replace outlet3. Trim trees at boatramp4. Maintain 2 hunting locations (mowing/disking)5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 44
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 2 times Reduce cattails/tules 2ACRES:TREATMENT: OBJECTIVE:
Disc 2 timesACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 43
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T28 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED along south levee and eastside. 20067 first year in SW in recent years.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
111
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
22
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace two outlets into T332. Mow cocklebur prior to seed-set3. Spray pepperweed with telar4. Tule transplants immediately prior to floodup5. Spray jointgrass north end and south end6. Rehab blinds 6-107. Rehab boat ramp8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 134
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarMow prior to seed-setSpray Roundup
Reduce pepperweedReduce cockleburReduce jointgrass
0.1105
ACRES:TREATMENT: OBJECTIVE:Spray TelarMow prior to seed-setSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 44
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T29 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED along south dike and eastside. Converted to Assigned Pond hunting area in 2004/5 season. Mosquito study "Control" site in 2004.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
35
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed with telar2. Repair west dike3. Mow cocklebur prior to seed-set4. Rehab assigned pond5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 35
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarMow prior to seed-set
Reduce pepperweedReduce cocklebur
0.15
ACRES:TREATMENT: OBJECTIVE:Spray TelarMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 45
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T30 CELL: 99
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:New handicapped blind site at #13 beginning in 1998-99. Overwater burn completed on 3/23/06.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
133
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Overwater burn in cell 12. Spray pepperweed with telar in NW corner3. Spray perla grass on north end with Roundup4. Rehab blinds 12, 13D, 14, 15, 165.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 133
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarSpray Round-upBurn/disc
Reduce pepperweedReduce perla grass and tall wheatReduce cattail and tule
0.10.130
ACRES:TREATMENT: OBJECTIVE:Spray TelarSpray Round-upBurn/disc
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 46
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T31 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Converted to Assigned Pond hunting area in 2005/6
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
59
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Build boatramp and pack gravel in NW corner2. Disk retrieval zone3. Rehab assigned pond4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 59
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate) Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Scald (by irrigate)ACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 47
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T32 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PRESCRIBED BURN JULY 2003. We sprayed the jointgrass/bermuda with Roundup, burned and then disked with 99% kill. Project work (NAWCA) was completed in Sept. 2004 with channels and potholes.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
138
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
9
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray primrose in delivery ditch2. Spray pepperweed with telar (located in SW corner near gate)3. Mow cocklebur prior to seed-set4. Rehab hunt areas5. Remove blackberries in SW corner6. Evaluate for native grass restoration7. Gravel west boundary road8. Disk jointgrass9. Disk emerging tules/cattails to keep hunter spacing
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 147
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscIrrigate/scaldSpray RodeoSpray TelarSpray Roundup
Reduce jointgrassEnhance moist soil plantsReduce primroseReduce pepperweedReduce Him. blackberry
51381
0.10.1
ACRES:TREATMENT: OBJECTIVE:DiscIrrigate/scaldSpray RodeoSpray TelarSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 48
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T33 CELL: 99
DRAWDOWN DATE: 6/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:CORDYLANTHUS present in N and W portions of this unit, access/use prohibited without prior consultation. Botulism hotspot in 2005.
# OF WCS's TO REPLACE: 2
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
224
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
32
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove remaining bamboo and spray resprouts2. Replace middle outlet into T40 with a 24" WCS3. Install elbow and pipe on outlet from T34.3 in ditch to allowing filling of ditch for easier boat
launching4. Replace inlet off of center lateral with a 30" WCS5. Keep north levee mowed to discourage road hunters6. Move east outlet into SE corner7. Clean center lateral8. Construct 2 hunt (dog) islands9. Maintain 6 hunting locations (mowing/disking)
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 256
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resprout
Eliminate arundoEliminate arundo
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 49
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T34 CELL: 1-2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:If fill dirt is needed take from large island in cell 1. Mosquito study "Control" site in 2004. Botulism outbreak in 2004. Cell 1 was converted to Assigned Pond hunting area in 2004/5 season.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
104
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed in the NE corner of cell 1 and east side of the X-dike between cells 2 and 32. Remove bamboo and spray resprouts with round-up3. Mow cocklebur prior to seed-set4. Maintain 3 hunting locations (mowing/disking) in cell 25. Take dirt from large island for T33 boat ramp project6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 104
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resproutMow prior to seed-setSpray Telar
Eliminate arundoEliminate arundoReduce cockleburReduce pepperweed
0.10.15
0.2
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resproutsMow prior to seed-setSpray Telar
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 50
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T34 CELL: 3
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED in parking lot C and in NE corner.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
60
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove bamboo and spray with Roundup2. Spray pepperweed with telar3. Move southwest outlet for T33 boat ramp project4. Maintain hunting locations (mowing/disking)5. Construct additional islands and plant tules, especially on the eastside6. Plant willows/cottonwoods for screen to replace the bamboo7. Gravel access routes to disabled sites8. Modify dock to ADA standards - pour concrete for boat approach9. Maintain cannon-net site in the NE corner
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 60
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarCut to groundSpray Roundup resprout
Reduce pepperweedEliminate arundoEliminate arundo
0.10.10.1
ACRES:TREATMENT: OBJECTIVE:Spray TelarCut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 51
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T35 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 12/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DU PROJECT IN 1993. Keep dry until 12/1 and then only keep water in the channels.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
36
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
6
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clean out channel from inlet to outlet2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 41
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 52
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T35 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DU PROJECT IN 1993. SW rotation with T31, T41 and T44.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
33
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
9
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove bamboo and spray resprouts with Roundup2. Install boatramp in SW corner3. Tule transplants prior to flood-up4. Mow cocklebur prior to seed set5. Maintain 2 hunting locations (mowing/disking)6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 42
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Cut to groundSpray Roundup resproutMow prior to seed-set
Reduce cockleburEliminate arundoEliminate arundoReduce cocklebur
330.10.15
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Cut to groundSpray Roundup resproutsMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 53
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T36 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:PEPPERWEED AND SALT CEDAR INCREASING ALONG CREEK. Salt cedar cut down and treated with roundup during the summer of 2000. Area has had no followup since then and salt cedar is again a problem.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
10
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Cut salt cedar and paint stumps with garlon2. Remove bamboo and spray resprouts with Roundup3. Spray pepperweed located on the westside and along creek (telar)4. Remove trash dumps along 4-mile in Feb. before vegetation covers them again. Dumping is
becoming a serious problem.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 10
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarSpray Garlon-cut stumpSpray Roundup resproutCut to ground
Reduce pepperweedElliminate salt cedarEliminate arundoEliminate arundo
0.10.20.20.2
ACRES:TREATMENT: OBJECTIVE:Spray TelarSpray Garlon-cut stumpSpray Roundup resproutsCut to ground
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 54
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T37 CELL: 1
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
25
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove CMP in SW corner2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 25
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 55
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T37 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Submitted proposal for CDFG Duck Stamp in 2006
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
78
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace inlet and channel out to unit2. Spray pepperweed with telar located on westside3. Rehab X-dike4. Install boatramp and pack gravel in SW corner5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 78
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 56
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T38 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:UNIT WAS LAST IN SW IN 2002 with good enhancement of emergent vegetation. Growing population of pepperweed in the SE corner along the drain.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
87
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove arundo (2 clumps) around blind 272. Spray pepperweed with telar in SE corner3. Spray or clean primrose in ditch4. Treat perla grass on roads5. Rehab blinds 26, 27 & 28.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 87
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upSpray RodeoSpray Telar
Reduce perla grassReduce primroseReduce pepperweed
0.52
0.1
ACRES:TREATMENT: OBJECTIVE:Spray Round-upSpray RodeoSpray Telar
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 57
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T39 CELL: 99
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Last in SW in 2003.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
146
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install boat ramp and pack gravel in SW corner of cell 12. Remove bamboo and spray with round-up3. Move cell 2 outlet to NW corner4. Rehab blinds 21, 22, 23, 24 & 255. Open up channel south of blind 226. Keep tule line disked east of blind 237. Keep cattails in check around blind 258. Open up cattails/tules to the east of blind 219. Spray blackberries on south end
10.Hold water in bottom cell to help grow cover around blind 24
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 146
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resproutSpray Roundup
Eliminate arundoEliminate arundoEliminate blackberries
0.30.30.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resproutsSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 58
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T40 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 8/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:BOR habitat project completed in July of 2003 (channels, potholes, perimeter levee rehab). Jointgrass becoming a real problem. Consider spraying followed by disking.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
112
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disk jointgrass located in the south and north end (consider spraying?)2. Spray pepperweed on eastside and south end3. Replace siphon under MID ditch to T444. Remove bamboo on south dike5. Mow cocklebur prior to seed-set6. Mow north end levee for loafing7. Rehab blinds 19 and 208.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 112
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarCut to groundSpray Roundup resproutDisc ASAP after drawdowScald (by irrigate)Mow prior to seed-set
Reduce pepperweedEliminate arundoEliminate arundoReduce jointgrassReduce cockleburReduce cocklebur
0.10.10.11011210
ACRES:TREATMENT: OBJECTIVE:Spray TelarCut to groundSpray Roundup resproutsDisc ASAP after drawdownScald (by irrigate)Mow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 59
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T41 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: R
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:None
# OF WCS's TO REPLACE: 4
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
16
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
136
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clean channels and potholes2. Mow south end to discourage hunting from road3. Flood uplands after 12/1 for hunting opportunties4. Replace 4 pipes in X-dikes5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 152
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow Discourage firing line 4ACRES:TREATMENT: OBJECTIVE:
MowACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 60
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T42 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS: DRAWDOWN PRIOR TO MID STARTUP IN SPRING (mid-April).
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
147
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Channel from west low area to outlet and use spoil for south dike repair2. Replace inlet with 24" WCS and set lower3. Spray pepperweed in SE corner4. Add islands5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 147
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Eliminate pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 61
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T42 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: R
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Tricolor blackbird colony site in 1993 - 1995. Last burn conducted on 3/17/04 (over the water) with good results. Channel/pothole project completed August 2004 along with several islands added, after which waterfowl use went way up. Consider for SW in 2007. DRAWDOWN PRIOR TO MID STARTUP IN SPRING (mid-April).
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
35
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Replace inlet WCS with 18" WCS2. Mow slopes for loafing habitat3. Remove blackberries 3 patches in SW corner and 2 patches in the north end4. Pick up trash along 4-mile5. Evaluate for future need of disking6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 35
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resprout
Remove blackberriesRemove blackberries
0.20.2
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 62
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T43 CELL: 99
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE: S
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:WILDLIFE VIEWPOINT UNIT. TCBB SITE IN 1996, 97, 00 and 2005. Largest TCBB colony in the world in 2005. Unit last burned on 9/27/02 (110 acres), all but the SE corner. First year of WFIB colony set up on 6/11/04. WFIB colony grew to about 9000 birds in 2005. Tule goose use still continues to be huge. Chronic botulism history, especially when in SW. Wildfire (arson?) in the uplands at the gate on 10/1/05. Pulled down unit in mid-Nov. and had a huge increase of bird use.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
224
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
39
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Connect inlet with existing ditch and rebuild ditch banks as needed2. Shape west dike and north perimeter dike at siphons3. Channel and pothole on westside using spoil to rehab the west dike4. Spray pepperweed with telar located on the westside and north end (in middle)5. Remove bamboo and spray resprouts with round-up6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 263
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarCut to groundSpray Roundup resprout
Reduce pepperweedElliminate arundoElliminate arundo
0.10.20.2
ACRES:TREATMENT: OBJECTIVE:Spray TelarCut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 63
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T44 CELL: 1
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DU PROJECT COMPLETED IN 1995.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
60
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
3
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seed-set2. Disk openings in cattails3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 64
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setScald (by irrigate)Disc
Reduce cockleburReduce cockleburReduce cattails
10605
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setScald (by irrigate)Disc
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 64
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T44 CELL: 2
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Great-tailed grackles nested in the NW corner in 2001, 2002, 2003 and 2005. Left in PP in 2001, 2002, 2003 and 2005 with great results both in brood production and food value. TCBB'S nested in 2003. Problems with high predation rate (or heat stress?) along edges. In some instances both the young and parent were killed potentially by Grackles. Excellent shorebird and waterbird use during drawdown. Project work including channels/potholes and islands was completed August 2004. Good pondweed unit (sago and horned).
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
43
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
4
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab and repair islands prior to fall flood-up2. Disk channels if needed after summer water3. Replace CMP outlet4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 46
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 65
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T44 CELL: 3
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Upland triangle east of 2047 canal. Infested with starthistle.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
40
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Develop plan for native grass restoration2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 40
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 66
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T45 CELL: 1
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:WFIB NESTING LOCATION IN 2000. TCBB's nested in NW corner in 2001, 2002 and attempted in 2003. Floodup for summer water contingent on repairs to east levee and depends on when dry enough to do work.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
41
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Rehab east levee2. Remove old nesting structures3. Spray pepperweed with telar4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 41
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.1ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 67
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: T45 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
35
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove bamboo and spray re-sprouts (eastside)2. Gravel west road3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 35
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Roundup resprout
Eliminate arundoEliminate arundo
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/23/2006SACRAMENTO NWR COMPLEX DEL YEAR 20067 printed: 68
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: DEL UNIT: TA CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
34
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove poles from old wood duck sites2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
Sum
mar
y of
Pla
nned
Hab
itat A
cres
*12
-Jul
-06
Sacr
amen
to N
WR
Com
plex
2006
7Ye
ar:
REF
UG
E
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lity
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
610
035
00
BTS
10
029
00
00
40
110
00
645
646
2915
691
0
2730
135
255
227
40C
LS11
918
239
739
741
00
01
014
00
633
4734
6610
5715
4555
50
3480
226
435
459
7D
EL13
9036
437
292
00
424
00
00
545
9946
1292
646
5582
0
667
930
06
LS2
00
314
217
184
8037
150
064
03
760
762
800
116
1674
0
5735
162
619
570
87SA
C16
320
0185
334
105
00
511
02
00
031
7086
7249
3079
117
1038
90
1059
416
964
90
SUT
450
010
112
50
00
011
328
70
35
1880
1925
226
403
2559
0
1428
161
915
1219
0414
0TO
TALS
2272
1247
580
184
8084
134
313
114
343
1614
643
5018
317
1866
061
1625
450
713
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
ads,
can
als,
and
othe
r unm
anag
ed a
reas
.
51
Sum
mar
y of
Pla
nned
Hab
itat A
cres
by
Uni
t*
Sacr
amen
to N
WR
Com
plex
YEA
R:
2006
7R
EFU
GE:
DEL
23-M
ay-0
6
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
CAN
A99:
00
00
00
00
00
00
00
00
00
00
00
00
0T1
1:14
00
014
014
00
073
00
073
00
00
00
00
880
T12:
600
00
600
600
00
260
00
260
00
00
00
086
0T2
1:0
950
095
095
00
00
00
00
00
00
00
00
950
T22:
800
00
800
800
00
00
00
00
00
00
00
080
0T3
99:0
00
00
33
00
470
270
074
00
00
00
01
780
T499:
00
00
00
00
045
027
00
720
00
00
00
072
0T5
1:24
00
024
024
00
00
00
00
00
00
00
00
240
T52:
141
00
014
10
141
00
00
00
00
00
00
00
00
141
0T5
3:80
00
080
080
00
00
00
00
00
00
00
00
800
T54:
106
00
010
60
106
00
00
00
00
00
00
00
00
106
0T5
5:64
00
064
064
00
00
00
00
00
00
00
00
640
T699:
00
900
900
900
00
00
00
00
00
00
00
090
0T7
99:3
650
068
068
00
00
00
00
00
00
00
00
680
T899:
00
00
00
00
032
00
00
320
00
00
00
032
0T9
1:0
00
00
1010
00
610
40
065
00
00
00
00
750
T92:
00
02
20
20
02
00
00
20
00
00
00
04
0T1
099:
00
00
00
00
081
09
00
900
00
00
00
090
0T1
199:
149
00
014
90
149
00
00
00
00
00
00
00
00
149
0T1
299:
00
00
00
06
560
00
00
620
40
00
04
166
0T1
499:
00
280
280
280
00
00
00
00
00
00
00
028
0T1
599:
148
00
014
80
148
00
00
00
00
00
00
00
00
148
0T1
699:
231
00
023
10
231
00
00
00
00
00
00
00
00
231
0T1
71:
320
00
320
320
00
00
00
00
00
00
00
032
0T1
72:
390
00
390
390
00
00
00
00
00
00
00
039
0T1
899:
330
00
330
331
170
00
00
180
00
00
00
051
0T1
999:
340
00
340
340
170
00
00
170
00
00
00
051
0T2
099:
166
00
016
60
166
00
00
00
00
00
00
00
00
166
0T2
11-
2:
012
80
012
80
128
00
00
00
00
00
00
00
00
128
0T2
13:
540
00
540
540
00
00
00
00
00
00
00
054
0T2
14:
280
00
280
280
00
00
00
00
00
00
00
028
0T2
299:
470
00
470
470
017
00
00
170
00
00
00
064
0T2
399:
270
00
270
270
00
260
00
260
00
00
00
052
0
Pag
e 1
of 2
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
T24
1:74
00
074
074
00
160
00
016
00
00
00
01
910
T24
2:13
40
00
134
013
40
00
00
00
08
00
00
08
014
20
T25
99:52
00
052
052
00
00
00
00
00
00
00
00
520
T26
1:14
10
00
141
014
10
00
00
00
00
00
00
00
014
10
T26
2:23
00
023
023
00
00
00
00
00
00
00
00
230
T27
1-2
:34
00
034
034
00
00
00
00
00
00
00
00
340
T27
3:12
30
00
123
012
30
00
00
00
00
00
00
00
312
50
T27
4:51
00
051
051
00
00
00
00
00
00
00
00
510
T27
5:44
00
044
044
00
00
00
00
00
00
00
00
440
T28
99:0
011
10
111
011
10
022
00
00
220
00
00
00
013
40
T29
99:35
00
035
035
00
00
00
00
00
00
00
00
350
T30
99:13
30
00
133
013
30
00
00
00
00
00
00
00
013
30
T31
99:0
059
059
059
00
00
00
00
00
00
00
00
590
T32
99:0
138
00
138
013
80
00
90
00
90
00
00
00
014
70
T33
99:22
40
00
224
022
40
032
00
00
320
00
00
00
025
60
T34
1-2
:10
40
00
104
010
40
00
00
00
00
00
00
00
010
40
T34
3:60
00
060
060
00
00
00
00
00
00
00
00
600
T35
1:36
00
036
036
00
06
00
06
00
00
00
00
410
T35
2:0
330
033
033
00
90
00
09
00
00
00
00
420
T36
99:0
00
00
00
00
010
00
010
00
00
00
00
100
T37
1:0
00
00
00
00
00
250
025
00
00
00
00
250
T37
2:78
00
078
078
00
00
00
00
00
00
00
00
780
T38
99:0
087
087
087
00
00
00
00
00
00
00
00
870
T39
99:14
60
00
146
014
60
00
00
00
00
00
00
00
014
60
T40
99:11
20
00
112
011
20
00
00
00
00
00
00
00
011
20
T41
99:0
016
016
016
00
013
60
00
136
00
00
00
00
152
0T4
21:
147
00
014
70
147
00
00
00
00
00
00
00
00
147
0T4
22:
350
00
350
350
00
00
00
00
00
00
00
035
0T4
399:
00
022
422
40
224
00
039
00
039
00
00
00
00
263
0T4
41:
600
00
600
600
00
30
00
30
00
00
00
064
0T4
42:
00
430
430
430
00
40
00
40
00
00
00
046
0T4
43:
00
00
00
00
00
400
00
400
00
00
00
040
0T4
51:
410
00
410
410
00
00
00
00
00
00
00
041
0T4
52:
350
00
350
350
00
00
00
00
00
00
00
035
0TA
99:0
00
00
00
00
00
00
00
340
00
00
340
340
3480
226
435
459
7TO
TALS
9037
292
00
424
00
1336
40
05
4599
4612
926
5589
46
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
othe
r unm
anag
ed a
reas
.
0
Pag
e 2
of 2
UN
IT W
OR
K P
LAN
2006
7D
ELR
efug
eYe
ar:
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T52
59/
15/2
006
1:
Dis
k un
it fo
r joi
ntgr
ass
cont
rol
Inst
all a
36"
inlin
e in
the
late
ral i
n N
W c
orne
r
Rep
lace
2 o
utle
ts a
nd a
dd 1
out
let
Inst
all a
24"
inle
t in
NW
cor
ner
Add
2 is
land
s
Eva
luat
e pu
tting
in a
leve
e to
sep
arat
e th
e up
land
on
the
N. e
nd
Mow
slo
pes
for l
oafin
g ha
bita
t
Y
Y
Y
Y Y Y Y
* * * * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Mow
prio
r to
seed
-set
Irrig
ate/
scal
d
Spr
ay R
ound
up
resp
rout
s
5 10 140
0.1
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
cock
lebu
r
Enh
ance
moi
st
soil
plan
tsE
limin
ate
arun
do
T53
28/
1/20
061
:P
ut s
ipho
n ou
tlet i
n SE
cor
ner i
n ea
rly M
arch
(sta
rt pe
rmit
proc
ess
in N
ov/D
ec. 2
005)
Dis
k jo
intg
rass
Spr
ay jo
intg
rass
in S
W c
orne
r (3
acre
s)
Inst
all b
oatra
mp
and
pack
gra
vel i
n S
W c
orne
r
Rep
lace
rise
r in
X-di
ke (c
ell3
/4)
Reh
ab X
-dik
e (c
ell3
/4) f
lood
dam
age
and
rat d
amag
e
Mow
per
imet
er le
vee
tops
/slo
pes
for l
oafin
g ar
eas
on s
outh
and
no
rth e
ndR
emov
e ol
d du
ck b
linds
Rem
ove
old
inle
t
Y
Y
Y Y Y
* * * * * * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Spr
ay R
ound
-up
15 3
Red
uce
Ber
m./j
oint
gras
sR
educ
e jo
intg
rass
T54
08/
1/20
061
:D
isk
fireb
reak
s
Bur
n jo
intg
rass
. Con
side
r spr
ayin
g w
ith R
ound
up fi
rst
Spo
t rep
air X
-dik
e be
twee
n ce
ll 4
& 5
Mow
slo
pes
for l
oafin
g
Rem
ove
old
duck
blin
d in
sou
th c
ente
r
Y
Y Y
* * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Bur
n
5 106
Mak
e fir
ebre
aks
Red
uce
join
tgra
ss
T55
19/
1/20
061
:R
epai
r eas
t per
imet
er le
vee
Rep
lace
pip
e an
d ris
er in
to T
15 w
ith 2
4"
Bur
n fo
r joi
ntgr
ass
cont
rol
Mow
X-d
ike
for l
oafin
g ha
bita
t
Y
Y* * * *
04/1
5/20
06Bu
rn/d
isc
64R
educ
e jo
intg
rass
Page
1 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T10
990
1:
Fix
leak
in th
e S
E c
orne
r
Spr
ay p
eppe
rwee
d w
ith te
lar.
Mos
t of i
t's lo
cate
d w
ithin
the
cord
ylan
thus
tow
ards
the
north
end
Y Y
* *
Spra
y Te
lar
0.1
Red
uce
pepp
erw
eed
T27
30
9/1/
2006
1:
Rem
ove
blac
kber
ries
in s
outh
wes
t cor
ner a
nd s
pray
resp
rout
s
Spr
ay p
eppe
rwee
d w
ith te
lar
Rem
ove
foot
brid
ge X
-ing
Rem
ove
spoi
l alo
ng e
ast r
oad
Inst
all b
oat r
amp
at in
let
Gra
vel c
heck
stat
ion
road
Reh
ab b
linds
1,2
,4,&
5
Y
Y
Y Y Y
* * * * * * *
04/1
5/20
06Sp
ray
Tela
r
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sC
ut to
gro
und
Spr
ay G
arlo
n-cu
t stu
mp
0.1
0.1
0.1
0.1
0.1
Red
uce
pepp
erw
eed
Elim
inat
e bl
ackb
errie
sE
limin
ate
blac
kber
ries
Elim
inat
e eu
c's
Elim
inat
e eu
c's
T27
40
9/15
/200
61
:C
hann
el fr
om in
let w
est
Dis
c op
enin
gs in
cat
tails
Nee
ds c
hann
el a
nd is
land
reha
b
Mai
ntai
n 3
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Y
Y
Y Y Y
* * * *
04/0
1/20
06D
isc
2 tim
es5
Red
uce
catta
ils/tu
les
T28
992
10/1
/200
61
:R
epla
ce tw
o ou
tlets
into
T33
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Spr
ay p
eppe
rwee
d w
ith te
lar
Tule
tran
spla
nts
imm
edia
tely
prio
r to
flood
up
Spr
ay jo
intg
rass
nor
th e
nd a
nd s
outh
end
Reh
ab b
linds
6-1
0
Reh
ab b
oat r
amp
Y
Y
Y Y Y Y Y
* * * * * * *
07/1
5/20
06Sp
ray
Tela
r
Mow
prio
r to
seed
-set
Spr
ay R
ound
up
0.1
10 5
Red
uce
pepp
erw
eed
Red
uce
cock
lebu
r
Red
uce
join
tgra
ss
T33
992
9/15
/200
61
:R
emov
e re
mai
ning
bam
boo
and
spra
y re
spro
uts
Rep
lace
mid
dle
outle
t int
o T4
0 w
ith a
24"
WC
S
Inst
all e
lbow
and
pip
e on
out
let f
rom
T34
.3 in
ditc
h to
allo
win
g fil
ling
of d
itch
for e
asie
r boa
t lau
nchi
ngR
epla
ce in
let o
ff of
cen
ter l
ater
al w
ith a
30"
WC
S
Kee
p no
rth le
vee
mow
ed to
dis
cour
age
road
hun
ters
Mov
e ea
st o
utle
t int
o S
E c
orne
r
Cle
an c
ente
r lat
eral
Con
stru
ct 2
hun
t (do
g) is
land
s
Mai
ntai
n 6
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Y
Y Y Y
* * * * * * * * *
06/0
1/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Page
2 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T45
10
10/1
5/20
061
:R
ehab
eas
t lev
ee
Rem
ove
old
nest
ing
stru
ctur
es
Spr
ay p
eppe
rwee
d w
ith te
lar
Y
Y Y Y
* * *
04/0
1/20
06Sp
ray
Tela
r0.
1R
educ
e pe
pper
wee
d
T16
993
9/7/
2006
2:
Rep
lace
inle
t with
a 2
4"
Add
inle
t in
NW
cor
ner a
nd c
hann
el o
ut to
SFM
Rep
lace
out
let w
/24"
con
cret
e W
CS
Reh
ab is
land
s an
d ad
d tw
o m
ore
Mow
coc
kleb
ur p
rior t
o se
ed-s
et, e
spec
ially
in th
e S
E c
orne
r
Inst
all b
oat r
amp
and
pack
gra
vel i
n SE
cor
ner
Mow
lane
s on
wes
tsid
e in
al.
bulru
sh fo
r dis
ease
mon
itorin
g
Y
Y
YY
Y Y* * * * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et3
Red
uce
cock
lebu
r
T17
10
10/1
/200
62
:R
ehab
cha
nnel
s an
d po
thol
es
Inst
all r
ock/
grav
el fo
r boa
t ram
p in
NE
cor
ner
Rem
ove
palm
tree
on
isla
nd in
sou
th e
nd
Y
Y Y Y
* * *
04/1
5/20
06C
ut to
gro
und
Spr
ay G
arlo
n-cu
t stu
mp
0.1
0.1
Rem
ove
palm
tree
Rem
ove
palm
tree
T24
20
9/15
/200
62
:R
epai
r flo
od d
amag
e to
per
imet
er d
ikes
,esp
ecia
lly o
n ea
st s
ide
Fini
sh c
hann
elin
g to
out
let
Rem
ove
old
duck
blin
ds
Y Y* * *
05/0
1/20
06
T36
990
2:
Cut
sal
t ced
ar a
nd p
aint
stu
mps
with
gar
lon
Rem
ove
bam
boo
and
spra
y re
spro
uts
with
Rou
ndup
Spr
ay p
eppe
rwee
d lo
cate
d on
the
wes
tsid
e an
d al
ong
cree
k (te
lar)
Rem
ove
trash
dum
ps a
long
4-m
ile in
Feb
. bef
ore
vege
tatio
n co
vers
them
aga
in. D
umpi
ng is
bec
omin
g a
serio
us p
robl
em.
Y Y Y Y
* * * *
Spra
y Te
lar
Spr
ay G
arlo
n-cu
t stu
mp
Spr
ay R
ound
up
resp
rout
sC
ut to
gro
und
0.1
0.2
0.2
0.2
Red
uce
pepp
erw
eed
Elli
min
ate
salt
ceda
rE
limin
ate
arun
do
Elim
inat
e ar
undo
T40
991
8/15
/200
62
:D
isk
join
tgra
ss lo
cate
d in
the
sout
h an
d no
rth e
nd (c
onsi
der
spra
ying
?)S
pray
pep
perw
eed
on e
asts
ide
and
sout
h en
d
Rep
lace
sip
hon
unde
r MID
ditc
h to
T44
Rem
ove
bam
boo
on s
outh
dik
e
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Mow
nor
th e
nd le
vee
for l
oafin
g
Reh
ab b
linds
19
and
20
Y
Y
Y Y Y
* * * * * * *
04/0
1/20
06Sp
ray
Tela
r
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sD
isc
AS
AP
afte
r dr
awdo
wn
Sca
ld (b
y irr
igat
e)
Mow
prio
r to
seed
-set
0.1
0.1
0.1
10 112
10
Red
uce
pepp
erw
eed
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Red
uce
join
tgra
ss
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
Page
3 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
CAN
ALS9
90
3:
Cle
an c
ente
r lat
eral
(1.5
mile
s)
Spr
ay p
rimro
se in
ditc
hes
(3.5
mile
s w
ere
treat
ed la
st y
ear)
Rep
lace
rise
r in
cent
er la
tera
l with
a 3
0" (T
27.5
)
Cle
an e
ast d
rain
(bet
wee
n T3
8/T3
9) o
f silt
and
prim
rose
bui
ldup
* * * *
Spra
y R
odeo
4R
educ
e pr
imro
se
T51
19/
1/20
063
:R
ehab
isla
nds
Dis
k pr
imro
se a
nd o
pen
up c
atta
il in
NW
cor
ner
Gra
vel b
oatra
mp
in S
W c
orne
r
Cha
nnel
/pot
hole
nor
th c
orne
r
Add
out
let i
n N
E c
orne
r
Y
YY
Y Y
* * * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Dis
c A
SA
P a
fter
draw
dow
n
3 2
Red
uce
prim
rose
Red
uce
catta
ils/tu
les
T20
990
9/15
/200
63
:C
hann
el lo
w s
pots
usi
ng s
poil
for X
-dik
e (b
etw
een
cells
1&
2) a
nd
isla
nds
Spo
t rep
air f
lood
dam
age
on s
outh
, nor
th a
nd e
ast d
ikes
Con
stru
ct b
oatra
mp
and
pack
gra
vel i
n S
E c
orne
r
Spr
ay p
rimro
se in
ditc
h
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Rem
ove
old
inle
t int
o T2
0.1
Y
Y Y
* * * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay R
odeo
10 0.5
Red
uce
cock
lebu
r
Red
uce
prim
rose
T26
10
8/15
/200
63
:S
pray
pep
perw
eed
with
tela
r (bi
g po
pula
tion
loca
ted
on w
est l
evee
on
laun
ch p
ad)
Rem
ove
rem
aini
ng b
ambo
o an
d sp
ray
resp
rout
s w
ith R
ound
up
Kee
p w
est a
nd e
ast X
-dik
es m
owed
or d
iske
d fo
r bet
ter w
ater
fow
l us
eIn
stal
l pit
blin
ds (s
ee R
ich
P. o
r Mik
e C
. for
loca
tion)
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
YY
Y
YY
Y Y
* * * * *
05/1
5/20
06Sp
ray
Tela
r
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
0.1
Red
uce
pepp
erw
eed
Elim
inat
e a
rund
o
Elim
inat
e a
rund
o
T26
20
9/15
/200
63
:D
isk
prim
rose
Inst
all b
oatra
mp
and
grav
el in
SE
cor
ner
Mai
ntai
n 2
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Dis
k is
land
s an
d op
en u
p un
it
Y
Y
Y Y Y Y
* * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
4R
educ
e pr
imro
se
T27
1-2
18/
15/2
006
3:
Ove
rwat
er b
urn
Rep
lace
CM
P (i
nlet
of c
ell 2
) with
CW
S
Reh
ab b
linds
29D
and
30D
Y
Y* * *
04/1
5/20
06Bu
rn/d
isc
15re
duce
som
e ca
ttail
and
tule
Page
4 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T34
31
9/10
/200
63
:R
emov
e ba
mbo
o an
d sp
ray
with
Rou
ndup
Spr
ay p
eppe
rwee
d w
ith te
lar
Mov
e so
uthw
est o
utle
t for
T33
boa
t ram
p pr
ojec
t
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
Con
stru
ct a
dditi
onal
isla
nds
and
plan
t tul
es, e
spec
ially
on
the
east
side
Pla
nt w
illow
s/co
ttonw
oods
for s
cree
n to
repl
ace
the
bam
boo
Gra
vel a
cces
s ro
utes
to d
isab
led
site
s
Mod
ify d
ock
to A
DA
stan
dard
s - p
our c
oncr
ete
for b
oat a
ppro
ach
Mai
ntai
n ca
nnon
-net
site
in th
e N
E c
orne
r
Y
Y
Y Y Y
* * * * * * * * *
05/1
5/20
06Sp
ray
Tela
r
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
0.1
Red
uce
pepp
erw
eed
Elim
inat
e ar
undo
Elim
inat
e ar
undo
T42
21
10/1
/200
63
:R
epla
ce in
let W
CS
with
18"
WC
S
Mow
slo
pes
for l
oafin
g ha
bita
t
Rem
ove
blac
kber
ries
3 pa
tche
s in
SW
cor
ner a
nd 2
pat
ches
in
the
north
end
Pic
k up
tras
h al
ong
4-m
ile
Eva
luat
e fo
r fut
ure
need
of d
iski
ng
Y
YY
Y Y Y Y
* * * * *
04/1
5/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
s
0.2
0.2
Rem
ove
blac
kber
ries
Rem
ove
blac
kber
ries
T44
10
9/15
/200
63
:M
ow c
ockl
ebur
prio
r to
seed
-set
Dis
k op
enin
gs in
cat
tails
YY
YY
Y* *
05/1
5/20
06M
ow p
rior t
o se
ed-s
et
Sca
ld (b
y irr
igat
e)
Dis
c
10 60 5
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
Red
uce
catta
ils
T11
991
10/1
/200
64
:S
pot r
epai
r sou
th x
-dik
e us
e di
rt fro
m T
16 p
roje
ct
Inst
all b
oatra
mp
and
pack
gra
vel i
n S
E c
orne
r
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Rep
lace
CM
P in
let
Y
Y
Y* * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T21
1-2
08/
15/2
006
4:
Spr
ay p
eppe
rwee
d w
ith te
lar
Follo
w u
p di
skin
g fo
r cel
ls 1
-2
Dis
k jo
intg
rass
in N
W c
orne
r of c
ell 2
. Con
side
r spr
ayin
g it
first
w
ith R
ound
upS
pray
isol
ated
pat
ches
of j
oint
gras
s
Mow
X-d
ike
slop
es fo
r loa
fing
Reh
ab in
line
at S
W c
orne
r
Y
YY
Y Y Y Y
* * * * * *
04/0
1/20
06Sp
ray
Tela
r
Irrig
ate/
scal
d
Dis
c A
SA
P a
fter
draw
dow
nS
pray
Rou
ndup
0.1
128
20 2
Red
uce
pepp
erw
eed
Enh
ance
moi
st
soil
plan
tsR
educ
e jo
intg
rass
Elim
inat
e jo
intg
rass
Page
5 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T21
30
9/1/
2006
4:
Spr
ay p
eppe
rwee
d w
ith te
lar
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Mow
X-d
ikes
for l
oafin
g ha
bita
t
Dis
k jo
intg
rass
on
north
end
Y
YY
Y Y Y
* * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay T
elar
Dis
c 3
or m
ore
times
10 0.1 5
Red
uce
cock
lebu
r
Red
uce
pepp
erw
eed
Red
uce
Ber
mud
a/jo
intg
ras
s
T21
40
9/10
/200
64
:S
cald
coc
kleb
ur w
ith ir
rigat
ion
wat
er fr
om c
ells
1-3
Mow
X-d
ikes
for l
oafin
g ha
bita
t
Y
Y
YY
Y* *
05/0
1/20
06Sc
ald
(by
irrig
ate)
28R
educ
e co
ckle
bur
T22
991
10/1
/200
64
:E
valu
ate
deep
pon
ds in
uni
t
Rem
ove
met
al h
azar
ds a
t cem
ent p
ad
Rem
ove
old
fenc
e an
d ba
rbw
ire (Y
CC
pro
ject
)
Inst
all o
utle
t to
T28
Con
stru
ct 2
isla
nds
in d
eep
part
of u
nit,
stay
aw
ay fr
om fe
athe
r ed
ges
Y
Y Y Y
* * * * *
04/0
1/20
06
T42
11
9/15
/200
64
:C
hann
el fr
om w
est l
ow a
rea
to o
utle
t and
use
spo
il fo
r sou
th d
ike
repa
irR
epla
ce in
let w
ith 2
4" W
CS
and
set
low
er
Spr
ay p
eppe
rwee
d in
SE
cor
ner
Add
isla
nds
Y
Y
Y* * * *
04/1
5/20
06Sp
ray
Tela
r0.
1E
limin
ate
pepp
erw
eed
T18
991
10/1
5/20
065
:R
epla
ce o
utle
t
Mow
eas
t sid
e le
vee
for l
oafin
g
Spr
ay ta
ll w
heat
gra
ss o
n so
uth
end
Y
* * *
04/0
1/20
06Sp
ray
Rou
ndup
0.1
Elim
inat
e ta
ll w
heat
gra
ss
T27
51
9/15
/200
65
:C
ontin
ue to
dis
k pr
evio
usly
dis
ked
chan
nels
and
poc
kets
Rep
lace
out
let
Trim
tree
s at
boa
tram
p
Mai
ntai
n 2
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Y
Y
Y* * * *
04/0
1/20
06D
isc
2 tim
es2
Red
uce
catta
ils/tu
les
T31
990
10/1
/200
65
:B
uild
boa
tram
p an
d pa
ck g
rave
l in
NW
cor
ner
Dis
k re
triev
al z
one
Reh
ab a
ssig
ned
pond
YY
Y
Y* * *
07/1
5/20
06Sc
ald
(by
irrig
ate)
10R
educ
e co
ckle
bur
Page
6 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T32
990
9/1/
2006
5:
Spr
ay p
rimro
se in
del
iver
y di
tch
Spr
ay p
eppe
rwee
d w
ith te
lar (
loca
ted
in S
W c
orne
r nea
r gat
e)
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Reh
ab h
unt a
reas
Rem
ove
blac
kber
ries
in S
W c
orne
r
Eva
luat
e fo
r nat
ive
gras
s re
stor
atio
n
Gra
vel w
est b
ound
ary
road
Dis
k jo
intg
rass
Dis
k em
ergi
ng tu
les/
catta
ils to
kee
p hu
nter
spa
cing
Y
Y
Y
Y Y Y Y
* * * * * * * * *
04/1
5/20
06D
isc
Irrig
ate/
scal
d
Spr
ay R
odeo
Spr
ay T
elar
Spr
ay R
ound
up
5 138 1 0.1
0.1
Red
uce
join
tgra
ss
Enh
ance
moi
st
soil
plan
tsR
educ
e pr
imro
se
Red
uce
pepp
erw
eed
Red
uce
Him
. bl
ackb
erry
T37
21
8/1/
2006
5:
Rep
lace
inle
t and
cha
nnel
out
to u
nit
Spr
ay p
eppe
rwee
d w
ith te
lar l
ocat
ed o
n w
ests
ide
Reh
ab X
-dik
e
Inst
all b
oatra
mp
and
pack
gra
vel i
n S
W c
orne
r
Y
Y Y
* * * *
04/1
5/20
06Sp
ray
Tela
r0.
1R
educ
e pe
pper
wee
d
T21
09/
15/2
006
6:
Reh
ab is
land
s
Dis
k re
mai
ning
join
tgra
ss
Mow
X-d
ike
for l
oafin
g ha
bita
t
Spr
ay p
rimro
se in
N. d
eliv
ery
ditc
h
Y
Y
Y
Y Y* * * *
04/0
1/20
06Sp
ray
Rod
eo
Irrig
ate
Dis
c
2 95 5
Red
uce
prim
rose
Enh
ance
moi
st
soil
plan
tsS
pot d
isk
for
join
tgra
ss
T699
010
/15/
2006
6:
Gra
vel b
oatra
mp
Con
stru
ct is
land
and
reha
b cu
rrent
one
s
YY
Y* *
07/1
5/20
06
T15
990
10/1
5/20
066
:S
pray
join
tgra
ss
Spo
t rep
air n
orth
leve
e
Y
Y
Y* *
05/0
1/20
06Sp
ray
Rou
ndup
5C
ontro
l joi
ntgr
ass
T24
10
9/1/
2006
6:
Spr
ay p
eppe
rwee
d w
ith te
lar
Mow
X-d
ike
for l
oafin
g ha
bita
t
Dis
k to
con
trol t
he jo
intg
rass
and
to p
repa
re a
moi
st-s
oil p
lant
se
edbe
d
Y
Y
YY
Y* * *
04/0
1/20
06Sp
ray
Tela
r
Dis
c A
SA
P a
ft.
draw
dow
nS
cald
(by
irrig
ate)
0.1
30 74
Red
uce
pepp
erw
eed
Red
uce
join
tgra
ss
Red
uce
cock
lebu
r
Page
7 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T30
990
9/1/
2006
6:
Ove
rwat
er b
urn
in c
ell 1
Spr
ay p
eppe
rwee
d w
ith te
lar i
n N
W c
orne
r
Spr
ay p
erla
gra
ss o
n no
rth e
nd w
ith R
ound
up
Reh
ab b
linds
12,
13D
, 14,
15,
16
Y
Y Y
* * * *
05/1
5/20
06Sp
ray
Tela
r
Spr
ay R
ound
-up
Bur
n/di
sc
0.1
0.1
30
Red
uce
pepp
erw
eed
Red
uce
perla
gr
ass
and
tall
whe
atR
educ
e ca
ttail
and
tule
T35
20
9/15
/200
66
:R
emov
e ba
mbo
o an
d sp
ray
resp
rout
s w
ith R
ound
up
Inst
all b
oatra
mp
in S
W c
orne
r
Tule
tran
spla
nts
prio
r to
flood
-up
Mow
coc
kleb
ur p
rior t
o se
ed s
et
Mai
ntai
n 2
hunt
ing
loca
tions
(mow
ing/
disk
ing)
Y
Y
Y* * * * *
04/0
1/20
06Sc
ald
(by
irrig
ate)
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
sM
ow p
rior t
o se
ed-s
et
33 0.1
0.1 5
Red
uce
cock
lebu
r
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Red
uce
cock
lebu
r
T22
09/
15/2
006
7:
Sca
ld o
r mow
coc
kleb
ur
Spr
ay p
eppe
rwee
d w
ith te
lar i
n N
E c
orne
r
Reh
ab X
-dik
e (e
ast s
ide
only
)
Dis
k fo
r joi
ntgr
ass
cont
rol
Y
Y
Y
Y Y
* * * *
04/0
1/20
06Sp
ray
Tela
r
Dis
c A
SA
P a
fter
draw
dow
n
Irrig
ate/
scal
d
Mow
prio
r to
seed
-set
0.1
20 80 20
Red
uce
pepp
erw
eed
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
T399
07
:R
ehab
nor
th d
ike
of n
orth
late
ral
Mon
itor w
ood
duck
box
es
Rep
air l
oadi
ng d
ock
Spr
ay s
hop
area
with
Rou
ndup
Mai
ntai
n sh
op a
rea
Cle
an w
est s
ide
behi
nd s
hop
* * * * * *
Spra
y R
ound
up0.
5W
eed
mai
nten
ance
T799
19/
15/2
006
7:
Rep
lace
CM
P in
inlin
e
Dis
k jo
intg
rass
Pic
k tw
o ce
lls a
nd d
isk
for b
ette
r wat
ergr
ass
germ
inat
ion
YY
Y
Y Y
* * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Mow
prio
r to
seed
-set
20 20
Red
uce
join
tgra
ss
Red
uce
cock
lebu
r
T12
990
7:
Spr
ay ta
ll w
heat
gra
ss o
n so
uth
end
Cle
an u
p pi
pe p
ile in
SW
cor
ner
Y* *
Spra
y R
ound
up0.
1E
limin
ate
tall
whe
at g
rass
T14
990
10/1
/200
67
:R
ock
inle
t
Reb
uild
isla
nds
Mow
X-d
ike
for l
oafin
g ha
bita
t
Y
Y
Y Y* * *
07/1
5/20
06
Page
8 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T17
22
9/15
/200
67
:S
pray
pep
perw
eed
on e
ast s
ide
in m
iddl
e al
ong
road
with
tela
r
Rai
se s
outh
per
mite
r lev
ee
Rep
lace
inle
t and
out
let
Y
Y* * *
04/1
5/20
06Sp
ray
Tela
r0.
1R
educ
e pe
pper
wee
d
T34
1-2
09/
1/20
067
:S
pray
pep
perw
eed
in th
e N
E c
orne
r of c
ell 1
and
eas
t sid
e of
the
X-di
ke b
etw
een
cells
2 a
nd 3
Rem
ove
bam
boo
and
spra
y re
spro
uts
with
roun
d-up
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Mai
ntai
n 3
hunt
ing
loca
tions
(mow
ing/
disk
ing)
in c
ell 2
Take
dirt
from
larg
e is
land
for T
33 b
oat r
amp
proj
ect
Y
Y
Y Y Y
* * * * *
04/1
5/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
sM
ow p
rior t
o se
ed-s
et
Spr
ay T
elar
0.1
0.1 5 0.2
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Red
uce
cock
lebu
r
Red
uce
pepp
erw
eed
T38
990
10/1
/200
67
:R
emov
e ar
undo
(2 c
lum
ps) a
roun
d bl
ind
27
Spr
ay p
eppe
rwee
d w
ith te
lar i
n S
E c
orne
r
Spr
ay o
r cle
an p
rimro
se in
ditc
h
Trea
t per
la g
rass
on
road
s
Reh
ab b
linds
26,
27
& 2
8.
YY
Y
Y
Y Y
* * * * *
07/1
5/20
06Sp
ray
Rou
nd-u
p
Spr
ay R
odeo
Spr
ay T
elar
0.5 2 0.1
Red
uce
perla
gr
ass
Red
uce
prim
rose
Red
uce
pepp
erw
eed
T39
991
9/15
/200
67
:In
stal
l boa
t ram
p an
d pa
ck g
rave
l in
SW
cor
ner o
f cel
l 1
Rem
ove
bam
boo
and
spra
y w
ith ro
und-
up
Mov
e ce
ll 2
outle
t to
NW
cor
ner
Reh
ab b
linds
21,
22,
23,
24
& 2
5
Ope
n up
cha
nnel
sou
th o
f blin
d 22
Kee
p tu
le li
ne d
iske
d ea
st o
f blin
d 23
Kee
p ca
ttails
in c
heck
aro
und
blin
d 25
Ope
n up
cat
tails
/tule
s to
the
east
of b
lind
21
Spr
ay b
lack
berri
es o
n so
uth
end
Hol
d w
ater
in b
otto
m c
ell t
o he
lp g
row
cov
er a
roun
d bl
ind
24
YY
Y
Y Y* * * * * * * * * *
05/1
5/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
sS
pray
Rou
ndup
0.3
0.3
0.1
Elim
inat
e ar
undo
Elim
inat
e ar
undo
Elim
inat
e bl
ackb
errie
s
T43
990
1/1/
2007
7:
Con
nect
inle
t with
exi
stin
g di
tch
and
rebu
ild d
itch
bank
s as
nee
ded
Sha
pe w
est d
ike
and
north
per
imet
er d
ike
at s
ipho
ns
Cha
nnel
and
pot
hole
on
wes
tsid
e us
ing
spoi
l to
reha
b th
e w
est
dike
Spr
ay p
eppe
rwee
d w
ith te
lar l
ocat
ed o
n th
e w
ests
ide
and
north
en
d (in
mid
dle)
Rem
ove
bam
boo
and
spra
y re
spro
uts
with
roun
d-up
Y
Y
Y Y Y Y
* * * * *
12/3
1/20
06Sp
ray
Tela
r
Cut
to g
roun
d
Spr
ay R
ound
up
resp
rout
s
0.1
0.2
0.2
Red
uce
pepp
erw
eed
Elli
min
ate
arun
do
Elli
min
ate
arun
do
Page
9 o
f 11
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T12
09/
15/2
006
8:
Bur
n up
land
s (c
ombi
ne w
ith T
1.1)
*04
/01/
2006
Burn
26E
nhan
ce n
ativ
e pl
ants
T92
11/
1/20
078
:R
epla
ce in
let w
ith 1
8" W
CS
Veg
etat
ion
cont
rol a
long
road
for t
raffi
c vi
sibi
lity
* *12
/31/
2006
T19
990
11/1
/200
68
:S
pray
pep
perw
eed
with
tela
r - m
ostly
loca
ted
alon
g w
est s
ide
Fix
rath
ole
on e
ast s
ide
com
ing
from
the
east
late
ral
Spr
ay ta
ll w
heat
gra
ss o
n no
rth e
nd
Spr
ay p
rimro
se in
ditc
h on
eas
t sid
e
Y
Y Y
* * * *
04/1
5/20
06Sp
ray
Tela
r
Spr
ay R
odeo
Spr
ay R
ound
up
0.1
0.5
0.1
Red
uce
pepp
erw
eed
Red
uce
prim
rose
Elim
inat
e ta
ll w
heat
gra
ss
T23
991
10/1
/200
68
:R
emov
e in
let i
n N
W a
nd p
ut in
NE
cor
ner w
ith 1
8" c
oncr
ete
and
40' p
ipe
Spr
ay ta
ll w
heat
/Per
la g
rass
on
wes
t sid
e
* *
04/1
5/20
06Sp
ray
Rou
ndup
0.1
Elim
inat
e ta
ll w
heat
/Per
la g
rass
T29
990
9/1/
2006
8:
Spr
ay p
eppe
rwee
d w
ith te
lar
Rep
air w
est d
ike
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Reh
ab a
ssig
ned
pond
Y
Y* * * *
04/0
1/20
06Sp
ray
Tela
r
Mow
prio
r to
seed
-set
0.1 5
Red
uce
pepp
erw
eed
Red
uce
cock
lebu
r
T41
994
10/1
/200
68
:C
lean
cha
nnel
s an
d po
thol
es
Mow
sou
th e
nd to
dis
cour
age
hunt
ing
from
road
Floo
d up
land
s af
ter 1
2/1
for h
untin
g op
portu
ntie
s
Rep
lace
4 p
ipes
in X
-dik
es
* * * *
07/1
5/20
06M
ow4
Dis
cour
age
firin
g lin
e
T44
21
10/1
/200
68
:R
ehab
and
repa
ir is
land
s pr
ior t
o fa
ll flo
od-u
p
Dis
k ch
anne
ls if
nee
ded
afte
r sum
mer
wat
er
Rep
lace
CM
P o
utle
t
Y
Y
Y* * *
07/1
5/20
06
T45
20
10/1
/200
68
:R
emov
e ba
mbo
o an
d sp
ray
re-s
prou
ts (e
asts
ide)
Gra
vel w
est r
oad
Y* *
04/1
5/20
06C
ut to
gro
und
Spr
ay R
ound
up
resp
rout
s
0.1
0.1
Elim
inat
e ar
undo
Elim
inat
e ar
undo
T11
011
/1/2
006
9:
Bur
n up
land
s (c
ombi
ne w
ith T
1.2)
. Spr
ay fi
rebr
eak
with
Rou
ndup
an
d bu
rn fi
rebr
eak
prio
r to
the
burn
Dev
elop
a p
lan
to c
ontro
l sta
rthis
tle. D
ata
indi
cate
s un
less
we
can
burn
3 y
ears
in a
row
, bur
ning
is n
ot e
ffect
ive
Y* *
04/0
1/20
06Bu
rn
Spr
ay R
ound
up
Spr
ay R
ound
up
87 1 5
Enh
ance
nat
ive
plan
tsR
educ
e st
arth
istle
Fire
brea
ks
T899
09
:R
emov
e w
ire a
nd w
ood
debr
is fr
om S
W c
orne
r
*
Page
10
of 1
1
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T25
991
10/1
/200
69
:A
dd lo
gs fo
r tur
tle b
aski
ng h
abita
t in
sout
h w
est c
orne
r
Y
YY
*04
/01/
2006
Scal
d (b
y irr
igat
e)52
Red
uce
cock
lebu
r
T35
10
12/1
/200
69
:C
lean
out
cha
nnel
from
inle
t to
outle
t
Y
Y
*04
/01/
2006
T37
10
9:
Rem
ove
CM
P in
SW
cor
ner
*
T44
30
9:
Dev
elop
pla
n fo
r nat
ive
gras
s re
stor
atio
n
*
T499
010
:
T91
010
:M
onito
r "ve
rnal
poo
ls" c
reat
ed d
urin
g 19
92 d
roug
ht re
lief w
ork
*
TA99
010
:R
emov
e po
les
from
old
woo
d du
ck s
ites
*
381=
unit
not f
unct
iona
l due
to m
ultip
le p
robl
ems
5-6=
unit
will
like
l y m
ake
it th
roug
h up
com
ing
seas
on O
NLY
9=un
it fu
nctio
nal,
but r
equi
res
enha
ncem
ent t
o im
prov
e qu
alit y
2=un
it no
t fun
ctio
nal d
ue to
a s
ingl
e pr
oble
m
3-4=
will
like
l y fa
il du
ring
upco
min
g flo
od c
ycle
7-8=
rout
ine
mai
nten
ance
onl
y (i.
e. d
isci
ng la
nes
or c
heck
s, g
rave
l, et
c.)
10=n
o m
aint
enan
ce n
eces
sar y
oth
er th
an s
ite v
isit.
Prio
rity
Num
bers
:
Page
11
of 1
1
PLANNED DRAWDOWN SCHEDULE23-May-06 DEL 20067Year:
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
CANALS 99 S 0 0%:
T10 99 0 0%:
T12 99 0 0%:
T3 99 0 0%:
T36 99 0 0%:
T37 1 0 0%:
T4 99 0 0%:
T44 3 0 0%:
T8 99 0 0%:
T9 1 0 0%:TA 99 0 0%:
0 0
T1 1 14 0%4/1/2006 :
T1 2 S 60 2%4/1/2006 :
T18 99 S 33 2%4/1/2006 :
T2 2 S 80 4%4/1/2006 :
T2 1 S 95 6%4/1/2006 :
T21 1-2 R 128 9%4/1/2006 :
T22 99 S 47 10%4/1/2006 :
T24 1 S 74 12%4/1/2006 :T25 99 S 52 13%4/1/2006 :
T26 2 R 23 13%4/1/2006 :
T27 4 S 51 14%4/1/2006 :
T27 5 R 44 15%4/1/2006 :
T29 99 S 35 16%4/1/2006 :
T35 2 S 33 17%4/1/2006 :
T35 1 S 36 18%4/1/2006 :
T40 99 S 112 20%4/1/2006 :
T45 1 S 41 21%4/1/2006 :
T5 1 R 24 21%4/1/2006 :T5 2 S 141 24%4/1/2006 :
T5 4 S 106 27%4/1/2006 :
T5 3 S 80 28%4/1/2006 :
T7 99 ST 68 30%4/1/2006 :
Page 1 of 3
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
1377 1377
T11 99 S 149 33%4/15/2006 :
T16 99 S 231 38%4/15/2006 :
T17 1 S 32 39%4/15/2006 :
T17 2 S 39 40%4/15/2006 :
T19 99 S 34 40%4/15/2006 :
T20 99 S 166 44%4/15/2006 :
T21 3 S 54 45%4/15/2006 :
T23 99 S 27 46%4/15/2006 :
T27 1-2 S 34 47%4/15/2006 :
T27 3 S 123 49%4/15/2006 :
T32 99 S 138 52%4/15/2006 :
T34 1-2 S 104 54%4/15/2006 :T37 2 S 78 56%4/15/2006 :
T42 2 R 35 57%4/15/2006 :
T42 1 ST 147 60%4/15/2006 :
T45 2 S 35 61%4/15/2006 :
T5 5 S 64 62%4/15/2006 :
1487 2864
T15 99 S 148 65%5/1/2006 :
T21 4 S 28 66%5/1/2006 :
T24 2 S 134 69%5/1/2006 :
310 3174
T26 1 S 141 72%5/15/2006 :
T30 99 S 133 75%5/15/2006 :
T34 3 S 60 76%5/15/2006 :
T39 99 S 146 79%5/15/2006 :
T44 1 S 60 81%5/15/2006 :
541 3714
T33 99 S 224 86%6/1/2006 :
224 3939
T14 99 S 28 86%7/15/2006 :
T28 99 S 111 89%7/15/2006 :
T31 99 S 59 90%7/15/2006 :
T38 99 S 87 92%7/15/2006 :
T41 99 R 16 92%7/15/2006 :
T44 2 S 43 93%7/15/2006 :
Page 2 of 3
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
T6 99 S 90 95%7/15/2006 :
435 4374
T43 99 S 224 100%12/31/2006 :
T9 2 S 2 100%12/31/2006 :
226 4599
4599Grand Total :
Page 3 of 3
Irrigation SummaryRefuge: DEL Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T2 1 4/1/2006 Yes 9/15/2006 Irrigate Enhance moist soil plants 95:
T2 2 4/1/2006 Yes 9/15/2006 Irrigate/scald Reduce cocklebur 80:
T5 2 4/1/2006 Yes 9/15/2006 Irrigate/scald Enhance moist soil plants 140:
T21 1-2 4/1/2006 Yes 8/15/2006 Irrigate/scald Enhance moist soil plants 128:
T21 4 5/1/2006 Yes 9/10/2006 Scald (by irrigate) Reduce cocklebur 28:
T24 1 4/1/2006 No 9/1/2006 Scald (by irrigate) Reduce cocklebur 74:
T25 99 4/1/2006 Yes 10/1/2006 Scald (by irrigate) Reduce cocklebur 52:
T31 99 7/15/2006 No 10/1/2006 Scald (by irrigate) Reduce cocklebur 10:
T32 99 4/15/2006 Yes 9/1/2006 Irrigate/scald Enhance moist soil plants 138:
T35 2 4/1/2006 Yes 9/15/2006 Scald (by irrigate) Reduce cocklebur 33:
T40 99 4/1/2006 Yes 8/15/2006Scald (by irrigate) Reduce cocklebur 112
:
T44 1 5/15/2006 Yes 9/15/2006 Scald (by irrigate) Reduce cocklebur 60:
Page 1 of 1
PLANNED FLOODUP SCHEDULE23-May-06 DEL 20067Year:Refuge:
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED
T44 3 0 0%:T10 99 0 0%:T9 1 0 0%:T8 99 0 0%:T12 99 0 0%:T37 1 0 0%:T36 99 0 0%:T4 99 0 0%:T3 99 0 0%:TA 99 0 0%:CANAL 99 0 0%:
0Subtotal: 08/1/2006
T5 4 106 2%:T5 3 80 4%:T37 2 78 6%:
264Subtotal: 2648/15/2006
T40 99 112 8%:T27 1-2 34 9%:T26 1 141 12%:T21 1-2 128 15%:
680Subtotal: 4169/1/2006
T29 99 35 16%:T30 99 133 18%:T32 99 138 21%:T34 1-2 104 24%:T24 1 74 25%:T21 3 54 26%:T27 3 123 29%:T5 5 64 31%:T5 1 24 31%:
1427Subtotal: 7489/7/2006
T16 99 231 36%:1658Subtotal: 231
Page 1 of 3
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED9/10/2006
T34 3 60 37%:T21 4 28 38%:
1746Subtotal: 899/15/2006
T24 2 134 41%:T1 2 60 42%:T7 99 68 44%:T17 2 39 44%:T2 1 95 47%:T2 2 80 48%:T20 99 166 52%:T5 2 141 55%:T26 2 23 55%:T42 1 147 59%:T39 99 146 62%:T35 2 33 63%:T33 99 224 67%:T27 4 51 69%:T44 1 60 70%:T27 5 44 71%:
3257Subtotal: 151110/1/2006
T41 99 16 71%:T44 2 43 72%:T31 99 59 73%:T22 99 47 74%:T25 99 52 76%:T11 99 149 79%:T28 99 111 81%:T23 99 27 82%:T38 99 87 84%:T45 2 35 84%:T42 2 35 85%:T17 1 32 86%:T14 99 28 86%:
3978Subtotal: 72110/15/2006
T45 1 41 87%:T15 99 148 91%:T18 99 33 91%:T6 99 90 93%:
Page 2 of 3
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED
4289Subtotal: 31111/1/2006
T1 1 14 94%:T19 99 34 94%:
4338Subtotal: 4912/1/2006
T35 1 36 95%:4374Subtotal: 36
1/1/2007T9 2 2 95%:T43 99 224 100%:
4599Subtotal: 226
Page 3 of 3
PLANNED FLOODUP RATE BY MANAGED WETLAND HABITAT TYPE23-May-06 DEL 20067Refuge: Year:
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total8/1/2006 78 0 0 00% 0% 0%2%8/1/2006 184 0 0 00% 0% 0%5%8/1/2006 264 0 0 00% 0% 0%8%
264 0 0 08/1/2006
8/15/2006 405 0 0 00% 0% 0%12%8/15/2006 439 0 0 00% 0% 0%13%8/15/2006 439 128 0 028% 0% 0%13%8/15/2006 551 128 0 028% 0% 0%16%
287 128 0 08/15/2006
9/1/2006 586 128 0 028% 0% 0%17%9/1/2006 649 128 0 028% 0% 0%19%9/1/2006 772 128 0 028% 0% 0%22%9/1/2006 846 128 0 028% 0% 0%24%9/1/2006 870 128 0 028% 0% 0%25%9/1/2006 1003 128 0 028% 0% 0%29%9/1/2006 1003 266 0 058% 0% 0%29%9/1/2006 1057 266 0 058% 0% 0%30%9/1/2006 1161 266 0 058% 0% 0%33%
610 138 0 09/1/2006
9/7/2006 1391 266 0 058% 0% 0%40%231 0 0 09/7/2006
9/10/2006 1419 266 0 058% 0% 0%41%9/10/2006 1480 266 0 058% 0% 0%43%
89 0 0 09/10/2006
9/15/2006 1480 299 0 065% 0% 0%43%9/15/2006 1645 299 0 065% 0% 0%47%9/15/2006 1779 299 0 065% 0% 0%51%9/15/2006 1802 299 0 065% 0% 0%52%9/15/2006 1862 299 0 065% 0% 0%54%9/15/2006 2086 299 0 065% 0% 0%60%9/15/2006 2131 299 0 065% 0% 0%61%9/15/2006 2278 299 0 065% 0% 0%65%9/15/2006 2316 299 0 065% 0% 0%67%9/15/2006 2397 299 0 065% 0% 0%69%9/15/2006 2447 299 0 065% 0% 0%70%9/15/2006 2589 299 0 065% 0% 0%74%9/15/2006 2734 299 0 065% 0% 0%79%9/15/2006 2734 394 0 086% 0% 0%79%9/15/2006 2795 394 0 086% 0% 0%80%9/15/2006 2798 459 0 0100% 0% 0%80%
1318 192 0 09/15/2006
10/1/2006 2798 459 43 0100% 10% 0%80%10/1/2006 2833 459 43 0100% 10% 0%81%
Page 1 of 2
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total10/1/2006 2868 459 43 0100% 10% 0%82%10/1/2006 3017 459 43 0100% 10% 0%87%10/1/2006 3017 459 102 0100% 23% 0%87%10/1/2006 3069 459 102 0100% 23% 0%88%10/1/2006 3095 459 102 0100% 23% 0%89%10/1/2006 3127 459 102 0100% 23% 0%90%10/1/2006 3174 459 102 0100% 23% 0%91%10/1/2006 3174 459 130 0100% 30% 0%91%10/1/2006 3174 459 146 0100% 34% 0%91%10/1/2006 3174 459 234 0100% 54% 0%91%10/1/2006 3174 459 345 0100% 79% 0%91%
376 0 345 010/1/2006
10/15/2006 3207 459 345 0100% 79% 0%92%10/15/2006 3355 459 345 0100% 79% 0%96%10/15/2006 3355 459 435 0100% 100% 0%96%10/15/2006 3395 459 435 0100% 100% 0%98%
221 0 90 010/15/2006
11/1/2006 3430 459 435 0100% 100% 0%99%11/1/2006 3444 459 435 0100% 100% 0%99%
49 0 0 011/1/2006
12/1/2006 3480 459 435 0100% 100% 0%100%36 0 0 012/1/2006
1/1/2007 3480 459 435 224100% 100% 99%100%1/1/2007 3480 459 435 226100% 100% 100%100%
0 0 0 2261/1/2007
Page 2 of 2
Planned Mowing SummaryRefuge: DEL Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T2 1: 4/1/2006 Yes 9/15/2006 Y
T2 2: 4/1/2006 Yes 9/15/2006Mow prior to seed-set Reduce cocklebur 20
Y
T5 1: 4/1/2006 No 9/1/2006 Y
T5 2: 4/1/2006 Yes 9/15/2006 Mow prior to seed-set Reduce cocklebur 10YY
T5 3: 4/1/2006 No 8/1/2006 Y
T5 4: 4/1/2006 No 8/1/2006 Y
T5 5: 4/15/2006 No 9/1/2006 Y
T6 99: 7/15/2006 No 10/15/2006 Y
T7 99: 4/1/2006 Yes 9/15/2006 Mow prior to seed-set Reduce cocklebur 20Y
T11 99: 4/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 10Y
T14 99: 7/15/2006 No 10/1/2006 YY
T16 99: 4/15/2006 No 9/7/2006 Mow prior to seed-set Reduce cocklebur 3YY
T18 99: 4/1/2006 No 10/15/2006 Y
T20 99: 4/15/2006 No 9/15/2006 Mow prior to seed-set Reduce cocklebur 10Y
T21 1-2: 4/1/2006 Yes 8/15/2006 Y
T21 3: 4/15/2006 Yes 9/1/2006 Mow prior to seed-set Reduce cocklebur 10Y
T21 4: 5/1/2006 Yes 9/10/2006 Y YY
T22 99: 4/1/2006 No 10/1/2006 Y
Page 1 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T24 1: 4/1/2006 No 9/1/2006 YY
T25 99: 4/1/2006 Yes 10/1/2006 YY
T26 1: 5/15/2006 No 8/15/2006 Y YY
T27 3: 4/15/2006 No 9/1/2006 Y
T28 99: 7/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 10YY
T29 99: 4/1/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 5Y
T31 99: 7/15/2006 No 10/1/2006 Y
T32 99: 4/15/2006 Yes 9/1/2006 Y
T33 99: 6/1/2006 No 9/15/2006 Y
T34 1-2: 4/15/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 5YY
T34 3: 5/15/2006 No 9/10/2006 Y Y
T35 2: 4/1/2006 Yes 9/15/2006Mow prior to seed-set Reduce cocklebur 5
Y
T37 2: 4/15/2006 No 8/1/2006 Y
T38 99: 7/15/2006 No 10/1/2006 Y YY
T39 99: 5/15/2006 No 9/15/2006 Y
T40 99: 4/1/2006 Yes 8/15/2006Mow prior to seed-set Reduce cocklebur 10
Y
T41 99: 7/15/2006 No 10/1/2006 Mow Discourage firing line 4
T42 1: 4/15/2006 No 9/15/2006 Y
T42 2: 4/15/2006 No 10/1/2006 Y
T43 99: 12/31/2006 No 1/1/2007 Y
Page 2 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T44 1: 5/15/2006 Yes 9/15/2006 Mow prior to seed-set Reduce cocklebur 10YY
T44 2: 7/15/2006 No 10/1/2006 Y
Page 3 of 3
Planned Discing SummaryRefuge: DEL Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T2 1: 04/01/2006 Yes 09/15/2006 Disc Spot disk for jointgrass 5YY
T2 2: 04/01/2006 Yes 09/15/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 20YY
T5 1: 04/01/2006 No 09/01/2006 Disc ASAP after drawdownDisc ASAP after drawdown
Reduce primroseReduce cattails/tules
32
YY
T5 2: 04/01/2006 Yes 09/15/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 5Y
T5 3: 04/01/2006 No 08/01/2006 Disc ASAP after drawdown Reduce Berm./jointgrass 15Y
T5 4: 04/01/2006 No 08/01/2006 Disc ASAP after drawdown Make firebreaks 5
T5 5: 04/15/2006 No 09/01/2006 Burn/disc Reduce jointgrass 64
T6 99: 07/15/2006 No 10/15/2006 Y
T7 99: 04/01/2006 Yes 09/15/2006 Disc ASAP after drawdown Reduce jointgrass 20YY
T11 99: 04/15/2006 No 10/01/2006 Y
T15 99: 05/01/2006 No 10/15/2006 YY
T16 99: 04/15/2006 No 09/07/2006 YY
T17 1: 04/15/2006 No 10/01/2006 Y
T17 2: 04/15/2006 No 09/15/2006 Y
T19 99: 04/15/2006 No 11/01/2006 Y
T21 1-2: 04/01/2006 Yes 08/15/2006 Disc ASAP after drawdown Reduce jointgrass 20YY
T21 3: 04/15/2006 Yes 09/01/2006 Disc 3 or more times Reduce Bermuda/jointgrass 5YY
Page 1 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T21 4: 05/01/2006 Yes 09/10/2006 Y
T24 1: 04/01/2006 No 09/01/2006 Disc ASAP aft. drawdown Reduce jointgrass 30YY
T26 1: 05/15/2006 No 08/15/2006 YY
T26 2: 04/01/2006 No 09/15/2006 Disc ASAP after drawdown Reduce primrose 4YY
T27 1-2: 04/15/2006 No 08/15/2006 Burn/disc reduce some cattail and tule 15Y
T27 3: 04/15/2006 No 09/01/2006 Y
T27 4: 04/01/2006 No 09/15/2006 Disc 2 times Reduce cattails/tules 5YY
T27 5: 04/01/2006 No 09/15/2006 Disc 2 times Reduce cattails/tules 2YY
T30 99: 05/15/2006 No 09/01/2006 Burn/disc Reduce cattail and tule 30Y
T31 99: 07/15/2006 No 10/01/2006 YY
T32 99: 04/15/2006 Yes 09/01/2006 Disc Reduce jointgrass 5YY
T35 1: 04/01/2006 No 12/01/2006 Y
T35 2: 04/01/2006 Yes 09/15/2006 Y
T38 99: 07/15/2006 No 10/01/2006 Y
T39 99: 05/15/2006 No 09/15/2006 YY
T40 99: 04/01/2006 Yes 08/15/2006Disc ASAP after drawdown Reduce jointgrass 10
Y
T42 1: 04/15/2006 No 09/15/2006 Y
T42 2: 04/15/2006 No 10/01/2006 YY
T43 99: 12/31/2006 No 01/01/2007 Y
Page 2 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T44 1: 05/15/2006 Yes 09/15/2006 Disc Reduce cattails 5YY
T44 2: 07/15/2006 No 10/01/2006 Y
T45 1: 04/01/2006 No 10/15/2006 Y
Page 3 of 3
Planned Spray SummaryRefuge: DEL Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?CANAL 99 No Spray Rodeo Reduce primrose 4:
T1 1 4/1/2006 No 11/1/2006 Spray RoundupSpray Roundup
Reduce starthistleFirebreaks
15
:
T2 1 4/1/2006 Yes 9/15/2006 Spray Rodeo Reduce primrose 2:
T2 2 4/1/2006 Yes 9/15/2006 Spray Telar Reduce pepperweed 0.1:
T3 99 No Spray Roundup Weed maintenance 0.5:
T5 2 4/1/2006 Yes 9/15/2006Spray Roundup resprouts Eliminate arundo 0.1
:
T5 3 4/1/2006 No 8/1/2006 Spray Round-up Reduce jointgrass 3:
T10 99 No Spray Telar Reduce pepperweed 0.1:
T12 99 No Spray Roundup Eliminate tall wheat grass 0.1:
T15 99 5/1/2006 No 10/15/2006 Spray Roundup Control jointgrass 5:
T17 1 4/15/2006 No 10/1/2006 Spray Garlon-cut stump Remove palm tree 0.1:
T17 2 4/15/2006 No 9/15/2006 Spray Telar Reduce pepperweed 0.1:
T18 99 4/1/2006 No 10/15/2006 Spray Roundup Eliminate tall wheat grass 0.1:
T19 99 4/15/2006 No 11/1/2006 Spray TelarSpray RodeoSpray Roundup
Reduce pepperweedReduce primroseEliminate tall wheat grass
0.10.50.1
:
T20 99 4/15/2006 No 9/15/2006 Spray Rodeo Reduce primrose 0.5:
T21 1-2 4/1/2006 Yes 8/15/2006 Spray Telar
Spray Roundup
Reduce pepperweed
Eliminate jointgrass
0.1
2
:
T21 3 4/15/2006 Yes 9/1/2006 Spray Telar Reduce pepperweed 0.1:
T23 99 4/15/2006 No 10/1/2006 Spray Roundup Eliminate tall wheat/Perla grass
0.1:
Page 1 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T24 1 4/1/2006 No 9/1/2006 Spray Telar Reduce pepperweed 0.1:
T26 1 5/15/2006 No 8/15/2006 Spray Telar
Spray Roundup resprouts
Reduce pepperweed
Eliminate arundo
0.1
0.1
:
T27 3 4/15/2006 No 9/1/2006 Spray Telar
Spray Roundup resprouts
Spray Garlon-cut stump
Reduce pepperweed
Eliminate blackberries
Eliminate euc's
0.1
0.1
0.1
:
T28 99 7/15/2006 No 10/1/2006 Spray Telar
Spray Roundup
Reduce pepperweed
Reduce jointgrass
0.1
5
:
T29 99 4/1/2006 No 9/1/2006 Spray Telar Reduce pepperweed 0.1:
T30 99 5/15/2006 No 9/1/2006 Spray TelarSpray Round-up
Reduce pepperweedReduce perla grass and tall wheat
0.10.1
:
T32 99 4/15/2006 Yes 9/1/2006 Spray RodeoSpray TelarSpray Roundup
Reduce primroseReduce pepperweedReduce Him. blackberry
10.10.1
:
T33 99 6/1/2006 No 9/15/2006 Spray Roundup resprouts Eliminate arundo 0.1:
T34 1-2 4/15/2006 No 9/1/2006 Spray Roundup resprouts
Spray Telar
Eliminate arundo
Reduce pepperweed
0.1
0.2
:
T34 3 5/15/2006 No 9/10/2006 Spray Telar
Spray Roundup resprouts
Reduce pepperweed
Eliminate arundo
0.1
0.1
:
T35 2 4/1/2006 Yes 9/15/2006 Spray Roundup resprouts Eliminate arundo 0.1:
T36 99 No Spray TelarSpray Garlon-cut stumpSpray Roundup resprouts
Reduce pepperweedElliminate salt cedarEliminate arundo
0.10.20.2
:
T37 2 4/15/2006 No 8/1/2006 Spray Telar Reduce pepperweed 0.1:
T38 99 7/15/2006 No 10/1/2006 Spray Round-upSpray RodeoSpray Telar
Reduce perla grassReduce primroseReduce pepperweed
0.52
0.1
:
T39 99 5/15/2006 No 9/15/2006 Spray Roundup resproutsSpray Roundup
Eliminate arundoEliminate blackberries
0.30.1
:
T40 99 4/1/2006 Yes 8/15/2006 Spray Telar
Spray Roundup resprouts
Reduce pepperweed
Eliminate arundo
0.1
0.1
:
Page 2 of 3
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T42 1 4/15/2006 No 9/15/2006 Spray Telar Eliminate pepperweed 0.1:
T42 2 4/15/2006 No 10/1/2006 Spray Roundup resprouts Remove blackberries 0.2:
T43 99 12/31/2006 No 1/1/2007 Spray Telar
Spray Roundup resprouts
Reduce pepperweed
Elliminate arundo
0.1
0.2
:
T45 1 4/1/2006 No 10/15/2006 Spray Telar Reduce pepperweed 0.1:
T45 2 4/15/2006 No 10/1/2006 Spray Roundup resprouts Eliminate arundo 0.1:
Page 3 of 3
Planned Burn SummaryRefuge: DEL Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T1 1 4/1/2006: No 11/1/2006 Burn Enhance native plants 87
T1 2 4/1/2006: No 9/15/2006 Burn Enhance native plants 26
T5 4 4/1/2006: No 8/1/2006 Burn Reduce jointgrass 106
T5 5 4/15/2006: No 9/1/2006 Burn/disc Reduce jointgrass 64
T27 1-2 4/15/2006: No 8/15/2006 Burn/disc reduce some cattail and tule 15
T30 99 5/15/2006: No 9/1/2006 Burn/disc Reduce cattail and tule 30
Page 1 of 1
Plan
ned
Publ
ic U
se P
roje
cts
Ref
uge:
Year
:D
EL20
067
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T26
1K
eep
wes
t and
eas
t X-d
ikes
mow
ed o
r dis
ked
for b
ette
r wat
erfo
wl u
seIn
stal
l pit
blin
ds (s
ee R
ich
P. o
r Mik
e C
. for
loca
tion)
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)
:08
/15/
2006
05/1
5/20
06
T26
2M
aint
ain
2 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g):
09/1
5/20
0604
/01/
2006
T27
1-2
Reh
ab b
linds
29D
and
30D
:08
/15/
2006
04/1
5/20
06
T27
3R
emov
e fo
otbr
idge
X-in
gG
rave
l che
ckst
atio
n ro
adR
ehab
blin
ds 1
,2,4
,&5
:09
/01/
2006
04/1
5/20
06
T27
4M
aint
ain
3 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g):
09/1
5/20
0604
/01/
2006
T27
5M
aint
ain
2 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g):
09/1
5/20
0604
/01/
2006
T28
99Tu
le tr
ansp
lant
s im
med
iate
ly p
rior t
o flo
odup
Reh
ab b
linds
6-1
0:
10/0
1/20
0607
/15/
2006
T29
99R
ehab
ass
igne
d po
nd:
09/0
1/20
0604
/01/
2006
T30
99R
ehab
blin
ds 1
2, 1
3D, 1
4, 1
5, 1
6:
09/0
1/20
0605
/15/
2006
T31
99D
isk
retri
eval
zon
eR
ehab
ass
igne
d po
nd:
10/0
1/20
0607
/15/
2006
T32
99R
ehab
hun
t are
asD
isk
emer
ging
tule
s/ca
ttails
to k
eep
hunt
er s
paci
ng:
09/0
1/20
0604
/15/
2006
T33
99In
stal
l elb
ow a
nd p
ipe
on o
utle
t fro
m T
34.3
in d
itch
to a
llow
ing
fillin
g of
ditc
h fo
r eas
ier b
oat l
aunc
hing
Rep
lace
inle
t off
of c
ente
r lat
eral
with
a 3
0" W
CS
Kee
p no
rth le
vee
mow
ed to
dis
cour
age
road
hun
ters
Con
stru
ct 2
hun
t (do
g) is
land
s
:09
/15/
2006
06/0
1/20
06
T34
1-2
Mai
ntai
n 3
hunt
ing
loca
tions
(mow
ing/
disk
ing)
in c
ell 2
Take
dirt
from
larg
e is
land
for T
33 b
oat r
amp
proj
ect
:09
/01/
2006
04/1
5/20
06
Page
1 o
f 2
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T34
3M
ove
sout
hwes
t out
let f
or T
33 b
oat r
amp
proj
ect
Mai
ntai
n hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g)C
onst
ruct
add
ition
al is
land
s an
d pl
ant t
ules
, esp
ecia
lly o
n th
e ea
stsi
deP
lant
willo
ws/
cotto
nwoo
ds fo
r scr
een
to re
plac
e th
e ba
mbo
oG
rave
l acc
ess
rout
es to
dis
able
d si
tes
Mod
ify d
ock
to A
DA
sta
ndar
ds -
pour
con
cret
e fo
r boa
t app
roac
h
:09
/10/
2006
05/1
5/20
06
T35
2M
aint
ain
2 hu
ntin
g lo
catio
ns (m
owin
g/di
skin
g):
09/1
5/20
0604
/01/
2006
T38
99R
ehab
blin
ds 2
6, 2
7 &
28.
:10
/01/
2006
07/1
5/20
06
T39
99R
ehab
blin
ds 2
1, 2
2, 2
3, 2
4 &
25
Ope
n up
cha
nnel
sou
th o
f blin
d 22
Kee
p tu
le li
ne d
iske
d ea
st o
f blin
d 23
Kee
p ca
ttails
in c
heck
aro
und
blin
d 25
Ope
n up
cat
tails
/tule
s to
the
east
of b
lind
21H
old
wat
er in
bot
tom
cel
l to
help
gro
w c
over
aro
und
blin
d 24
:09
/15/
2006
05/1
5/20
06
T40
99R
ehab
blin
ds 1
9 an
d 20
:08
/15/
2006
04/0
1/20
06
T41
99M
ow s
outh
end
to d
isco
urag
e hu
ntin
g fro
m ro
adFl
ood
upla
nds
afte
r 12/
1 fo
r hun
ting
oppo
rtunt
ies
:10
/01/
2006
07/1
5/20
06
Page
2 o
f 2
Colusa NWRT1AT1:1
T1:2
T2 T3:2 T3:1T4
T9
Powe ll Slough
T8
T7
T1:3T6:1
T6:2
T6AT6:3
T5:99 T6:4
T10A:2
T10A:1T10:1 T10:3
T10:2 T10:4
T12:1 T12:3
T12A:1
T11
T12:2 T12:4
T13:1 T13:3
T13:2 T13:4
T13A
T15AT15:4T15:3
T15:2T15:1
T16T16A
T17
T12A:2
T14:1
T14:3
T24:1
T24:2
T24:3
T24:4
T24:5
T24:7
T24:8
T24:9
T24:10
T24:12 T24:13
T24:11
T18
T21:1
T21:2
T22:1
P3 P4
P1 P2
T19:1
T19:2
T19:3
T19:4
P6P5
T23:1 T23:2
T20:1
T20:3
T20:2
T2A
T14:4
T24:7A
T24:6
T:25
T14:2
T22:2
2047
J-Drain
152
149
97
97
144
143
93
92
87
83
119
124
82
81
115
80
113
76
76
76
73
71
71
70
69
69
68
59
57
55
5555
54
54
54
53
53
52
52
52
51
5050
47
45
45
45
44
42
42
41
41
39
38
37
37
34
34
34
31
29
28
28
27
27
26
25
25
24
23
22
19
18
18
18
18
15
13
12
12
11
12
12
6
5
25
11
11
5
4
3
2
Cal ifornia
°
0 6 12 18 243Miles
Sacramento NWR
Delevan NWR
Colusa NWR
Sutter NWR
Butte S ink NWR
Sacramento River NWR
Sacramento NWR Complex
0 0.5 1 1.5 20.25Miles
Refuge Boundary
Roads 2006-07Paved
All Weather
Standard Dirt
Non-Drivable
Railroad
Cell Boundaries (no roads)
Habitat Management 2006-07Seasonal Flooded Marsh
Unmanaged Freshwater Wetland
Watergrass
Summer Water
Permanent Pond
Vernal Pool
Alkali Meadow
Vernal Pool/Alkali Meadow Complex
Riparian Willow Scrub
Cottonwood Willow
Mixed Riparian Forest
Annual Grassland
Perennial Grassland
Facilities
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 1
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T1 CELL: 1-2
DRAWDOWN DATE: 3/15/2006DRAWDOWN RATE: ST
Yes
FLOOD DATE: 8/10/2006
UNITS REQ. DOWN 1st: none
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Draw c1 into c2 starting 3/15; New outlet from T1.2 to the 2047 added in 2005 so can drain without going through T1.3
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
84
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disc Bermuda/jointgrass in both cells2. Mow cockleburr prior to seedset3. Mow levee tops and slopes for loafing prior to floodup4. Drawdown 3/15/06, then evaluate need to scald cocklebur5. Replace southwest WCS of T1.1 with a 4ft, 24" WCS6. Rock the new WCS in T1.2 (outlet to 2047)7. Possible regrade of roads due to flood damage between c1 & c2 and between c2 & c38. Gravel area near highway pump NW corner of c1 (one load) and regrade low spot9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 84
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscMow prior to seed-setScald (by irrigate)
Reduce Bermuda/jointgrassReduce cockleburReduce cocklebur
202083
ACRES:TREATMENT: OBJECTIVE:DiscMow prior to seed-setScald (by irrigate)
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 2
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T1 CELL: 3
DRAWDOWN DATE: 8/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T1.1-2 OR T2A
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water 1996, 1997, 2002, 2003, 2005; Cattails have increased adjacent to tour route since 2002; Good production of GADW and CITE in 2002 (banding site), and GADW, CITE, and WODU in 2005
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
52
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disc viewing lanes, but leave cattail buffer along most of tour route and leave a solid central patch
for nesting tricolor BB's2. Evaluate funding for tour route turn-out3. Photo blind potentially funded for 2006, evaluate best location4. Photo blind parking area to be built by bridge5. Gravel path to photo blind6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 52
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Rodeo resprouts
Reduce arundoReduce arundo
0.10.1
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Rodeo resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 3
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T1A CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Converted this unit name from Tract 25 to Tract A in 2002, then T1A in 2003; T25 was used for new unit south of T24; Acquired by refuge in 1996; A triangle of upland betw. 2047 and ricefields to west, across from T1
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
11
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove trash2. Repost boundary3. Evaluate for potential habitat enhancement project, possible with willow and cottonwood plantings4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 11
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 4
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T2 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Watergrass 1995, 2001, 2002; NAWCA project completed summer 2000: rehabbed interior/perimeter levees, created potholes/channels/islands; Have only irrigated bottom cell (thru T2A) - only cell where watergrass had germinated well - N cells have had good timothy
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
81
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot repair west road with scraper2. Rip-rap WCS at hwy 20 gate3. Mow sections of interior levees (incl. slopes) for loafing/grazing areas prior to floodup4. Spot disc Bermuda grass5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 81
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc Reduce Bermuda grass 10ACRES:TREATMENT: OBJECTIVE:
DiscACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 5
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T2A CELL: 99
DRAWDOWN DATE: 8/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water in 1998; NAWCA project completed summer 2000: rehab perimeter levees; Draw down to 6-12" above pond bottom from Nov 1 through Mar 15, otherwise hold water stable at max level
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
12
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Haul eucalyptus snags into center and north areas (1 each)2. Remove old metal pipe visible from N end3. Hold water level at 6-12" until August to encourage cattail growth4. Replace 4ft riser going into T2A from T3.2 with 24" pipe5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 12
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 6
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T3 CELL: 1
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water in 1996, 2001-2005; Modified walking trail in 2002 to keep visitors on E side of ditch to reduce disturbance - worked well; Crossed by power line; Completed NAWCA project summer 2000: repaired perimeter levee, excavated potholes/channels, built islands; Good watergrass production in low-lying areas of burhead following drawdown (not reflected in 6/18/01 survey); Excellent unit for waterfowl production (esp. wood ducks), winter densities, resident spp (WP turtles) and quality viewing
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
18
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disc to leave about 20-25% lanes/openings for viewing, leave majority of vegetation screen along
east edge2. Evaluate need to spray Himalayan blackberry along east side, including walking trail with Round-
up, Rodeo or Garlon3. Mud up WCS after drawdown to prevent accidental reflooding4. Mud up WCS to prevent flooding of T45.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 18
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setSpray Round-up, Rodeo
Reduce cockleburReduce blackberry
200.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setSpray Round-up, Rodeo or Gar
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 7
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T3 CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Current kiosk/parking area may be upgraded in 2007 public use facilities renovation; NAWCA project summer 2000: repaired perimeter levee, excavated potholes/channels, built islands; Unit continues to be excellent for visitor viewing at kiosk - waterfowl here are in good numbers/diversity and have traditionally habituated well to disturbance; Mosquito research "treatment" unit fall 2004, 2005 and 2006
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
54
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cockleburr prior to seed set as necessary2. Evaluate kiosk for potential upgrades when new public use area east of Powell Slough is constucted3. Mosquito study ongoing4. Lay grit again between kiosk and island5. Replace WCS at SW corner w/ 4' concrete 24" WCS6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 54
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 8
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T4 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: T9
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water 2001-02; Permanent pond 2003-04; NAWCA project completed summer 2000: created wetland from T3 siphon to T9 in 2002, siphon failed but started functioning again in 2003; Planted 3500 creeping wildrye and 2500 SB sedge plugs 20-60 yds N of Powell Sl bridge on east side in 2003; Good late season whitefront use (grazing on grasses) Jan-Mar 2006; Public facilities upgrade planned for SW corner - parking area/kiosk/obs platform - construction to begin 2007
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
2
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
45
Perennial Grasslnd
20
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Cap/fill well at old residence site2. Drawdown T4 and T9 for NAWCA siphon project summer 20063. Disc firebreak along Hwy 20 border4. Parking area (~10 cars) along entrance road near old residence site fully funded and to be
constructed in May/June 20075. Concrete paths leading north from parking area fully funded and to be constucted in 20076. Investigate funding for construction of viewing platform and shelter7. Continue to spray pepperweed patches w/Telar, with priority to those in east half8. Spray satellite patches of tall wheat w/Roundup to keep from invading open areas9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 68
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarIrrigateDiscSpray Roundup
Reduce pepperweedMaintain treesCreate firebreakReduce tall wheat
0.1111
ACRES:TREATMENT: OBJECTIVE:Spray TelarIrrigateDiscSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 9
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T5 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: T10A
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Last summer water in 2004 - good alkali/tuberous bulrush response; BOR/DU project for T5/T6A/T10A completed summer 2003; Planted 1500 creeping wildrye and SB sedge plugs on both sides along eastern 1/4 of new ditch on S end in 2003
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
97
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disc Bermuda/jointgrass early, ASAP after drawdown2. Mow sections of levees/slopes for loafing/grazing areas, including interior and east levees3. Mow cockleburr prior to seed set as necessary4. Mow viewing lanes along tour route5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 97
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowMow prior to seed-set
Reduce Bermuda/jointgrassReduce cocklebur
2010
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 10
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T6 CELL: 99
DRAWDOWN DATE: 4/10/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Cell 3 grazed (sheep) and heavily disced 2000-2003; Cells 2 and 3 grazed and lightly disced in 2005
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
134
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Disc Bermuda/jointgrass in cells 1, 2 & 32. Mow sections of interior levees (incl. slopes) for loafing/grazing areas prior to floodup3. Disc viewing lanes and mow turnouts on tour route4. Follow up spraying pepperweed on interior levees/islands with Telar5. Monitor plant response to drawdowns and spring rains, and if need to irrigate, avoid timing just
before Colusa County Fair in early June6. Replace riser in SE corner of cell 17.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 134
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscSpray TelarIrrigate
Reduce Bermuda/jointgrassReduce pepperweedEnhance moist soil plants
400.5134
ACRES:TREATMENT: OBJECTIVE:DiscSpray TelarIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 11
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T6A CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water in 1996, 1997, 1999, 2000; SFM in 2003; PP in 2004, 2005; NAWCA project 1997 rehabbed perimeter levees, created channels/island; BOR/DU project for T5/T6A/T10A completed summer 2003 - conveyance project; During PP cycle, draw down to 6-12" above pond bottom from Nov 1 through Mar 15, otherwise hold water stable at max level; TCBB's nested in 2001 in S end; Major BCNH roost
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
41
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add/repair wood duck boxes2. Repair muskrat holes on roads between 6A & 6.3 and between 6A & 6.23. Disc primrose4. Push 2005 willow trimmings into unit for decomposition5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 41
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP aft. drawdown Reduce primrose 20ACRES:TREATMENT: OBJECTIVE:
Disc ASAP aft. drawdownACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 12
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T7/8/11 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:All mgd wetlands eliminated 1998; T7, 8, & 11 combined & called "T7:99" 1999-2004…as of 2005, they are "T7/8/11:99"; Cordylanthus unit - avoid travel or other ground disturbance; Burned N 1/3 (T7) in 12/99 & middle 1/3 (T8) in 1/00; Pepperweed and burn study site 1999-2000; Very W side along 2047 grazed w/sheep '02, '04, '05 outside cordyl areas - good results in removing pepperweed/starthistle; WFGO grazed heavy Feb/Mar '03-04; Heavy bird use in Dec/Jan '04-06; 3 freq frame monit. stns (one ea in T7, 8, & 11) w/3 transects in ea…marked by rebar; Veg spp comp meas. 6/04 during fire pre-burn monitoring
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
42
Vernal Pool
9.7
VP Alkali Meadow Complex
0
Alkalli Meadow
225
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
2
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Cordylanthus/cattle grazing study to be started late summer/fall 2006 to remove lolium & annual
grasses2. Initiate control of pepperweed (Telar)3. Experiment with use of Roundup for control of salsola soda4. Spot-spray perla grass with Roundup (outliers on edge)5. Burn southern end (original T11) in fall/winter if cattle grazing study permits6. Remove arundo patches along 2047 and spray resprouts w/Rodeo7. Spraypaint frequency plot rebar markers8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 534
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Graze cattleSpray RodeoSpray Round-upSpray Round-upSpray TelarBurn
Reduce lolium & annual grassesReduce arundoReduce salsola sodaReduce perlagrassReduce pepperweedEnhance native plants
800.10.10.10.180
ACRES:TREATMENT: OBJECTIVE:Graze cattleSpray RodeoSpray Round-upSpray Round-upSpray TelarBurn
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 13
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T9 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T4
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water 1995, 2001, 2005; Permanent pond 2002-2004; SFM 1996-2000. Water dates apply to SFM…N end wetlands should remain permanent (tied to T4); NAWCA project completed in summer 2000, enhancing existing and creating additional wetlands; Pepperweed study site 1999-2001; Grazed sheep '03, 04, 05…good results in removing above-ground biomass of pepperweed/starthistle & other non-natives; Good use by grazing geese spring 2004, 2006; in 2003, cattail and other emergents starting to come in along edges - increasing WL diversity and #'s
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
18
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
124
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Graze 300-400 head of sheep, follow up with spot-spraying Telar on pepperweed resprouts2. May have to fence N end of unit to keep sheep in, will lose water barrier due to loss of water mg't
through T43. Spot spray pepperweed as needed4. Maintain west perimeter road5. Repair road on W side - sloughing bank6. Post east boundary7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 144
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Graze sheepSpray TelarSpray Round-up
Reduce starthistle/pepperweedReduce pepperweedMaintain Shop Parking Area
13351
ACRES:TREATMENT: OBJECTIVE:Graze sheepSpray TelarSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 14
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T10 CELL: 1-2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: T10.3-4
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
101
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate cost/need of abandoning well in nw corner2. Mow cockleburr prior to seed set, including areas along tour route to allow viewing3. Mow sections of interior levees (incl slopes) for loafing/grazing areas prior to floodup4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 101
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 15
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T10 CELL: 3
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: none
UNITS REQ. FLOOD 1st: none
SPECIAL MANAGEMENT CONSIDERATIONS:Flood to west side and hold stable; Added new inlet from the T5 ditch in 2005 to give independent water mgt capability
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
42
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add more gravel to boat ramp in NE corner of cell 32. Mow sections of interior levees (incl slopes) for loafing/grazing areas prior to floodup3. Tule transplants along tour route in cell 3 to buffer disturbance…island currently has little bird use4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 42
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 16
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T10 CELL: 4
DRAWDOWN DATE: 3/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: T10A
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Flood to west side and hold stable
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 0
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
50
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Drawdown 3/6/06, reflood after cocklebur germination, then drawdown again2. Repair roads between T10.4 and T12.3, and between T10.4 and T10A.13. Mow sections of interior levees (incl slopes) for loafing/grazing areas prior to floodup4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 50
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate/scald Reduce cocklebur 50ACRES:TREATMENT: OBJECTIVE:
Irrigate/scaldACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 17
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T10A CELL: 1
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE:
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:SFM in 1995-1999, 2003-2005; SW in 2000; PP in 2001-2002; BOR/DU project for T5/T6A/T10A completed summer 2003 = new capability for independent water delivery for T10A.1 and independent drain for T6A; During PP cycle, draw down to 6-12" above pond bottom from Nov 1 through Mar 15, otherwise hold water stable at max level; Increasing large BCNH winter roost 2002-05; Mosquito research "treatment" unit fall 2004 and again 2005
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
41
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor Santa Barbara sedge plugs planted along new drain canal in NW corner2. Repair toe levee where canal comes out of T6A and T6.4 (leaking) following next SFM cycle3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 41
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 18
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T10A CELL: 2
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:"Turtle Pond"; Draw water off upper shelf at drawdown and reflood at flood date; "Turtle Pond" acres classified as PP…more appropriate for this wetland as it has always remained flooded to some degree (unmanaged wetland)
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
7
Water-grass
0
Summer Water
0
Perm Pond
6
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove arundo from along 2047 drain and spray resprouts with Rodeo2. Add wood duck box on downed tree3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 13
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Cut to groundSpray Rodeo resprouts
Reduce arundoReduce arundo
0.50.5
ACRES:TREATMENT: OBJECTIVE:Cut to groundSpray Rodeo resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 19
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T12 CELL: 1-2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: T12.3-4
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Willow cuttings planted along west side of c2 in 2002
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
107
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate need to irrigate trees in cell 2 only - do not spill into areas outside berm, let evaporate2. Clean out inlet channels at west lateral3. Mow sections of interior levees (incl slopes) for loafing/grazing areas4. Mow cockleburr as necessary5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 107
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setEvaluate need to irrigate
Reduce cockleburMaintain trees
104.7
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setEvaluate need to irrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 20
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T12 CELL: 3-4
DRAWDOWN DATE: 4/10/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/10/2006
UNITS REQ. DOWN 1st: T12A
UNITS REQ. FLOOD 1st: T12.1-2
SPECIAL MANAGEMENT CONSIDERATIONS:Flood to west side and hold stable
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
126
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Repair east sides of cells 3 and 4 levees2. Mow sections of interior levees (incl slopes) for loafing/grazing areas prior to flood-up3. Mow cocklebur prior to seedset4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 126
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 21
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T12A CELL: 1
DRAWDOWN DATE: 4/10/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T10A or T12.3-4
SPECIAL MANAGEMENT CONSIDERATIONS:Permanent pond in 1998; SFM in 2005; Project planned for conveying drainwater from T12A directly to N-S J-Drain to avoid having to dump back into GCID system rather than using in other downstream refuge wetlands (Duck Stamp $); Mosquito research "treatment" unit fall 2004, 2005, and 2006
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
76
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Flume structure to be installed from outlet to N/S J-Drain (contracted)2. Clean out silt around inlet from T10A3. Keep trapping island clean of vegetation - lay grit on SE road4. Mow heavy stands of cockleburr prior to seed set as necessary5. Mosquito research ongoing6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 76
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 40ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 22
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T12A CELL: 2
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st:
SPECIAL MANAGEMENT CONSIDERATIONS:Currently unmanaged unit: floods naturally during early flood stage of 2047 and provides good waterfowl habitat; Pepperweed study site 1999-00; Redtails and great-horned owls have nested nearly annually in willows along 2047
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
12
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 12
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 23
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T13 CELL: 1-2
DRAWDOWN DATE: 4/5/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: T13.3-4
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:New delivery canal from west canal to N-S J-Drain (N side of c1/c3/T13A) constructed 2002
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
109
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate need to irrigate trees in cell 1 - do not spill outside bermed area…let evaporate2. Mow sections of interior levees (incl slopes) for loafing/grazing areas3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 109
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate west edge cell 1 Maintain trees 3.5ACRES:TREATMENT: OBJECTIVE:
Irrigate west edge cell 1ACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 24
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T13 CELL: 3-4
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: T13A
UNITS REQ. FLOOD 1st: T13.1-2
SPECIAL MANAGEMENT CONSIDERATIONS:New delivery canal from west canal to N-S J-Drain (N side of c1/c3/T13A) constructed 2002
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
110
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow sections of interior levees (incl slopes) for loafing/grazing areas2. Mow cockleburr as necessary prior to seedset3. Evaluate experimental plot in cell 3 to increase timothy production = 2 east/west disc passes (to
powder) after timothy dries out4. Repair levee between cells 3/4 and T13A5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 110
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc
Reduce cockleburEnhance swamp timothy
21
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 25
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T13A CELL: 99
DRAWDOWN DATE: 4/20/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Excellent waterfowl and shorebird use; High J-Drain flows will back in thru outlet if not boarded; New delivery canal from west canal to N-S J-Drain (N side of c1/c3/T13A) constructed 2002
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
92
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow sections of west levee (incl slopes) for loafing/grazing areas2. Mow cocklebur as necessary prior to seedset3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 92
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 26
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T14 CELL: 1-2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st:
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Last permanent pond in 1999-2000; During PP cycle, draw down to 6-12" above pond bottom from Nov 1 through Mar 15; Rehab project completed in summer 1998
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
30
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove old screwgate inlet in north end in conjunction with T12A flume project2. Control primrose through discing in both cells - do not disc tules3. Add dirt around riser in cells 1 & 24.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 30
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc Reduce primrose 10ACRES:TREATMENT: OBJECTIVE:
DiscACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 27
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T14 CELL: 3
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Monitor wood duck boxes via volunteers; C3/C4 levee was moved north and independent inlet installed in C3 with C4 habitat project in 2001
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
18
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset2. Drawdown ASAP, reflood after cockleburr germination, then cut water supply 5/15/06 and allow to
evaporate3. Monitor wood duck boxes via volunteers4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 18
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Mow prior to seed-set
Reduce cockleburReduce cocklebur
17.710
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Mow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 28
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T14 CELL: 4
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Permanent pond in 1999; Summer water in 2000, 2003-2005; Monitor wood duck boxes via volunteers; C3/C4 levee was moved north (left center portion of old levee as islands) with C4 habitat project in 2001; Monitor health of oak trees; Great blue heron and great egret rookery 2004 (~4 GBHE nests) and 2005 (~5 GBHE & ~4 GREG nests, 1 DCCO nest, and 4 BCNH nests); switch to SFM 2006…noticing some decline in willow health
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
3
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor wood duck boxes via volunteers2. Monitor great blue heron/ great egret rookery on east side3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 3
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 29
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T15 CELL: 99
DRAWDOWN DATE: 6/1/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: T15A
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Tule whitefront use area (400-500 birds between c4 and T15A early in season); Historic small Canada goose roost sites in c3-c4; Last habitat project completed summer 1996 - removed multiple old rice checks, added potholes, channels, and rehabbed levees
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
224
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
7
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. c2/3/4=pull 6" board 3/1, hold until 6/1, then drawdown, leaving a board in risers to hold H2O in
potholes/chnls for evap2. Mow cockleburr prior to seedset3. Mow sections of interior levees (incl slopes) for loafing/grazing areas, leaving buffer on S end along
county road4. Evaluate experimental plot in cell 4 to increase timothy production = 2 east/west disc passes (to
powder) after timothy dries out5. Contact DU re: removal or replacement of old DU/FWS sign in SW corner of T15.46.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 231
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc
Reduce cockleburEnhance swamp timothy
202
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 30
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T15A CELL: 99
DRAWDOWN DATE: 6/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Tule whitefront use area (400-500 birds between T15:4 and T15A early in season)
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
90
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
3
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Pull 6" board 3/1, hold until 6/1, then drawdown; leaving a board in risers to hold H2O in
potholes/chnls for evap2. Mow cocklbur as necessary prior to seedset3. Transplant tule clump to east side of island, plus lay gravel for grit, for possible tule goose trapping
site4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 93
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 3ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 31
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T16 CELL: 99
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Formerly T16:2 - changed to T16:99 in 2004 with the small cell on east side being T16A; Tule whitefront use area 1999-2003, esp in SW corner, with use declining 2004-2006; Completed NAWCA project summer 2001 and split T16 into 2 cells, this cell being the larger most west cell to be managed as SFM
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
119
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Hold water level 6" lower until 7/15/06 drawdown2. Mow cockleburr prior to seedset3. Mow sections of interior levees (inlc slopes) for loafing/grazing areas4. Gravel boat ramp5. Remove large concrete block in N end6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 119
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 32
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T16A CELL: 99
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE:
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:SFM in 2003; Formerly T16:1 - changed to T16A in 2004 with the large cell on west side being T16:99; Completed NAWCA project summer 2001 and split T16 into two cells, this being the smaller most east cell to be managed as PP/SW
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
27
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor for tricolor blackbirds2. Drop water level down 12" to encourage pondweed until mid April/early May3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 27
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 33
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T17 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/20/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water in 1999 and 2002 (good brood production - banding site in 2002); Emergent cover now well established
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
64
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
23
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Drawdown ASAP for cocklebur germination and scalding, reflood and then drawdown if can get
down by 3/15/062. Repair sloughing bank on drain ditch side of S levee3. Spot disc Bermuda/jointgrass and alkali/tuberous bulrush4. Evaluate for upland habitat restoration in N end with riparian forest (oaks?)5. Call PG&E to straighten power poles along E side6. Gravel spillway7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 87
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc Reduce Bermuda/jointgrass 5ACRES:TREATMENT: OBJECTIVE:
DiscACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 34
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T18 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Cordylanthus unit - avoid travel and other ground disturbance in this unit; Fire effects study plots in S end 1999-2001; Aerial herbicide drop along W edge (north 1/2) of unknown origin between 3/1/03 and 3/10/03 killed vegetation 60-70 yds out into the unit from W levee
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
29
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
40
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor cordylanthus2. Levees on N & E sides need rebuilding…must enter from levees to avoid Cordylanthus3. Put in a crossing @ north end of GCID ditch with pipe & cauffer dam to provide access for levee
work4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 69
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 35
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T19 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: P2
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
92
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
1
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklbur prior to seedset2. Transplant tules (use P2 as source) around center islands in c2 just prior to floodup- delay P3-P6
floodup to accelerate delivery to tules3. Maintain cover on islands4. Mow cross-levees including slopes prior to floodup5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 92
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 10ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 36
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T20 CELL: 1
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
71
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disc pothole in S end to keep open2. Mosquito research potentially ongoing3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 71
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc Reduce cattails/tules 1ACRES:TREATMENT: OBJECTIVE:
DiscACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 37
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T20 CELL: 2-3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Summer water in 1994-1996, 2001, 2002; Hunt unit; T20 NAWCA project 2000-01, perim levee rehab and potholes/channels/islands in cell 1-2; Burned c2 (overwater) on 3/20/03 followed by discing that summer
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
53
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
1
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disc as needed2. Spray pepperweed on south end of c3 with Telar as needed3. Replace siphon to T21 with flume - priorty to find funding4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 54
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscSpray Telar
Enhance moist soil plantsReduce pepperweed
100.5
ACRES:TREATMENT: OBJECTIVE:DiscSpray Telar
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 38
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T21 CELL: 1
DRAWDOWN DATE: 3/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Avoid any travel or disturbance in uplands; Consult before making any levee repairs; flow thru during floodup then board up in early Nov
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
38
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
33
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Remove old bridge parts from footbridge area in north end2. Replace pipe between T21.1 and T21.2 with 30 feet of 24" pipe and 4' riser3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 71
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 39
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T21 CELL: 2
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Flow thru during floodup then board up early Nov
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
56
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
1
Alkalli Meadow
14
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate potential to burn in N end in summer/fall to open up tules2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 70
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Burn Reduce tules 20ACRES:TREATMENT: OBJECTIVE:
BurnACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 40
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T22 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T21.2
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Avoid any disturbance in uplands - cordylanthus outside E and S levees and on S levee; 4,198 plants in 2002 (1,587 of those on S levee);* If rice is grown in field to east across Ohm Rd, watch for seepage across to T22--flooding at that time will kill cordylanthus in low areas (SE corner) - chronic problem
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
31
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
15
Alkalli Meadow
10
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Flooding from private land to south still a problem - MP to contact landowner to inquire regarding
their ditch2. Monitor cordylanthus3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 56
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 41
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T23 CELL: 99
DRAWDOWN DATE: 3/15/2006DRAWDOWN RATE: EVAP
No
FLOOD DATE: 11/20/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T20.1
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Check station in SE corner; Native grass project in N end adj to T20 - planted fall 1997 - an additional 50 acres planted immediately south down to Ware Rd in Jan/Feb 2003; Both sites burned 11/15/02; Goose grazing in N end late Feb/early Mar 2002; 2002 study initiated to evaluate bird use of native vs non-native grasslands (UCD); CWA nesting investigations indicate good #'s and success of MALL in 97 planting; Avoid disturbance in c2 (rare plants); Potential burrowing owl nest in S end spring 2006; GHOW & RTHA nesting in trees around check station most years
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
48
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
108
Perennial Grasslnd
21
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray mounds in c1 with Roundup to maintain open for burrowing owl habitat - January 2007 by
ATV2. Graze sheep ASAP in March/April on both native grass planting areas and cell 2 (fence N end)3. Cut off water supply 3/15, but don't pull boards…allow to evap4. Disc an additional 5-10 acres just S of existing '97 planting to prep for new planting in 20065. Plant native grass and forbes in the 5-10 fallow acres, and forbes in the SW corner of native grass
planting - evaluate $ for contracting6. Eval creation of artificial burrows for BUOW in existing mounds or creation of new mounds using
from any future dirtwork in T24.127. Spray starthistle and other weeds along Ware Rd outside of fence to remove seed source8. Spray and repair gravel at check station parking lot9. Evaluate potential for burning, post grazing
10.YCC to paint check station gates and eaves on check station
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 184
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Graze sheepSpray Round-upSpray Round-upBurnSpray Round-up
Reduce starthistleMaintain sparse mound vegReduce starthistleEnhance native plantsReduce weeds in pkg lot
18411701
ACRES:TREATMENT: OBJECTIVE:Graze sheepSpray Round-upSpray Round-upBurnSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
5
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 42
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 1
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; **Aerial heribicide drop along W edge of unknown origin between 3/1/03 and 3/10/03 killed vegetation 60-70 yds out into unit from W levee; Veg spp comp measured 4/27/04 during fire pre-burn monitoring effort - consider for upland restoration, possible native grasses - already significant amounts of native clovers and others; Burned 7/28/05 along with T24.2
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
52
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray pepperweed w/Telar in N end and anywhere near c2 as needed2. Mow mustard on west side in March prior to seed set3. Conduct 1-year post-burn vegetation monitoring4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 52
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarMow prior to seed-set
Reduce pepperweedReduce mustard
0.15
ACRES:TREATMENT: OBJECTIVE:Spray TelarMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 43
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 2
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE: S
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:First year wetland in 1999; SFM in 2005; Hunt unit; Burned 7/28/05 with T24.1; Rebuilt levees and rechannelized pond bottom 2005
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
15
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 15
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 44
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 3-5
DRAWDOWN DATE: 5/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:First year wetland in 1999; SFM in 2000-2001; Hunt unit; Cells 4 & 5 designated as "Assigned Pond" hunting area 2004-05
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
93
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disc or spray emerging patches of Bermuda grass2. Keep the irrigation floodup SLOW so as not to drown out watergrass in channel bottoms3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 93
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscSpray Round-upIrrigate
Reduce Bermuda grassReduce Bermuda grassEnhance moist soil plants
5593
ACRES:TREATMENT: OBJECTIVE:DiscSpray Round-upIrrigate
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 45
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 6
DRAWDOWN DATE: 7/1/2006DRAWDOWN RATE:
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS: First year wetland in 1999; Permanent pond 2000-2005; Draw down to 6-12" above pond bottom from Nov. 1 through Mar. 15, otherwise hold water stable at max level
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 0
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
12
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot repair roads between cells 5 & 62.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 12
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 46
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 7
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE:
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.11
SPECIAL MANAGEMENT CONSIDERATIONS:First year wetland in 1999; Summer water in 2000, 2003, 2005; Permanent pond in 2001-2002, 2004; Hunt unit; Draw down to 6-12" above pond bottom from Nov 1 through Mar 15, otherwise hold water stable at max level; Designated as "Assigned Pond" hunting area 2004-05
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
24
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Add gravel to boat ramp in NW corner2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 24
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 47
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 7A
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE: S
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.8, T24.11
SPECIAL MANAGEMENT CONSIDERATIONS:First year wetland in 1999; Summer water in 2000, 2004; Permanent pond in 2002-2003, 2005; SFM in 2001; This unit allows independent drainage of cell 8 so cell 7 may be rotated to SW or other water regimes
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
6
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 6
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 48
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 8
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE: S
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.11
SPECIAL MANAGEMENT CONSIDERATIONS:First year wetland in 1999; Permanent pond in 2000-2003, 2005; Summer water in 2000, 2004; Hunt unit; Draw down to 6-12" above pond bottom from Nov 1 through Mar 15, otherwise hold water stable at max level; Designated as "Assigned Pond" hunting area 2004-05; Great pondweed production and brood use 2005
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
22
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 22
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 49
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 9-10
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: ST
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.11
SPECIAL MANAGEMENT CONSIDERATIONS: First year wetland in 1999; Hunt unit; Pull water down to east side for staged drawdown; Both cells have evolved into excellent quality seasonal wetlands in short period of time since restoration efforts started in 1999; Tule WF use areas; CA hibiscus volunteered in c10 in 2003; Designated as "Assigned Pond" hunting area 2004-05
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
76
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Transplant several bulrush clumps along east and north sides of c92. Mow c9/c10 levee for loafing/grazing prior to floodup3. Spot repair east levee4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 76
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 50
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 11
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE:
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:First year wetland in 1999; SFM in 2000; Hunt unit; Continues to be Giant Garter Snake core use area
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
19
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Drawdown to minimum ponding level for fish control opportunistically during late winter2. Remove piles of beaver plug material from around water control structures and use to create
submerged islands in adjacent units3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 19
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 51
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 12
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.11
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; First year wetland in 1999; Good late season use by GWT; Changed drawdown from 6/1 evap to 4/15 slow starting 2003; T25 habitat restoration project in 2004 resulted in re-routing T24.12 drainwater through swale in east side of T25 (previous drain between T24:13 and T25 was filled in)
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
27
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
32
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Develop restoration plan for west side to restore additional VPs and mounds and seek funding2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 59
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 52
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T24 CELL: 13
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Leave structure on east side open to allow drainage of floodwater; Created large pool in S end 1999; Deepened large pool and created mounds and pools throughout cell with NAWCA project in 2001; Cordylanthus present along N perimeter of large pool (from translocated soil during restoration); 240 plants min in 2003; Spring 2003 downingia appeared in pools in SE and NE corners (at least); Lindahli's fairy shrimp (Branchinecta lindahli) found in big VP & smaller mima mound pools Feb 2005, last survey in Feb 2002 showed only seed shrimp; Good duck & goose use spring 2006
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: VERNAL POOL
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
12.0
VP Alkali Meadow Complex
40
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Monitor cordylanthus and other vegetation2. Evaluate potential for sheep grazing3. YCC paint parking lot C gate4. Repost Parking Lot C - put the "Westside Access Only" sign on its own post5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 52
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-up Maintain Parking Lot C 0.5ACRES:TREATMENT: OBJECTIVE:
Spray Round-upACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 53
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: T25 CELL: 99
DRAWDOWN DATE: 4/20/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/20/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T24.12
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Acquired 2002; Managed as SFM in recent years by Richmond Hunt Club, was formerely rice; 2002-2003, water not resupplied after Jan 31 - let evaporate for drawdown; Good late season use by GWT, AMWI, shorebirds; Restoration to VP/VPAM done fall 2004 (east 1/2, Duck Stamp $) and fall 2005 (west 1/2, Duck Stamp/DU Marsh $), with swale & potholes created along W portion to drain T24:12; ** KEEP MANAGED WATER ONLY IN SWALE & POTHOLES, remainder of unit to flood only w/rainwater**; Lindahli's fairy shrimp found in big VP 2/04, just 5 months post-restoration
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: VERNAL POOL
CELL PARAMETERS:
Seasonal Flooded
Marsh
3
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
18.2
VP Alkali Meadow Complex
93
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Native grass & forb planting funded by BOR for late summer/fall 20062. Post "Danger, Deep Mud" signs on swale on west 1/2 of unit and fence off area (approx. 10 signs
needed)3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 115
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 54
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: P1 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 8/25/2006
UNITS REQ. DOWN 1st: P3
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Flood-up date shifted back from 8/15 starting fall 2000; Posted retrieval zone in N end starting 2002 (similar zone may have been in effect in 1980's or earlier); New delivery canal into J-Drain from W Lateral constructed 2002; Designated as "Assigned Pond" hunting area 2004-05
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
82
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disc as necessary2. Maintain retrieval zone on N end3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 82
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc Enhance moist soil plants 5ACRES:TREATMENT: OBJECTIVE:
DiscACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 55
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: P2 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Posted retrieval zone in N end starting 2002 (similar zone may have been in effect in 1980's or earlier); Designated as "Assigned Pond" hunting area (for disabled and junior hunter opportunities) 2004-05
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
71
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
3
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklbur prior to seedset as necessary2. Spot disc to maintain openings, especially on east side3. Maintain retrieval zone on N end4. Evaluate relocation of disabled parking area to NE5. Open up tules south and NW of disabled blind - 2 discs wide6. YCC maintain disabled blind7. Spray path to disabled blind8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 73
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDiscSpray Roundup
Reduce cockleburReduce cattails/tulesMaintain path to blind
51
0.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDiscSpray Roundup
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 56
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: P3 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: P5/P6
UNITS REQ. FLOOD 1st: P1 or T22
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Avoid any disturbance in west uplands - large cordylanthus populations - 4,736 plants in 2002; Delay floodup of far west side unit 10/1 to avoid killing actively growing cordylanthus; Burned SE corner overwater 3/21/03; Veg spp comp measured on west side 6/23/04 during fire pre-burn monitoring effort; Burned 10 ac 9/22/04 and 40 ac 9/29/04, 1 year post-burn monitoring 6/24/05
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
148
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
2
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
2
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Keep water off west side until mid-October for Cordylanthus2. Spray pepperweed (Telar) on perimeter levees and especially around old check station as
necessary3. Mow W levee for designated hunter access off Ohm Rd4. YCC paint parking lot B gate5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 152
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray TelarSpray Round-up
Reduce pepperweedMaintain Parking Lot B
0.51
ACRES:TREATMENT: OBJECTIVE:Spray TelarSpray Round-up
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 57
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: P4 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: P6
UNITS REQ. FLOOD 1st: P2/P3
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Tule whitefront use area, esp south levee Dec/Feb
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
124
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow P4/P6 levee for loafing/grazing - also potential tule goose trapping site2. Repair low spots in levee between P2/P43. Spray levee between P4 & P6 with Telar for pepperweed4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 124
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscMowSpray Telar
Reduce cattails/tulesReduce cockleburReduce pepperweed
3100.1
ACRES:TREATMENT: OBJECTIVE:DiscMowSpray Telar
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 58
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: P5 CELL: 99
DRAWDOWN DATE: 4/20/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: P6
UNITS REQ. FLOOD 1st: P3
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit; Avoid any disturbance in uplands; Burned N end overwater 3/21/03
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
41
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
54
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate modification/removal of P5/P6 levee based on ability to maintain water levels through P6
mgt alone2. Evaluate adjacent acquisition for any potential restoration3. Spray pepperweed between P5 & P6 on north end ASAP in spring with Telar4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 97
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Telar Reduce pepperweed 0.25ACRES:TREATMENT: OBJECTIVE:
Spray TelarACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
1
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 59
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: P6 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: P3/P4
SPECIAL MANAGEMENT CONSIDERATIONS:Hunt unit
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
132
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
10
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Find funding to acquire and install sheet piling to ends of weir crossing on S end2. Mow cocklebur prior to seedset3. Contact PGE re: downed powerline on south end4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 143
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
DiscMow prior to seed-set
Reduce tulesReduce cocklebur
110
ACRES:TREATMENT: OBJECTIVE:DiscMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
1
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 60
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: PS CELL: 99
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE:
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Powell Slough water level is unmanaged; Public use facilities area and walking trail adj to T4; Shop area in NE corner of T9; Service wood duck boxes, checking that box condition is adequate by Mar and estimating production after July; BCNH roost in buttonbush adj to T9; Fed. Lands/Highways project planned for bridge work @ T4/T3.2 crossing in 2007
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: PERMANENT POND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
37
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
12
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
3
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Continue removal of non-native trees - use cut stump herbicide treatments as needed and replant
with native spp2. Evaluate hyacinth removal3. Remove old equipment on W side4. Service wood duck boxes5. Monitor sedge/creeping wildrye plugs planted N of bridge6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 53
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Garlon-cut stump Reduce non-native trees 0.1ACRES:TREATMENT: OBJECTIVE:
Spray Garlon-cut stumpACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 61
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: 2047 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE: S
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Important Giant Garter Snake habitats..consult prior to any major work
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
21
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
21
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
9
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1.2.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 50
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 62
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: JD CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE: S
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Important Giant Garter Snake habitats..consult prior to any major work
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
5
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Install conveyance structure from T12A outlet to N/S J-Drain2. Dig out pipe from N/S J-Drain to T14 canal…need to dry out N/S J-Drain prior to work3. Primrose control for entire N/S Jdrain4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 25
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo Maint canal capacity 2ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
19
UNIT MANAGEMENT PLAN - 5/18/2006SACRAMENTO NWR COMPLEX CLS YEAR 20067 printed: 63
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: CLS UNIT: CANALS CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE: S
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:Important Giant Garter Snake habitats..consult prior to any major work
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Hwy 20 delivery canal needs rock @ green gates2. West Lateral @ T5 lift pump…36" pipe rotten, need to add 30" screwgate & 30ft of pipe3. Add rock @ siphon @ T13 canal to prevent erosion (back eddy)4. Primrose control for entire West Lateral, T13 delivery ditch, T14 delivery ditch, and Abel Rd to P1
inlet5. West Lateral @ Ware Rd needs 2 loads of cobble (near meters)6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 24
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo Maint canal capacity 3ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
24
Sum
mar
y of
Pla
nned
Hab
itat A
cres
by
Uni
t*
Sacr
amen
to N
WR
Com
plex
YEA
R:
2006
7R
EFU
GE:
CLS
02-M
ay-0
6
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
T11-
2:
840
00
840
840
00
00
00
00
00
00
00
084
0T1
3:0
052
052
052
00
00
00
00
00
00
00
00
520
T1A
99:0
00
00
00
00
011
00
011
00
00
00
00
110
T299:
810
00
810
810
00
00
00
00
00
00
00
081
0T2
A99:
00
120
120
120
00
00
00
00
00
00
00
012
0T3
1:0
018
018
018
00
00
00
00
00
00
00
00
180
T32:
540
00
540
540
00
00
00
00
00
00
00
054
0T4
99:2
00
02
02
00
045
200
065
00
00
00
01
680
T599:
970
00
970
970
00
00
00
00
00
00
00
097
0T6
99:0
134
00
134
013
40
00
00
00
00
00
00
00
013
40
T6A
99:41
00
041
041
00
00
00
00
00
00
00
00
410
T7/8
/199:
00
00
042
4210
022
50
00
023
40
00
20
02
027
90
T999:
180
00
180
180
00
124
00
012
40
00
00
00
114
40
T10
1-2
:10
10
00
101
010
10
00
00
00
00
00
00
00
010
10
T10
3:0
042
042
042
00
00
00
00
00
00
00
00
420
T10
4:50
00
050
050
00
00
00
00
00
00
00
00
500
T10A
1:0
00
4141
041
00
00
00
00
00
00
00
00
410
T10A
2:7
00
613
013
00
00
00
00
00
00
00
00
130
T12
1-2
:10
70
00
107
010
70
00
00
00
00
00
00
00
010
70
T12
3-4
:12
60
00
126
012
60
00
00
00
00
00
00
00
012
60
T12A
1:76
00
076
076
00
00
00
00
00
00
00
00
760
T12A
2:0
00
00
1212
00
00
00
00
00
00
00
00
120
T13
1-2
:10
90
00
109
010
90
00
00
00
00
00
00
00
010
90
T13
3-4
:11
00
00
110
011
00
00
00
00
00
00
00
00
011
00
T13A
99:92
00
092
092
00
00
00
00
00
00
00
00
920
T14
1-2
:30
00
030
030
00
00
00
00
00
00
00
00
300
T14
3:18
00
018
018
00
00
00
00
00
00
00
00
180
T14
4:3
00
03
03
00
00
00
00
00
00
00
00
30
T15
99:22
40
00
224
022
40
07
00
00
70
00
00
00
023
10
T15A
99:90
00
090
090
00
30
00
03
00
00
00
00
930
T16
99:0
011
90
119
011
90
00
00
00
00
00
00
00
011
90
T16A
99:0
00
2727
027
00
00
00
00
00
00
00
00
270
T17
99:64
00
064
064
00
023
00
023
00
00
00
00
870
Pag
e 1
of 2
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
T18
99:29
00
029
029
00
400
00
040
00
00
00
00
690
T19
99:92
00
092
092
00
10
00
01
00
00
00
00
920
T20
1:71
00
071
071
00
00
00
00
00
00
00
00
710
T20
2-3
:53
00
053
053
00
00
00
00
01
00
00
10
540
T21
1:38
00
038
038
033
00
00
033
00
00
00
00
710
T21
2:56
00
056
056
01
140
00
014
00
00
00
00
700
T22
99:31
00
031
031
015
100
00
025
00
00
00
00
560
T23
99:48
00
048
048
00
010
821
00
129
00
00
00
01
184
5T2
41:
00
00
00
00
00
520
00
520
00
00
00
052
0T2
42:
00
015
150
150
00
00
00
00
00
00
00
015
0T2
43-
5:
093
00
930
930
00
00
00
00
00
00
00
093
0T2
46:
00
120
120
120
00
00
00
00
00
00
00
012
0T2
47:
240
00
240
240
00
00
00
00
00
00
00
024
0T2
47A:
00
06
60
60
00
00
00
00
00
00
00
06
0T2
48:
00
022
220
220
00
00
00
00
00
00
00
022
0T2
49-
10:
760
00
760
760
00
00
00
00
00
00
00
076
0T2
411:
00
019
190
190
00
00
00
00
00
00
00
019
0T2
412:
270
00
270
270
032
00
00
320
00
00
00
059
0T2
413:
00
00
00
012
400
00
00
520
00
00
00
052
0T2
599:
30
00
30
318
930
00
00
111
00
00
00
00
115
0P
199:
820
00
820
820
00
00
00
00
00
00
00
082
0P
299:
710
00
713
730
00
00
00
00
00
00
00
073
0P
399:
148
00
014
80
148
00
20
00
02
00
00
00
02
152
0P
499:
124
00
012
40
124
00
00
00
00
00
00
00
00
124
0P
599:
410
00
410
410
054
00
00
540
00
00
00
097
1P
699:
132
00
013
20
132
00
100
00
010
00
00
00
00
143
1P
S99:
00
00
037
370
00
120
00
120
00
30
03
053
020
4799:
00
00
021
210
00
210
00
210
00
90
09
050
0JD
99:0
00
00
55
00
00
00
00
00
00
00
00
2520
CAN
A99:
00
00
00
00
00
00
00
00
00
00
00
024
2027
3013
525
522
740
TOTA
LS18
239
741
00
01
140
119
397
00
633
4734
6610
5745
9515
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
othe
r unm
anag
ed a
reas
.
51
Pag
e 2
of 2
Sum
mar
y of
Pla
nned
Hab
itat A
cres
*12
-Jul
-06
Sacr
amen
to N
WR
Com
plex
2006
7Ye
ar:
REF
UG
E
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lity
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
610
035
00
BTS
10
029
00
00
40
110
00
645
646
2915
691
0
2730
135
255
227
40C
LS11
918
239
739
741
00
01
014
00
633
4734
6610
5715
4555
50
3480
226
435
459
7D
EL13
9036
437
292
00
424
00
00
545
9946
1292
646
5582
0
667
930
06
LS2
00
314
217
184
8037
150
064
03
760
762
800
116
1674
0
5735
162
619
570
87SA
C16
320
0185
334
105
00
511
02
00
031
7086
7249
3079
117
1038
90
1059
416
964
90
SUT
450
010
112
50
00
011
328
70
35
1880
1925
226
403
2559
0
1428
161
915
1219
0414
0TO
TALS
2272
1247
580
184
8084
134
313
114
343
1614
643
5018
317
1866
061
1625
450
713
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
ads,
can
als,
and
othe
r unm
anag
ed a
reas
.
51
UN
IT W
OR
K P
LAN
2006
7C
LSR
efug
eYe
ar:
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T11-
21
8/10
/200
61
:S
pot d
isc
Ber
mud
a/jo
intg
rass
in b
oth
cells
Mow
coc
kleb
urr p
rior t
o se
edse
t
Mow
leve
e to
ps a
nd s
lope
s fo
r loa
fing
prio
r to
flood
up
Dra
wdo
wn
3/15
/06,
the
n ev
alua
te n
eed
to s
cald
coc
kleb
ur
Rep
lace
sou
thw
est W
CS
of T
1.1
with
a 4
ft, 2
4" W
CS
Roc
k th
e ne
w W
CS
in T
1.2
(out
let t
o 20
47)
Pos
sibl
e re
grad
e of
road
s du
e to
floo
d da
mag
e be
twee
n c1
& c
2 an
d be
twee
n c2
& c
3G
rave
l are
a ne
ar h
ighw
ay p
ump
NW
cor
ner o
f c1
(one
load
) and
re
grad
e lo
w s
pot
Y
Y
Y
Y Y Y
* * * * * * * *
03/1
5/20
06D
isc
Mow
prio
r to
seed
-set
Sca
ld (b
y irr
igat
e)
20 20 83
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
T6A
990
10/1
/200
61
:A
dd/re
pair
woo
d du
ck b
oxes
Rep
air m
uskr
at h
oles
on
road
s be
twee
n 6A
& 6
.3 a
nd b
etw
een
6A
& 6
.2D
isc
prim
rose
Pus
h 20
05 w
illow
trim
min
gs in
to u
nit f
or d
ecom
posi
tion
Y Y
* * * *
04/0
1/20
06D
isc
AS
AP
aft.
dr
awdo
wn
20R
educ
e pr
imro
se
T7/8
/11
990
1:
Cor
dyla
nthu
s/ca
ttle
graz
ing
stud
y to
be
star
ted
late
sum
mer
/fall
2006
to re
mov
e lo
lium
& a
nnua
l gra
sses
Initi
ate
cont
rol o
f pep
perw
eed
(Tel
ar)
Exp
erim
ent w
ith u
se o
f Rou
ndup
for c
ontro
l of s
also
la s
oda
Spo
t-spr
ay p
erla
gra
ss w
ith R
ound
up (o
utlie
rs o
n ed
ge)
Bur
n so
uthe
rn e
nd (o
rigin
al T
11) i
n fa
ll/w
inte
r if c
attle
gra
zing
st
udy
perm
itsR
emov
e ar
undo
pat
ches
alo
ng 2
047
and
spra
y re
spro
uts
w/R
odeo
Spr
aypa
int f
requ
ency
plo
t reb
ar m
arke
rs
Y Y
* * * * * * *
Gra
ze c
attle
Spr
ay R
odeo
Spr
ay R
ound
-up
Spr
ay R
ound
-up
Spr
ay T
elar
Bur
n
80 0.1
0.1
0.1
0.1
80
Red
uce
loliu
m &
an
nual
gra
sses
Red
uce
arun
do
Red
uce
sals
ola
soda
Red
uce
perla
gras
sR
educ
e pe
pper
wee
dE
nhan
ce n
ativ
e pl
ants
T12A
11
9/1/
2006
1:
Flum
e st
ruct
ure
to b
e in
stal
led
from
out
let t
o N
/S J
-Dra
in
(con
tract
ed)
Cle
an o
ut s
ilt a
roun
d in
let f
rom
T10
A
Kee
p tra
ppin
g is
land
cle
an o
f veg
etat
ion
- lay
grit
on
SE
road
Mow
hea
vy s
tand
s of
coc
kleb
urr p
rior t
o se
ed s
et a
s ne
cess
ary
Mos
quito
rese
arch
ong
oing
Y
Y
Y
Y Y
* * * * *
04/1
0/20
06M
ow p
rior t
o se
ed-s
et40
Red
uce
cock
lebu
r
Page
1 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T18
990
10/1
/200
61
:M
onito
r cor
dyla
nthu
s
Leve
es o
n N
& E
sid
es n
eed
rebu
ildin
g…m
ust e
nter
from
leve
es
to a
void
Cor
dyla
nthu
sP
ut in
a c
ross
ing
@ n
orth
end
of G
CID
ditc
h w
ith p
ipe
& c
auffe
r da
m to
pro
vide
acc
ess
for l
evee
wor
k
Y Y
* * *
04/0
1/20
06
T20
2-3
19/
15/2
006
1:
Spo
t dis
c as
nee
ded
Spr
ay p
eppe
rwee
d on
sou
th e
nd o
f c3
with
Tel
ar a
s ne
eded
Rep
lace
sip
hon
to T
21 w
ith fl
ume
- prio
rty to
find
fund
ing
Y
* * *
04/1
5/20
06D
isc
Spr
ay T
elar
10 0.5
Enh
ance
moi
st
soil
plan
tsR
educ
e pe
pper
wee
d
JD99
11
:In
stal
l con
veya
nce
stru
ctur
e fro
m T
12A
out
let t
o N
/S J
-Dra
in
Dig
out
pip
e fro
m N
/S J
-Dra
in to
T14
can
al…
need
to d
ry o
ut N
/S J
-D
rain
prio
r to
wor
kP
rimro
se c
ontro
l for
ent
ire N
/S J
drai
n
Y Y
* * *
Spra
y R
odeo
2M
aint
can
al
capa
city
T2A
991
9/15
/200
62
:H
aul e
ucal
yptu
s sn
ags
into
cen
ter a
nd n
orth
are
as (1
eac
h)
Rem
ove
old
met
al p
ipe
visi
ble
from
N e
nd
Hol
d w
ater
leve
l at 6
-12"
unt
il A
ugus
t to
enco
urag
e ca
ttail
grow
th
Rep
lace
4ft
riser
goi
ng in
to T
2A fr
om T
3.2
with
24"
pip
e
* * * *
08/0
1/20
06
T499
09/
15/2
006
2:
Cap
/fill
wel
l at o
ld re
side
nce
site
Dra
wdo
wn
T4 a
nd T
9 fo
r NA
WC
A s
ipho
n pr
ojec
t sum
mer
200
6
Dis
c fir
ebre
ak a
long
Hw
y 20
bor
der
Par
king
are
a (~
10 c
ars)
alo
ng e
ntra
nce
road
nea
r old
resi
denc
e si
te fu
lly fu
nded
and
to b
e co
nstru
cted
in M
ay/J
une
2007
Con
cret
e pa
ths
lead
ing
north
from
par
king
are
a fu
lly fu
nded
and
to
be
cons
tuct
ed in
200
7In
vest
igat
e fu
ndin
g fo
r con
stru
ctio
n of
vie
win
g pl
atfo
rm a
nd s
helte
r
Con
tinue
to s
pray
pep
perw
eed
patc
hes
w/T
elar
, with
prio
rity
to
thos
e in
eas
t hal
fS
pray
sat
ellit
e pa
tche
s of
tall
whe
at w
/Rou
ndup
to k
eep
from
in
vadi
ng o
pen
area
s
Y Y Y Y
* * * * * * * *
05/0
1/20
06Sp
ray
Tela
r
Irrig
ate
Dis
c
Spr
ay R
ound
up
0.1 1 1 1
Red
uce
pepp
erw
eed
Mai
ntai
n tre
es
Cre
ate
fireb
reak
Red
uce
tall
whe
at
Page
2 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T699
09/
15/2
006
2:
Dis
c B
erm
uda/
join
tgra
ss in
cel
ls 1
, 2 &
3
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl. s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
odup
Dis
c vi
ewin
g la
nes
and
mow
turn
outs
on
tour
rout
e
Follo
w u
p sp
rayi
ng p
eppe
rwee
d on
inte
rior l
evee
s/is
land
s w
ith
Tela
rM
onito
r pla
nt re
spon
se to
dra
wdo
wns
and
spr
ing
rain
s, a
nd if
ne
ed to
irrig
ate,
avo
id ti
min
g ju
st b
efor
e C
olus
a C
ount
y Fa
ir in
ea
rly J
une
Rep
lace
rise
r in
SE
cor
ner o
f cel
l 1
Y
Y
Y
Y Y Y Y
* * * * * *
04/1
0/20
06D
isc
Spr
ay T
elar
Irrig
ate
40 0.5
134
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
pepp
erw
eed
Enh
ance
moi
st
soil
plan
ts
T14
1-2
110
/1/2
006
2:
Rem
ove
old
scre
wga
te in
let i
n no
rth e
nd in
con
junc
tion
with
T12
A
flum
e pr
ojec
tC
ontro
l prim
rose
thro
ugh
disc
ing
in b
oth
cells
- do
not
dis
c tu
les
Add
dirt
aro
und
riser
in c
ells
1 &
2
Y
Y* * *
04/0
1/20
06D
isc
10R
educ
e pr
imro
se
T23
990
11/2
0/20
062
:S
pray
mou
nds
in c
1 w
ith R
ound
up to
mai
ntai
n op
en fo
r bur
row
ing
owl h
abita
t - J
anua
ry 2
007
by A
TVG
raze
she
ep A
SAP
in M
arch
/Apr
il on
bot
h na
tive
gras
s pl
antin
g ar
eas
and
cell
2 (fe
nce
N e
nd)
Cut
off
wat
er s
uppl
y 3/
15, b
ut d
on't
pull
boar
ds…
allo
w to
eva
p
Dis
c an
add
ition
al 5
-10
acre
s ju
st S
of e
xist
ing
'97
plan
ting
to p
rep
for n
ew p
lant
ing
in 2
006
Pla
nt n
ativ
e gr
ass
and
forb
es in
the
5-10
fallo
w a
cres
, and
forb
es
in th
e S
W c
orne
r of n
ativ
e gr
ass
plan
ting
- eva
luat
e $
for
cont
ract
ing
Eva
l cre
atio
n of
arti
ficia
l bur
row
s fo
r BU
OW
in e
xist
ing
mou
nds
or
crea
tion
of n
ew m
ound
s us
ing
from
any
futu
re d
irtw
ork
in T
24.1
2S
pray
sta
rthis
tle a
nd o
ther
wee
ds a
long
War
e R
d ou
tsid
e of
fenc
e to
rem
ove
seed
sou
rce
Spr
ay a
nd re
pair
grav
el a
t che
ck s
tatio
n pa
rkin
g lo
t
Eva
luat
e po
tent
ial f
or b
urni
ng, p
ost g
razi
ng
YC
C to
pai
nt c
heck
sta
tion
gate
s an
d ea
ves
on c
heck
sta
tion
Y Y Y Y Y
* * * * * * * * * *
03/1
5/20
06G
raze
she
ep
Spr
ay R
ound
-up
Spr
ay R
ound
-up
Bur
n
Spr
ay R
ound
-up
184 1 1 70 1
Red
uce
star
this
tle
Mai
ntai
n sp
arse
m
ound
veg
Red
uce
star
this
tle
Enh
ance
nat
ive
plan
tsR
educ
e w
eeds
in
pkg
lot
T25
990
11/2
0/20
062
:N
ativ
e gr
ass
& fo
rb p
lant
ing
fund
ed b
y B
OR
for l
ate
sum
mer
/fall
2006
Pos
t "D
ange
r, D
eep
Mud
" sig
ns o
n sw
ale
on w
est 1
/2 o
f uni
t and
fe
nce
off a
rea
(app
rox.
10
sign
s ne
eded
)
Y Y
* *
04/2
0/20
06
P699
09/
25/2
006
2:
Find
fund
ing
to a
cqui
re a
nd in
stal
l she
et p
iling
to e
nds
of w
eir
cros
sing
on
S e
ndM
ow c
ockl
ebur
prio
r to
seed
set
Con
tact
PG
E re
: dow
ned
pow
erlin
e on
sou
th e
nd
Y Y
* * *
05/0
1/20
06D
isc
Mow
prio
r to
seed
-set
1 10
Red
uce
tule
s
Red
uce
cock
lebu
r
Page
3 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
CAN
ALS9
91
2:
Hw
y 20
del
iver
y ca
nal n
eeds
rock
@ g
reen
gat
es
Wes
t Lat
eral
@ T
5 lif
t pum
p…36
" pip
e ro
tten,
nee
d to
add
30"
sc
rew
gate
& 3
0ft o
f pip
eA
dd ro
ck @
sip
hon
@ T
13 c
anal
to p
reve
nt e
rosi
on (b
ack
eddy
)
Prim
rose
con
trol f
or e
ntire
Wes
t Lat
eral
, T13
del
iver
y di
tch,
T14
de
liver
y di
tch,
and
Abe
l Rd
to P
1 in
let
Wes
t Lat
eral
@ W
are
Rd
need
s 2
load
s of
cob
ble
(nea
r met
ers)
Y
* * * * *
Spra
y R
odeo
3M
aint
can
al
capa
city
T999
09/
15/2
006
3:
Gra
ze 3
00-4
00 h
ead
of s
heep
, fol
low
up
with
spo
t-spr
ayin
g Te
lar
on p
eppe
rwee
d re
spro
uts
May
hav
e to
fenc
e N
end
of u
nit t
o ke
ep s
heep
in, w
ill lo
se w
ater
ba
rrier
due
to lo
ss o
f wat
er m
g't t
hrou
gh T
4S
pot s
pray
pep
perw
eed
as n
eede
d
Mai
ntai
n w
est p
erim
eter
road
Rep
air r
oad
on W
sid
e - s
loug
hing
ban
k
Pos
t eas
t bou
ndar
y
Y Y Y
* * * * * *
05/0
1/20
06G
raze
she
ep
Spr
ay T
elar
Spr
ay R
ound
-up
133 5 1
Red
uce
star
this
tle/p
eppe
rw
eed
Red
uce
pepp
erw
eed
Mai
ntai
n S
hop
Par
king
Are
a
T13
3-4
010
/1/2
006
3:
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl s
lope
s) fo
r loa
fing/
graz
ing
area
sM
ow c
ockl
ebur
r as
nece
ssar
y pr
ior t
o se
edse
t
Eva
luat
e ex
perim
enta
l plo
t in
cell
3 to
incr
ease
tim
othy
pro
duct
ion
= 2
east
/wes
t dis
c pa
sses
(to
pow
der)
afte
r tim
othy
drie
s ou
tR
epai
r lev
ee b
etw
een
cells
3/4
and
T13
A
Y
Y
Y
* * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
Dis
c
2 1
Red
uce
cock
lebu
r
Enh
ance
sw
amp
timot
hy
T21
10
9/25
/200
63
:R
emov
e ol
d br
idge
par
ts fr
om fo
otbr
idge
are
a in
nor
th e
nd
Rep
lace
pip
e be
twee
n T2
1.1
and
T21.
2 w
ith 3
0 fe
et o
f 24"
pip
e an
d 4'
rise
r
Y* *
03/1
5/20
06
T24
10
3:
Spr
ay p
eppe
rwee
d w
/Tel
ar in
N e
nd a
nd a
nyw
here
nea
r c2
as
need
edM
ow m
usta
rd o
n w
est s
ide
in M
arch
prio
r to
seed
set
Con
duct
1-y
ear p
ost-b
urn
vege
tatio
n m
onito
ring
* * *
Spra
y Te
lar
Mow
prio
r to
seed
-set
0.1 5
Red
uce
pepp
erw
eed
Red
uce
mus
tard
P499
09/
15/2
006
3:
Mow
P4/
P6
leve
e fo
r loa
fing/
graz
ing
- als
o po
tent
ial t
ule
goos
e tra
ppin
g si
teR
epai
r low
spo
ts in
leve
e be
twee
n P
2/P
4
Spr
ay le
vee
betw
een
P4
& P
6 w
ith T
elar
for p
eppe
rwee
d
Y
Y
* * *
04/1
5/20
06D
isc
Mow
Spr
ay T
elar
3 10 0.1
Red
uce
catta
ils/tu
les
Red
uce
cock
lebu
r
Red
uce
pepp
erw
eed
Page
4 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P599
010
/1/2
006
3:
Eva
luat
e m
odifi
catio
n/re
mov
al o
f P5/
P6
leve
e ba
sed
on a
bilit
y to
m
aint
ain
wat
er le
vels
thro
ugh
P6
mgt
alo
neE
valu
ate
adja
cent
acq
uisi
tion
for a
ny p
oten
tial r
esto
ratio
n
Spr
ay p
eppe
rwee
d be
twee
n P
5 &
P6
on n
orth
end
AS
AP
in s
prin
g w
ith T
elar
Y
* * *
04/2
0/20
06Sp
ray
Tela
r0.
3R
educ
e pe
pper
wee
d
T15
990
10/1
/200
64
:c2
/3/4
=pul
l 6" b
oard
3/1
, hol
d un
til 6
/1, t
hen
draw
dow
n, le
avin
g a
boar
d in
rise
rs to
hol
d H
2O in
pot
hole
s/ch
nls
for e
vap
Mow
coc
kleb
urr p
rior t
o se
edse
t
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl s
lope
s) fo
r loa
fing/
graz
ing
area
s, le
avin
g bu
ffer o
n S
end
alo
ng c
ount
y ro
adE
valu
ate
expe
rimen
tal p
lot i
n ce
ll 4
to in
crea
se ti
mot
hy p
rodu
ctio
n =
2 ea
st/w
est d
isc
pass
es (t
o po
wde
r) af
ter t
imot
hy d
ries
out
Con
tact
DU
re: r
emov
al o
r rep
lace
men
t of o
ld D
U/F
WS
sig
n in
S
W c
orne
r of T
15.4
Y
Y
* * * * *
06/0
1/20
06M
ow p
rior t
o se
ed-s
et
Dis
c
20 2
Red
uce
cock
lebu
r
Enh
ance
sw
amp
timot
hy
T15A
990
10/1
/200
64
:P
ull 6
" boa
rd 3
/1, h
old
until
6/1
, the
n dr
awdo
wn;
leav
ing
a bo
ard
in
riser
s to
hol
d H
2O in
pot
hole
s/ch
nls
for e
vap
Mow
coc
klbu
r as
nece
ssar
y pr
ior t
o se
edse
t
Tran
spla
nt tu
le c
lum
p to
eas
t sid
e of
isla
nd, p
lus
lay
grav
el fo
r gr
it, fo
r pos
sibl
e tu
le g
oose
trap
ping
site
Y
Y
* * *
06/0
1/20
06M
ow p
rior t
o se
ed-s
et3
Red
uce
cock
lebu
r
T17
990
10/2
0/20
064
:D
raw
dow
n A
SA
P fo
r coc
kleb
ur g
erm
inat
ion
and
scal
ding
, ref
lood
an
d th
en d
raw
dow
n if
can
get d
own
by 3
/15/
06
Rep
air s
loug
hing
ban
k on
dra
in d
itch
side
of S
leve
e
Spo
t dis
c B
erm
uda/
join
tgra
ss a
nd a
lkal
i/tub
erou
s bu
lrush
Eva
luat
e fo
r upl
and
habi
tat r
esto
ratio
n in
N e
nd w
ith ri
paria
n fo
rest
(o
aks?
)C
all P
G&
E to
stra
ight
en p
ower
pol
es a
long
E s
ide
Gra
vel s
pillw
ay
Y
* * * * * *
04/0
1/20
06D
isc
5R
educ
e B
erm
uda/
join
tgra
ss
T22
990
10/1
/200
64
:Fl
oodi
ng fr
om p
rivat
e la
nd to
sou
th s
till a
pro
blem
- M
P to
con
tact
la
ndow
ner t
o in
quire
rega
rdin
g th
eir d
itch
Mon
itor c
ordy
lant
hus
Y* *
04/0
1/20
06
T24
130
4:
Mon
itor c
ordy
lant
hus
and
othe
r veg
etat
ion
Eva
luat
e po
tent
ial f
or s
heep
gra
zing
YC
C p
aint
par
king
lot C
gat
e
Rep
ost P
arki
ng L
ot C
- pu
t the
"Wes
tsid
e Ac
cess
Onl
y" s
ign
on it
s ow
n po
st
Y
* * * *
Spra
y R
ound
-up
0.5
Mai
ntai
n P
arki
ng
Lot C
Page
5 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
P299
09/
1/20
064
:M
ow c
ockl
bur p
rior t
o se
edse
t as
nece
ssar
y
Spo
t dis
c to
mai
ntai
n op
enin
gs, e
spec
ially
on
east
sid
e
Mai
ntai
n re
triev
al z
one
on N
end
Eva
luat
e re
loca
tion
of d
isab
led
park
ing
area
to N
E
Ope
n up
tule
s so
uth
and
NW
of d
isab
led
blin
d - 2
dis
cs w
ide
YC
C m
aint
ain
disa
bled
blin
d
Spr
ay p
ath
to d
isab
led
blin
d
Y
* * * * * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Dis
c
Spr
ay R
ound
up
5 1 0.1
Red
uce
cock
lebu
r
Red
uce
catta
ils/tu
les
Mai
ntai
n pa
th to
bl
ind
T13
011
/1/2
006
5:
Dis
c vi
ewin
g la
nes,
but
leav
e ca
ttail
buffe
r alo
ng m
ost o
f tou
r ro
ute
and
leav
e a
solid
cen
tral p
atch
for n
estin
g tri
colo
r BB
'sE
valu
ate
fund
ing
for t
our r
oute
turn
-out
Pho
to b
lind
pote
ntia
lly fu
nded
for 2
006,
eva
luat
e be
st lo
catio
n
Pho
to b
lind
park
ing
area
to b
e bu
ilt b
y br
idge
Gra
vel p
ath
to p
hoto
blin
d
Y
Y
* * * * *
08/1
5/20
06C
ut to
gro
und
Spr
ay R
odeo
resp
rout
s
0.1
0.1
Red
uce
arun
do
Red
uce
arun
do
T32
19/
1/20
065
:M
ow c
ockl
ebur
r prio
r to
seed
set
as
nece
ssar
y
Eva
luat
e ki
osk
for p
oten
tial u
pgra
des
whe
n ne
w p
ublic
use
are
a ea
st o
f Pow
ell S
loug
h is
con
stuc
ted
Mos
quito
stu
dy o
ngoi
ng
Lay
grit
agai
n be
twee
n ki
osk
and
isla
nd
Rep
lace
WC
S a
t SW
cor
ner w
/ 4' c
oncr
ete
24" W
CS
Y
* * * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T599
09/
1/20
065
:S
pot d
isc
Ber
mud
a/jo
intg
rass
ear
ly, A
SA
P a
fter d
raw
dow
n
Mow
sec
tions
of l
evee
s/sl
opes
for l
oafin
g/gr
azin
g ar
eas,
incl
udin
g in
terio
r and
eas
t lev
ees
Mow
coc
kleb
urr p
rior t
o se
ed s
et a
s ne
cess
ary
Mow
vie
win
g la
nes
alon
g to
ur ro
ute
Y
Y
* * * *
05/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Mow
prio
r to
seed
-set
20 10
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
cock
lebu
r
T10A
10
1/1/
2007
5:
Mon
itor S
anta
Bar
bara
sed
ge p
lugs
pla
nted
alo
ng n
ew d
rain
can
al
in N
W c
orne
rR
epai
r toe
leve
e w
here
can
al c
omes
out
of T
6A a
nd T
6.4
(leak
ing)
follo
win
g ne
xt S
FM c
ycle
* *
12/3
1/20
06
T12
1-2
09/
25/2
006
5:
Eva
luat
e ne
ed to
irrig
ate
trees
in c
ell 2
onl
y - d
o no
t spi
ll in
to
area
s ou
tsid
e be
rm, l
et e
vapo
rate
Cle
an o
ut in
let c
hann
els
at w
est l
ater
al
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl s
lope
s) fo
r loa
fing/
graz
ing
area
sM
ow c
ockl
ebur
r as
nece
ssar
y
Y
Y
* * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Eva
luat
e ne
ed to
irrig
ate
10 4.7
Red
uce
cock
lebu
r
Mai
ntai
n tre
es
Page
6 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T12
3-4
010
/10/
2006
5:
Rep
air e
ast s
ides
of c
ells
3 a
nd 4
leve
es
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
od-u
pM
ow c
ockl
ebur
prio
r to
seed
set
Y
Y
Y* * *
04/1
0/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T299
010
/1/2
006
6:
Spo
t rep
air w
est r
oad
with
scr
aper
Rip
-rap
WC
S a
t hw
y 20
gat
e
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl. s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
odup
Spo
t dis
c B
erm
uda
gras
s
Y
Y
Y
* * * *
04/0
1/20
06D
isc
10R
educ
e Be
rmud
a gr
ass
T31
010
/1/2
006
6:
Dis
c to
leav
e ab
out 2
0-25
% la
nes/
open
ings
for v
iew
ing,
leav
e m
ajor
ity o
f veg
etat
ion
scre
en a
long
eas
t edg
eE
valu
ate
need
to s
pray
Him
alay
an b
lack
berry
alo
ng e
ast s
ide,
in
clud
ing
wal
king
trai
l with
Rou
nd-u
p, R
odeo
or G
arlo
nM
ud u
p W
CS
afte
r dra
wdo
wn
to p
reve
nt a
ccid
enta
l ref
lood
ing
Mud
up
WC
S to
pre
vent
floo
ding
of T
4
Y
Y
Y Y
* * * *
07/1
5/20
06M
ow p
rior t
o se
ed-s
et
Spr
ay R
ound
-up,
R
odeo
or G
arlo
n
20 0.1
Red
uce
cock
lebu
r
Red
uce
blac
kber
ry
T13
1-2
09/
25/2
006
6:
Eva
luat
e ne
ed to
irrig
ate
trees
in c
ell 1
- do
not
spi
ll ou
tsid
e be
rmed
are
a…le
t eva
pora
teM
ow s
ectio
ns o
f int
erio
r lev
ees
(incl
slo
pes)
for l
oafin
g/gr
azin
g ar
eas
Y
Y
* *
04/0
5/20
06Irr
igat
e w
est e
dge
cell
13.
5M
aint
ain
trees
T14
30
11/1
/200
66
:M
ow c
ockl
ebur
prio
r to
seed
set
Dra
wdo
wn
AS
AP
, ref
lood
afte
r coc
kleb
urr g
erm
inat
ion,
then
cut
w
ater
sup
ply
5/15
/06
and
allo
w to
eva
pora
teM
onito
r woo
d du
ck b
oxes
via
vol
unte
ers
Y
Y
* * *
05/1
5/20
06Sc
ald
(by
irrig
ate)
Mow
prio
r to
seed
-set
18 10R
educ
e co
ckle
bur
Red
uce
cock
lebu
r
T24
3-5
09/
1/20
066
:S
pot d
isc
or s
pray
em
ergi
ng p
atch
es o
f Ber
mud
a gr
ass
Kee
p th
e irr
igat
ion
flood
up S
LOW
so
as n
ot to
dro
wn
out
wat
ergr
ass
in c
hann
el b
otto
ms
Y
Y
* *
05/1
5/20
06D
isc
Spr
ay R
ound
-up
Irrig
ate
5 5 93
Red
uce
Berm
uda
gras
sR
educ
e B
erm
uda
gras
sE
nhan
ce m
oist
so
il pl
ants
P399
09/
15/2
006
6:
Kee
p w
ater
off
wes
t sid
e un
til m
id-O
ctob
er fo
r Cor
dyla
nthu
s
Spr
ay p
eppe
rwee
d (T
elar
) on
perim
eter
leve
es a
nd e
spec
ially
ar
ound
old
che
ck s
tatio
n as
nec
essa
ryM
ow W
leve
e fo
r des
igna
ted
hunt
er a
cces
s of
f Ohm
Rd
YC
C p
aint
par
king
lot B
gat
e
Y
Y* * * *
04/1
5/20
06Sp
ray
Tela
r
Spr
ay R
ound
-up
0.5 1
Red
uce
pepp
erw
eed
Mai
ntai
n P
arki
ng
Lot B
Page
7 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T10
1-2
09/
10/2
006
7:
Eva
luat
e co
st/n
eed
of a
band
onin
g w
ell i
n nw
cor
ner
Mow
coc
kleb
urr p
rior t
o se
ed s
et, i
nclu
ding
are
as a
long
tour
rout
e to
allo
w v
iew
ing
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
odup
Y
Y
Y
* * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T10
30
9/25
/200
67
:A
dd m
ore
grav
el to
boa
t ram
p in
NE
cor
ner o
f cel
l 3
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
odup
Tule
tran
spla
nts
alon
g to
ur ro
ute
in c
ell 3
to b
uffe
r di
stur
banc
e…is
land
cur
rent
ly h
as li
ttle
bird
use
Y
Y
* * *
07/1
5/20
06
T16
990
10/1
0/20
067
:H
old
wat
er le
vel 6
" low
er u
ntil
7/15
/06
draw
dow
n
Mow
coc
kleb
urr p
rior t
o se
edse
t
Mow
sec
tions
of i
nter
ior l
evee
s (in
lc s
lope
s) fo
r loa
fing/
graz
ing
area
sG
rave
l boa
t ram
p
Rem
ove
larg
e co
ncre
te b
lock
in N
end
Y
Y
* * * * *
07/1
5/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T16A
990
1/1/
2007
7:
Mon
itor f
or tr
icol
or b
lack
bird
s
Dro
p w
ater
leve
l dow
n 12
" to
enco
urag
e po
ndw
eed
until
mid
A
pril/
early
May
* *12
/31/
2006
T13A
990
10/1
0/20
068
:M
ow s
ectio
ns o
f wes
t lev
ee (i
ncl s
lope
s) fo
r loa
fing/
graz
ing
area
s
Mow
coc
kleb
ur a
s ne
cess
ary
prio
r to
seed
set
Y
Y
* *04
/20/
2006
Mow
prio
r to
seed
-set
10R
educ
e co
ckle
bur
T14
40
10/1
/200
68
:M
onito
r woo
d du
ck b
oxes
via
vol
unte
ers
Mon
itor g
reat
blu
e he
ron/
gre
at e
gret
rook
ery
on e
ast s
ide
* *04
/01/
2006
T19
990
9/10
/200
68
:M
ow c
ockl
bur p
rior t
o se
edse
t
Tran
spla
nt tu
les
(use
P2
as s
ourc
e) a
roun
d ce
nter
isla
nds
in c
2 ju
st p
rior t
o flo
odup
- del
ay P
3-P
6 flo
odup
to a
ccel
erat
e de
liver
y to
tu
les
Mai
ntai
n co
ver o
n is
land
s
Mow
cro
ss-le
vees
incl
udin
g sl
opes
prio
r to
flood
up
Y
Y* * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et10
Red
uce
cock
lebu
r
T24
9-10
09/
15/2
006
8:
Tran
spla
nt s
ever
al b
ulru
sh c
lum
ps a
long
eas
t and
nor
th s
ides
of
c9 Mow
c9/
c10
leve
e fo
r loa
fing/
graz
ing
prio
r to
flood
up
Spo
t rep
air e
ast l
evee
Y
* * *
04/1
5/20
06
P199
08/
25/2
006
8:
Spo
t dis
c as
nec
essa
ry
Mai
ntai
n re
triev
al z
one
on N
end
* *
04/0
1/20
06D
isc
5E
nhan
ce m
oist
so
il pl
ants
Page
8 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
PS99
01/
1/20
078
:C
ontin
ue re
mov
al o
f non
-nat
ive
trees
- us
e cu
t stu
mp
herb
icid
e tre
atm
ents
as
need
ed a
nd re
plan
t with
nat
ive
spp
Eva
luat
e hy
acin
th re
mov
al
Rem
ove
old
equi
pmen
t on
W s
ide
Ser
vice
woo
d du
ck b
oxes
Mon
itor s
edge
/cre
epin
g w
ildry
e pl
ugs
plan
ted
N o
f brid
ge
* * * * *
12/3
1/20
06Sp
ray
Gar
lon-
cut s
tum
p0.
1R
educ
e no
n-na
tive
trees
T1A
990
9:
Rem
ove
trash
Rep
ost b
ound
ary
Eva
luat
e fo
r pot
entia
l hab
itat e
nhan
cem
ent p
roje
ct, p
ossi
ble
with
w
illow
and
cot
tonw
ood
plan
tings
* * *
T10A
20
11/1
/200
69
:R
emov
e ar
undo
from
alo
ng 2
047
drai
n an
d sp
ray
resp
rout
s w
ith
Rod
eoA
dd w
ood
duck
box
on
dow
ned
tree
* *
04/1
5/20
06C
ut to
gro
und
Spr
ay R
odeo
resp
rout
s
0.5
0.5
Red
uce
arun
do
Red
uce
arun
do
T20
10
9/1/
2006
9:
Spo
t dis
c po
thol
e in
S e
nd to
kee
p op
en
Mos
quito
rese
arch
pot
entia
lly o
ngoi
ng
* *
04/1
5/20
06D
isc
1R
educ
e ca
ttails
/tule
s
T21
21
10/1
/200
69
:E
valu
ate
pote
ntia
l to
burn
in N
end
in s
umm
er/fa
ll to
ope
n up
tule
s
*
04/0
1/20
06Bu
rn20
Red
uce
tule
s
T24
70
9/15
/200
69
:A
dd g
rave
l to
boat
ram
p in
NW
cor
ner
*04
/01/
2006
T24
110
1/1/
2007
9:
Dra
wdo
wn
to m
inim
um p
ondi
ng le
vel f
or fi
sh c
ontro
l op
portu
nist
ical
ly d
urin
g la
te w
inte
rR
emov
e pi
les
of b
eave
r plu
g m
ater
ial f
rom
aro
und
wat
er c
ontro
l st
ruct
ures
and
use
to c
reat
e su
bmer
ged
isla
nds
in a
djac
ent u
nits
* *
12/3
1/20
06
T24
120
11/1
/200
69
:D
evel
op re
stor
atio
n pl
an fo
r wes
t sid
e to
rest
ore
addi
tiona
l VP
s an
d m
ound
s an
d se
ek fu
ndin
g
*
04/1
5/20
06
T12A
20
10:
T24
20
1/1/
2007
10:
12/3
1/20
06
T24
7A0
1/1/
2007
10:
12/3
1/20
06
T24
80
1/1/
2007
10:
12/3
1/20
06
Page
9 o
f 10
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
2047
990
10:
91=
unit
not f
unct
iona
l due
to m
ultip
le p
robl
ems
5-6=
unit
will
like
l y m
ake
it th
roug
h up
com
ing
seas
on O
NLY
9=un
it fu
nctio
nal,
but r
equi
res
enha
ncem
ent t
o im
prov
e qu
alit y
2=un
it no
t fun
ctio
nal d
ue to
a s
ingl
e pr
oble
m
3-4=
will
like
l y fa
il du
ring
upco
min
g flo
od c
ycle
7-8=
rout
ine
mai
nten
ance
onl
y (i.
e. d
isci
ng la
nes
or c
heck
s, g
rave
l, et
c.)
10=n
o m
aint
enan
ce n
eces
sar y
oth
er th
an s
ite v
isit.
Prio
rity
Num
bers
:
Page
10
of 1
0
PLANNED DRAWDOWN SCHEDULE02-May-06 CLS 20067Year:
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
2047 99 S 0 0%:
CANALS 99 S 0 0%:
JD 99 S 0 0%:
T12A 2 0 0%:
T1A 99 0 0%:
T24 13 0 0%:
T24 1 0 0%:
T7/8/11 99 0 0%:
0 0
T1 1-2 ST 84 2%3/15/2006 :T10 4 S 50 4%3/15/2006 :
T21 1 S 38 5%3/15/2006 :
T23 99 EVAP 48 7%3/15/2006 :
219 219
P1 99 S 82 9%4/1/2006 :
P2 99 S 71 11%4/1/2006 :
T12 1-2 S 107 14%4/1/2006 :
T14 4 S 3 14%4/1/2006 :
T14 1-2 S 30 15%4/1/2006 :
T17 99 S 64 17%4/1/2006 :T18 99 S 29 18%4/1/2006 :
T19 99 S 92 21%4/1/2006 :
T2 99 S 81 23%4/1/2006 :
T21 2 S 56 25%4/1/2006 :
T22 99 S 31 26%4/1/2006 :
T24 7 24 27%4/1/2006 :
T6A 99 S 41 28%4/1/2006 :
710 929
T13 1-2 S 109 31%4/5/2006 :
109 1038
T12 3-4 S 126 35%4/10/2006 :
T12A 1 S 76 37%4/10/2006 :
T6 99 S 134 41%4/10/2006 :
335 1373
Page 1 of 3
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
P3 99 S 148 45%4/15/2006 :
P4 99 S 124 49%4/15/2006 :
T10 1-2 S 101 52%4/15/2006 :
T10A 2 S 13 53%4/15/2006 :
T13 3-4 S 110 56%4/15/2006 :
T20 1 S 71 58%4/15/2006 :
T20 2-3 S 53 60%4/15/2006 :
T24 12 S 27 60%4/15/2006 :
T24 9-10 ST 76 63%4/15/2006 :
T3 2 S 54 64%4/15/2006 :
779 2152
P5 99 S 41 66%4/20/2006 :
T13A 99 S 92 68%4/20/2006 :T25 99 S 3 68%4/20/2006 :
137 2289
P6 99 S 132 72%5/1/2006 :
T4 99 S 2 72%5/1/2006 :
T5 99 S 97 75%5/1/2006 :
T9 99 S 18 76%5/1/2006 :
249 2538
T14 3 S 18 76%5/15/2006 :
T24 3-5 S 93 79%5/15/2006 :
111 2649
T15 99 ST 224 86%6/1/2006 :
T15A 99 S 90 89%6/1/2006 :
314 2962
T24 6 12 89%7/1/2006 :
12 2975
T10 3 S 42 90%7/15/2006 :
T16 99 S 119 94%7/15/2006 :
T3 1 S 18 94%7/15/2006 :
179 3154
T2A 99 S 12 95%8/1/2006 :
12 3166
T1 3 S 52 96%8/15/2006 :
52 3218
Page 2 of 3
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
PS 99 0 96%12/31/2006 :
T10A 1 41 97%12/31/2006 :
T16A 99 27 98%12/31/2006 :
T24 7A S 6 98%12/31/2006 :
T24 11 19 99%12/31/2006 :
T24 2 S 15 99%12/31/2006 :
T24 8 S 22 100%12/31/2006 :
129 3347
3347Grand Total :
Page 3 of 3
Irrigation SummaryRefuge: CLS Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T1 1-2 3/15/2006 Yes 8/10/2006 Scald (by irrigate) Reduce cocklebur 83:
T4 99 5/1/2006 Yes 9/15/2006 Irrigate Maintain trees 1:
T6 99 4/10/2006 Yes 9/15/2006 Irrigate Enhance moist soil plants 134:
T10 4 3/15/2006 Yes 10/1/2006 Irrigate/scald Reduce cocklebur 50:
T12 1-2 4/1/2006 Yes 9/25/2006 Evaluate need to irrigate Maintain trees 4.7:
T13 1-2 4/5/2006 Yes 9/25/2006 Irrigate west edge cell 1 Maintain trees 3.5:
T14 3 5/15/2006 Yes 11/1/2006 Scald (by irrigate) Reduce cocklebur 17.7:
T24 3-5 5/15/2006 Yes 9/1/2006 Irrigate Enhance moist soil plants 93:
Page 1 of 1
PLANNED FLOODUP SCHEDULE17-May-06 CLS 20067Year:Refuge:
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED
T7/8/11 99 0 0%:T1A 99 0 0%:2047 99 0 0%:T12A 2 0 0%:T24 1 0 0%:CANAL 99 0 0%:T24 13 0 0%:JD 99 0 0%:
0Subtotal: 0
8/10/2006T1 1-2 84 2%:
84Subtotal: 848/25/2006
P1 99 82 5%:165Subtotal: 82
9/1/2006T24 3-5 93 8%:T20 1 71 10%:T12A 1 76 12%:P2 99 71 14%:T3 2 54 16%:T5 99 97 19%:
628Subtotal: 4629/10/2006
T19 99 92 21%:T10 1-2 101 24%:
820Subtotal: 1929/15/2006
P3 99 148 29%:P4 99 124 33%:T2A 99 12 33%:T20 2-3 53 35%:T24 9-10 76 37%:T24 6 12 37%:T4 99 2 37%:T9 99 18 38%:T6 99 134 42%:
Page 1 of 3
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODEDT24 7 24 43%:
1424Subtotal: 604
9/25/2006T13 1-2 109 46%:T10 3 42 47%:T12 1-2 107 50%:T21 1 38 51%:P6 99 132 55%:
1851Subtotal: 42710/1/2006
T6A 99 41 57%:T3 1 18 57%:P5 99 41 58%:T22 99 31 59%:T18 99 29 60%:T21 2 56 62%:T13 3-4 110 65%:T14 1-2 30 66%:T10 4 50 67%:T14 4 3 68%:T15 99 224 74%:T15A 99 90 77%:T2 99 81 79%:
2655Subtotal: 804
10/10/2006T12 3-4 126 83%:T16 99 119 87%:T13A 99 92 89%:
2992Subtotal: 33710/20/2006
T17 99 64 91%:3056Subtotal: 64
11/1/2006T10A 2 13 92%:T1 3 52 93%:T14 3 18 94%:T24 12 27 95%:
3166Subtotal: 11011/20/2006
T23 99 48 96%:T25 99 3 96%:
Page 2 of 3
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED
3218Subtotal: 521/1/2007
T10A 1 41 97%:PS 99 0 97%:T24 11 19 98%:T24 2 15 98%:T24 7A 6 99%:T24 8 22 99%:T16A 99 27 100%:
3347Subtotal: 129
Page 3 of 3
PLANNED FLOODUP RATE BY MANAGED WETLAND HABITAT TYPE17-May-06 CLS 20067Refuge: Year:
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total8/10/2006 84 0 0 00% 0% 0%3%
84 0 0 08/10/2006
8/25/2006 165 0 0 00% 0% 0%6%82 0 0 08/25/2006
9/1/2006 241 0 0 00% 0% 0%9%9/1/2006 312 0 0 00% 0% 0%11%9/1/2006 409 0 0 00% 0% 0%15%9/1/2006 464 0 0 00% 0% 0%17%9/1/2006 534 0 0 00% 0% 0%20%9/1/2006 534 93 0 041% 0% 0%20%
369 93 0 09/1/2006
9/10/2006 635 93 0 041% 0% 0%23%9/10/2006 726 93 0 041% 0% 0%27%
192 0 0 09/10/2006
9/15/2006 803 93 0 041% 0% 0%29%9/15/2006 821 93 0 041% 0% 0%30%9/15/2006 821 93 12 041% 5% 0%30%9/15/2006 845 93 12 041% 5% 0%31%9/15/2006 898 93 12 041% 5% 0%33%9/15/2006 1046 93 12 041% 5% 0%38%9/15/2006 1046 93 24 041% 9% 0%38%9/15/2006 1048 93 24 041% 9% 0%38%9/15/2006 1048 227 24 0100% 9% 0%38%9/15/2006 1173 227 24 0100% 9% 0%43%
447 134 24 09/15/2006
9/25/2006 1173 227 66 0100% 26% 0%43%9/25/2006 1280 227 66 0100% 26% 0%47%9/25/2006 1411 227 66 0100% 26% 0%52%9/25/2006 1449 227 66 0100% 26% 0%53%9/25/2006 1558 227 66 0100% 26% 0%57%
385 0 42 09/25/2006
10/1/2006 1607 227 66 0100% 26% 0%59%10/1/2006 1637 227 66 0100% 26% 0%60%10/1/2006 1640 227 66 0100% 26% 0%60%10/1/2006 1865 227 66 0100% 26% 0%68%10/1/2006 1975 227 66 0100% 26% 0%72%10/1/2006 2064 227 66 0100% 26% 0%76%10/1/2006 2145 227 66 0100% 26% 0%79%10/1/2006 2176 227 66 0100% 26% 0%80%10/1/2006 2206 227 66 0100% 26% 0%81%10/1/2006 2247 227 66 0100% 26% 0%82%10/1/2006 2247 227 84 0100% 33% 0%82%10/1/2006 2288 227 84 0100% 33% 0%84%
Page 1 of 2
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total10/1/2006 2344 227 84 0100% 33% 0%86%
786 0 18 010/1/2006
10/10/2006 2344 227 203 0100% 80% 0%86%10/10/2006 2436 227 203 0100% 80% 0%89%10/10/2006 2562 227 203 0100% 80% 0%94%
218 0 119 010/10/2006
10/20/2006 2626 227 203 0100% 80% 0%96%64 0 0 010/20/2006
11/1/2006 2633 227 203 6100% 80% 4%96%11/1/2006 2651 227 203 6100% 80% 4%97%11/1/2006 2651 227 255 6100% 100% 4%97%11/1/2006 2678 227 255 6100% 100% 4%98%
52 0 52 611/1/2006
11/20/2006 2726 227 255 6100% 100% 4%100%11/20/2006 2730 227 255 6100% 100% 4%100%
52 0 0 011/20/2006
1/1/2007 2730 227 255 47100% 100% 34%100%1/1/2007 2730 227 255 65100% 100% 48%100%1/1/2007 2730 227 255 65100% 100% 48%100%1/1/2007 2730 227 255 81100% 100% 60%100%1/1/2007 2730 227 255 86100% 100% 64%100%1/1/2007 2730 227 255 109100% 100% 80%100%1/1/2007 2730 227 255 135100% 100% 100%100%
0 0 0 1291/1/2007
Page 2 of 2
Planned Mowing SummaryRefuge: CLS Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T1 1-2: 3/15/2006 Yes 8/10/2006 Mow prior to seed-set Reduce cocklebur 20YY
T1 3: 8/15/2006 No 11/1/2006 Y
T2 99: 4/1/2006 No 10/1/2006 YY
T3 1: 7/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 20Y
T3 2: 4/15/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 10Y
T5 99: 5/1/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 10YY
T6 99: 4/10/2006 Yes 9/15/2006 YY
T10 1-2: 4/15/2006 No 9/10/2006 Mow prior to seed-set Reduce cocklebur 10Y YY
T10 3: 7/15/2006 No 9/25/2006 YY
T10 4: 3/15/2006 Yes 10/1/2006 YY
T12 1-2: 4/1/2006 Yes 9/25/2006 Mow prior to seed-set Reduce cocklebur 10YY
T12 3-4: 4/10/2006 No 10/10/2006 Mow prior to seed-set Reduce cocklebur 10YY
T12A 1: 4/10/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 40YY
T13 1-2: 4/5/2006 Yes 9/25/2006 YY
T13 3-4: 4/15/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 2YY
T13A 99: 4/20/2006 No 10/10/2006 Mow prior to seed-set Reduce cocklebur 10YY
T14 1-2: 4/1/2006 No 10/1/2006 Y
T14 3: 5/15/2006 Yes 11/1/2006 Mow prior to seed-set Reduce cocklebur 10YY
Page 1 of 2
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T15 99: 6/1/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 20YY
T15A 99: 6/1/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 3Y
T16 99: 7/15/2006 No 10/10/2006 Mow prior to seed-set Reduce cocklebur 10YY
T17 99: 4/1/2006 No 10/20/2006 Y
T19 99: 4/1/2006 No 9/10/2006 Mow prior to seed-set Reduce cocklebur 10Y
T24 1: No Mow prior to seed-set Reduce mustard 5
T24 3-5: 5/15/2006 Yes 9/1/2006 Y
T24 9-10: 4/15/2006 No 9/15/2006 Y
P2 99: 4/1/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 5
P3 99: 4/15/2006 No 9/15/2006 Y
P4 99: 4/15/2006 No 9/15/2006 Mow Reduce cocklebur 10Y
P6 99: 5/1/2006 No 9/25/2006 Mow prior to seed-set Reduce cocklebur 10
Page 2 of 2
Planned Discing SummaryRefuge: CLS Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T1 1-2: 03/15/2006 Yes 08/10/2006 Disc Reduce Bermuda/jointgrass 20Y
T1 3: 08/15/2006 No 11/01/2006 Y
T2 99: 04/01/2006 No 10/01/2006 Disc Reduce Bermuda grass 10Y
T3 1: 07/15/2006 No 10/01/2006 Y
T4 99: 05/01/2006 Yes 09/15/2006 Disc Create firebreak 1
T5 99: 05/01/2006 No 09/01/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 20
T6 99: 04/10/2006 Yes 09/15/2006 Disc Reduce Bermuda/jointgrass 40Y
T6A 99: 04/01/2006 No 10/01/2006 Disc ASAP aft. drawdown Reduce primrose 20
T12A 1: 04/10/2006 No 09/01/2006 Y
T13 3-4: 04/15/2006 No 10/01/2006 Disc Enhance swamp timothy 1
T14 1-2: 04/01/2006 No 10/01/2006 Disc Reduce primrose 10
T15 99: 06/01/2006 No 10/01/2006 Disc Enhance swamp timothy 2
T17 99: 04/01/2006 No 10/20/2006 Disc Reduce Bermuda/jointgrass 5
T20 1: 04/15/2006 No 09/01/2006 Disc Reduce cattails/tules 1
T20 2-3: 04/15/2006 No 09/15/2006 Disc Enhance moist soil plants 10
T24 3-5: 05/15/2006 Yes 09/01/2006 Disc Reduce Bermuda grass 5Y
P1 99: 04/01/2006 No 08/25/2006 Disc Enhance moist soil plants 5
Page 1 of 2
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
P2 99: 04/01/2006 No 09/01/2006 Disc Reduce cattails/tules 1Y
P4 99: 04/15/2006 No 09/15/2006 Disc Reduce cattails/tules 3
P6 99: 05/01/2006 No 09/25/2006 Disc Reduce tules 1
Page 2 of 2
Planned Spray SummaryRefuge: CLS Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T1 3 8/15/2006 No 11/1/2006 Spray Rodeo resprouts Reduce arundo 0.1:
T3 1 7/15/2006 No 10/1/2006 Spray Round-up, Rodeo or Garlon
Reduce blackberry 0.1:
T4 99 5/1/2006 Yes 9/15/2006 Spray Telar
Spray Roundup
Reduce pepperweed
Reduce tall wheat
0.1
1
:
T6 99 4/10/2006 Yes 9/15/2006 Spray Telar Reduce pepperweed 0.5:
T7/8/11 99 No Spray RodeoSpray Round-upSpray Round-upSpray Telar
Reduce arundoReduce salsola sodaReduce perlagrassReduce pepperweed
0.10.10.10.1
:
T9 99 5/1/2006 No 9/15/2006 Spray TelarSpray Round-up
Reduce pepperweedMaintain Shop Parking Area
51
:
T10A 2 4/15/2006 No 11/1/2006 Spray Rodeo resprouts Reduce arundo 0.5:
T20 2-3 4/15/2006 No 9/15/2006 Spray Telar Reduce pepperweed 0.5:
T23 99 3/15/2006 No 11/20/2006 Spray Round-upSpray Round-up
Spray Round-up
Maintain sparse mound vegReduce starthistle
Reduce weeds in pkg lot
11
1
:
T24 1 No Spray Telar Reduce pepperweed 0.1:
T24 3-5 5/15/2006 Yes 9/1/2006 Spray Round-up Reduce Bermuda grass 5:
T24 13 No Spray Round-up Maintain Parking Lot C 0.5:
P2 99 4/1/2006 No 9/1/2006 Spray Roundup Maintain path to blind 0.1:
P3 99 4/15/2006 No 9/15/2006 Spray TelarSpray Round-up
Reduce pepperweedMaintain Parking Lot B
0.51
:
P4 99 4/15/2006 No 9/15/2006 Spray Telar Reduce pepperweed 0.1:
P5 99 4/20/2006 No 10/1/2006 Spray Telar Reduce pepperweed 0.25:
Page 1 of 2
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?PS 99 12/31/2006 No 1/1/2007 Spray Garlon-cut stump Reduce non-native trees 0.1:
JD 99 No Spray Rodeo Maint canal capacity 2:
CANAL 99 No Spray Rodeo Maint canal capacity 3:
Page 2 of 2
Planned Grazing SummaryRefuge: CLS Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T7/8/11 99 No: Graze cattle Reduce lolium & annual
grasses80
T9 99 5/1/2006 No 9/15/2006: Graze sheep Reduce starthistle/pepperweed
133
T23 99 3/15/2006 No 11/20/2006: Graze sheep Reduce starthistle 184
Page 1 of 1
Planned Burn SummaryRefuge: CLS Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T7/8/11 99: No
Burn Enhance native plants 80
T21 2 4/1/2006: No 10/1/2006 Burn Reduce tules 20
T23 99 3/15/2006: No 1/20/2006Burn Enhance native plants 70
Page 1 of 1
Plan
ned
Publ
ic U
se P
roje
cts
Ref
uge:
Year
:C
LS20
067
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T13
Dis
c vi
ewin
g la
nes,
but
leav
e ca
ttail
buffe
r alo
ng m
ost o
f tou
r rou
te a
nd le
ave
a so
lid c
entra
l pat
ch fo
r nes
ting
trico
lor B
B's
Eva
luat
e fu
ndin
g fo
r tou
r rou
te tu
rn-o
ut
Pho
to b
lind
pote
ntia
lly fu
nded
for 2
006,
eva
luat
e be
st lo
catio
nP
hoto
blin
d pa
rkin
g ar
ea to
be
built
by
brid
geG
rave
l pat
h to
pho
to b
lind
:11
/01/
2006
08/1
5/20
06
T31
Dis
c to
leav
e ab
out 2
0-25
% la
nes/
open
ings
for v
iew
ing,
leav
e m
ajor
ity o
f veg
etat
ion
scre
en a
long
eas
t edg
eE
valu
ate
need
to s
pray
Him
alay
an b
lack
berry
alo
ng e
ast s
ide,
incl
udin
g w
alki
ng tr
ail w
ith R
ound
-up,
Rod
eo o
r Gar
lon
:10
/01/
2006
07/1
5/20
06
T32
Eva
luat
e ki
osk
for p
oten
tial u
pgra
des
whe
n ne
w p
ublic
use
are
a ea
st o
f Pow
ell S
loug
h is
con
stuc
ted
Lay
grit
agai
n be
twee
n ki
osk
and
isla
nd:
09/0
1/20
0604
/15/
2006
T499
Par
king
are
a (~
10 c
ars)
alo
ng e
ntra
nce
road
nea
r old
resi
denc
e si
te fu
lly fu
nded
and
to b
e co
nstru
cted
in M
ay/J
une
2007
Con
cret
e pa
ths
lead
ing
north
from
par
king
are
a fu
lly fu
nded
and
to b
e co
nstu
cted
in 2
007
Inve
stig
ate
fund
ing
for c
onst
ruct
ion
of v
iew
ing
plat
form
and
she
lter
:09
/15/
2006
05/0
1/20
06
T599
Mow
vie
win
g la
nes
alon
g to
ur ro
ute
:09
/01/
2006
05/0
1/20
06
T699
Mow
sec
tions
of i
nter
ior l
evee
s (in
cl. s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
odup
Dis
c vi
ewin
g la
nes
and
mow
turn
outs
on
tour
rout
e:
09/1
5/20
0604
/10/
2006
T10
3Tu
le tr
ansp
lant
s al
ong
tour
rout
e in
cel
l 3 to
buf
fer d
istu
rban
ce…
isla
nd c
urre
ntly
has
littl
e bi
rd u
se:
09/2
5/20
0607
/15/
2006
T23
99S
pray
and
repa
ir gr
avel
at c
heck
sta
tion
park
ing
lot
YC
C to
pai
nt c
heck
sta
tion
gate
s an
d ea
ves
on c
heck
sta
tion
:11
/20/
2006
03/1
5/20
06
T24
13Y
CC
pai
nt p
arki
ng lo
t C g
ate
Rep
ost P
arki
ng L
ot C
- pu
t the
"Wes
tsid
e A
cces
s O
nly"
sig
n on
its
own
post
:
T25
99P
ost "
Dan
ger,
Dee
p M
ud" s
igns
on
swal
e on
wes
t 1/2
of u
nit a
nd fe
nce
off a
rea
(app
rox.
10
sign
s ne
eded
):
11/2
0/20
0604
/20/
2006
P199
Mai
ntai
n re
triev
al z
one
on N
end
:08
/25/
2006
04/0
1/20
06
Page
1 o
f 2
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
P299
Mai
ntai
n re
triev
al z
one
on N
end
Eva
luat
e re
loca
tion
of d
isab
led
park
ing
area
to N
EO
pen
up tu
les
sout
h an
d N
W o
f dis
able
d bl
ind
- 2 d
iscs
wid
eY
CC
mai
ntai
n di
sabl
ed b
lind
Spr
ay p
ath
to d
isab
led
blin
d
:09
/01/
2006
04/0
1/20
06
P399
Mow
W le
vee
for d
esig
nate
d hu
nter
acc
ess
off O
hm R
dY
CC
pai
nt p
arki
ng lo
t B g
ate
:09
/15/
2006
04/1
5/20
06
Page
2 o
f 2
2006-07 Annual Habitat Management Plan
Sutter National Wildlife Refuge
Prepared By: Date: _________________
Refuge Biologist Reviewed By: Date: _________________
Supervisory Wildlife Biologist Reviewed By: Date: _________________
Assistant Refuge Manager
Reviewed By: Date: _________________
Deputy Refuge Manager Approved By: Date: _________________
Project Leader
Sutter NWRT1:1
T2:1
T2:2
T3
T6
T7:1
T7:2
T8:2
T8:4
T8:3
T8:1
T4T5
T2:3
T2:4T2A
T13
T9:1-3
T9:4 T9:5 T9:6
T1:2
T9:7 T9:8
T10
T12:1
T12:2
T12:3
T12:4
T14:1
T14:2
T15
T16
T17
T1:3
T21:1
T21:2
T20:3
T20:2
T20:1
T19:2 T19:1
T18:2
T7:3
T11:1
T11:2
T18:1
185
172
98
97
96
95
86
84
83
78
75
128
60
59
58
56
53
53
48
48
46
45
44
44
44
42
40
40
37
36
34
34
34
32
32
31
30
29
29
27
26
26
26
1815
14
48
3
3
Cal ifornia
°
0 6 12 18 243Miles
Sacramento NWR
Delevan NWR
Colusa NWR
Sutter NWR
Butte S ink NWR
Sacramento River NWR
Sacramento NWR Complex
Refuge Boundary
RoadsPaved
All Weather
Standard Dirt
Non-Drivable
Railroad
Cell Boundaries (no roads)
Habitat Management 2006-07Seasonal Flooded Marsh
Unmanaged Freshwater Wetland
Watergrass
Summer Water
Permanent Pond
Vernal Pool
Alkali Meadow
Vernal Pool/Alkali Meadow Complex
Riparian Willow Scrub
Cottonwood Willow
Mixed Riparian Forest
Valley Oak Riparian Forest
Flooded Willow
Annual Grassland
Perennial Grassland
Facilities
0 0.5 1 1.5 20.25Miles
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 1
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T1 CELL: 1
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:PERIMETER UNIT; HERON/EGRET ROOKERY IN NW CORNER-MINIMIZE DISTURBANCE FROM MARCH 1-AUG. 15; Y-B CUCKOOS USING FORESTED AREAS DURING SUMMER. Major tree removal work conducted in summer 2005- most of box elder, Oregon ash, black and sandbar willows, and eucalyptus were removed/stump-treated from interior areas n. of T2.1. Several large willows and all large oaks were left or otherwise just limbed up. Hydraulic modeling conducted by DWR in 2005-06.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
7
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
63
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
5
Mixed Riparian
Forest
127
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
3
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clear/maintain "tree roads" ASAP2. Evaluate abandoning maintenance of tree roads-check on pipes that drain east side under tree road3. Tree mgt to maintain Byp. flood-flows: any additional tree removal needed (see above SMCs)- take
no oaks; time aft. mid-Aug4. Evaluate DWR hydraulic modeling from 2005-06.5. Spot repair flood damage on perimeter and interior levees.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 205
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Selective tree removalSpray Roundup resprout
maint. of flood flowsMaint. of flood flows
10.5
ACRES:TREATMENT: OBJECTIVE:Selective tree removalSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 2
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T1 CELL: 2
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NEW ROOKERY OF 4-5 GBHE NESTS NEAR SE CORNER OF T9.1-3 IN 2005; IN 2006, MIN. 28 GBHE NESTS AND FEW GREG NESTS; Y-B CUCKOOS USING FORESTED AREAS DURING SUMMER;
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
59
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clear and maintain tree roads ASAP2. Remove any eucalyptus3. Spot repair flood damage on perimeter and interior levees.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 59
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Garlon-cut stump reduce eucalyptus 0.1ACRES:TREATMENT: OBJECTIVE:
Spray Garlon-cut stumpACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 3
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T1 CELL: 3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T14.2,T17
SPECIAL MANAGEMENT CONSIDERATIONS:PERIMETER UNIT; Y-B CUCKOOS USING FORESTED AREAS DURING SUMMER.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
27
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
4
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
17
Mixed Riparian
Forest
33
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
1
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Clear/maintain "tree roads" ASAP2. Remove tanks, boxes, and other trash from forest SE of weir #13. Remove any eucalyptus4. Tree mgt to maintain Byp. flood flows: spot spray sandbar willow resprouts along T17 S levee
where intial trees removed5. Further modify SE gate to improve disabled access (widened posts 2003)?6. Spot repair flood damage on perimeter and interior levees.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 82
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-up maint. of flood flows 0.5ACRES:TREATMENT: OBJECTIVE:
Spray Round-upACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 4
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T2 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HEAVY DISKING AND DELEVELING IN WEST SIDES OF C1-C2 FROM MAIN CANAL PROJECT IN SUMMER 2003; HIGH POTENTIAL FOR JOINT/BERMUDA GRASS INVASION. 2006 DRAWDOWNS DELAYED DUE TO BYPASS FLOODING.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
155
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot repair flood damage on perimeter and interior levees.2. Tree mgt to maintain Byp. flood flows: spray willow resprouts on n. and w. sides3. Disk Bermuda/jointgrass - disk tree saplings at same time4. Mow sections of interior levees/slopes for loafing/grazing areas prior to flood-up5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 155
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP after drawdowIrrigate/scaldSpray Roundup resprout
Reduce Bermuda/jointgrassEnhance moist soil plantsMaint. of flood flows
301551
ACRES:TREATMENT: OBJECTIVE:Disc ASAP after drawdownIrrigate/scaldSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 5
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T3 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/5/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:2004-SCALDED COCKLEBUR (NOT NEEDED IN 2005-LATE FLOODING IN BYPASS)
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 8
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
60
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset multiple times if necessary2. Focus lane disking on bermuda/ jointgrass patches3. Evaluate need for irrigation/cocklebur scald post-drawdown4. Spot repair flood damage on perimeter and interior levees.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 60
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Disc ASAP after drawdow
Reduce cockleburReduce Bermuda/jointgrass
6010
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Disc ASAP after drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 6
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T4 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T2
SPECIAL MANAGEMENT CONSIDERATIONS:
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
84
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset, multiple times if nec2. Mow T4/T5 levee/slopes for loafing3. Spot repair flood damage on perimeter and interior levees.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 84
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-set Reduce cocklebur 40ACRES:TREATMENT: OBJECTIVE:
Mow prior to seed-setACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 7
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T5 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/25/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:NONE
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
56
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset as necessary2. Spot disk bermuda/jointgrass3. Rebuild levee at NE corner to recreate "beaver pond" to facilitate adequate water mgt. in T5-add
inlet4. Spot repair flood damage on perimeter and interior levees.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 56
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc
Reduce cockleburReduce Bermuda/jointgrass
205
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 8
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T6 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:LAST BURNED AUGUST 1997-TULES MAINTAINED WITH DISKING SINCE THEN
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
34
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset as necessary2. Spot disk bermuda/jointgrass and openings/lanes in perennial smartweed3. Mow sections of n. levee (inc. slopes) for loafing/grazing areas prior to flood-up4. Add 1-2 islands and rehab existing5. Spray sandbar willow resprouts along hi-line canal6. Spot repair flood damage on perimeter and interior levees.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 34
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc ASAP aft. drawdownDisc 2 timesSpray Roundup resproutMow prior to seed-set
open up perenn. smartweedReduce Bermuda/jointgrassMaint. of flood flowsReduce cocklebur
33
0.55
ACRES:TREATMENT: OBJECTIVE:Disc ASAP aft. drawdownDisc 2 timesSpray Roundup resproutsMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 9
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T7 CELL: 99
DRAWDOWN DATE: 4/20/2006DRAWDOWN RATE: R
Yes
FLOOD DATE: 11/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:SUBMITTED FOR PROJECT FUNDING IN 2004 TO REHAB LEVEES, WATER CONTROL STRUCTURES-FUNDING LIKELY NOT AVAILABLE UNTIL SUMMER 2006; FEW NEW CHANNELS AND POTHOLES FROM MAIN CANAL PROJECT IN SUMMER 2003;
# OF WCS's TO REPLACE: 3
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
90
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Develop project plan for rehab to complete #'s 3, 5, and 6 (NAWCA - funded)2. Mow cocklebur prior to seedset as necessary3. Raise s. levees in c2 and c34. Mow sections of interior levees (inc. slopes) for loafing/grazing areas prior to flood-up5. Construct channels, potholes, and islands in each cell6. Replace outlets in all cells7. Tree mgt to maintain Byp. flood flows: spray willow resprouts on e. side8. Spot repair flood damage on perimeter and interior levees.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 90
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Mow prior to seed-setSpray Roundup resprout
Reduce cockleburReduce cockleburmaint. of flood flows
909
0.5
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Mow prior to seed-setSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
YYY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 10
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T8 CELL: 99
DRAWDOWN DATE: 4/20/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 11/5/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T8.2
SPECIAL MANAGEMENT CONSIDERATIONS:LAST LEVEE REHAB PROJECT COMPLETED SUMMER 1997
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
170
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disk joint/bermudagrass2. Mow sections of interior levees (inc. slopes) for loafing/grazing areas prior to flood-up3. Spot repair flood damage on perimeter and interior levees.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 170
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate/scaldDisc 2 times
Enhance moist soil plantsReduce Bermuda/jointgrass
17040
ACRES:TREATMENT: OBJECTIVE:Irrigate/scaldDisc 2 times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 11
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T9 CELL: 1-3
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:SW 1995-2001;BURNED 3/20/02 (OVER WATER), FOLLOWED BY NAWCA PROJECT COMPLETED SUMMER 2002-REMOVED INT. LEVEES, CREATED POTHOLES/CHANNELS/ISLANDS, AND DISKED BURNED TULE AREAS MULTIPLE TIMES-REDUCED TULE COVER BY 60%; **AS A RESULT OF PROJECT NOW CELLS 1,2,&3 ARE A SINGLE UNIT; SFM IN 2002-03, BACK TO SW IN 2004-CONTINUES TO LOOK GOOD AND RECEIVE GOOD SUMMER BIRD USE, LOTS OF BURHEAD IN OPEN WATER AREAS. GBHE/GREG ROOKERY IN T1.2 ADJ. TO SE CORNER.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
75
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Recalculate acres as a result of cut-off pond on east side2. Spot repair flood damage on perimeter levees.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 75
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 12
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T9 CELL: 4-8
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 3
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
202
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot disk bermuda/jointgrass in all cells2. Tree mgt. to maintain Byp. flood flows: disk sapling resprouts throughout, w/objective of 80%
removal (take bef.&aft. pics.).3. Mow cocklebur prior to seed-set4. Mow line in n. ends of cells 4-6 for area closed signs5. Remove remaining section of n. ditch bank in s. end of c7 and replace WCS into T11.16. Evaluate grazing.7. Spot repair flood damage on perimeter and interior levees.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 202
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Graze cattleMow prior to seed-setDisc 2 times post-grazing
Reduce Bermuda/jointgrassReduce cockleburReduce Bermuda/jointgrass
2025050
ACRES:TREATMENT: OBJECTIVE:Graze cattleMow prior to seed-setDisc 2 times post-grazing
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 13
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T10 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 11/5/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; HEAVY DISKING IN 1999 FOLLOWED BY IRRIGATION IN 2000 HAS RESULTED IN INCREASED WATERGRASS; UNFORTUNATELY, SUBBING/DRAINAGE PROBLEMS IN ADJACENT RIP. FOREST (TO EAST) DURING SUMMER IRRIGATIONS HAS RESULTED IN HEAVY MOSQUITO PRODUCTION AND DRAMATICALLY INCREASED ABATEMENT ACTIVITY; UNTIL WATER MGT. PROBLEMS CAN BE MODIFIED, IRRIGATIONS HAVE BEEN DISCONTINUED (TOO MANY CONFLICTS FOR 26 ACRES!).
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
26
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
1
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Continue to work on drainage problem out to Bypass - mosquito issue2. Spray sandbar willow resprouts along east road.3. Spot repair flood damage on perimeter and interior levees.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 27
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Roundup resprout Maint. of flood flows 0.5ACRES:TREATMENT: OBJECTIVE:
Spray Roundup resproutsACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 14
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T11 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; AVOID DISTURBING HIBISCUS PLANTS; CHANNEL CREATED AND FEW TREES REMOVED DURING MAIN CANAL PROJECT.
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 2
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
63
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate disking efforts conducted in 2005 and spot-disk remaining bermuda/jointgrass patches.2. Spray tree resprouts along roads.3. Replace C1 outlet (okay shape now, but eventually)4. Mow cocklebur prior to seed-set5. Spot repair flood damage on perimeter and interior levees.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 63
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Disc 2 timesSpray Round-upDisc ASAP after drawdowMow prior to seed-set
Enhance moist soil plantsmaint. of flood flowsReduce Bermuda/jointgrassReduce cocklebur
50.5530
ACRES:TREATMENT: OBJECTIVE:Disc 2 timesSpray Round-upDisc ASAP after drawdownMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 15
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T12 CELL: 1-3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; MAKE SURE DRAINAGE SPREADING INTO ADJACENT FOREST IS MINIMIZED TO AVOID UNECESSARY MOSQUITO ABATEMENT ACTIVITY-KEEP WCS's ACROSS TREE ROAD UNPLUGGED; NO IRRIGATION IN 2002 DUE TO MAIN CANAL PROJ. WORK; LONG-TERM HABITAT OBJ. IS WG AFTER JOINTGRASS UNDER CONTROL
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
90
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklerbur prior to seed-set in all cells2. Spot disk Bermuda/jointgrass throughout3. Spot repair flood damage on perimeter and interior levees.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 90
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate/scaldDisc 2 timesMow prior to seed-set
Enhance moist soil plantsReduce Bermuda/jointgrassReduce cocklebur
90510
ACRES:TREATMENT: OBJECTIVE:Irrigate/scaldDisc 2 timesMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 16
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T12 CELL: 4
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/5/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; MAKE SURE DRAINAGE SPREADING INTO ADJACENT FOREST IS MINIMIZED TO AVOID UNECESSARY MOSQUITO ABATEMENT ACTIVITY-KEEP WCS's ACROSS TREE ROAD UNPLUGGED; LAST SUMMER WATER IN 2000; HOLD UNIT LOW DURNING WINTER MONTHS (DEC.-MAR.)
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 9
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
32
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Put up 2 wood duck boxes in SE corner2. Spot repair flood damage on perimeter and interior levees.3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 32
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 17
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T13 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE: 12/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT/PERIMETER UNIT; CALIF. HIBISCUS STRONGHOLD (AT LEAST 100 PLANTS); SW DAM (WEIR #1) NOT OPERATED OR USED FOR S. END FLOODUP SINCE FALL 1997 - WETLANDS IN T13 ARE NOT FLOODED UNTIL WEST BYPASS CANAL FLOWS RISE FROM NATURAL FLOOD EVENTS - FLOOD DATE ABOVE REPRESENTS ESTIMATED DATE T13 WETLANDS WOULD FLOOD ON AN AVERAGE YEAR.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
37
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
91
Mixed Riparian
Forest
54
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Keep debris clear from SW dam (Weir 1) and access road2. Coordinate with planning effort on engineering/env. documentation for SW dam
removal/modification3. Spot repair flood damage on perimeter and interior levees.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 182
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 18
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T14 CELL: 99
DRAWDOWN DATE: 4/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; CHANNELS PLUS SEVERAL SMALL POTHOLES EXCAVATED IN C1 DURING MAIN CANAL PROJECT SUMMER 2003
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
101
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur in both cells prior to seedset - follow up if necessary2. Spot disk bermuda/jointgrass3. Evaluate need for irrigation/cocklebur scald post-drawdown4. Tree mgt to maintain Byp. flood flows: spray willow resprouts on n. road of c1.5. Spot repair flood damage on perimeter and interior levees.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 101
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc 2 timesSpray Roundup resprout
Reduce cockleburReduce Bermuda/jointgrassMaint. of flood flows
20200.5
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc 2 timesSpray Roundup resprouts
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 19
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T15 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; NEW CHANNEL CREATED DURING MAIN CANAL PROJECT IN SUMMER 2003
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
97
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray tree resprouts along road2. Evaluate need for irrigation/cocklebur scald post-drawdown3. Mow cocklebur prior to seedset as necessary4. Spot repair flood damage on perimeter and interior levees.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 97
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Round-upselective tree removalMow prior to seed-set
maint. of flood flowsreduce eucalyptusReduce cocklebur
0.10.120
ACRES:TREATMENT: OBJECTIVE:Spray Round-upselective tree removalMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 20
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T16 CELL: 99
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/10/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: T15
SPECIAL MANAGEMENT CONSIDERATIONS:HUNT UNIT; NEW CHANNELS CREATED/REWORKED DURING MAIN CANAL PROJECT IN SUMMER 2003
# OF WCS's TO REPLACE: 1
DATE BOARDS PULLED:_______________
WORK PRIORITY: 4
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
97
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset as necessary2. Replace SE outlet3. Remove eucalyptus tree in east side4. Spot repair flood damage on perimeter and interior levees.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 97
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setselective tree removal
Reduce cockleburreduce eucalyptus
200.1
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setselective tree removal
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 21
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T17 CELL: 99
DRAWDOWN DATE: 5/1/2006DRAWDOWN RATE: S
No
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:RIVER BULRUSH STANDS IMPROVED AS A RESULT OF SUMMER WATER IN 2004 AND EARLY FLOODUP (9/12) IN 2005; HUNT UNIT(DISABLED/BOAT ACCESS IN SE CORNER);
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SEASONALLY FLOODED MARSH
CELL PARAMETERS:
Seasonal Flooded
Marsh
96
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spray any resprouts from last season's control efforts (flood flow tree control efforts) - contact DWR2. Mow cocklebur prior to seedset as necessary3. Spot disk bermuda/jointgrass (may have to do twice), but leave all cattail.4. Mow an additional path (cut channel?) from disabled boat access ramp to T16 levee, possibly at
WCS.5. Spot repair flood damage on perimeter and interior levees.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 96
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Mow prior to seed-setDisc ASAP after drawdow
Reduce cockleburReduce Bermuda/jointgrass
1010
ACRES:TREATMENT: OBJECTIVE:Mow prior to seed-setDisc ASAP after drawdown
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 22
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T18 CELL: 99
DRAWDOWN DATE: 12/31/2006DRAWDOWN RATE:
No
FLOOD DATE: 1/1/2007
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DU PROJECT IN 1993 CREATED WETLAND CHANNEL WITH POTHOLES-REWORKED SUMMER 2003; PHEASANT HUNTING ONLY UNIT
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 7
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: UPLAND
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
4
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
125
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Separate large tree debris pile into multiple smaller piles, manageable for eventual burning2. Mow line for area closed signs in n. end3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 129
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
MowBurn - piles
line for signseliminate tree debris
11
ACRES:TREATMENT: OBJECTIVE:MowBurn - piles
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / Unk
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 23
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T19 CELL: 1
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 10/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DRAW DOWN LATE MARCH AND REFLOOD TO KILL COCKLEBUR AND HOLD FOR SW; PERIMETER UNIT; HAS BEEN IN SW SINCE 2004; HISTORIC AVIAN BOTULISM OUTBREAK SITE IN AUGUST-SEPTEMBER WHEN IN SUMMER OR PERMANENT WATER; EARLIER FLOOD-UP DATE MAY BE PROBLEMATIC BECAUSE OF POTENTIAL SUBBING IMPACTS TO ADJACENT FARMERS FROM HIGH DELIVERY CANAL FLOWS; SIGNIFICANT BCNH ROOST IN WINTER.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
31
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Mow cocklebur prior to seedset as necessary2. Spot disk Bermuda/jointgrass3. Rehab islands4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 31
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Scald (by irrigate)Mow prior to seed-setDisc 2 times
Reduce cockleburReduce cockleburReduce Bermuda/jointgrass
311515
ACRES:TREATMENT: OBJECTIVE:Scald (by irrigate)Mow prior to seed-setDisc 2 times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 24
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T19 CELL: 2
DRAWDOWN DATE: 4/25/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:COMPLETED BOR/DU HABITAT PROJECT TO RECONFIGURE/REPAIR INTERIOR AND PERIMETER LEVEES, CREATE POTHOLES/ CHANNELS/ISLANDS IN SUMMER 2001; GOOD SUCCESS WITH DISKING ON W. SIDE IN 2005
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 5
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
97
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Run irrigation through T20.3 and T19.1 if possible to increase speed2. Spot disk bermuda/jointgrass3. Mow cocklebur if necessary prior to irrigation, including levee slopes4. Mow sections of interior levees/slopes for loafing/grazing areas prior to flood-up5. Rehab perimeter and interior levees and islands (resloping-scraper job)6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 97
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate/scaldDisc 2 timesMow prior to seed-set
Enhance moist soil plantsReduce Bermuda/jointgrassReduce cocklebur
97355
ACRES:TREATMENT: OBJECTIVE:Irrigate/scaldDisc 2 timesMow prior to seed-set
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
Y
Y
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 25
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T20 CELL: 1
DRAWDOWN DATE: 7/15/2006DRAWDOWN RATE: S
No
FLOOD DATE: 9/15/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:WFIB NESTED HERE SUCCESSFULLY IN 1999-2002&2004; TCBB'S NESTED IN 2000 & 2002; WHEN IN SW/PP, DO NOT DRAIN UNTIL AFTER COLONIAL NESTING BIRDS HAVE FINISHED - AS LATE AS EARLY AUG. IN SOME YEARS. DRAIN QUICKLY AND COMPLETELY TO AVOID/ MINIMIZE BOTULISM PROBLEMS. TAKEN OUT OF SW IN 2003 AND REHABBED TO FIX DRAINAGE (BOTULISM) PROBLEM, PERIMETER LEVEE, & ISLANDS-PUT BACK INTO SW IN 2004.AS OF SPRING 2005 PREV. IBIS NESTING COLONY HAS CAUSED THE LOSS OF >75% OF EMERG. VEG.-STARTING TO
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: SUMMER WATER
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
31
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Call cropduster service using strip by shop to ensure they're taking off/landing to & from the N- to
avoid disturbance to T19/T202. Monitor for TCBB's, IBIS, and other colonial nesting birds3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 31
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 26
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T20 CELL: 2-3
DRAWDOWN DATE: 4/15/2006DRAWDOWN RATE: S
Yes
FLOOD DATE: 9/1/2006
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:DRAW DOWN EARLY FEB. AND REFLOOD TO KILL COCKLEBUR 2X AND HOLD FOR SW; LAST BURNED IN SUMMER 1998 TO CONTROL JOINTGRASS (SUCCESSFUL) FOLLOWED BY DU/STATE DUCK STAMP PROJ. WHICH CREATED CHANNELS/POTHOLES/ ISLANDS, REMOVED SEVERAL INT. LEVEES, AND REHABBED ALL LEVEES.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 6
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: WATERGRASS
CELL PARAMETERS:
Seasonal Flooded
Marsh
36
Water-grass
127
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
2
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
5
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Evaluate need for irrigation based on germination/soil moisture2. Spot disk bermuda/jointgrass3. Mow cocklebur prior to irrigation if necessary4. Mow sections of interior levees/slopes for loafing/grazing areas prior to flood-up5. Construct new hunter check station.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 170
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Irrigate/scaldMow prior to seed-setDisc 2 times
Enhance moist soil plantsReduce cockleburReduce Bermuda/jointgrass
127520
ACRES:TREATMENT: OBJECTIVE:Irrigate/scaldMow prior to seed-setDisc 2 times
ACRES:TREATMENT: SUCCESSFUL?Yes / No / Partial / UnkYes / No / Partial / UnkYes / No / Partial / Unk
Y
YY
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 27
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: T21 CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:TRACT 21 IS DISJUNCT AND UNMARKED SUTTER NWR PROPERTY LOCATED NEAR THE CONFLUENCE OF SUTTER AND TISDALE BYPASSES; ACREAGE AND HABITAT TYPE ARE UNKNOWN DUE TO UNKNOWN BOUNDARY LOCATIONS; Y-B CUCKOO USE AREA.
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 10
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: RIPARIAN
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
31
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
14
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Locate boundaries, post, and research access we have to this unit2. Evaluate future management of this unit3.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 45
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
ACRES:TREATMENT: OBJECTIVE: ACRES:TREATMENT: SUCCESSFUL?
Priority?
Ditch
0
UNIT MANAGEMENT PLAN - 7/12/2006SACRAMENTO NWR COMPLEX SUT YEAR 20067 printed: 28
PLANNED ACTUAL
# WCS''s REPLACED : __________
ISLANDS: LANES:
DRAWDOWN DATE (AT 90% DOWN): _________DRAWDOWN RATE: ______
BEGIN IRRIG. DATE: __________
END IRRIG. DATE: __________
FLOOD DATE (when 1st turned in): ____________DATE COVERED: ____________
COMMENTS / PROBLEMS:
REFUGE: SUT UNIT: CANALS CELL: 99
DRAWDOWN DATE:DRAWDOWN RATE:
No
FLOOD DATE:
UNITS REQ. DOWN 1st: NONE
UNITS REQ. FLOOD 1st: NONE
SPECIAL MANAGEMENT CONSIDERATIONS:2003-COMPLETED CALFED PROJECT TO REHAB INTERNAL WATER CONVEYANCE SYSTEM INCLUDING MAIN AND HI-LINE CANALS, WATER CONTROL STRUCTURES, AND ACCESS POINTS (GRAVEL ROADS, CROSSINGS, FOOT BRIDGES, ETC.)
# OF WCS's TO REPLACE: 0
DATE BOARDS PULLED:_______________
WORK PRIORITY: 1
Slow=S, Rapid=R, St=Staged
LANES:
(AT 90% DOWN)
ISLANDS: Y / N
PRIMARY HABITAT OBJECTIVE: NONE
CELL PARAMETERS:
Seasonal Flooded
Marsh
0
Water-grass
0
Summer Water
0
Perm Pond
0
Unmg'd Flooded Wetland
0
Vernal Pool
0.0
VP Alkali Meadow Complex
0
Alkalli Meadow
0
Annual Grasslnd
0
Perennial Grasslnd
0
Irrigated Pasture
0
Vernally Wet
Annual Grasslnd
0
Riparian Willow Scrub
0
Cotton-wood Willow
0
Flooded Willow
0
Mixed Riparian
Forest
0
Valley Oak
Savanna
0
Valley Oak
Riparian Forest
0
Facility
0
HABITAT MANAGEMENT:DRAWDOWN: DRAWDOWN:
IRRIGATION: IRRIGATION:
FLOODUP: FLOODUP:
REQUIRED HABITAT TREATMENTS: REQUIRED HABITAT TREATMENTS:
DISCED?
MOWED?
Y / N Y / N
Y / N
SPECIFIC PROJECTS:1. Spot spray primrose and milfoil early to prevent long-term problem.2. Monitor creeping wildrye and santa barbara sedge plug plantings from 2003 and 2004.3. Repair flood damaged levees and structures, retrieve lost gravel from levee tops and regrade.4.5.6.7.8.9.
10.
DONE?
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
Y / N
TOTAL HABITAT ACRES: 0
DATE COVERED: ____________
CHECKS: CHECKS:
Y / N Y / N
DISC?
MOW?
Spray Rodeo reduce primrose/milfoil 1ACRES:TREATMENT: OBJECTIVE:
Spray RodeoACRES:TREATMENT: SUCCESSFUL?
Yes / No / Partial / Unk
Priority?
Ditch
0
Sum
mar
y of
Pla
nned
Hab
itat A
cres
by
Uni
t*
Sacr
amen
to N
WR
Com
plex
YEA
R:
2006
7R
EFU
GE:
SUT
12-J
ul-0
6
UN
IT
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lit
y
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
T11:
00
00
07
70
00
630
00
630
05
127
03
135
020
50
T12:
00
00
00
00
00
00
00
00
00
590
059
059
0T1
3:27
00
027
027
00
04
00
04
00
1733
00
501
820
T299:
015
50
015
50
155
00
00
00
00
00
00
00
00
155
0T3
99:60
00
060
060
00
00
00
00
00
00
00
00
600
T499:
840
00
840
840
00
00
00
00
00
00
00
084
0T5
99:56
00
056
056
00
00
00
00
00
00
00
00
560
T699:
340
00
340
340
00
00
00
00
00
00
00
034
0T7
99:90
00
090
090
00
00
00
00
00
00
00
00
900
T899:
017
00
017
00
170
00
00
00
00
00
00
00
00
170
0T9
1-3
:0
075
075
075
00
00
00
00
00
00
00
00
750
T94-
8:
202
00
020
20
202
00
00
00
00
00
00
00
00
202
0T1
099:
260
00
260
260
00
00
00
00
00
10
01
027
0T1
199:
630
00
630
630
00
00
00
00
00
00
00
063
0T1
21-
3:
900
00
900
900
00
00
00
00
00
00
00
090
0T1
24:
00
320
320
320
00
00
00
00
00
00
00
032
0T1
399:
00
00
037
370
00
00
00
00
091
540
014
50
182
0T1
499:
010
10
010
10
101
00
00
00
00
00
00
00
00
101
0T1
599:
970
00
970
970
00
00
00
00
00
00
00
097
0T1
699:
970
00
970
970
00
00
00
00
00
00
00
097
0T1
799:
960
00
960
960
00
00
00
00
00
00
00
096
0T1
899:
00
04
40
40
00
012
50
012
50
00
00
00
012
90
T19
1:0
031
031
031
00
00
00
00
00
00
00
00
310
T19
2:0
970
097
097
00
00
00
00
00
00
00
00
970
T20
1:0
031
031
031
00
00
00
00
00
00
00
00
310
T20
2-3
:36
127
00
163
016
30
00
20
00
20
00
00
00
517
00
T21
99:0
00
00
00
00
031
00
031
00
014
00
140
450
CAN
A99:
00
00
00
00
00
00
00
00
00
00
00
00
010
594
169
649
0TO
TALS
010
112
50
00
028
711
345
00
35
1880
1925
226
2559
403
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
othe
r unm
anag
ed a
reas
.
0
Pag
e 1
of 1
Sum
mar
y of
Pla
nned
Hab
itat A
cres
*12
-Jul
-06
Sacr
amen
to N
WR
Com
plex
2006
7Ye
ar:
REF
UG
E
TOTAL
Seas
onal
Fl
oode
d M
arsh
Wat
er-
gras
sSu
mm
er
Wat
er
Perm
-an
ent
Pond
Unm
anag
ed F
lood
ed
Wet
land
Vern
al
Pool
Alk
ali
Mea
dow
V. P
ool/
Alk
ali
Mea
dow
C
ompl
ex
Ann
ual
Gra
ss-
land
Pere
n.
Gra
ss-
land
Irrig
. Pa
stur
e
Vern
ally
W
et
Ann
ual
Gra
ssl.
Rip
. W
illow
Scru
b
Cot
ton-
woo
d W
illo w
Mix
ed
Rip
aria
n Fo
rest
Floo
ded
Will
ow
Valle
y O
ak
Sava
n-na
h
Valle
y O
ak
Rip
. Fo
rest
Faci
-lity
Man
aged
Flo
oded
Wet
land
Upl
and
Rip
aria
n
Wetland
Wetland
Wet
land
Upland
Riparian
Total
Total
Total
Total Managed
Ditc
h
610
035
00
BTS
10
029
00
00
40
110
00
645
646
2915
691
0
2730
135
255
227
40C
LS11
918
239
739
741
00
01
014
00
633
4734
6610
5715
4555
50
3480
226
435
459
7D
EL13
9036
437
292
00
424
00
00
545
9946
1292
646
5582
0
667
930
06
LS2
00
314
217
184
8037
150
064
03
760
762
800
116
1674
0
5735
162
619
570
87SA
C16
320
0185
334
105
00
511
02
00
031
7086
7249
3079
117
1038
90
1059
416
964
90
SUT
450
010
112
50
00
011
328
70
35
1880
1925
226
403
2559
0
1428
161
915
1219
0414
0TO
TALS
2272
1247
580
184
8084
134
313
114
343
1614
643
5018
317
1866
061
1625
450
713
* Sou
rce
of p
lann
ed h
abita
t acr
es a
re fr
om th
e R
efug
e C
ompl
ex G
IS.
They
diff
er fr
om o
ffici
al to
tal a
crea
ges
for i
ndiv
idua
l Ref
uges
, bec
ause
they
do
not i
nclu
de a
ll ro
ads,
can
als,
and
othe
r unm
anag
ed a
reas
.
51
UN
IT W
OR
K P
LAN
2006
7SU
TR
efug
eYe
ar:
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T11
01
:C
lear
/mai
ntai
n "tr
ee ro
ads"
AS
AP
Eva
luat
e ab
ando
ning
mai
nten
ance
of t
ree
road
s-ch
eck
on p
ipes
th
at d
rain
eas
t sid
e un
der t
ree
road
Tree
mgt
to m
aint
ain
Byp
. flo
od-fl
ows:
any
add
ition
al tr
ee re
mov
al
need
ed (s
ee a
bove
SM
Cs)
- tak
e no
oak
s; ti
me
aft.
mid
-Aug
Eva
luat
e D
WR
hyd
raul
ic m
odel
ing
from
200
5-06
.
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y Y
* * * * *
Sele
ctiv
e tre
e re
mov
al
Spr
ay R
ound
up
resp
rout
s
1 0.5
mai
nt. o
f flo
od
flow
sM
aint
. of f
lood
flo
ws
T13
010
/25/
2006
1:
Cle
ar/m
aint
ain
"tree
road
s" A
SA
P
Rem
ove
tank
s, b
oxes
, and
oth
er tr
ash
from
fore
st S
E o
f wei
r #1
Rem
ove
any
euca
lypt
us
Tree
mgt
to m
aint
ain
Byp
. flo
od fl
ows:
spo
t spr
ay s
andb
ar w
illow
re
spro
uts
alon
g T1
7 S
leve
e w
here
intia
l tre
es re
mov
edFu
rther
mod
ify S
E ga
te to
impr
ove
disa
bled
acc
ess
(wid
ened
po
sts
2003
)?S
pot r
epai
r flo
od d
amag
e on
per
imet
er a
nd in
terio
r lev
ees.
Y Y
* * * * * *
04/1
5/20
06Sp
ray
Rou
nd-u
p0.
5m
aint
. of f
lood
flo
ws
T799
311
/15/
2006
1:
Dev
elop
pro
ject
pla
n fo
r reh
ab to
com
plet
e #'
s 3,
5, a
nd 6
(N
AW
CA
- fu
nded
)M
ow c
ockl
ebur
prio
r to
seed
set a
s ne
cess
ary
Rai
se s
. lev
ees
in c
2 an
d c3
Mow
sec
tions
of i
nter
ior l
evee
s (in
c. s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
od-u
pC
onst
ruct
cha
nnel
s, p
otho
les,
and
isla
nds
in e
ach
cell
Rep
lace
out
lets
in a
ll ce
lls
Tree
mgt
to m
aint
ain
Byp
. flo
od fl
ows:
spr
ay w
illow
resp
rout
s on
e.
sid
eS
pot r
epai
r flo
od d
amag
e on
per
imet
er a
nd in
terio
r lev
ees.
Y
Y
Y
Y Y Y Y Y
* * * * * * * *
04/2
0/20
06Sc
ald
(by
irrig
ate)
Mow
prio
r to
seed
-set
Spr
ay R
ound
up
resp
rout
s
90 9 0.5
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
mai
nt. o
f flo
od
flow
s
T13
990
12/1
0/20
061
:K
eep
debr
is c
lear
from
SW
dam
(Wei
r 1) a
nd a
cces
s ro
ad
Coo
rdin
ate
with
pla
nnin
g ef
fort
on e
ngin
eerin
g/en
v.
docu
men
tatio
n fo
r SW
dam
rem
oval
/mod
ifica
tion
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y* * *
T20
10
9/15
/200
61
:C
all c
ropd
uste
r ser
vice
usi
ng s
trip
by s
hop
to e
nsur
e th
ey're
ta
king
off/
land
ing
to &
from
the
N- t
o av
oid
dist
urba
nce
to T
19/T
20M
onito
r for
TC
BB
's, I
BIS
, and
oth
er c
olon
ial n
estin
g bi
rds
Y
Y
Y Y
* *
07/1
5/20
06
Page
1 o
f 5
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
CAN
ALS9
90
1:
Spo
t spr
ay p
rimro
se a
nd m
ilfoi
l ear
ly to
pre
vent
long
-term
pro
blem
.
Mon
itor c
reep
ing
wild
rye
and
sant
a ba
rbar
a se
dge
plug
pla
ntin
gs
from
200
3 an
d 20
04.
Rep
air f
lood
dam
aged
leve
es a
nd s
truct
ures
, ret
rieve
lost
gra
vel
from
leve
e to
ps a
nd re
grad
e.
Y Y
* * *
Spra
y R
odeo
1re
duce
pr
imro
se/m
ilfoi
l
T299
09/
1/20
062
:S
pot r
epai
r flo
od d
amag
e on
per
imet
er a
nd in
terio
r lev
ees.
Tree
mgt
to m
aint
ain
Byp
. flo
od fl
ows:
spr
ay w
illow
resp
rout
s on
n.
and
w. s
ides
Dis
k B
erm
uda/
join
tgra
ss -
disk
tree
sap
lings
at s
ame
time
Mow
sec
tions
of i
nter
ior l
evee
s/sl
opes
for l
oafin
g/gr
azin
g ar
eas
prio
r to
flood
-up
Y
Y
Y
Y Y Y
* * * *
04/0
1/20
06D
isc
AS
AP
afte
r dr
awdo
wn
Irrig
ate/
scal
d
Spr
ay R
ound
up
resp
rout
s
30 155 1
Red
uce
Ber
mud
a/jo
intg
ras
s Enh
ance
moi
st
soil
plan
tsM
aint
. of f
lood
flo
ws
T899
011
/5/2
006
2:
Spo
t dis
k jo
int/b
erm
udag
rass
Mow
sec
tions
of i
nter
ior l
evee
s (in
c. s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
od-u
p
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
Y
Y* * *
04/2
0/20
06Irr
igat
e/sc
ald
Dis
c 2
times
170
40
Enh
ance
moi
st
soil
plan
tsR
educ
e B
erm
uda/
join
tgra
ss
T11
991
9/1/
2006
2:
Eva
luat
e di
skin
g ef
forts
con
duct
ed in
200
5 an
d sp
ot-d
isk
rem
aini
ng b
erm
uda/
join
tgra
ss p
atch
es.
Spr
ay tr
ee re
spro
uts
alon
g ro
ads.
Rep
lace
C1
outle
t (ok
ay s
hape
now
, but
eve
ntua
lly)
Mow
coc
kleb
ur p
rior t
o se
ed-s
et
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y Y Y
* * * * *
04/0
1/20
06D
isc
2 tim
es
Spr
ay R
ound
-up
Dis
c A
SA
P a
fter
draw
dow
n
Mow
prio
r to
seed
-set
5 0.5 5 30
Enh
ance
moi
st
soil
plan
tsm
aint
. of f
lood
flo
ws
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
cock
lebu
r
T499
09/
10/2
006
3:
Mow
coc
kleb
ur p
rior t
o se
edse
t, m
ultip
le ti
mes
if n
ec
Mow
T4/
T5 le
vee/
slop
es fo
r loa
fing
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
Y
Y* * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et40
Red
uce
cock
lebu
r
T599
110
/25/
2006
3:
Mow
coc
kleb
ur p
rior t
o se
edse
t as
nece
ssar
y
Spo
t dis
k be
rmud
a/jo
intg
rass
Reb
uild
leve
e at
NE
cor
ner t
o re
crea
te "b
eave
r pon
d" to
faci
litat
e ad
equa
te w
ater
mgt
. in
T5-a
dd in
let
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
Y
* * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Dis
c
20 5
Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s
Page
2 o
f 5
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T94-
80
10/1
5/20
063
:S
pot d
isk
berm
uda/
join
tgra
ss in
all
cells
Tree
mgt
. to
mai
ntai
n B
yp. f
lood
flow
s: d
isk
sapl
ing
resp
rout
s th
roug
hout
, w/o
bjec
tive
of 8
0% re
mov
al (t
ake
bef.&
aft.
pics
.).M
ow c
ockl
ebur
prio
r to
seed
-set
Mow
line
in n
. end
s of
cel
ls 4
-6 fo
r are
a cl
osed
sig
ns
Rem
ove
rem
aini
ng s
ectio
n of
n. d
itch
bank
in s
. end
of c
7 an
d re
plac
e W
CS
into
T11
.1E
valu
ate
graz
ing.
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
* * * * * * *
04/0
1/20
06G
raze
cat
tle
Mow
prio
r to
seed
-set
Dis
c 2
times
pos
t-gr
azin
g
202
50 50
Red
uce
Ber
mud
a/jo
intg
ras
s Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s
T14
990
10/1
/200
64
:M
ow c
ockl
ebur
in b
oth
cells
prio
r to
seed
set -
follo
w u
p if
nece
ssar
yS
pot d
isk
berm
uda/
join
tgra
ss
Eva
luat
e ne
ed fo
r irri
gatio
n/co
ckle
bur s
cald
pos
t-dra
wdo
wn
Tree
mgt
to m
aint
ain
Byp
. flo
od fl
ows:
spr
ay w
illow
resp
rout
s on
n.
road
of c
1.S
pot r
epai
r flo
od d
amag
e on
per
imet
er a
nd in
terio
r lev
ees.
Y
Y
* * * * *
04/0
1/20
06M
ow p
rior t
o se
ed-s
et
Dis
c 2
times
Spr
ay R
ound
up
resp
rout
s
20 20 0.5
Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s Mai
nt. o
f flo
od
flow
s
T16
991
9/10
/200
64
:M
ow c
ockl
ebur
prio
r to
seed
set a
s ne
cess
ary
Rep
lace
SE
out
let
Rem
ove
euca
lypt
us tr
ee in
eas
t sid
e
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y Y* * * *
04/1
5/20
06M
ow p
rior t
o se
ed-s
et
sele
ctiv
e tre
e re
mov
al
20 0.1
Red
uce
cock
lebu
r
redu
ce e
ucal
yptu
s
T12
1-3
010
/1/2
006
5:
Mow
coc
kler
bur p
rior t
o se
ed-s
et in
all
cells
Spo
t dis
k B
erm
uda/
join
tgra
ss th
roug
hout
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y Y
* * *
04/1
5/20
06Irr
igat
e/sc
ald
Dis
c 2
times
Mow
prio
r to
seed
-set
90 5 10
Enh
ance
moi
st
soil
plan
tsR
educ
e B
erm
uda/
join
tgra
ss R
educ
e co
ckle
bur
T17
990
10/1
/200
65
:S
pray
any
resp
rout
s fro
m la
st s
easo
n's
cont
rol e
fforts
(flo
od fl
ow
tree
cont
rol e
fforts
) - c
onta
ct D
WR
Mow
coc
kleb
ur p
rior t
o se
edse
t as
nece
ssar
y
Spo
t dis
k be
rmud
a/jo
intg
rass
(may
hav
e to
do
twic
e), b
ut le
ave
all
catta
il.M
ow a
n ad
ditio
nal p
ath
(cut
cha
nnel
?) fr
om d
isab
led
boat
acc
ess
ram
p to
T16
leve
e, p
ossi
bly
at W
CS
.S
pot r
epai
r flo
od d
amag
e on
per
imet
er a
nd in
terio
r lev
ees.
Y
Y Y
* * * * *
05/0
1/20
06M
ow p
rior t
o se
ed-s
et
Dis
c A
SA
P a
fter
draw
dow
n
10 10
Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s
Page
3 o
f 5
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T19
20
9/15
/200
65
:R
un ir
rigat
ion
thro
ugh
T20.
3 an
d T1
9.1
if po
ssib
le to
incr
ease
sp
eed
Spo
t dis
k be
rmud
a/jo
intg
rass
Mow
coc
kleb
ur if
nec
essa
ry p
rior t
o irr
igat
ion,
incl
udin
g le
vee
slop
esM
ow s
ectio
ns o
f int
erio
r lev
ees/
slop
es fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
od-u
pR
ehab
per
imet
er a
nd in
terio
r lev
ees
and
isla
nds
(resl
opin
g-sc
rape
r job
)
Y
Y
Y
Y Y Y Y
* * * * *
04/2
5/20
06Irr
igat
e/sc
ald
Dis
c 2
times
Mow
prio
r to
seed
-set
97 35 5
Enh
ance
moi
st
soil
plan
tsR
educ
e B
erm
uda/
join
tgra
ss R
educ
e co
ckle
bur
T699
09/
15/2
006
6:
Mow
coc
kleb
ur p
rior t
o se
edse
t as
nece
ssar
y
Spo
t dis
k be
rmud
a/jo
intg
rass
and
ope
ning
s/la
nes
in p
eren
nial
sm
artw
eed
Mow
sec
tions
of n
. lev
ee (i
nc. s
lope
s) fo
r loa
fing/
graz
ing
area
s pr
ior t
o flo
od-u
pA
dd 1
-2 is
land
s an
d re
hab
exis
ting
Spr
ay s
andb
ar w
illow
resp
rout
s al
ong
hi-li
ne c
anal
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
Y Y Y
* * * * * *
04/0
1/20
06D
isc
AS
AP
aft.
dr
awdo
wn
Dis
c 2
times
Spr
ay R
ound
up
resp
rout
sM
ow p
rior t
o se
ed-s
et
3 3 0.5 5
open
up
pere
nn.
smar
twee
dR
educ
e B
erm
uda/
join
tgra
ss M
aint
. of f
lood
flo
ws
Red
uce
cock
lebu
r
T15
990
9/1/
2006
6:
Spr
ay tr
ee re
spro
uts
alon
g ro
ad
Eva
luat
e ne
ed fo
r irri
gatio
n/co
ckle
bur s
cald
pos
t-dra
wdo
wn
Mow
coc
kleb
ur p
rior t
o se
edse
t as
nece
ssar
y
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y Y
* * * *
04/1
5/20
06Sp
ray
Rou
nd-u
p
sele
ctiv
e tre
e re
mov
al
Mow
prio
r to
seed
-set
0.1
0.1
20
mai
nt. o
f flo
od
flow
sre
duce
euc
alyp
tus
Red
uce
cock
lebu
r
T19
10
10/1
/200
66
:M
ow c
ockl
ebur
prio
r to
seed
set a
s ne
cess
ary
Spo
t dis
k B
erm
uda/
join
tgra
ss
Reh
ab is
land
s
Y
Y
Y
Y Y* * *
07/1
5/20
06Sc
ald
(by
irrig
ate)
Mow
prio
r to
seed
-set
Dis
c 2
times
31 15 15
Red
uce
cock
lebu
r
Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s
T20
2-3
09/
1/20
066
:E
valu
ate
need
for i
rriga
tion
base
d on
ger
min
atio
n/so
il m
oist
ure
Spo
t dis
k be
rmud
a/jo
intg
rass
Mow
coc
kleb
ur p
rior t
o irr
igat
ion
if ne
cess
ary
Mow
sec
tions
of i
nter
ior l
evee
s/sl
opes
for l
oafin
g/gr
azin
g ar
eas
prio
r to
flood
-up
Con
stru
ct n
ew h
unte
r che
ck s
tatio
n.
Y
Y
Y
Y Y Y
* * * * *
04/1
5/20
06Irr
igat
e/sc
ald
Mow
prio
r to
seed
-set
Dis
c 2
times
127 5 20
Enh
ance
moi
st
soil
plan
tsR
educ
e co
ckle
bur
Red
uce
Ber
mud
a/jo
intg
ras
s
Page
4 o
f 5
Uni
tC
ell
Spec
ific
Proj
ects
Floo
d D
ate
Dis
c:
Lanes
Vege
tatio
n M
anip
ulat
ion:
Islands
Mow
:
Lanes
Islands
#WCS replace
Project Priority?
Uni
t Pr
iorit
y
Checks
Checks
Dra
wdo
wn
Dat
eM
etho
d:Ac
res:
Obj
ectiv
e:
T12
07
:C
lear
and
mai
ntai
n tre
e ro
ads
AS
AP
Rem
ove
any
euca
lypt
us
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y* * *
Spra
y G
arlo
n-cu
t stu
mp
0.1
redu
ce e
ucal
yptu
s
T18
990
1/1/
2007
7:
Sep
arat
e la
rge
tree
debr
is p
ile in
to m
ultip
le s
mal
ler p
iles,
m
anag
eabl
e fo
r eve
ntua
l bur
ning
Mow
line
for a
rea
clos
ed s
igns
in n
. end
Y
* *
12/3
1/20
06M
ow
Bur
n - p
iles
1 1
line
for s
igns
elim
inat
e tre
e de
bris
T399
09/
5/20
068
:M
ow c
ockl
ebur
prio
r to
seed
set m
ultip
le ti
mes
if n
eces
sary
Focu
s la
ne d
iski
ng o
n be
rmud
a/ jo
intg
rass
pat
ches
Eva
luat
e ne
ed fo
r irri
gatio
n/co
ckle
bur s
cald
pos
t-dra
wdo
wn
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
Y Y
* * * *
04/0
1/20
06Sc
ald
(by
irrig
ate)
Dis
c A
SA
P a
fter
draw
dow
n
60 10
Red
uce
cock
lebu
r
Red
uce
Ber
mud
a/jo
intg
ras
s
T91-
30
10/1
5/20
069
:R
ecal
cula
te a
cres
as
a re
sult
of c
ut-o
ff po
nd o
n ea
st s
ide
Spo
t rep
air f
lood
dam
age
on p
erim
eter
leve
es.
Y
* *07
/15/
2006
T10
990
11/5
/200
69
:C
ontin
ue to
wor
k on
dra
inag
e pr
oble
m o
ut to
Byp
ass
- mos
quito
is
sue
Spr
ay s
andb
ar w
illow
resp
rout
s al
ong
east
road
.
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
Y
* * *
04/0
1/20
06Sp
ray
Rou
ndup
re
spro
uts
0.5
Mai
nt. o
f flo
od
flow
s
T12
40
10/5
/200
69
:P
ut u
p 2
woo
d du
ck b
oxes
in S
E c
orne
r
Spo
t rep
air f
lood
dam
age
on p
erim
eter
and
inte
rior l
evee
s.
Y
* *07
/15/
2006
T21
990
10:
Loca
te b
ound
arie
s, p
ost,
and
rese
arch
acc
ess
we
have
to th
is u
nit
Eva
luat
e fu
ture
man
agem
ent o
f thi
s un
it
* *
61=
unit
not f
unct
iona
l due
to m
ultip
le p
robl
ems
5-6=
unit
will
like
l y m
ake
it th
roug
h up
com
ing
seas
on O
NLY
9=un
it fu
nctio
nal,
but r
equi
res
enha
ncem
ent t
o im
prov
e qu
alit y
2=un
it no
t fun
ctio
nal d
ue to
a s
ingl
e pr
oble
m
3-4=
will
like
l y fa
il du
ring
upco
min
g flo
od c
ycle
7-8=
rout
ine
mai
nten
ance
onl
y (i.
e. d
isci
ng la
nes
or c
heck
s, g
rave
l, et
c.)
10=n
o m
aint
enan
ce n
eces
sar y
oth
er th
an s
ite v
isit.
Prio
rity
Num
bers
:
Page
5 o
f 5
PLANNED DRAWDOWN SCHEDULE12-Jul-06 SUT 20067Year:
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
CANALS 99 0 0%:
T1 1 0 0%:
T1 2 0 0%:
T13 99 0 0%:
T21 99 0 0%:
0 0
T10 99 S 26 1%4/1/2006 :
T11 99 S 63 5%4/1/2006 :
T14 99 S 101 10%4/1/2006 :
T2 99 S 155 18%4/1/2006 :T3 99 S 60 22%4/1/2006 :
T5 99 S 56 25%4/1/2006 :
T6 99 S 34 26%4/1/2006 :
T9 4-8 S 202 37%4/1/2006 :
697 697
T1 3 S 27 39%4/15/2006 :
T12 1-3 S 90 43%4/15/2006 :
T15 99 S 97 48%4/15/2006 :
T16 99 S 97 54%4/15/2006 :
T20 2-3 S 163 62%4/15/2006 :T4 99 S 84 67%4/15/2006 :
559 1256
T7 99 R 90 72%4/20/2006 :
T8 99 S 170 81%4/20/2006 :
259 1515
T19 2 S 97 86%4/25/2006 :
97 1612
T17 99 S 96 91%5/1/2006 :
96 1707
T12 4 S 32 92%7/15/2006 :
T19 1 S 31 94%7/15/2006 :
T20 1 S 31 96%7/15/2006 :
T9 1-3 S 75 100%7/15/2006 :
Page 1 of 2
DATE UNIT CELL RATE
MANAGED WETLAND
ACRES
MANAGED WETLAND
ACRES
CUMULATIVE
DRAWN DOWN% OF TOTALDDOWN DDOWN
169 1876
T18 99 4 100%12/31/2006 :
4 1880
1880Grand Total :
Page 2 of 2
Irrigation SummaryRefuge: SUT Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T2 99 4/1/2006 Yes 9/1/2006 Irrigate/scald Enhance moist soil plants 155:
T3 99 4/1/2006 Yes 9/5/2006 Scald (by irrigate) Reduce cocklebur 60:
T7 99 4/20/2006 Yes 11/15/2006 Scald (by irrigate) Reduce cocklebur 90:
T8 99 4/20/2006 Yes 11/5/2006 Irrigate/scald Enhance moist soil plants 170:
T12 1-3 4/15/2006 Yes 10/1/2006 Irrigate/scald Enhance moist soil plants 90:
T19 1 7/15/2006 Yes 10/1/2006 Scald (by irrigate) Reduce cocklebur 31:
T19 2 4/25/2006 Yes 9/15/2006 Irrigate/scald Enhance moist soil plants 97:
T20 2-3 4/15/2006 Yes 9/1/2006 Irrigate/scald Enhance moist soil plants 127:
Page 1 of 1
PLANNED FLOODUP SCHEDULE12-Jul-06 SUT 20067Year:Refuge:
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODED
T21 99 0 0%:T1 1 0 0%:T1 2 0 0%:CANAL 99 0 0%:
0Subtotal: 09/1/2006
T15 99 97 5%:T2 99 155 13%:T20 2-3 163 22%:T11 99 63 25%:
478Subtotal: 4789/5/2006
T3 99 60 29%:538Subtotal: 60
9/10/2006T4 99 84 33%:T16 99 97 38%:
719Subtotal: 181
9/15/2006T20 1 31 40%:T19 2 97 45%:T6 99 34 47%:
881Subtotal: 16110/1/2006
T19 1 31 48%:T12 1-3 90 53%:T14 99 101 59%:T17 99 96 64%:
1198Subtotal: 317
10/5/2006T12 4 32 65%:
1230Subtotal: 3210/15/2006
T9 4-8 202 76%:T9 1-3 75 80%:
1507Subtotal: 27710/25/2006
Page 1 of 2
FLOOD DATE UNIT CELL
MANAGED WETLAND
ACRES
CUMULATIVE MANAGED
WETLAND AC.
% OF TOTALTO BE
FLOODEDT5 99 56 83%:T1 3 27 85%:
1591Subtotal: 84
11/5/2006T10 99 26 86%:T8 99 170 95%:
1786Subtotal: 19611/15/2006
T7 99 90 100%:1876Subtotal: 90
12/10/2006T13 99 0 100%:
1876Subtotal: 0
1/1/2007T18 99 4 100%:
1880Subtotal: 4
Page 2 of 2
PLANNED FLOODUP RATE BY MANAGED WETLAND HABITAT TYPE12-Jul-06 SUT 20067Refuge: Year:
FLOOD DATE
WG SW PPSFM
Acres % of Total Acres % of
Total Acres % of Total Acres % of
Total9/1/2006 97 0 0 00% 0% 0%9%9/1/2006 133 127 0 020% 0% 0%13%9/1/2006 196 127 0 020% 0% 0%19%9/1/2006 196 282 0 043% 0% 0%19%
196 282 0 09/1/2006
9/5/2006 256 282 0 043% 0% 0%24%60 0 0 09/5/2006
9/10/2006 354 282 0 043% 0% 0%33%9/10/2006 438 282 0 043% 0% 0%41%
181 0 0 09/10/2006
9/15/2006 438 282 31 043% 18% 0%41%9/15/2006 472 282 31 043% 18% 0%45%9/15/2006 472 378 31 058% 18% 0%45%
34 97 31 09/15/2006
10/1/2006 568 378 31 058% 18% 0%54%10/1/2006 568 378 62 058% 37% 0%54%10/1/2006 568 479 62 074% 37% 0%54%10/1/2006 657 479 62 074% 37% 0%62%
185 101 31 010/1/2006
10/5/2006 657 479 93 074% 55% 0%62%0 0 32 010/5/2006
10/15/2006 859 479 93 074% 55% 0%81%10/15/2006 859 479 169 074% 100% 0%81%
202 0 75 010/15/2006
10/25/2006 916 479 169 074% 100% 0%86%10/25/2006 943 479 169 074% 100% 0%89%
84 0 0 010/25/2006
11/5/2006 943 649 169 0100% 100% 0%89%11/5/2006 969 649 169 0100% 100% 0%92%
26 170 0 011/5/2006
11/15/2006 1059 649 169 0100% 100% 0%100%90 0 0 011/15/2006
1/1/2007 1059 649 169 4100% 100% 100%100%0 0 0 41/1/2007
Page 1 of 1
Planned Mowing SummaryRefuge: SUT Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T2 99: 4/1/2006 Yes 9/1/2006 Y
T3 99: 4/1/2006 Yes 9/5/2006 Y
T4 99: 4/15/2006 No 9/10/2006 Mow prior to seed-set Reduce cocklebur 40YY
T5 99: 4/1/2006 No 10/25/2006 Mow prior to seed-set Reduce cocklebur 20Y
T6 99: 4/1/2006 No 9/15/2006Mow prior to seed-set Reduce cocklebur 5
Y
T7 99: 4/20/2006 Yes 11/15/2006 Mow prior to seed-set Reduce cocklebur 9Y YY
T8 99: 4/20/2006 Yes 11/5/2006 YY
T9 1-3: 7/15/2006 No 10/15/2006 Y
T9 4-8: 4/1/2006 No 10/15/2006 Mow prior to seed-set Reduce cocklebur 50
T11 99: 4/1/2006 No 9/1/2006Mow prior to seed-set Reduce cocklebur 30
T12 1-3: 4/15/2006 Yes 10/1/2006 Mow prior to seed-set Reduce cocklebur 10
T14 99: 4/1/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 20
T15 99: 4/15/2006 No 9/1/2006 Mow prior to seed-set Reduce cocklebur 20
T16 99: 4/15/2006 No 9/10/2006 Mow prior to seed-set Reduce cocklebur 20
T17 99: 5/1/2006 No 10/1/2006 Mow prior to seed-set Reduce cocklebur 10
T18 99: 12/31/2006 No 1/1/2007 Mow line for signs 1
T19 1: 7/15/2006 Yes 10/1/2006 Mow prior to seed-set Reduce cocklebur 15YY
T19 2: 4/25/2006 Yes 9/15/2006 Mow prior to seed-set Reduce cocklebur 5YY
Page 1 of 2
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
IslandsLanes
Checks
T20 2-3: 4/15/2006 Yes 9/1/2006 Mow prior to seed-set Reduce cocklebur 5Y
Page 2 of 2
Planned Discing SummaryRefuge: SUT Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T2 99: 04/01/2006 Yes 09/01/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 30YY
T3 99: 04/01/2006 Yes 09/05/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 10Y
T4 99: 04/15/2006 No 09/10/2006 Y
T5 99: 04/01/2006 No 10/25/2006 Disc Reduce Bermuda/jointgrass 5Y
T6 99: 04/01/2006 No 09/15/2006 Disc ASAP aft. drawdownDisc 2 times
open up perenn. smartweedReduce Bermuda/jointgrass
33
Y
T8 99: 04/20/2006 Yes 11/05/2006 Disc 2 times Reduce Bermuda/jointgrass 40Y
T9 4-8: 04/01/2006 No 10/15/2006 Disc 2 times post-grazing Reduce Bermuda/jointgrass 50Y
T10 99: 04/01/2006 No 11/05/2006 YY
T11 99: 04/01/2006 No 09/01/2006 Disc 2 times
Disc ASAP after drawdown
Enhance moist soil plants
Reduce Bermuda/jointgrass
5
5
Y
T12 1-3: 04/15/2006 Yes 10/01/2006 Disc 2 times Reduce Bermuda/jointgrass 5Y
T12 4: 07/15/2006 No 10/05/2006 Y
T14 99: 04/01/2006 No 10/01/2006 Disc 2 times Reduce Bermuda/jointgrass 20Y
T15 99: 04/15/2006 No 09/01/2006 Y
T16 99: 04/15/2006 No 09/10/2006 Y
T17 99: 05/01/2006 No 10/01/2006 Disc ASAP after drawdown Reduce Bermuda/jointgrass 10Y
T19 1: 07/15/2006 Yes 10/01/2006 Disc 2 times Reduce Bermuda/jointgrass 15Y
T19 2: 04/25/2006 Yes 09/15/2006 Disc 2 times Reduce Bermuda/jointgrass 35Y
Page 1 of 2
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?
ChecksLanes
Islands
T20 1: 07/15/2006 No 09/15/2006 YY
T20 2-3: 04/15/2006 Yes 09/01/2006 Disc 2 times Reduce Bermuda/jointgrass 20YY
Page 2 of 2
Planned Spray SummaryRefuge: SUT Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T1 1 No Spray Roundup resprouts Maint. of flood flows 0.5:
T1 2 No Spray Garlon-cut stump reduce eucalyptus 0.1:
T1 3 4/15/2006 No 10/25/2006 Spray Round-up maint. of flood flows 0.5:
T2 99 4/1/2006 Yes 9/1/2006 Spray Roundup resprouts Maint. of flood flows 1:
T6 99 4/1/2006 No 9/15/2006 Spray Roundup resprouts Maint. of flood flows 0.5:
T7 99 4/20/2006 Yes 11/15/2006 Spray Roundup resprouts maint. of flood flows 0.5:
T10 99 4/1/2006 No 11/5/2006 Spray Roundup resprouts Maint. of flood flows 0.5:
T11 99 4/1/2006 No 9/1/2006 Spray Round-up maint. of flood flows 0.5:
T14 99 4/1/2006 No 10/1/2006 Spray Roundup resprouts Maint. of flood flows 0.5:
T15 99 4/15/2006 No 9/1/2006 Spray Round-up maint. of flood flows 0.1:
CANAL 99 No Spray Rodeo reduce primrose/milfoil 1:
Page 1 of 1
Planned Burn SummaryRefuge: SUT Year: 20067
Unit Cell Treatment Objective AcresDrawdown FloodupIrrig?T18 99 12/31/2006: No 1/1/2007 Burn - piles eliminate tree debris 1
Page 1 of 1
Plan
ned
Publ
ic U
se P
roje
cts
Ref
uge:
Year
:SU
T20
067
Uni
t:C
ell:
Publ
ic U
se P
roje
cts:
Floo
dup:
Dra
wdo
wn:
T94-
8M
ow li
ne in
n. e
nds
of c
ells
4-6
for a
rea
clos
ed s
igns
:10
/15/
2006
04/0
1/20
06
T17
99M
ow a
n ad
ditio
nal p
ath
(cut
cha
nnel
?) fr
om d
isab
led
boat
acc
ess
ram
p to
T16
leve
e, p
ossi
bly
at W
CS
.:
10/0
1/20
0605
/01/
2006
T18
99M
ow li
ne fo
r are
a cl
osed
sig
ns in
n. e
nd:
01/0
1/20
0712
/31/
2006
Page
1 o
f 1
Recommended